HomeMy WebLinkAboutTR-26-97 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
REPORT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# `� E Q��
Date: MONDAY, APRIL 21, 1997 Res. #
Report#: TR-26-97 File#: By-Law#
Subject: PURCHASE OF PAVEMENT MARKINGS
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT Report TR-26-97 be received;
2 . THAT the procedures set out in Purchasing By-law No. 94-129,
Section 5, Paragraph 06, be waived for this particular
transaction;
3 . THAT Council authorize the Region of Durham to provide
pavement marking services at an estimated cost of $24, 000 . 00;
and
4 . THAT the funds be drawn from the 1997 approved Public Works
Budget for Pavement Marking, Account 7208-00431-0249
FORTHWITH.
BACKGROUND AND COMMENT:
1 . 0 ATTACHMENTS
No. 1 : Pavement Marking Locations
i
2 . 0 BACKGROUND
2 . 1 The amount of pavement marking services which must be
contracted out for 1997 is estimated at $24, 000 . 00, which
exceeds the $20, 000 . 00 limit of Purchasing By-law No. 94-129,
which requires a tender to be issued. Staff is recommending
that By-law No. 94-129, Section 5, Paragraph 06, be waived for
this particular transaction.
PAPEERD&RECYCLE 80 1
-BPRItMDQ RECYCLED PAPER
REPORT NO. : TR-26-97 PAGE 2
PURCHASE OF PAVEMENT MARKINGS
3 . 0 REVIEW AND COMMENT
3 . 1 The approved 1997 Public Works Department Budget for pavement
marking is $31, 000 . 00 . This amount includes $7, 000 . 00 for
painting by Clarington Public Works staff and $24, 000 . 00 to be
contracted to an outside agency.
i
3 . 2 Of the $24, 000 . 00 to be contracted to an outside agency,
approximately pp y $22, 000 . 00 will be spent on directional dividing
lines . The locations include 2 . 7 km of white edge line, 3 . 7
km of lane lines and 50 . 0 km of yellow centre line locations
(Attachment No. 1) .
I
The remaining $2, 000 . 00 will be spent on transverse pavement
markings such as stop bars, crosswalks and turn arrows . These
markings will be applied by the Region of Durham with a two
(2) part cold epoxy plastic which has a longer life than
paint . These plastic markings are more expensive than paint
to apply but, due to the durability in high volume areas, they
have a a back"
p y period of only three (3) years . By using
this high grade plastic, areas which were previously painted
once or twice every year will no longer require continual
maintenance resulting in a long term savings to the
Municipality.
i
I
3 . 3 The Region of Durham provides this high level pavement marking
service to all Municipalities within its boundaries . The
Region of Durham has provided this quality service to the
Municipality of Clarington since 1989 . The estimated price of
applied paint at $376 . 82 per kilometre for 1997 is unchanged
from previous years .
i
i
i
802
i
REPORT NO. : TR-26-97 PAGE 3
PURCHASE OF PAVEMENT MARKINGS
3 . 4 The Region of Durham requires authorization as soon as
possible in order to schedule Clarington locations in
conjunction with Regional Roads, therefore a FORTHWITH
approval to proceed is requested.
i
Respectfully submitted, Reviewed by,
Marie Marano, H.BSc . ,AMCT. , W.H. Stockwell,
Treasurer Chief Administrative Officer
Steph n A. Vokes, P.Eng.
Director of Public Works
MM*LB*ld
Attach.
