HomeMy WebLinkAboutTR-69-96 REPORT #2
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting: OUNCIL ''
9� File#� � �, °G�-\A
Date: MONDAY, AUGUST 12, 1996 Res. #
#Report##: TR-6 9-9 6 File#: By-Lawn
Subject: TENDER CL9 6-11, RECONSTRUCTION OF HIGHWAY #2, GREEN ROAD,
EXTENSION OF UPTOWN AVENUE
Recommendations:
It is respectfully recommended to Council the following:
1 . THAT Report TR-69-96 be received;
2 . THAT Mardave Construction Ltd. , Weston, Ontario, with a
total bid in the amount of $1, 971, 041 .54, being the
lowest responsible bidder meeting all terms, conditions
and specifications of Tender CL96-11, be awarded the
contract for the Reconstruction of Highway #2, Green
Road, and the Extension of Uptown Avenue, as required by
the Department of Public Works;
3 . THAT the Municipality of Clarington portion for Highway
#2 construction of $1, 127,460 . 00 be drawn from Public
Works Capital Budget Account #7205-96005-0261;
4 . THAT the Municipality of Clarington portion for Green Road
reconstruction of $612, 649 . 00 be drawn from Public Works
Capital Budget Account #7205-96001-0261;
5 . THAT the Municipality of Clarington portion for Uptown Avenue
Extension of $44, 350 . 00 be drawn from Public Works Capital
Budget Account #7205-'01001-0261;
6 . THAT the funding for the extra works requested by the
developer and the budgeted contributions from the developers
for these projects be in place prior to the signing of the
contract;
7 . THAT the Kaitlin Group be invoiced for an additional
$17, 000 . 00 toward the installation of storm sewer laterals on
Green Road; _
8 . THAT the Regional portion of the work be billed accordingly;
9 . THAT the award be subj ect to the approval of the Regional
Municipality of Durham and the Ministry of Transportation
of Ontario; and
10 . THAT the attached By-Law marked Schedule "A" , be
approved.
PAPER RE'CIE
THIS IS PRIMED O RECYCLED PAPER
REPORT NO. : TR-69-96 PAGE 2
TENDER CL96-11
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki
Associates for the Reconstruction of Highway #2, Green Road, and
the Uptown Avenue Extension, as required by the Department of
Public Works.
Tenders were advertised in the local papers, as well as the Daily
Commercial News . Subsequently, tenders were received and tabulated
as per Schedule "B" attached.
The cost summary and cost allocation for the total project cost,
including Project Administration, is detailed by Totten Sims
Hubicki Associates on Schedule "D" .
Included in the total tendered price of $1, 971, 041. 54 is work to be
performed on behalf of the Region, as identified in Schedule "D"
for which they will be invoiced as appropriate.
As approved under report Admin 14-95, and as identified in Schedule
"E" Markborough Properties Inc. , and Willsonia Industries Limited
are providing funding for part of the urbanization of Highway #2
and Green Road Reconstruction.
In addition to the contributions detailed on Schedule "E" , it is
anticipated that an additional $17, 000 . 00 will be recoverable by
the Municipality from the Kaitlin Group for the installation of
storm sewer laterals on Green Road (refer to letter from Totten
Sims Hubicki - Schedule "C") .
Although the low bidder has not previously performed for the
Municipality of Clarington, they have provided satisfactory service
to numerous Municipalities within the Regions of Halton, Peel,
Waterloo, and York.
REPORT NO. : TR-69-96 PAGE 3
TENDER CL96-11
The Treasurer has reviewed the funding requirements and concurs
with the recommendations. Queries with respect to department
needs, specifications, etc. , should be referred to the Director of
Public Works .
After further review and analysis of the bids by Public Works,
Totten Sims Hubicki Associates and purchasing, it was mutually
agreed that the low bidder, Mardave Construction, Weston, Ontario,
be recommended for the contract for the Reconstruction of Highway
#2, Green Road, and the Extension of Uptown Avenue.
Respectfully submitted, Reviewe
Ma e arano, H.BSc. ,AMCT. , H. S c we Y,
Treasurer e%hiel---Ad5 ' strative Officer
Stephen A. Vokes, P.Eng.
Director of Public Works
MM*LB*ld
SCHEDULE "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 96-
Being a By-law to authorize a contract between
the Corporation of the Municipality of
Clarington and Mardave Construction Ltd. ,
Weston, Ontario, for the Reconstruction of
Highway #2, Green Road, Extension of Uptown
Avenue.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on
behalf of the Corporation of the Municipality of Clarington
with the Corporation Seal, a contract between Mardave
Construction Ltd. and said Corporation.
