Loading...
HomeMy WebLinkAbout09/14/2015 (;Iarington PlanningDevelopmentand Committee Agenda Date: September 14, 2015 Time: 7:00 PM Place: Council Chambers, 2nd Floor Municipal Administrative Centre 40 Temperance Street Bowmanville, Ontario Inquiries & Accommodations: For inquiries about this agenda, or to make arrangements for accessibility accommodations for persons attending, please contact: Michelle Chambers, Committee Coordinator, at 905-623-3379, ext. 2106 or by email at mchambers(a)-clarington.net. Alternate Format: If this information is required in an alternate format, please contact the Accessibility Coordinator, at 905-623-3379 ext. 2131. Audio Record: The Municipality of Clarington makes an audio record of Planning and Development Committee meetings. If you make a delegation or presentation at a Planning and Development Committee meeting, the Municipality will be audio recording you and will make the recording public by publishing the recording on the Municipality's website. Copies of Reports are available at www.clarington.net s Ual!R" Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 1 Call to Order 2 New Business — Introduction 3 Adopt the Agenda 4 Disclosures of Pecuniary Interest 5 Announcements 6 Adoption of Minutes of Previous Meeting 6.1 There are no previous minutes to be considered under this Section of the Agenda. 7 Public Meetings 7.1 Application to Permit an Outdoor Wedding and Event Venue 7-1 Applicant: Lesle Gibson Report: PSD-041-15 7.2 Application for a General Amendment to Zoning By-Law 84-63 7-3 Applicant: Municipality of Clarington Report PSD-042-15 8 Delegations No Delegations 9 Communications - Receive for Information 1 - 1 D. Bowen, AMCT, Regional Clerk/Director of Legislative Services, 9-1 Regional Municipality of Durham — 2015 Corporate Climate Change Update 1 - 2 Melodee Smart, Works Department, Regional Municipality of Durham — 9-48 DurhamNork Energy from Waste Project—Ambient Air Monitoring Page 1 Clal*WM Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 1 - 3 Melodee Smart, Works Department, Regional Municipality of Durham — 9-135 Durham/York Energy from Waste Project—2014 Durham Region and York Region Waste Diversion Program Monitoring Reports and Waste Management Annual Reports (Due to volume, these reports have not been reproduced but are available at http://www.durhamyorkwaste.ca/) 1 - 4 Melodee Smart, Works Department, Regional Municipality of Durham — 9-138 Durham/York Energy from Waste Project—April, May and June 2015 Complaint and Inquiry Logs and Project Team Direct Contact Log 1 - 5 Minutes of the Ganaraska Region Conservation Authority dated May21, 9-151 and June 18, 2015 10 Communications — Direction D - 1 Lesle Gibson, Letter Addressing Concerns of Neighbours Regarding 10-1 Proposed Amendment to the Official Plan, Report PSD-041-015, Applications by Lesle Gibson to Permit an Outdoor Wedding and Event Venue (Motion to refer the correspondence from Lesle Gibson, regarding Report PSD-041-15, Applications by Lesle Gibson to Permit an Outdoor Wedding and Event Venue, to the Director of Planning Services to be considered as part of the application review process) 11 Presentations No Presentations 12 Planning Services Department Reports 12.1 PSD-041-15 Applications by Lesle Gibson to Permit an Outdoor 12-1 Wedding and Event Venue 12.2 PSD-042-15 Public Meeting Report for a General Amendment to Zoning 12-13 By-law 84-63 Page 2 • 0 1 '" Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 12.3 PSD-043-15 A Rezoning Application by 1351739 Ontario Limited to 12-48 Amend Zoning By-Law 84-63 to Permit the Severance of a Residential Lot Fronting on Townline Road, Courtice 12.4 PSD-044-15 Courtice Main Street Community Improvement Plan — 12-61 Terms of Reference 12.5 PSD-045-15 Application by Zemer Holdings Ltd. to Rezone Lands to 12-67 Permit an Apartment Building at 50 Martin Road in Bowmanville 12.6 PSD-046-15 Ontario Heritage Trust Recognition Program 12-88 12.7 PSD-047-15 Clarington Heritage Week 2015 12-96 12.8 PSD-048-15 An Application by 2346123 Ontario Inc. (Wally Gupta) to 12-100 Permit a Motor Vehicle Fuel Bar 13 New Business - Consideration 14 Unfinished Business. None 15 Confidential Reports 15.1 Confidential Verbal Report from the Director of Planning Services Regarding a Property Matter 16 Adjournment Page 3 I PUBLIC MEETING REPORT#PSD-041-15lar*wn LESLE GIBBON Notice of Public Meeting A land use change has been proposed, have your say! The Municipality is seeking public comments before making a decision on an application to amend the Official Plan and Zoning By-law Property Location Map(Clarke) lProposal N Lesle Gibson (Events by Grace) wants to establish an outdoor wedding and event venue, including: • A designated area for wedding ceremonies and other i Z o events accommodating up to 250 guests; Storage ° 0 Q Temporary reception tents and washroom facilities; Barn 2 I i �11 Z a and Ex,To Orchard _ Food services provided b outside.local catering II O To Remain I i Ex.Orchard Subject m � • p y g To Remain Site O companies. r I— O r— a Implement The applications are complete. Shed IA 4 3238 Concession Road 3 ------ -------- ~ I i �`' Barn9e - Part Lot 34, Concession 3, Former Townshipof Clarke CONCESSION RD 3 -6-Gravelled J �i rA{rea I• How to be Informed - Area of Application r for Zoning By-law Questions? Ex.Orchard r ,� Amendment Q To Remain , t Portable Washroom Please contact Anne Taylor Scott at 905-623-3379, II Trailers r extension 2414 or by email at Proposed I, , � , Reception Tent I I Proposed Catering Tent I �t 11 t ataylorscott -clarington.net.. Proposed 1 .J �. ISI Area for Orchard ThemAd � Events/Ceremonies i ZBA 2015-0011 How to Provide C �1 11Ex.Orchard Zoning By-law Amendment : To Remain Speak at the Public Meeting: EOrchard Too Remain COPA 2015-0003 Date: Monday, September 14, 2015 �. Iml j I l I o 1 X m Official Plan Amendment Time: 7:00 PM FI 1 _ I tc I I ,p 2015-0013 SPA Place: 40 Temperance StreetBowmanville 4 Site Plan Amendment Municipal Administrative Centre -'r Concession Road 3 X Council Chambers Applicant: Lesle Gibson/ Or write to the Planning Services Department to the N Events by Grace attention of Anne Taylor Scott. r ZBA 2015-0011 7-1 The personal information you submit will become part of the public record and may be released to the public. Questions about the information we collect can be directed to the Clerk's Department at 905-623-3379, extension 2102. Accessibility If you have accessibility needs and require alternate formats of this document or other accommodations please contact the Clerk's Department at 905-623-3379, extension 2109. Appeal Requirements If you do not speak at the public meeting, or send your comments or concerns to the Municipality of Clarington before a decision is made, you will not: i) be able to appeal the decision to the Ontario Municipal Board; and ii) be added as a party to the hearing of an appeal before the Ontario Municipal Board unless the Board decides there are reasonable grounds to do so. David J. Crome, MCIP, RPP Director of Planning Services August 12, 2015 7-2 i PUBLIC MEETING REPORT#PSD-042-15 MUNICIPALITY OF CLARINGTON Notice of Public Meeting Have your say.about a Proposed General Amendment to Zoning By-law 84-63! The Municipality is seeking public comments before making a decision on a proposed General Zoning By-law Amendment to Zoning By-law 84-63. I Pr • • • • - P The Municipality of Clarington is proposing to: ZBA2015-0004 • Restrict the establishment of residential units with storefronts in the "General Commercial (C1) Zone". r Permit pet care as a home occupation. • Delete the provisions regarding the removal of the holding symbol to • - . - • r i Detailed information is available for review at the Planning Services Department and on our website at http://www.clarington.net/en/do-business/current-development-proposals.asp. Questions? Please contact Tracey Webster 905-623-3379, extension 2415, or by email at twebster(cD-clarington.net. How • • • • - r- Z 31 Speak at the Public Meeting Write to the Planning Services Department Date: September 14, 2015 Send your comments, questions, or request to be Time: 7:00 PM notified of further meetings and decisions to Tracey Place: 40 Temperance Street, Webster at: Bowmanville, Municipal Mail: Planning Services Department Administrative Centre 40 Temperance Street Council Chambers Bowmanville, ON L1 C 3A6 Email: twebster(a)-clarington.net Freedom of Information and Protection of Privacy Act The personal information you submit will become part of the public record and may be released to the public. Questions about the information we collect can be directed to the Clerk's Department at 905- 623-3379, extension 2102. Accessibility r If you have accessibility needs and require alternate formats of this document or other accommodations please contact the Clerk's Department at 905-623-3379, extension 2109. L Appeal Requirements If you do not speak at a the public meeting or send your comments or concerns to the Municipality of Clarington before the by-law is passed, you will not be entitled to appeal the decision to the Ontario Municipal Board and you will not be able to participate at a hearing of an appeal before the Ontario Municipal Board unless, in the opinion of the Board, there are reasonable grounds to do so. David J. Crome, MCIP, RPP Director of Planning Services 21 July 2015 7-3 f y•,Q THIS LETTER HAS BEEN FORWARDED TO THE EIGHT AREA CLERKS June 29, 2015 i A Ms. A. Greentree Clerk Municipality of Clarington 40 Temperance Street The Regional Bowmanville, ON L1 C 3A6 Municipality of Durham Corporate services RE: 2015 Corporate Climate Change Update.