Loading...
HomeMy WebLinkAboutTR-40-95 TIRE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File # 1-,,r6L Date: MONDAY, JUNE 5, 1995 Res. # Report TR-40-95 File #: By-Law# Ak—__ 9 z Subject: TENDER CL95-9, RECONSTRUCTION OF BASELINE ROAD, MARTIN ROAD TO 400 METRES WESTERLY Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1 . THAT Report TR-40-95 be received; 2 . THAT Fernview Construction Ltd. , Bolton, Ontario, with a total bid in the amount of $493, 306 . 17, being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL95-9, be awarded the contract for the Reconstruction of Baseline Road, Martin Road to 400 Metres Westerly, as required by the Department of Public Works; 3 . THAT the total funds required in the amount of $433 , 822 . 89 ($489, 306 . 17 Contract, plus design, contract administration and utilities, less Regional portion) be drawn from the approved 1995 Public Works Capital budget, account #7205- 95001-0261; 4 . THAT the attached By-law marked Schedule "A" , be forwarded to Council for approval; and 5 . THAT the award be subject to the approval of the Region of Durham and the Ministry of Transportation of Ontario. BACKGROUND AND COMMENT: Tender specifications were provided by Totten Sims Hubicki Associates for the Reconstruction of Baseline Road, Martin Road to 400 Metres Westerly, as required by the Department of Public Works . Tenders were advertised in the local papers, as well as the Daily Commercial News . Subsequently, tenders were received and tabulated as per Schedule "B" attached. 723 PIS IS-E-4 RECYCLED PAPER REPORT NO. : TR-40-95 PAGE 2 TENDER CL95-9 The Municipality of Clarington' s portion of the total project cost, which includes the Sidewalk Construction and Project Administration, as detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C" is estimated at $433 , 822 . 89, which is within the budget allocation of $615, 000 . 00, as reflected in the 1995 Draft Capital Budget, Page 30 . Included in the total tendered price of $493 , 306 . 17, is work to be performed on behalf of the Region in an approximate amount of $152,440 . 57, and they will be invoiced as appropriate . 1 For the information of Council, the amount shown in the letter from Totten Sims Hubicki Associates, as eligible for Ministry of Transportation of Ontario subsidy, is meant to show the portion that could be subsidized. However, the Development Charges and Roads Contribution Reserve Funds must be applied before the application for subsidy is submitted. It is proposed that the required funds be drawn from the Public Works Capital budget, account #7205-95001-0261 . i The low bidder has previously performed satisfactorily for the Municipality of Clarington. The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . i After further review and analysis of the bids by Public Works, i Totten Sims Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Fernview Construction Ltd. , Bolton, Ontario, be recommended for the contract for the Reconstruction of Baseline Road, Martin Road to 400 Metres Westerly. I 724 REPORT NO. : TR-40-95 PAGE 3 TENDER CL95-9 Respectfully submitted, Reviewed by, a-:�ib Marano, H.BSc . ,AMCT. , W.H. Stockwell, Treasurer Chief Administrative Officer W.A. Evans, P.Eng. Director of Public Works MM*LB*ld I i i i I 725 i SCHEDULE "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 95- Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and Fernview Construction Ltd. , for the Reconstruction of Baseline Road, Martin Road to 400 metres Westerly. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS : 1 . THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington with the Corporation Seal, a contract between Fernview Construction Ltd. and said Corporation. By-law read a first and second time this day of June, 1995 . By-law read a third time and finally passed this day of June, 1995 . Mayor Clerk I X26 i SCHEDULE "B" BID SUMMARY CL95-9 BASELINE ROAD RECONSTRUCTION MARTIN ROAD TO 400 METRES WESTERLY BIDDER TOTAL BID AMOUNT Fernview Const . Ltd. $493 , 306 . 17 Bolton, Ontario Ron Robinson Limited $501, 657 . 33 Oshawa, Ontario B.N. Fenton Const . Ltd. $515, 938 . 31 Courtice, Ontario Hard-Co Const . Ltd. $516, 654 . 85 Whitby, Ontario Elirpa Const . & Materials $517, 590 . 34 Pickering, Ontario Alfa Contracting $519, 353 . 94 Concord, Ontario Miwel Construction Ltd. $532, 451 . 58 Stouffville, Ontario Advice Contracting Limited $536, 092 . 14 *** Stouffville, Ontario Bennett Paving & Materials $541, 740 . 83 ** Oshawa, Ontario Sancor Construction Ltd. $558 , 000 . 82 Aurora, Ontario Novacor Const . Ltd. $595, 000 . 