Subject: TENDER CL94-3, RECONSTRUCTION OF MEARNS AVENUE
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report TR-22-94 be received;
2 . THAT George H. Harding Construction Co. Ltd. , Whitby, Ontario,
with a total bid in the amount of $494,781. 12 being the lowest
responsible bidder meeting all terms, conditions, and
specifications of Tender CL94-3, be awarded the contract for
the Reconstruction of Mearns Avenue, as required by the
Department of Public Works; and
3 . THAT the funds in the amount of $520,000. 00 be drawn from the
approved 1994 Public Works Capital budget, account
#7205-94001-0261 .
BACKGROUND AND COMMENT:
Tender specifications were provided by Totten Sims Hubicki
Associates for the Reconstruction of Mearns Avenue as required by
the Department of Public Works.
Tenders were advertised in the local papers, as well as the Daily
Commercial News. Subsequently, tenders were received and tabulated
as per Schedule "All attached.
The Municipality of Clarington's portion of the total project cost
as detailed in the letter from Totten Sims Hubicki Associates,
marked Schedule "B" is estimated. at $520,000. 00, which is within
the budget allocation of $708,000. 00, as reflected in the 1994
Draft Capital Budget, Page 30. Included in the total tendered
price of $494,781. 12 is work to be performed on behalf of the
Region in an approximate amount of $85,806 - 00 and they will be
invoiced as appropriate.
1 4- _T
REPORT NO. : TR-22-94 PAGE 2
TENDER CL94-3
It is proposed that the required funds be drawn from the Public
Works Capital budget, account #7205-94001-0261.
The low bidder has previously performed for the Municipality of
Clarington in the Reconstruction of Holt Road in 1991-1992 .
As indicated in the attached letter from Totten Sims Hubicki
Associates, marked Schedule "B" , our experience with this firm was
not entirely favourable. However, as indicated, they have since j
performed satisfactorily for the Town of Whitby, the Regional
Municipality of Durham, and Harnden and King Construction. Staff
and Totten Sims Hubicki Associates have met with the subject firm
and are confident the work can be completed satisfactorily.
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to department
needs, specifications, etc . , should be referred to the Director of
Public Works .
After further review and analysis of the bids by Public Works,
Totten Sims Hubicki Associates and Purchasing, it was mutually
agreed that the low bidder, George H. Harding Construction Ltd. ,
Whitby, Ontario, be recommended for the contract for the
Reconstruction of Mearns Avenue.
I
Respectfully submitted, Reviewed by,
Marie Marano Sc. ,AMCT. , W.H. Stockwell,
Treasurer Chief Administrative Officer
W.A. Evans, P.Eng.
Director of Public Works
MM*LB*ld
Schedule "A"
Bid Summary
Tender CL94-3, Construction of Mearns Avenue
BIDDER TOTAL BID AMOUNT
George H. Harding Const. Co. Ltd. $494,781.12
Whitby, Ontario
Ron Robinson Limited 499,445.48
Oshawa, Ontario
rearview Construction Limited 506,085.84
Bolton, Ontario
Belian Construction Limited 518,651.63
Cobourg, Ontario
Novacor Construction Limited 532,000.00
Queensville, Ontario
Calder Hill Contracting Limited 542,438.11
Tliornhill, Ontario
Mar-King Construction Co. Limited 550,000.00
Concord, Ontario
Elirpa Construction and Material 550,370.35
Pickering, Ontario
Hollingsworth Construction Co. 550,672.39
Gormley, Ontario
Cobourg Development Services 555,959.04*
Cobourg, Ontario
Dagmar Construction Inc. 565,615.12
Markham, Ontario
Pachino Construction Co. Ltd. 567,000.00
Stouffville, Ontario
Dave Boyle Excavating Ltd. 569,792.44
Bowmanville, Ontario
Bar-Bro Construction Ltd. 624,794.40
Concord, Ontario
Bennett Paving & Materials Ltd. 634,202.30
Oshawa, Ontario
Empire Paving Ltd. 738,210.12
North York, Ontario
*Bid Amended, Extension Error
i
SCHEDULE "B"
513 DIVISION STREET, P.O. BOX 910, COBOURG
ONTARIO,CANADA K9A 4W4
totten sims hubicki associates (905)372-2121 FAX(905)372-3621
Mrs. Lou Ann Birkett, Purchasing and Supply Agent
