Loading...
HomeMy WebLinkAboutTR-63-96 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# /�1 10AA • i4 C� Date: TUESDAY, JULY 2, 1996 Res. # ` R l Report#: TR-6 3-96 File#: [3y-Law# _____ Subject: TENDER CL96-6, ELECTRICAL SERVICES, STREET AND PARK LIGHTING Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: I 1 . THAT Report TR-63-96 be received; 2 . THAT Langley Utilities Cont . Ltd. , Bowmanville, Ontario, with bid prices of $40 . 00 per hour for Electrician and $21 . 50 per hour for Electrician' s Helper be awarded the contract to provide Electrical Services for Street and Park Lighting, as required by the Municipality of Clarington for 1996 ; and 3 . THAT the funds expended be drawn from the Street and Park Lighting Accounts 7230-00201-0000, 7230-00101-0000 and 7603-00001-0137 . BACKGROUND AND COMMENT: i Tenders were publicly advertised and issued to provide Electrical Services for Street and Park Lighting as required by the Municipality of Clarington for approximately May 1996 to May 1998 . i Subsequently, Tenders were received and tabulated as per Schedule "A" attached. Note, in addition to the hourly rate quoted, prices were also submitted for various pieces of equipment that may be required throughout the year. The prices shown on the bid summary are the items that reflect the greatest portion of the total annual expenditure . j The bid prices represent a twenty-six percent (26%) increase in the hourly rates over the 1994 contract prices . The required funds will be drawn from the respective years Street Lighting account . R RECYLD AP"' CE R799-020 Ri4S B PR,?RED CN RECYCLED PAPER REPORT NO. : TR-63-96 PAGE 2 TENDER CL96-6 I I For the information of Council, the Municipality of Clarington spent approximately $62, 000 . 00 for Electrical Services on Street and Park Lighting during the 1995 year. i With respect to the lower material charges by Bert Snowden Electric, based on previous years approximately 600 of the total annual expended funds is for parts . However, the value placed on this difference is not measurable as cost is relative to the actual price paid by the Contractor and may greatly vary. For comparison purposes, the hourly rates for labour and other miscellaneous equipment rates are considered to be of more cost significance . i The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc. , should be referred to the Director of Public Works . After further review and analysis of the bids by Purchasing and Public Works, it is respectfully recommended that Langley Utilities Cont . Ltd. , Bowmanville, Ontario, be awarded the contract to provide Electrical Services for Street and Park Lighting to the Municipality of Clarington as required. The subject firm has worked satisfactorily for the Municipality of Clarington in prior years . � I i i i i I i I 799021 REPORT NO. : TR-63-96 PAGE 3 TENDER CL96-6 Respectfully p y submitted, Reviewed by, j I 4asurer ano, H.BSc. ,AMCT. , W.H. Stockwell, Chief Ad ministrative Officer i Stephen A. Vokes, P.Eng. Director of Public Works MM*LB*ld i I I I I I i i i I I i l 799022 i SCHEDULE "A" I� BID SUMMARY CL96-6 ELECTRICAL SERVICES - STREET AND PARK LIGHTING MAINTENANCE BIDDER BID AMOUNT TERMS Langley Utilities Cont. Ltd. 36' Aerial with operator * $ 40.00/hr 1% 10 days Bowmanville, Ontario Electrician $ 27.50/hr Net 30 days Apprentice/Helper 21.50 hr Sub-total $ 89.00 Material Charges: Cost Plus 25% Minimum Charge Rate $ 20.00/call Other Misc. Equipment Backhoe & Operator $ 50.00/hr 55' Aerial & Operator $ 40.00/hr 80' Crane & Operator $ 60.00/hr Bert Snowden Electric 36' Aerial with operator * $ 55.00/hr 2% 