(2015-J-41) Department- Legislative Services � Ms. Greentree, the Joint Finance & Administration and Works Committees 605 ROSSLAND RD.E. of Regional Council considered the above matter and at a meeting held onPO BOX 623 E! WHITBY ON LiN 6A3 June 24, 2015, Council adopted the following recommendations of the CANADA Joint Committees, as amended: 905-668-7711 1-800-372-1102 "A) That Report#2015-J-41 of the Commissioner of Finance and the Fax:905-668-9963 Commissioner of Works be received for information, including an www.durham.ca update on: Matthew L.Gaskell 1) Progress related to the integration of climate adaptation Commissioner of planning into annual corporate risk management, asset Corporate Services management and financial planning processes; ii) Corporate climate adaptation plan initiatives implemented or- underway based on.the approved Corporate Adaptation Plan (2013-2017) and 2014 and 2015 approved Business Plans REVIEWED BY_ and Budgets; !ORIGINAL TO: pi) Q COUNCIL` ilriw L a FILE Iii) Adaptation objectives and planned strategic investments TQ!1UJ IF�PaRn�ATlOr� COPY `" � included within the 2016 to 2024 capital forecast, and subject I to review and future approvals through the annual Business 0 MAYOR c1 NIHABERS e CAD Planning Cycle OF COUNCIL , 10 COMiOUNIT'( 0 CORPORATE G EVIEFGEPICY SERVICES SERVICES SERVICES iv) Climate mitigation energy efficiency and demand side 1 Q SE!IIICE ING C MUNICICRK' AL 0 OPERATIMS 1 management initiatives, renewables implementation and other PLr1'Nt•!GA Q SOLICITOR Cl TREASURY. initiatives to reduce energy and fuel usage and Green House SERVICES Gas (GHG) emissions; I Q OTHER LWI�ICIPAL�LELlrtFILE -- B) That Report#2015-J-41 be forwarded to the.Region's eight local area municipalities and the Durham Region Roundtable on Climate h Change and posted publicly on the Region's website; and 1 "Se t"4V6Ei eRence fo)-ourCommanities" If this information is required in an accessible format, please contact the Accessibility Co-ordinator at 1-800-372-1102 ext. 2009. I 9-1 - 2 - C) That staff initiate discussions with Conservation Authorities as to how Conservation Authorities can assist Durham in mitigating and adapting to climate change risks and report back to the 2016 Budget deliberations." Please find enclosed a copy of Joint Report#2015-J-41 for your information. D. Bowen, AMCT Regional Clerk/Director of Legislative Services DB/daj c: R.J. Clapp, Commissioner of Finance C. Curtis, Commissioner of Works P. Reid, Director of Corporate Policy and Strategic Initiatives 9-2 , r �I The Regional Municipality of Durham Report to: The Joint Works, Finance and Administration, I Planning and Economic Development, Health and Social Services Committee From: R.J. Clapp, Commissioner of Finance Report#.: 2015-J-41 Date: June 16, 2015 SUBJECT: 2015 Corporate Climate Change Update - E RECOMMENDATIONS: ;r • j The Joint Works, Finance and Administration, Planning and Economic Development and Health and Social Services Committee recommend to Regional Council THAT: 1. This report be received for information, including an update on: I' a. Progress related to the integration of climate adaptation planning into annual corporate risk management, asset management and financial planning processes. b. Corporate climate adaptation plan initiatives implemented or underway based on the approved Corporate Adaptation Plan (2013-2017) and 2014 and 2015 approved Business Plans and Budgets; c. Adaptation objectives and planned strategic investments included within ' the 2016 to 2024 capital forecast, and subject to reviewand future approvals through the annual Business Planning Cycle; and, d. Climate mitigation energy efficiency and demand side management initiatives, renewables implementation and other initiatives to-reduce energy and fuel usage and GHG emissions. 