By-law read a first and second time this day of August, 1996 .
By-law read a third time and finally passed this day of August,
1996 .
Mayor
Clerk
SCHEDULE 'B"
BID SUMMARY
CL96-11
PART A - HWY. 2, GREEN ROAD TO REG. RD. 57
PART B - GREEN RD. FROM HWY. 2 TO 520 METRES SOUTH OF HWY. 2
PART C - UPTOWN AVENUE
BIDDER TOTAL BID AMOUNT
Mardave Construction Ltd. $1,971,041.54 *
Weston, Ontario
Novacor Construction Ltd. $2,096,813.32 *
Queensville, Ontario
Ron Robinson Ltd. $2,138,762.27
Oshawa, Ontario
Dagmar Construction Inc. $2,177,849.90
Markham, Ontario
Hard-Co Construction Ltd. $2,240,707.87
Whitby, Ontario
* Error in extension
-
SCHEDULE "C" t—(7 CJClh/1
513 DIVISION STREET, P.O. BOX 910, COBOURG
ONTARIO,CANADA K9A 4W4
wa
totten sims hubicki aSSO t (905)372-2121 FAX(905)372-3621
JUL 2 6 1
I
:1� 1
J
July 19, 1996 IV,UINI01 P-u ITY 0"-C.",".F,tlii, 0
Mrs. Lou Ann Birkett, AMCT(A), Purchasing & Supply Agent
Corporation of the Municipality of Claring-ron
Municipal Administration Centre, 40 Temperance Street ��.VJJ
BOWMANVILLE, Ontario L1C 3A6
Dear Mrs. Birkett:
Re: Contract No. CL96-11, Part `A' Highway No. 2 Reconstruction
Part `B' Green Road Reconstruction, Part `C' Extension of Uptown Avenue
Municipality of Clarington
Tenders for the above project were opened at the Municipal offices on Thursday, July 11, 1996. The bids
received (inclusive of GST) are summarized as follows:
BIDDER TOTAL BID:AMOUNT
Mardave Construction Ltd., Weston, Ontario $1,971,041.54*
Novacor Construction Ltd., Queensville, Ontario $2,096,813.32*
Ron Robinson Ltd., Oshawa, Ontario
$2,138,762.27
Dagmar Construction Inc., Markham, Ontario
$2,177,849.90
Hard-Co Construction Ltd., Whitby, Ontario $2,240,707.87
Engineer's Estimate $2,470,000.00
*Error in extension
We have checked the low bidder's tender and wish to ad%-ise that all requirements have been satisfactorily
addressed. An agreement to Bond and a deposit cheque in the amount of$100,000.00 accompanied the
bid.
Mardave Construction is based in Weston. Ontario. Thee have undertaken a number of million
dollar (plus) Municipal contracts within the Regions of Halton, Peel, Waterloo and York. All references
indicated that their workmanship was good and that they worked quickly.
ENGINEERS ARCHITECTS AND PLANNERS
Mrs. Lou Ann Birkett, AMCT(A), Purchasing & Supply Agent
July 19, 1996 2
Mardave Construction is capable of fulfilling the obligations of the contract based on our research. We
therefore, recommend the contract be awarded to the low bidder.
A copy of the Cost Apportionment Summary Sheet based on the low bid is attached herewith detailing the
estimated project cost and respective contributions required from other parties.
In addition to the contributions detailed on the Summary Sheet, it is anticipated that an additional
$17,000.00 will be recoverable by the Municipality from the Kaitlin Group for the installation of storm
sewer laterals on Green Road. Similarly, the Region of Durham should be able to recover approximately
$18,000.00 for sanitary sewer and watermain leads to the same development.
The share described as Hwy. No. 2 Urbanization is to be cost shared based on the recommendations
included in Report #ADM 14-15.
Kindly advise the undersigned subsequent to approval of this tender award.
Yours truly
totten sims hubicki associates
William McCrae, P.Eng.
Design/Construction Engineer
TOF/WMc/ag
15377/12/9/10520/C
encl.
PC: A.S. Cannella, CET, Manager of Engineering (+encl.)
D.B. Patterson, CET, Manager of Operations (+encl.)
Kaye Rand, Municipality of Clarington(+encl.)
J.G. Baker, Region of Durham (+encl.)
Mike Wilson, CET, Region of Durham (+encl.)
Peter Nundy, P.Eng., Region of Durham (+encl.)