10 days Bowmanville, Ontario Electrician $ 25.00/hr Apprentice/Helper 12.00 hr j Sub-total $ 92.00 Material Charges: Cost Plus 15% Minimum Charge Rate $ 25.00/call Other Misc. Equipment Backhoe & Operator $ 60.00/hr 55' Aerial & Operator $ 65.00/hr 80' Crane & Operator $ 90.00/hr i George Moore Electric 36' Aerial with operator * $ 48.00/hr Net 30 days Bowmanville, Ontario Electrician $ 28.00/hr Apprentice/Helper 23.00 hr Sub-total $ 99.00 Material Charges: Cost Plus 25% Minimum Charge Rate $ 60.00/call Other Misc. Equipment Backhoe & Operator $ 44.00/hr 55' Aerial & Operator $ 52.00/hr 80' Crane & Operator (4 hr. min.) $ 97.00/hr * Piece of equipment most often used i 799023 . BIDDER BID AMOUNT TERMS Elcon Electric 36' Aerial with operator * $ 55.00/hr 2% 10-Days Courtice, Ontario Electrician $ 35.00/hr Net 30 days Apprentice/Helper 22.50 hr Sub-total $112.50 Material Charges: Cost Plus 15% Minimum Charge Rate $ 45.00/call Other Misc. Equipment Backhoe & Operator $ 55.00/hr 55' Aerial & Operator $ 66.00/hr 80' Crane & Operator (3 hr. min.) $ 90.00/hr Ron Robinson Limited 36' Aerial with operator * $ 65.00/hr Net 30 days Oshawa, Ontario Electrician $ 45.00/hr Apprentice/Helper 31.05 hr Sub-total $141.50 Material Charges: Cost Plus 10% Minimum Charge Rate 4 hr. min. crane only Other Misc. Equipment Backhoe & Operator $ 66.00/hr 55' Aerial & Operator $ 95.00/hr 80' Crane & Operator $125.00/hr Black & McDonald Limited 36' Aerial with operator * $ 67.50/hr Net 30 days Scarborough, Ontario Electrician $ 47.50/hr Apprentice/Helper 28.60 hr Sub-total $143.60 Material Charges: Cost Plus 15% Minimum Charge Rate $368.00/call Other Misc. Equipment Backhoe & Operator $ 55.00/hr 55' Aerial & Operator $ 67.50/hr 80' Crane & Operator $ 89.50/hr Independent High Voltage Ltd. 36' Aerial with operator * $ 95.00/hr Net 30 days Courtice, Ontario Electrician $ 58.00/hr Apprentice/Helper 47.00 hr Sub-total $197.00 Material Charges: Cost Plus 15% Minimum Charge Rate 4 hrs/call Other Misc. Equipment Backhoe & Operator $ 75.00/hr 55' Aerial & Operator $105.00/hr 80' Crane & Operator $150.00 i * Piece of equipment most often used All Taxes extra 799024 BIDDER BID AMOUNT TERMS Elcon Electric 36' Aerial with operator * $ 55.00 1hr 10-Da Courtice, Ontario Electrician 2% ys $ 35.00/hr Net 30 days Apprentice/Helper 22.50 hr Sub-total $112.50 Material Charges: Cost Plus 15% Minimum Charge Rate $ 45.00/call Other Misc. Equipment Backhoe & Operator $ 55.00/hr 55' Aerial & Operator $ 66.00/hr 80' Crane & Operator (3 hr. min.) $ 90.00/hr Ron Robinson Limited 36' Aerial with operator p $ 65.00/hr Net 30 days Oshawa, Ontario Electrician $ 45.00/hr Apprentice/Helper 31.05 hr Sub-total $141.50 Material Charges: Cost Plus 10% Minimum Charge Rate 4 hr. min. Other Misc. Equipment crane only Backhoe & Operator $ 66.00/hr 55' Aerial & Operator $ 95.00/hr 80' Crane & Operator $125.00/hr Black & McDonald Limited 36' Aerial with operator * $ 67.50/hr Net 30 days Scarborough, Ontario Electrician $ 47.50/hr Apprentice/Helper 28.60 hr Sub-total $143.60 Material Charges: Cost Plus 15% Minimum Charge Rate $368.00/call Other Misc. Equipment Backhoe & Operator $ 55.00/hr 55' Aerial & Operator $ 67.50/hr 80' Crane & Operator $ 89.50/hr Independent High Voltage Ltd. 36' Aerial with operator * $ 95.00/hr Net 30 days Courtice, Ontario Electrician $ 58.00/hr Apprentice/Helper 47.00/h Sub-total $197.00 Material Charges: Cost Plus 15% Minimum Charge Rate 4 hrs/call Other Misc. Equipment Backhoe & Operator $ 75.00/hr 55' Aerial & Operator $105.00/hr 80' Crane & Operator $150.00 Piec�equ ost o ften used All Taxes extra 799024 ,