Report To: Planning and Development Committee
Date of Meeting: October 5, 2015
Report Number: PSD-053-15 Resolution Number: P0 -(��'�� \5
File Number: S-C-2005-0002 By-law Number:
Report Subject: Request for Extension of Draft Approval by Far Sight Investments
Ltd.
Recommendations:
1. That Report PSD-053-15 be received;
2. That the request to extend the lapsing date for draft approved Plan of Subdivision S-C-
2005-0002 be supported to November 27, 2018 for Phase 1 and November 27, 2022 for
any subsequent phase;
3. That the Durham Regional Planning and Economic Development Department and
Municipal Property Assessment Corporation be forwarded a copy of Report PSD-053-15
and Council's decision; and
4. That all interested parties listed in Report PSD-053-15 and any delegations be advised of
Council's decision.
Municipality of Clarington
Report PSD-053-15 Page 2
Report Overview
Far Sight Investments has submitted a request for extension of their Draft Approved Plan of
Subdivision initially Draft Approved August 11, 2010.
1 . Application Details
1.1 Applicant/Owner: Municipality of Clarington
1.2 Proposal: To extend the lapsing date for draft approved Plan of Subdivision
S-C-2005-0002 five years for phase 1 and ten years for any
subsequent phases.
1.3 Area: 46.041 ha
1.4 Location: The subject lands are east of Soper Creek, south of Concession
Street East, north of Durham Highway 2 and west of Lambs Road.
The property is contained within Part Lot 7, Concession 1, former
Township of Darlington
2. Background
2.1 On July 12, 2010 Council considered the application for proposed Draft Plan of
Subdivision S-C-2005-0002 and supported issuing draft approval for a total of 541 units.
The draft approved plan consists of 273 single detached dwelling lots; five blocks for 29
street townhouse units; 2 blocks for 239 block-townhouse units; open space blocks,
which includes lands associated with the main branch of the Soper Creek as well as
tributary to the Soper Creek; a stormwater management block; and a park block. See
Figure 1.
2.2 A provision within the conditions of draft approval indicates that if Final Approval of the
plan is not given to Phase 1 within five years of receiving Draft Approval and within seven
years for any subsequent phase, Draft Approval will lapse and the file shall be closed.
However, reasonable extensions to Draft Approval may be granted by the approval
authority.
These provisions are authorized under the Planning Act, where approval authorities may
provide that the approval of a draft Plan of Subdivision lapses after a period of no less
than three years. The approval authority may extend the approval for a time period
specified by the approval authority and may further extend it. No extension is permissible
if the approval lapses before the extension is given. The approval for draft Plan of
Subdivision S-C-2005-002 will lapse on November 27, 2015, if an extension is not
granted.
Municipality of Clarington
Report PSD-053-15 Page 3
Figure 1 — Draft Plan of Subdivision
'CONCESSION STREET I I
L— _ -.J L—
r-- �---
ri� N
�I� F q J 11 I -sous
-Ic_exdr+-ascs
�ro �.�� 1
I � !•i� ! ire
I ZZ r'
�t°7
—,$V"114
I � 'I � �•� '` t, r ,Y �e m
BOWMANVILLE.^._
ZOO__
IL
III � -•• 3.-sppp
h
I
I I t
----------�
t i
SC 2005-0002 i
Municipality of Clarington
Report PSD-053-15 Page 4
3. Staff Comments
3.1 The purpose of this report is to consider whether the conditions of draft approval for
S-C-2005-002 should lapse on November 27, 2015 as scheduled, or should be
reasonably extended.
3.2 The applicant has advised that Final Approval for the first phase of the plan was not
possible due to sanitary sewer capacity constraints at the Port Darlington Water Pollution
Control plant. The applicant has requested a 5 year extension for the registration of
phase 1 and an additional 5 years for any subsequent phases.
3.3 A servicing agreement with the Region of Durham is not in place for the subject lands.
Servicing restrictions on the Port Darlington Water Pollution Control Plant, since early
2010, means that the subject lands could not proceed to Final Approval as a result of a
lack of sanitary service capacity. The Municipality had approved a detailed engineering
drawings for Phase 1 in 2011. Construction on the plant expansion is nearing completion
and the expanded plant is expected to be operational early in 2016.
3.4 In June of this year Council approved a temporary rezoning for a sales pavilion related to
the subject Draft Approved Plan of Subdivision at the corner of Highway 2 and Lambs
Road. At this time the applicant has not finalized the site plan drawings associated with
the sales pavilion
3.5 Staff support the extension of the Draft Approval, however, in consideration of the fact
that the Port Darlington Water Pollution Control Plant expansion is almost complete and
will be operational early in 2016; detailed engineering drawings were previously
approved; and that Council has already approved a rezoning for the sales pavilion; staff
believe an extension of 3 years for Phase 1 and additional 4 years for any subsequent
phase is sufficient. Up to 239 unit townhouse units could be contained within two blocks
which will be subject to site plan approval, therefore, registration of these blocks is
possible well in advance of the blocks being serviced or available for building permit.
3.6 Both the Region of Durham Planning Department and Central Lake Ontario Conservation
Authority staff have no objection to the extension of Draft Approval.
4. Conclusion
4.1 In consideration of the comments noted above, Staff recommends supporting the
extension of draft approval until November 2018 for Phase 1 and November 2022 for any
subsequent phase.
Municipality of Clarington
Report PSD-053-15 Page 5
Submitted by: °� -- ' Reviewed b ,i�l
y.
David- ``Crome, MCIP, RPP FraAlin Wu,
Director of Planning Services Chief Administrative Officer
Staff Contact: Carlo Pellarin, Manager of Development Review, 905-623-3379 ext. 2408 or
cpellarin(@clarington.net
Attachment:
Attachment 1 - Conditions of Extension of Draft Approval
List of interested parties to be advised of Council's decision:
Far Sight Investments Limited Lorne Morton
Sernas Associates Lyndsay Luckhardt
Allison Lester Margaret Quinney
Anne Caroline Wilson Mark & Cheryl Rigby
Bernie Hirseland Marlene Amos
Bert Newtel Mary Mogford
Betty Marti Matt & Marianne Yeatman
Dave & Shelley Winkle Michael Hackenberger (Bowmanville Zoo)
Deborah Patrick Mike Domovich
Derrick Stein Peter Klose
Dr. Wendy Korvar Rhonda Hooper
Frank Lockhart Richard Mostert
Julie Mackenzie Shirley Amos
John O'Toole Shirley Johnson
Tom Campbell
Attachment 1 to
Municipality of Clarington Report PSD-053-15
CONDITIONS OF DRAFT APPROVAL
DRAFT PLAN OF SUBDIVISION S-C-2005-002
PART LOT 7, CONCESSION 1, FORMER TOWNSHIP OF DARLINGTON
The conditions of Draft Approval for S-C-2005-002 as originally issued on September 10, 2010
are hereby amended as follows:
1. That note 1 to the conditions of Draft Approval be deleted and replaced with the following
NOTES TO DRAFT APPROVAL
1. If final approval is not given to Phase 1 of this plan within 3 years (November 27,
2018), and within 7 years (November 27, 2022) for any subsequent phase of the draft
approval date, and no extensions have been granted, draft approval shall lapse and
the file shall be CLOSED. Extensions may be granted provided valid reason is given
and is submitted to the Director of Planning Services for the Municipality of Clarington
well in advance of the lapsing date.