Thor Eklund, P.Eng., Markborough
Glen Willson, Willsonia Industries
totten sims hubicki associates
COST APPORTIONMENT BASED ON LOW BID FROM MARDAVE CONSTRUCTION SCHEDULE "D"
CONTRACT CL96-11
ITEM
DESCRIPTION TOTAL CLARINGTON DURHAM REGION HWY No.2 URBANIZATION MARKBOROUGH WILLSONIA COMMENTS
PART'A'-HIGHWAY N0.2 URBANIZATION
SECTION 1 $830,917.90 $42,771.00 $568,313.50 $219,833.40
SECTION 2 $21,305.00 $800.00 $20,505.00
SECTION 3 $188,163.00 $9,140.00 $111,280.50 $67,742.50
SECTION 6 $87,058.00 $64,134.00 $22,924.00
TOTAL CONTRACT CL96-11 $1,127,443.90 $106,905.00 $0.00 $601,177.50 $331,113.90 $88,247.50
TOP LIFT OF ASPHALT $75,000.00 $62,500.00 $12,500.00
REGIONAL WORKS $80,000.00 $80,000.00 100%HWY 2 (signals,line painting,soils)
DETAILED DESIGN&TENDERING(ESTIMATED TO JULY 19,1996) $65,000.00 $65,000.00 100%HWY 2
CONTRACT ADMINISTRATION $112,744.39 $10,690.50 $0.00 $60,117.75 $33,111.39 $8,824.75 PRORATED ON CONTRACT COSTS
UTILITY RELOCATION $20,000.00 $20,000.00 100%HWY 2
SUBTOTAL $1,480,188.29 $117,595.50 $0.00 $888,795.25 $376,725.29 $97,072.25
GST(EXCLUDING CONTINGENCIES) $103,613.18 $8,231.69 $0.00 $62,215.67 $26,370.77 $6,795.06
CONTINGENCIES $34,198.53 $3,172.81 $17,989.09 $9,903.94 $3,132.70 PRORATED ON CONTRACT COSTS
TOTAL PART A $1,618,000,00 $129,000.00 $0,00 $969,000.00 $413,000.00 $107,000.00
PART'B'-GREEN ROAD RECONSTRUCTION
SECTION 1 $428,795.20 $428,795.20
SECTION 2
SECTION 3 $89,712.50 $79,795.00 $9,917.50
$82,846.30 $74,848.00 $7,998.30
SECTION 5 $10,000.00 $10,000.00
TOTAL CONTRACT CL96-11 $611,354.00 $428,795.20 $164,643.00 $17,915.80
DETAILED DESIGN&TENDERING(ESTIMATED TO JULY 19,1996) $55,800.00 $40,000.00 $15,800.00
CONTRACT ADMINISTRATION $61,135.40 $42,879.52 $16,464.30 $1,791.58 PRORATED ON CONTRACT COSTS
SOILS REPORT&WELL MONITORING $15,000.00 $10,838.41 $4,161.59
UTILITY RELOCATION $20,000.00 $20,000.00 100%CLARINGTON
SUBTOTAL $763,289.40 $542,513.13 $201,068.89 $19,707.38
GST(EXCLUDING CONTINGENCIES) $53,430.26 $37,975.92 $14,074.82 $1,379.52
CONTINGENCIES(EXCLUDING DURHAM REGION) $14,424.05 $13,510.95 $913.10
TOTAL PART'B' $831,143.71 $594,000.00 $215,143.71 $0.00 $22,000.00 $0.00
PART'C'-UPTOWN AVENUE EXTENSION
SECTION 1 CL96-11 $33,297.00 $33,297.00 100%CLARINGTON
DETAILED DESIGN&TENDERING(ESTIMATED TO JULY 19,1996) $2,200.00 $2,200.00 100%CLARINGTON
CONTRACT ADMINISTRATION $3,329.70 $3,329.70
SUBTOTAL $38,826.70 100°hCLARgSGTON
$38,826.70 100%CLARINGTON
GST(EXCLUDING CONTINGENCIES) $2,717.87 $2,717.87 100%CLARINGTON
CONTINGENCIES $1,455.43 $1,455.43 100%CLARINGTON
TOTAL PART'C' $43,000.00 $43,000.00 100%CLARINGTON
I
PART'D'- BONDING MOBILIZATION&DEMOBILIZATION $70,000.00 $22,476.11 $6,503.61 $23,747.28 $13,787.12 $3,485.89 PRORATED ON CONTRACT COSTS
GST $4,900.00 $1,573.33 $455.25 $1,662.31 $965.10 $244.01
TOTAL PART'D' $74,900.00 $24,049.44 $6,958.86 $25,409.58 $14,752.21 $3,729.90
TOTAL PROJECT COSTS $2 567 043.70 $790 049.43 $222 102.57 $994 409.59 $449 752.21 $110,729.90