00 Queensville, Ontario C.M. Dipede Group Ltd. $597, 984 .48 Toronto, Ontario Empire Paving Ltd. $678, 893 . 07 North York, Ontario * Error in Extension ** G. S .T. Error *** Pricing not included for Addendum j i 2 P10 25-96 THU 15; 18 SH CUBOURG FAX NO. 905 372 3621 P. 02/04 1 SCHEDULE "C" $13 DIV191014 STPEEr, p,0. BOX 910, COBOVR.0 si�`hs hLibickl a ysOciates, ONTARIO. rrONA4A K4A 4WA tQ ten f (405)37Q.y1;t1 FAX(soy)37241821 Nfrs, Lou Ami 1Birkett, Purchasing & Supply ALgetit 0uxporatio>,1 of the Municipality of Clarington Municipal Administration Centre, 40 Temperance strcct BOWMANVILLB, Ontario L1C 3A6 Fax h_ `2. 905.;6234169 May 24, 1995 Dear Mrs. Birkett; Rc: 8aceline Road Reconstruction, Martin Road to 400 Nletres Westerly, mtuliclpauty of Cla{ringgon, Contract lain. CL95-9 Tenders for the above prajcct were opened at t"C. Municipal offices on Friday, May 12, 1995. 1'he bids received were as follows: Fernview Construction, Bolton, OtltaCic) Ron Robinson Limited, Oshawa, Ontario 50111 B,14. Fenton, Construction Ltd,, Courtice, Otltaria 515,657.33 Hard-Co Construction Ltd., W11.ittly, Ontario `115,938.31 Elirpa Construction &. Materials,Pickering, Ontario 117,590.34 Alia Contraoting, Concord, Ontario .i19,353.94 Mi-,vel CAnStrltction Ltd., Stouffville, Ontario 532,353.94 Ad trice Contracting Limited, Stouffville, Ontario .,32,451.5$ Buulett paving & Materials, Oshawa, Ontario 541,740.83**, . Sarlcor Construction Ltd., Aurora, Ontario 1 No4,acor Construction Ltd. SS,OOO.S2 47uccnsvillG, Ontario 595,OU4 GU C-M, Dipede Group Ltd., I"pronto, Ontario Empire. Paving Ltd., North York Ontario °;97,994.48* � ' "78,893.07 Error in extension ** G.S.T. Error Pricing not included for Addendum E>i glueur's Estimate (� f�(� ,.82,1100.00 We have Checked the low bidder„' tender and wish to advise that all requirMlents have been satisfactorily addressed. An Agreement to Bond was supplied alld a deposit cheque for $19,000, acco'inparried the bid. i ENO(\F ,n,;_, /.ARCHITECTS AND FLAIiNE.R$ 728 riff -Lb-,1b i HU 1 u; 1 b 16H uubuuhu FU NO. 006 372 3621 P, 03/04 Mrs. Lou Anti Birlwtt, Fur-C11,15ing & Supply Agent May 24, 1995 2 Fornview C01-ISMIc tion Ltd, is based in Dolton, and has mideriaken a number of Municfpal contracts within the City of Oshawa aticl Region of> urhani, as well as work far the Municipality of C'laringtan (Edward St. hrpwcastle Village 1992), Projects undertaken in 1 qqg and 1994 include Brook]hi TruW,Sewer for the Region of Durhwn at 2.0 million and road rcconsti'uctiun at the Oshawa Airport for the City Of Oshawa for 1,3 rnillion, Construction and contract administration by Pernview Construction Ltd, on these contracts was carried out in a very satisfactory manner. Fernview Construction Ltd. is considered a good COontractor by Municipalities cQtitactod as references, Based On our research, we recommend that the contmot be awarded to Fernview Cotkitruction Ltd,, subject to agre m ement with the Regional Municipality of Durha and the Ministry of Transport�ition Ontario, The total value of the works within the contract char8eable to the Municipality of Clat;iigtun is estimated in accordance with the attached cost breakdown, Al' deposjt cheques other than these of the low and second low bids may now be released. Yours truly, Totten Sims hubick! associates 1. t�. Kenipton, f;Eng, Design Manager TO F/RAK/ag �ao�ti�isnozQa�c ` encl, PC: Mr. A.S. Cannella, CET, Nlasiager of Engineering Mr, D. Patterson, CET, Manager of Opertjtioits Ms. Kaye Rand, Municipality of Claringto-ii J, Petherick, TSH-Cobourg I i jtotten rimn hubicki assoaiotes t st:.•.•:;'2y;{; i ;`ii([ if;i;:f5i;Jf:ii s� Baseline Road Reconstruction,Marna Road to 400.Metres Wester N-h nici _ l3� panty of Qaringten, Contract No. CL95-9,14iay 25%1995,'TSff Project No. 12-10294 DctatYs oPConstrucirt�: B}t_ontcact � lisle tar f . 8 Chargesble to Clraesbiet6 Clrargeabl�trr` E�iiznatmn ' i iv W�VJrvx UAl,tl,�'ttpr{21N-AI A/II[n�Jn 3( �Op � � �Jlkers 280, 10.0) 1�}_00, ?63,790.00 t7 _ v Ebsible AL 5090 Y' Sevin 2:Sanitary Sewer and Appunenau= 10,999-00 70,999.00 3J Se:tien 3:Wwrraaiu and Apyurummxcs 1Ql,7il_80 l — — 103,741.80 .� Swim 4_GM rCKUI 15,000.00 10.453.78 4,546.82 CZ) Section 5:Contirrgencits Section 6: Culvert Extt-miun 40,333.08 f f 40,383.00 Eligible at SO"o C04629cncq Allowance(Ciariagton) 8,427.30 7,913.70 5I3.50 r j ]:trial Design and Tendering (Dec.24, 1994-May 27,1995) 30.000.00 ^8,171.66- 1,528_31 — = Construction AdrumiWation f.1 47,000.00 52,074.50 1.74530 13,180.20 Utilities 2,000.00 2.000.80 n Goods and Services Tax 37,Sti237 ° 26,381.06 1,448.55 9,972.75 TOTAL $586,263.47 $4I1,167.10 S2=,65539, S152,440a V 1 = 7814MItIM941C