HomeMy WebLinkAboutTR-95-97 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE File# E _au� Date: MONDAY, OCTOBER 20, 1997 Res. # Report#: TR-95-9 7 File#: By-Law# Subject: CL97-20, FOSTER CREEK CULVERT EXTENSION, ROBERT STREET, NEWCASTLE Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1 . THAT Report TR-95-97 be received; 2 . THAT B . N. Fenton Construction Ltd. Courtice, Ontario with a total bid in the amount of $49, 755 . 00 including G.S .T. , being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL97-20, be awarded the contract for Foster Creek Culvert Extension, Robert Street, Newcastle, Ontario; 3 . THAT funds in the amount of $50, 000 . 00 (total project cost $68, 374 . 60 including construction, final design, contract administration, soils report, legal survey, contingencies and G.S .T. ) be drawn from the approved 1997 Public Works Capital Account 7205-97002-0261; 4 . THAT the additional funds required in the amount of $18, 374 . 60 be drawn from Public Works Lot Levy Reserve Fund #5001-00036- 0401; and 5 . THAT the attached By-law marked Schedule "All authorizing the Mayor and Clerk to execute the agreement be approved; FORTHWITH. BACKGROUND AND COMMENT: Plans were provided by Totten Sims Hubicki Associates for the Culvert Improvement, Newcastle, Ontario, as required by the Department of Public Works . Tenders were advertised locally and in the Daily Commercial News . R E,CAPE REPORT NO. : TR-95-97 PAGE 2 TENDER CL97-20 Subsequently tenders were received and tabulated as per Schedule "B" attached The total project cost including final design and tendering, construction layout, contract administration, soils report, legal survey, contingencies and GST, detailed in the letter from Totten Sims Hubicki Associates, marked Schedule "C " is estimated at $68, 374 . 60 . Due to excessive ground water conditions and the requirement for additional geo-technical design information, the cost of the project has exceeded the budget amount of $50, 000 . 00 . Consequently, it is recommended that funds in the amount of $50, 000 . 00 be drawn from Public Works 1997 Capital Budget Account 7205-97002-0261 as reflected on Page 137 of the Capital Budget . Additional funds in the amount of $18, 374 . 60 are recommended to be drawn from the Public Works Lot Levy Reserve Fund Account #5001- 00036-0401 . The Treasurer has reviewed the funding requirements and concurs with the recommendation. Queries with respect to department needs, specifications, etc . , should be referred to the Director of Public Works . The low bidder, B. N. Fenton Construction Ltd. , Courtice, Ontario have completed work for the Region of Durham and the City of Oshawa. References confirm that B. N. Fenton Construction Ltd. is a capable contractor, work has been completed on time and in an acceptable manner. As the summer construction season is almost over, time is of the essence, and in order to complete the culvert extension a FORTHWITH approval is requested. REPORT NO. : TR-95-97 PAGE 3 TENDER CL97-20 Respectfully submitted, Reviewed by, M ie Marano, H.BSc . ,AMCT. , W.H. Stockwell, Treasurer Chief Administrative Officer Step en A. Vokes, P.Eng. Director of Public Works MM*LB*ld I I i I i I i SCHEDULE "A" THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NUMBER 97- I Being a By-law to authorize a contract between the Corporation of the Municipality of Clarington and B.N. Fenton Construction Ltd., Courtice, Ontario for the Foster Creek Culvert Extension, Robert Street, Newcastle. THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the Corporation of the Municipality of Clarington, and seal with the Corporation Seal, a Contract between B.N. Fenton Construction Ltd. and said Corporation; and 2. THAT this agreement attached hereto as Schedule "A" form part of this By-law. By-law read a first and second time this day of October, 1997. By-law read a third time and finally passed this day of October, 1997. Mayor Clerk i I � i0 SCHEDULE 'B" BID SUMMARY l CL97-20 FOSTER CREEK CULVERT EXTENSION, ROBERT STREET, NEWCASTLE OTA1�B1DMOU .:.. B.N. Fenton Construction Ltd. $49,755.00 Courtice, Ontario Sanan Construction $72,438.79 Concord, Ontario Elirpa Construction & Materials $81,405.00 Pickering, Ontario i Uf � 35"1'1 t{t ANNIVERSARY�;J.�} SCHEDULE "C" IN Ll z1 t i {' `2 p,1962-1997, 513 DIVISION STREET, P.O. BOX 910, COBOURG ONTARIO,CANADA I(JA 4W4 totter sims h1.Nbicki associates (905)372.2121 FAX(905)372-3621 September 25, 1997 Ms. Lou Ann Bilrkett, CPP, AMCT F,L Purchasing Manager Corporation of the Municipality of Clarington Temperance Street 1, IF 4U p BO'WMANVILLE, Ontario. OCT L1C 3A6 Dear Mrs. Birkett: Re: Poster Creek Culvert Extension, Robert Street Newcastle Municipality of Clarington ContraCt No. CL97-20 TSH Project No. 12 10599 Tenders for the above project were opened at the municipal offices on Friday, September 19, 1997. The bids received, inclusive of GST, are summarized as follows: Contractor Total Bid Amount B.N. Denton Construction Ltd, $49,755.00 Sanan Construction $72,438.70 Elirpa Construction $81,405.00 Engineer's Estimate $47,400.00 I The low bidder's tender has been reviewed and is in order. We have contacted references supplied by Penton Construction for contract work completed in 1996 and 1997 for the Region of Durham and the City of Oshawa and references confirm that Fenton is a capable Contractor. Works have been completed on time in an acceptable manner and to our knowledge no liens have been placed on any contracts. The value of contracts completed ranges from $200,000 - $700,000. We have also had experience in working with Penton Construction as a sub-contractor, Currently, we are providing site inspection on a contract on Croft Street for the Town of Port Hope, being j undertaken by Fenton Construction as the General Contractor at a cost of$250,000. We recommend acceptance of the low bid for this contract. f:NGiNk:E(iS ARCHITECTS AND PLANNERS �? U � � Municipality of Clarington September 25, 1997 2 Based on the low bid, we estimate the overall cost of the contract as follows: Descri tion of Work Cost By Contract $46,500,00 Design and Tendering 9,800,00 Construction Layout 500.00 Contract Administration 4,000.00 Soils Report 650.00 Legal Survey 951.50 Contingencies 1 500,00 Sub-Total $63,901.50 GST 4A73.10 Total 68 374.60 Yours very truly, totten sims hubicki associates R.A. Kompton, P,Eng. Design Manager RAK/jg 16196/16/7/C PC: A.S. Cannella, CET I totten aims hubicki associates