Loading...
HomeMy WebLinkAboutTR-24-95 REPORT #3 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: COUNCIL Fiie# Date: MONDAY, APRIL 10, 1995 Res. 40- -_erg C/ -q�s Report TR-24-95 By-Law## Report#: File #: - Subject: QUOTATION Q94-10, DRIVEWAY PAVING Recommendations: It is respectfully recommended to Council the following: 1 . THAT Report TR-24-95 be received; 2 . THAT authorization be given by Council for the additional expenditure of $11, 619 . 13 be paid to Tri-Son Contracting Inc; and 3 . THAT the required funds be drawn from Account ##2005-00002-0000 as carried over from the 1994 Current Budget . I BACKGROUND On August 16, 1994, Tri-Son Contracting Inc . , Prince Albert, Ontario was awarded Quotation Q94-10 for Driveway Paving in the amount of $27, 418 . 36, as required by the Department of Public Works . For the information of Council, it is the Public Works Standard Policy to provide a level of service to repave all asphalt driveways to raise the driveway flush with the newly reconstructed road. Tri-Son Contracting Inc . provided the requested level of service, however additional work above the quoted tender price was required for the following reasons : I i PEff EAY,'E iR51S PFIf(ED IXJ RECYCLED PAP[R REPORT NO. : TR-24-95 PAGE 2 QUOTATION Q94-10 1) It was noticed that on some driveways the slope of the new asphalt was not at a desired slope . To lessen the number of complaints, extra asphalt was added to the length of driveway to achieve a more suitable slope . Additional costs to do this totalled $3 , 057 . 60 . 2) Tri-Son Contracting Inc . also repaved several cross culverts which were either replaced or reset by Public Works staff . Staff needed to widen a number of cross culverts beyond the 4' x 24" specified on Quotation Q94- 10 to replace the new culverts properly. Additional cost above the quoted price was $1, 073 . 61 (G.S.T. included) . 3) Public Works staff had originally planned to repave a number of driveways using their own staff . However, due to increasing amount of holidays and lieu time, Public Works staff could not complete the selected driveways efficiently or within a reasonable time frame . Tri-Son Contracting Inc . were therefore requested to complete the remainder of the driveways since they were already in the area. Additional costs to include these extra driveways totalled $7, 412 . 77 (G.S .T. included) or 19% above the original quoted price . Consequently, the total expenditure required to complete the necessary work is $39, 037 . 49 (G.S.T. included) which is $11, 619 . 13 above the original contract award approved by Council . As the Contractor completed the requested work in November o �I f 1994 and has yet to be paid for the additional expenditure of $11, 619 . 13 , approval is being requested from Council in order that payment may be processed as soon as possible . It is recommended that the additional funds required be drawn from Account #2005-00002-0000, as carried over from the 1994 Current Budget . i REPORT NO. : TR-24-95 PAGE 3 QUOTATION Q94-10 The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . Respectfully submitted, Reviewed by, M r e Marano, H.BSc . ,AMCT. , W.H. to ell, Treasurer Chief Administrative Officer i Walter A. Evans, P.Eng. Director of Public Works MM*LB*ld April 5, 1995 I i I I i i I