2. This report be forwarded for information to the Region's eight local area municipalities and the Durham Region Roundtable on Climate Change and posted publicly on the,Region's web site. 9-3 R L Report No.: #2015-J-41 Page No.: 2 REPORT: 1>0 BACKGROUND This climate change update report provides information on climate adaptation (climate risk mitigation) and climate mitigation (greenhouse gas (GHG) emission reduction) initiatives across Regional program areas. Previous corporate climate change updates highlighted climate mitigation (GHG emission reduction) initiatives across Regional program areas. Current mitigation priorities are focused on reducing energy usage and are highlighted within the Region's first five-year Conservation and Demand Management (CDM) Plan approved by Regional Council in June 2014 (Report 2014-J-17). The CDM Plan includes consolidated energy usage and GHG emissions data, outlines previous, current and proposed means for conserving energy, and outlines go-forward corporate goals and objectives related to energy management, including anticipated savings. The development and preparation of the Region's CDM Plan was steered by an Energy Management Working Group comprised of Works and Finance staff, who are also members of the Energy Advisory Sub-committee of the Corporate Climate Change Staff Working Group. CDM Plan goals and objectives are based on strategic workshops and consultations held with senior management and front-line staff across operational areas during 2013/2014 and will be implemented through Business Planning processes and approvals. While the corporate climate mitigation program will be more fully updated in the fall of 2015, along with the 2007 to 2014 corporate carbon footprint update and (2015 to 2019) carbon forecast, a brief update of current initiatives is provided herein as Attachment #1. The sections of this report following will highlight updated climate adaptation (risk mitigation) priorities, including costing information related to approved program increases and new capital funding since the Corporate Adaptation Plan (2013-2017) was approved in January 2014 (Report 2014-J-1). Adaptation cost projections are also provided for the forecast period, based upon the capital forecast to 2024, with future years' initiatives subject to Council approval as required. Additional documentation and detail can be found in the following Regional reports, which reflect considerable climate adaptation work underway corporately and will again be updated as part of the 2016 Business Planning Cycle: ® The Corporate Adaptation Plan (2013 to 2017); Individual program annual Business Plans and Budgets; ® The annual Economic and Financial Forecast and Budget Guidelines Report; -The annual Asset Management Plan; and, Annual Servicing and Financing Studies for major program areas, including Durham Region Transit, Solid Waste Management, Transportation, Water Supply, Sanitary Sewerage and Housing. 9-4 _ 2015 Corporate Climate Change Update 17 i' i Report No.: #2015-J-41 Page No.: 3 In consultation with senior management, the multidisciplinary Corporate Climate Change Staff Working Group, its Sub-Committee on Adaptation, and the current j Corporate Asset Management and Risk Management working groups conduct key work to ensure climate vulnerability and risk assessments are advanced and considered for prioritization as part of the development of individual business and financial plans. Work includes: • Review and assessment of new and available research and analysis of anticipated local climate change projections and impacts; ® Vulnerability and risk reviews and updates conducted through Regional staff workshops across program areas to consider potential operational and infrastructure risks and potential business continuity impacts; Support to individual program areas considering and reporting on adaptation as part of annual business plans, joint servicing and financing and planning studies; and,' f. ® Consolidation of adaptation-related performance measures and benchmarks developed-by individual program areas or through external`benchmarking partnerships, to monitor and review ongoing progress and improvements. ! 2.0 CORPORATE CLIMATE ADAPTATION UPDATE The Region addresses a range of environment-related risks during the regular course of doing business to ensure sustainable and environmentally-sensitive service delivery and j stringent regulatory compliance. Progress can also be reported as staff continue to formalize annual consideration of climate adaptation and resiliency as a component of the annual business and asset management process and reporting structure. This will facilitate and assist in: • Selecting projects with the greatest benefits in terms of technical, financial and environmental considerations; • Ensuring continuous improvements to corporate climate resiliency, including both E: operational and infrastructure considerations; ® Coordinating and communicating adaptation-related initiatives to Regional Council and the public; and, ® Ensuring the continuous monitoring