LESS G.S.T.REBATE $1W231.36 $28.784.32 1 $8.282. $36,410.45' $28,715.39 $703907 57%TO MUNICIPALITIES 100%TO DEVELOPERS 1
TOTAL PROJECT COSTS AFTER G.S.T.REBATE $2,457,812.34 $761,265.12 $213,820,43 $957,999.14 $421,036.83 $103,690.83
PREMIUM FOR ALTERNATE SEWER ALIGNMENT $30,047.38
TO BE COMPLETED IN 1997
totter sims hubicki 10557LB.WK4 0722/96
HIGHWAY#2 URBANIZATION-Budget Analysis: Secedule E
Report TR-69-96
COSTS TbNRtR #CL96 1: . F1NA.'NC1Nq
Account# Projeot Budget Budget MurucipaI Devetr per Developers TOTAL
Page. Amount t?ortion, ._.Portion TOTAL Ctann ton:.>::Account:Name/Res onsilil` Re ion: Marklorou h;>;W[Isonia>finan6in
Final Allocation based on Original Cost Allocation:Note 1
72QS-96005 261 HighW 1. #2 Utbgnizatibn 149 1;190,tlOt) 400,000 Adminl4-95:Markborough----> 400,000
$[dewalks/Street Lights 290000 250,000 Adminl4-95:Wilsonia----> 250,000
1';480 000 240,000 Adminl4-95:Region----> 240,000
104,410 Adm14-95:Shortfall=Claringon-S150escalated 104,410
[No(elutludGsBottci)ng] 994,410 994,410 994,410 Urbanization Cost including traffic signals
[Note:includesBonding] 133,050 133,050 109,098 St.Lights/Sidewalks-Development Charge R/F
17,300 -Roads Contribution Res.Fund
6_,653 -Tax Levy
133,050 Total St.Ligbts/Sidewalks
Developers �Xtra Works 520,000 520,000 413,000 107,000
Total BUd�et/':Tender 1 48 OQO 1 127 460 520 000 1 647 460 1,647,460
7205 96001 ?61 G[eeRaid Fit construction 144 950 000 612,649 237,144 849,793 474,191 Development Charge R/F(.9%gowth/*86%) 215,144 22,000 849,793
138,459 Tax Levy(14%of growth+10%of total cost)
612,649
7203 1001 26P Uptown Avenue Extension 160 100,000 44,350 44,350 38,141 Development Charge Res.Fund(86%)
[lrtcluds�oadtstg/N�ts G$1]
6,209 Tax Levy(14%)
44.350 44,350
Developers:Bonding/Mobilization 25,441 25,441 6,959 14,752 3,730 25,441
TOTAL PROJECT:BUDGET&COST Net GST 2 5a0 000 1:784'450. 782585 2 5fi7 044 462'1.03 954162 1::360 Z30 2 567>0:4?
Financin Required from Developers Total
Project Construction Costs 462,103 954,162 360,730 1,776,995
Additional Costs: 1.Sewer alignment 30,047 30,047
2.Escalated$150,000 Value(difference$210,725.31 less allocated above$104,410) 106,316 106,316
Cash/Letter Credit received 0 0 (250,000 (250,000
Balance Owing 462,103 1,09 525 110 730 1 663357
COSTS NET OF G.S.T. 1,784,459 782,585 2,567,044
Project Construction Cost 462,103 954,162 360,730 1,776,995
Developers:additional sewer alignment (65,195) (44,036) (109,231) 8,282 28,715 7,039 44,036
NETPROJECTSUDGET&COST 1,719,264 73& 2,457,813 46 1 954,162 360,730 1,77 995
Attribtuion of Bonding/GST on Clarington Bonding GST REBATE NoWA ORIGINAL:CO.ST ALLOCAT1.0Ni: Total:
Cost %Total 24,049 (28,784) NET Markborough 400,000 0.34
HWy 2-
Side 129,000 0.17 4,050 (4,847) (797 Wilsonia 250,000 0.21
Green Rd 594,000 0.78 18,649 (22,321) (3,672 Region 240,000 0.20
Uptown Ave 43,000 0_06 1,350 (1,61 266 Municipality 300,000 0.25
766.000 1.00 24.049 28 784) 4 735 Preliminary Budget Estimate:Admin 14-95 1,190,000 1.00
DN:H:HWY2B