i
i
i
i
i
803
i
MUNICIPALITY OF CLARINGTON, PAVEMENT MARKING SCHEDULES
SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE #, DATE PAGE # PRINTED @
PAINTING 376.82 PER KM PREMARK 158.32 PER KM
LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST RIM
LANE LINE EDGE LINE CENTRE LINE
$0.00
MUNICIPALITY OF CLARINGTON, PAVEMENT MARKING SCHEDULES
SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE #, DATE @11 PAGE # PRINTED @
PAINTING 376.82 PER KM PREMARK 158.32 PER KM
LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST RIM
LANE LINE EDGE LINE CENTRE LINE
$0.00
DARLINGTON DARLINGTON PARK RD COURTICE RD, WESTERLY 620M "S" BEND 1 0 620 $233.63
DARLINGTON SOUTH SERVICE RD REGION RD 34 TO WAVERLEY RD VOLUME 1 6000 $2,260.92
DARLINGTON SOUTH SERVICE RD HOLT RD TO 300M EASTERLY S" BEND 1 600 $226.09
DARLINGTON BASELINE RD REGION RD 57 TO REGION 34 VOLUME 1 6000 $2,260.92
DARLINGTON BASELINE/PRESTONVALE 150M EACH WAY FROM CORNER 90* CURVE/TRACKS 1 300 0 $113.05
DARLINGTON PRESTONVALE RD 280M TO 650M SOUTH OF BLOOR CURVE 1 370 0 $139.42
DARLINGTON MAPLEGROVE RD HWY 2 SOUTHERLY FOR 300M CURVES 1 300 0 $113.05
DARLINGTON NASH RD 100M EAST & WEST OF TRULLS INT 1 200 0 $75.36
DARLINGTON TRULLS RD NASH RD TO HWY 2 VOLUME 1 340 0 $128.12
DARLINGTON TRULLS RD NASH RD TO 190M NORTH OF INT INT 1 190 0 $71.60
DARLINGTON TRULLS RD PEBBLESTONE RD 1200M NORTHERLY HILL 1 0 1200 0 $452.18
CO DARLINGTON TRULLS RD PEBBLESTONE RD TO 180M SOUTHERLY CURVE 1 180 0 $67.83
DARLINGTON NASH RD GREEN RD TO REGION 57 CURVES 1 0 1460 0 $550.16
DARLINGTON CONC. RD 6 OLD SCUGOG RD TO HOLT RD HILLS/BRIDGE 1 0 830 $312.76
DARLINGTON CONC. RD 6 310 TO 630M WEST OF SOLINA RD BRIDGE/HILL 1 0 320 $120.58
DARLINGTON CONC. RD 7 OLD SCUGOG RD TO HOLT RD BRIDGE/HILL 1 0 0 800 0 $301.46
DARLINGTON CONC. RD 7 N.J. OSHAWA TOWNLINE TO 900M EAST CURVE/HILL 1 900 $339.14
DARLINGTON CONC. RD 9 175 TO 1400M EAST OF ENFEILD RD CURVE 1 1225 0 $461.60
DARLINGTON CONC. RD 9 CURVE #2 L28/29 EAST OF ENFEILD CURVE 1 270 $101.74
DARLINGTON CONC. RD 9 CURVE #3&4 L24/25 EAST OF ENFEILD CURVE 1 700 $263.77
DARLINGTON CONC. RD 9 CURVE #5 L20/21 EAST OF ENFEILD CURVE 1 285 $107.39
DARLINGTON CONC. RD 9 CURVE #6 L20/21 EAST OF ENFEILD CURVE 1 305 0 $114.93
DARLINGTON OLD SCUGOG RD 250M SOUTH & 215M NORTH OF CONC 9 CURVE/INT 1 465 $175.22
PRINTED 04-Apr-97
MUNICIPALITY OF CAARINGTON, PAVEMENT MARKING SCHEDULES
SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE #, DATE PAGE # PRINTED
PAINTING 376.82 PER KM PREMARK 158.32 PER KM
LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE (M) YELLOW PREMARK COST RIM
1
LANE LINE EDGE LINE CENTRE LINE
$0.00
DARLINGTON OLD SCUGOG RD REGION RD 3 TO 170M NORTHERLY CURVE 1 170 $64.06
DARLINGTON CONC. RD 10 230 TO 1410M WEST OF ENFEILD RD CURVES 1 0 1180 $444.65
DARLINGTON CONC. RD 10 515 TO 930M EAST OF GRASSHOPPER RD CURVE 1 0 415 $156.38
DARLINGTON MIDDLE RD 150M NORTH & SOUTH OF CONC. RD 4 CURVE/INT 1 300 0 $113.05
DARLINGTON CONC. RD 3 205 TO 505M EAST OF MEARNS AVE BRIDGE 1 300 0 $113.05
DARLINGTON LIBERTY ST.N. 450M SOUTH AND 300 M NORTH OF CONC CURVE 1 750 $282.62
DARLINGTON LIBERTY ST.N. 1700M TO 2300M NORTH OF CONC 6 CURVE (TYRONE MIL 1 600 $226.09
DARLINGTON LIBERTY ST.N. CONC RD 8 SOUTHERLY 580M CURVE 1 580 $218.56
DARLINGTON LIBERTY ST.N. CONC RD 8 TO REGION RD 20 CURVES 1 2400 $904.37