Corporation of the Municipality of Clarington
Municipal Administration Centre
40 Temperance Street
BOWMANVILLE, Ontario
L1C 3A6
April 21, 1994
Dear Mrs. Birkett:
RE: Mearns Avenue Reconstruction, Orchard Park Drive to Concession Street,
Bowmanville, Municipality of Clarington, Contract No. CL94-3
Tenders for the above project were opened at the Municipal offices on Friday April 15, 1994. The bids
received inclusive of GST charges are summarized as follows:
Empire Paving Ltd. $ 738,210.12
Bennett Paving and Materials 634,202.30
Bar-Bro Construction 624,794.40
Boyle Excavating 569,79144
Pachino Construction 567,000.00
Dagmar Construction 565,615.12
Cobourg Development Services 554,711.64*
Hollingworth Construction 550,672.39
Elirpa Construction& Materials Ltd. 550,370.35
Mar-King Construction 550,000.00
Calder Hill Contracting Ltd. 541,336.00*
Novacor Construction 532,000.00
Behan Construction 518,651.63
Fernview Construction 506,085.84
Ron Robinson Ltd. 499,445.48
George H. Harding Construction 494,781.12
Engineer's Estimate: $632,000.00
* Corrected total - All totals have been corrected for omissions, errors of extension and
application of GST.
1"NGINFI-T-18 Alt"W[AffECTS AND PLANNERS
I
Mrs. Lou Ann Birkett
April 21, 1994 2
We have checked the low bidder's tender and wish to advise that all requirements have been satisfactorily
addressed. An Agreement to Bond was supplied and a deposit cheque of$19,000 accompanied the bid.
George Harding Construction Company Limited has previously undertaken work for the Municipality of
Clarington(then known as Town of Newcastle) in 1991-1992. The project was Holt Road reconstruction
and our experience with this firm in that contract was not entirely favourable. However, since the
completion of the Holt Road contract, George Harding Construction has completed projects for the Town
of Whitby and subcontract work under Hamden and King on other projects and has been awarded several
contracts by Oshawa and Whitby for 1994. References that we have checked with the Town of Whitby,
Hamden and King Construction, Consultants G.M. Sernas and Region of Durham for more recent works
indicate satisfaction with the work undertaken. Your Mr. Don Patterson and D.R. Bourne of Totten Sims
Hubicki Associates met with the contractor principle Mr. Robert Harding on April 20, 1994 and discussed
the complexities of the current tender and of his past performance. We are confident the work can be
completed to the satisfaction of your consultants and the Municipality of Clarington. The Mearns Avenue
Contract No. CL94-3 is the largest single contract successfully bid by George Harding Construction and
the company has expressed confidence in their ability to complete the work on time.
On the evidence of work completed in recent years we recommend acceptance of the low bid of George
Harding Construction.
The total value of the work chargeable to the Municipality of Clarington is estimated as follows:
Road Works - Section 1 and General Items - Section 4
1. By Contract (Section 1) $401,544.26
2. By Contract (Section 4, Prorated) 7,430.00
3. Contingency Allowance 15,000.00
4. Final Design and Tendering (Jan. - April 1994) 5,000.00
5. Construction Administration 45,000.00
6. Utility Relocation 5,000.00
7. Tree Planting 8,000.00
GST (Items 1, 2, 4, 5, 6 and 7) 33,035.74
Total Cost $520,000.00
Of the total cost sidewalk construction and tree planting are works which are not eligible for subsidy by
the Ministry of Transportation. These costs amount to approximately $74,500 including GST.
I
I
1 totten sims hubicki associates
L
I
Mrs. Lou Ann Birkett
April 21, 1994 3
All deposit cheques (other than those of the low and second low bids) may now be released.
Yours very truly,
totten sims hubicki associates
4,0"
R.A. Kempton, P.Eng.
Design Manager
RK/mfc
6304E/4/53/10325/C
bc: Mr. W.A. Evans, P.Eng.
Mr. D. Patterson, CET, Manager of Operations
Mr. A.S. Cannella, CET, Manager of Engineering
Ms. Kaye Rand
Ms. Lori Gordon
totten sims hubicki associates