HomeMy WebLinkAboutTR-94-97 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
X)VOMR # XX
REPORT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# - Z�
Date: MONDAY, OCTOBER 20, 1997 Res. # C -S`6Y 7
Report#: TR-94-9 7 File #: By-Law#
Subject: CL97-22, DARLINGTON SOCCER FIELD LIGHTING
i
i
i
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT Report TR-94-97 be received;
2 . THAT Langley Utilities Contracting Limited, Bowmanville,
Ontario, with a bid in the amount of $121, 300 . 00 plus GST,
being the lowest responsible bidder meeting all terms,
conditions and specifications of Tender CL97-22, be awarded
the contract for Darlington Soccer Field Lighting;
I
3 . THAT the total project cost detailed in a letter from Totten
Sims Hubicki Associates, marked Schedule "C" attached, is
estimated at $200, 100 . 00, including construction, final
design, contract administration, Ontario Hydro facilities,
contingencies and G.S.T. , be drawn from the Public Works 1995
Capital Budget Carryover Account 1110-196-0000; and
i
4 . THAT the attached By-law marked Schedule "A" authorizing the
Mayor and Clerk to execute the necessary agreement be
approved; FORTHWITH.
BACKGROUND AND COMMENT:
Plans were provided by Totten Sims Hubicki Associates for the
lighting at Darlington Soccer Fields as required by the Public
Works Department . Tenders were advertised locally and in the Daily
Commercial News .
i
PAPER All LE ( U
ww" �V
iH4S IS PRI-E W RECYCLED PAPER
REPORT NO. : TR-94-97 PAGE 2
TENDER CL97-22
Subsequently tenders were received and tabulated as per Schedule
"B" attached.
The total project cost detailed in a letter from Totten Sims
Hubicki Associates, marked Schedule "C" attached, is estimated at
$200, 100 . 00, including construction, final design, contract
administration, Ontario Hydro facilities, contingencies and G.S .T.
The required funds will be drawn from Public Works 1995 Capital
Budget Carryover Account 1110-196-0000 ($215, 000 . 00) .
The Treasurer has reviewed the funding requirements and concurs
with the recommendation. Queries with respect to department needs,
specifications, etc . , should be referred to the Director of Public
Works .
Langley Utilities Contracting Limited currently has the street
light servicing contract for the Municipality and has performed
their duties satisfactorily and with a high regard for safety,
workmanship and scheduling.
As the summer construction season is almost over, time is of the
essence, and in order that the Darlington Soccer Field lighting
contract be completed, a FORTHWITH approval is requested.
Respectfully submitted, Reviewed by,
Q
i arano, H.BSc . ,AMCT. , W.H. Stockwell',
Treasurer Chief Administrative Officer
Steph n A. Vokes, P.Eng.
Director of Public Works
MM*LB*ld
i) ;J
U
SCHEDULE "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW NUMBER 97-
Being a By-law to authorize a contract between the Corporation
of the Municipality of Clarington and Langley Utilities
Contracting Limited, Bowmanville, Ontario, for the Darlington
Soccer Field Lighting.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY
ENACTS AS FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington, and seal with the Corporation Seal,
a Contract between Langley Utilities Contracting Limited and said Corporation; and
2. THAT this agreement attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of October, 1997.
By-law read a third time and finally passed this day of October, 1997.
Mayor
Clerk
i
i
I
i
SCHEDULE 'B"
BID SUMMARY
CL97-22
DARLINGTON SOCCER FIELD LIGHTING
_A:.DDE
I'CQTA1 31D AMOUNT
Langley Utilities Contracting Ltd. $121,300.00
Bowmanville, Ontario
Wayne Electric Co. Limited $133,000.00
Carlisle, Ontario
Ron Robinson Limited $149,726.00
Oshawa, Ontario
Bright Electric Limited $154,777.00
Peterborough, Ontario
Dinardo Electric Ltd. $187.700.00
Richmond Hill, Ontario
I
i
i
i
�I
1364
vu I-u i-o I wcu uo i i rr) 16H UUMNU FAX N0, P, 01
f 35"t,
PtdANNIV90ARV�''� SCHEDULE "C"
> 1
a ,
" 513 DIVISION STRINeT, I10, 8bN 91o, co6oLjna
t Ottelll siwt S hubleld associates ONTARIO,CANADA K8A 4W4
(bog)372•x121 FAX(305)372-3827
October 1, 1997
Mrs. 1,ou Arun Birktit, C P1P, AMCT
>iht FAX 90��; +'
rchasing Kulager
Municipality of ClariOgtor►
40 Temperance Street
EOWMANVILLF-, Ontario L1C 3A6
Dear Mrs. Eirkett;
net Darlington Soccer Field Lightingp Municipality or Claris tort '
T81-I Project No, 22.13681 Y g Contract CLA7,22
As per your letter, received September 22, 1997, we have reviewed the bids received September 19, 1997,
and recominend Langley Utility Contracting Limited for this project.
The bids received ercelusive of G,S,T, are summarized below.
T(U{'�i��`'Al
yyt,;y{�xU
Langley UtWOO$Cont
acting Lim- ited $121,300,00
Wayne Wectric Co, Limited $133,000.00
ion Itobi�imited $149,726.00
])right Electric Limited $1S'1,7T1.00
1�inardo Electric Limited $187,100.00
Engineer's Estimate $155,00().00
Langley Utilities Contrrtctiug Linrlted currently has the street light servicing contract for die Municipality
of Ciai'ington and hay performed their duties satisfactorily and with a high regard for safety, workmanship
and scheduling.
i
Other references from Etobicoke Hydro, East York Hydro and Peterborough Hydro were also xeviewed,
1.,aitsley Utilities Contracting Ltd, have completed a number of contracts for each of the above noted hydro
authorities ranging in value froth $10,tM,00 to $200,000.00, All references contacted reported excellent
workmanship, site safety practices and cooperation from Langley Utilities Contracting Ltd.. To our
knowledge no liens were recorded on any of these contracts
ENGINEERS ANCHITECTS AND PLANNERS
i
60
Uul-vl-'yf wt UJ: IU M TSH Q080URG FAX NO, P, 02
Mrs, Lou Anti Sirkett, Cpp, AmcT
October 1, 1097
Tito following is a sulmllwy of the' .estimated project costs based on the low bid and the quotation from
Ontario Hydro;
Construction $921,300.00
........
MIMI 1)esign and Tondtring (0311611996 to 09/2711997) $9,800,00
COARract Administration(Estimated)
�A-- $500100
Works by Ontario Hydro(Estimated) $47,88C88
lutow
Contingencies 1 $3,234,04
TJ (Q 7%, excluding Contingencies)
Total
0,100.00
$10
If YOU have any questions regarding this matter, MOM Contact the undersigned.
Yours truly
gotten alms hublckl associates
Williain McCrae,
Des!go/Consti-actlon Engineer
Wmc/ra
t4i S. A. Vokes, P. Eng., Director of Public Works
Mr. A.S. Cannella, C.E.T., Manager of Engineering
Mr. D.B. Patterson, CX,T., Manager Of Operations
totter aims hubicki associates