BOWMANVILLE LAKE RD REGION RD 14 TO BRITTON CT BRIDGE/CURVE 1 0 825 $310.88
BOWMANVILLE PORT DARLINGTON RD LAKE RD TO 125M SOUTHERLY 1 125 $47.10
BOWMANVILLE WEST BEACH RD 195 AND 810M WEST OF PORTDARLINGTON BRIDGES/CURVE 1 1230 615 $695.23
BOWMANVILLE BASELINE RD REGION 57 EASTERLY TO $AINES ST VOLUME 1 2490 $938.28
BOWMANVILLE SIMPSON AVE KING ST SOUTHERLY 135M TO HOBBS DR VOLUME 1 135 135 $101.74
BOWMANVILLE SIMPSON AVE BASELINE ROAD TO SOPER CT CURVES 1 540 $203.48
BOWMANVILLE SPRY AVE LAWRENCE CRES TO LOSCOMBE DR 1 280 $105.51
BOWMANVILLE WAVERLEY RD REGION RD 57 NORTH TO ROENIGK DR 1 1180 $444.65
BOWMANVILLE ROENIGK DR WAVERLEY ST TO KING ST CURVES/HILL 1 700 350 $395.66
co BOWMANVILLE QUEEN ST KING ST TO TEMPERANCE ST CURVE/VOLUME 1 280 0 $105.51
BOWMANVILLE QUEEN ST TEMPERANCE ST TO ONTARIO ST VOLUME 1 415 0 $156.38
BOWMANVILLE FRANK ST KING ST SOUTHERLY 125M 1 200 100 0 $113.05
BOWMANVILLE TEMPERANCE ST QUEEN ST NORTHERLY TO CHURCH ST VOLUME 1 250 $94.21
BOWMANVILLE DIVISION ST QUEEN ST NORTHERLY TO CHURCH ST VOLUME 1 250 $94.21
BOWMANVILLE BROWN ST QUEEN ST NORTHERLY TO KING ST 1 125 $47.10
BOWMANVILLE ONTARIO ST KING ST SOUTHERLY TO REGION 14 1 1000 0 $376.82
BOWMANVILLE SCUGOG ST KING ST NORTHERLY TO ODELL ST VOLUME 1 400 0 $150.73
BOWMANVILLE SCUGOG ST KING ST TO 80M NORTH TURN LANE 1 80 $30.15
BOWMANVILLE SCUGOG ST CHURCH ST TO 80M NORTHERLY TURN LANE 1 80 $30.15
BOWMANVILLE CHURCH ST SCUGOG ST TO TEMPERANCE ST VOLUME 1 320 $120.58
BOWMANVILLE CHURCH ST TEMPERANCE ST TO DIVISION ST VOLUME 1 128 0 $48.23
PRINTED 04-Apr-97
i
MUNICIPALITY OF CLARINGTON, PAVEMENT MARKING SCHEDULES
SERVICES TO BE CONTRACTED TO THE REGION OF DURHAM PAGE #, DATE PAGE # PRINTED
PAINTING 376.82 PER KM PREMARK 158.32 PER KM
LOCATION ROAD SECTION REMARKS APP (M) WHITE (M) WHITE .(M) YELLOW PREMARK COST RIM
LANE LINE EDGE LINE CENTRE LINE
$0.00
BOWMANVILLE CHURCH ST DIVISION ST TO GEORGE ST VOLUME 1 128 0 $48.23
BOWMANVILLE CHURCH ST GEORGE ST TO LIBERTY ST VOLUME 1 384 0 $144.70
BOWMANVILLE BENNETT RD HWY 2 SOUTHERLY TO 401 BRIDGE SENIORS 1 1000 $376.82
BOWMANVILLE KING ST REGION 57, 780M EAST TO SCUGOG ST DOUBLE CENTRELINE 1 1560 $587.84
BOWMANVILLE KING ST REGION 57, 780M EAST TO SCUGOG ST LANES 1 1560 $587.84
BOWMANVILLE KING ST SCUGOG ST, 800M TO Brown ST SINGLE CENTRELINE 2 800 $602.91
BOWMANVILLE KING ST BROWN ST TO LIBERTY ST 130M DOUBLE CENTRELINE 2 260 $195.95
BOWMANVILLE KING ST LIBERTY ST TO HAINES ST 1300M DOUBLE CENTRELINE 1 2600 0 $979.73
BOWMANVILLE KING ST BROWN ST TO HAINES ST MISC LANES 1 1900 0 $715.96
NEWCASTLE KING ST BALDWIN ST EAST 600M VOLUME 1 600 $226.09
CLARKE CONC. RD 3 REGION RD 42 EASTERLY 825M CURVE 1 825 $310.88
CLARKE CONC. RD 3 100M WEST AND 220M EAST OF POLLARD BRIDGE 1 0 320 $120.58
CLARKE BEST RD REGION RD 4 NORTHERLY 250 CURVE 1 0 250 $94.21
CLARKE BEST RD 260M SOUTH & 250M NORTH OF CONC 7 CURVES/INT 1 510 0 $192.18
CLARKE CONC. RD 7 LESKARD RD TO 440M WESTERLY HILL/BRIDGE 1 0 440 $165.80
CLARKE CONC. RD 8 DARL/CLARKE LINE, 825M EASTERLY CURVE 1 825 $310.88
CLARK ORONO MILL ST REGION 17 TO HWY35/115 1 1055 $397.55
00 $22,181.51 TOTAL COST OF APPLIED PAINT ON TOWN ROADS 7211-00431-0249
CD 3755 TOTAL LANE LINES (M)
2730 TOTAL EDGE LINES (M)
51320 TOTAL CENTRE LINES (M)
0 TOTAL PREMARKING REQUIRED (M)
LATER ADD-ON
PRINTED 04-Apr-97