HomeMy WebLinkAboutTR-27-95 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# G� Date: TUESDAY, APRIL 18, 1995 Res. # �% ° Z!35 '9 Report#: TR-27-95 File#: By-Law# Subject: TENDER CL95-3, URBANIZATION AND SIDEWALK CONSTRUCTION KING STREET, KING' S HIGHWAY NO. 2, BOWMANVILLE (FROM REGIONAL ROAD 57 TO BOWMANVILLE CREEK) Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1 . THAT Report TR-27-95 be received; 2 . THAT Miwel Construction Limited, Stouffville, Ontario, with a total bid in the amount of $250, 522 . 74, being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL95-3 , be awarded the contract for the Urbanization and Sidewalk Construction, King Street, King' s Highway No. 2, Bowmanville, (from Regional Road 57 to Bowmanville Creek) , as required by the Department of Public Works; and 3 . THAT the funds in the amount of $301, 000 . 00 ($250, 522 . 74 Contract + $50,477 . 26 Consulting and Contingencies) , be drawn from the approved 1995 Public Works Capital budget, account #7212-95002-0261 . BACKGROUND AND COMMENT In accordance with Council Resolution #GPA-92-95, which authorized an early tender call, tender specifications were provided by Totten Sims Hubicki Associates for the Urbanization and Sidewalk Construction, King Street, King' s Highway No. 2 , Bowmanville, (from Regional Road 57 to Bowmanville Creek) as required by the Department of Public Works . i Tenders were advertised in the local papers, as well as the Daily Commercial News . Subsequently, tenders were received and tabulated as per Schedule "A" attached. ­S PR MER 4REGYCLM PAPER REPORT NO. : TR-27-95 PAGE 2 TENDER CL95-3 The total project cost as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "B" is estimated at $301, 000 . 00, which is within the budget allocation of $320, 000 . 00 as reflected on Page 61 of the 1995 Draft Capital Budget . The low bidder has previously performed satisfactorily for the Municipality of Clarington. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . After further review and analysis of the bids by Public Works, Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Miwel Construction Limited, Stouffville, Ontario, be recommended for the contract for the Urbanization and Sidewalk Construction, King Street, King' s Highway No. 2 , Bowmanville, (from Regional Road 57 to Bowmanville Creek) . Respectfully submitted, Reviewed by, CreM6a�r '—Marano, H.BSc . ,AMCT. , W.H. Stockwell, asurer Chief Administrative Officer I i W.A. Evans, P.Eng. Director of Public Works MM*LB*ld 707 SCHEDULE "A" BID SUMMARY CL95-3 , URBANIZATION AND SIDEWALK CONSTRUCTION KING STREET, KING' S HIGHWAY NO. 2, BOWMANVILLE BIDDER TOTAL BID AMOUNT Miwel Construction Limited, $250, 522 . 74* Stouffville, Ontario Harnden and King Construction $251, 735 . 58 Brooklin, Ontario Bennett Paving & Materials Ltd. $257, 030 . 95 Oshawa, Ontario Ron Robinson Limited $294 , 044 . 71 Oshawa, Ontario Empire Paving Limited $324 , 728 . 95* North York, Ontario * Bid Amended to include addendum i i i I i APR-11-95 TUE 10:03 TSH COBOURG FAX NO, 9105 372 3621 P. 02/02 SCHEDULE "B" E F-7 ! 513 CIIUISIOM STREET, P.O. BOX 910, COBOURG j ONTARIO,CANADA K9A 4Wd totten rims hubicki associate,; (905)372-21:!1 FAX(905)372...621 Mrs. Lou Ann lfirkett, Purchasing and Supply Agent Corporation of the Municipality of Clarington 40 Temperance Street BOWMANVILLE, Ontario L1C 3A6 April 5, 1995 Dear Mrs. Birkett: Re: King Street West Urbanization, RoeWgl; Drive to Martin Road Contract No. CL95-3, Municipality of t:la»ington Tenders for the above contract were opened at the Municipal offices on Friday, March 31, 1995. The bids received, inclusive of CST charges, are summarized as follows: Coxatr9ctOr Bid Prig Empire Paving Ltd. $324,728.95` Ron Robinson Ltd, $294,044.71 Bennett Paving and Materials Limited $257,030.95 14arnden and King Constmction S251,73S.SS Miwel Construction Limited $251,'1,522.74* Engineer's Estimate $27!;,,815.70 * Amended to include Addendum. We have cheeped the low bidder's tender and wish to advise that all requirements have been satisfactorily a&:1ressed. An Agreement to Bond and a Deposit.Cheque accompanied the hid. M,:'wel Construction Limited has undertaken a number of contracts under the supervision of our company_ The most recent projects were Liberty Street SidvNalk, Clarington- $124,000 and Tap ey 1/ Line, Cavan Township - $110,000,00. Both contracts were completed in 1994 and quality of worklaanship and cooperation were hor.h excellent. We do not feel it is necessary to check other referen'.es on this Ccimpany, On the basis of our experience with this firm we have no hesitation in recommending acceptarice of the lo11v bid, i EN;311NEERS ARCH;T EATS ANC FANNERS � O9 Corporation of the Municipality of Clarington April 5, 1995 2 The project cost is now estimated as follows: 1. By Contract $234,133.40 2. Preliminary Design, including analysis for additional pedestrian safety measures $5,800.00 3. Detailed Design, including preparation of Contract Specifications/Documents and Tendering (to March 18, 1995) $11,200.00 4. Contract Administration $23,400.00 5. Contingencies $7,249.29 Sub-total $281,782.69 GST (Items 1, 2, 3 and 4) $19,217.31 Total $301,000.00 All deposit cheques (other than those of low and second low bids) may now be released. Yours truly, totten sims hubicki associates -:0. A- -4_1 10..- R. A. Kempton, P.Eng. RAK/rd PC: Mr. W. A. Evans, P.Eng. Mr. D. Patterson, CET Mr. A. S. Cannella, CET Ms. K. Rand Ms. L. Gordon 7667En/7/10313/C ^ 0 totten sims hubicki associates