and review of potential vulnerabilities related to Regional infrastructure and service delivery due to future climate changes. Additional climate research has been utilized by Regional staff in the. reconsideration of implications for Regional service delivery and infrastructure objectives, as part of j subsequent annual corporate adaptation planning since the 2013 Corporate Adaptation Plan was approved. A study completed by SENES Consultants 1 for the Adaptation j Sub-committee of the Durham Region Roundtable on Climate Change, a key input to the creation of the broader Community Climate Adaptation Plan, was provided to staff to consider localized climate projections for each of the Region's eight area municipalities. This study, along with other publicly available information provided through senior 1"Dbrham Region's Future Climate(2040-2049)volumes 1 and 2,"prepared for the Durham Region Roundtable on Climate Change by SENES Consultants, December 2013. 9-5 .- Report No.: #2015-J-41 Page No.: 4 government and other relevant agencies, were considered as part of both 2014 and 2015 Business Planning and Asset Management planning processes. A brief description of this study is provided within Attachment#2, as well as the Executive Summary from the SENES Report included as Attachment#3. . The integration of climate adaptation into business and financial management, risk and asset management processes, which are already multi-disciplinary annual processes, enable coordinated operational, technical and financing strategies which enhance adaptation implementation success and performance measurement. Sustainability is a central component of Durham's best-practice decision-making, . reporting and approvals processes. Within the business planning framework, climate adaptation costs, benefits, and risks are considered annually, and monitored and, reported within the broader long-term planning and management process. Limited - resources must continue to be carefully balanced, including the maintenance, rehabilitation and the replacement of existing infrastructure assets,while addressing compliance requirements and maintaining standards of service delivery to a growing population. Annual investments will continue to be made in areas deemed most critical, including consideration of vulnerabilities and risks, of which climate risk is a component. As Durham moves forward, established business practices provide a strong-foundation to support implementation of the most cost effective and value-added corporate sustainability strategies over the forecast period and beyond, including the balance of social, environmental, technical, financial, economic, operational and regulatory considerations. Adaptation initiatives will continue to be prioritized within the Region's long-term planning outlook, based on Durham's already recognized business management approach, a foundation of the Region's long-standing Triple A credit rating. 3.0 Corporate Climate.Adaptation: Increasing the Resiliency of the Regional Corporation The Region's Business Plans include what are deemed to be the most credible, aggressive and economically viable options to adapt to climate change. A number of plans, improvements, capacity expansions and infrastructure initiatives, since the Corporate Adaptation Plan was approved, will further enhance the Region's capacity to adapt to climate changes. New investments include base and operational program changes, as well as significant new monies invested in resiliency capital in 2014 and 2015. Attachment#4 provides a summary of corporate investments approved through the 2014 and 2015 Business Plans and'Budgets, based on months of review, assessment and analysis undertaken during the Region's annual Business Planning Cycle. The process involved in-depth reviews conducted within individual program areas as well as subsequent coordinated annual reviews and additional analyses through multi- disciplinary corporate business, risk and asset management planning processes and 9-6 2015 Corporate Climate Change-Update .19 4' 1 Report No.: #2015-J-41 Page No.: 5 joint studies. The process culminates each year in the reports, refinements and approvals granted through Standing and Joint Committees and Regional Council. As summarized in Attachment#4, new operational and capital spending which Will directly enhance the Region's resilience or adaptive capacity exceeds $143.million, compared to an estimated $164 million approved in 2014. The Attachment#4 summary excludes capital specifically employed to address population growth and related service demands, and is meant instead to provide a best estimate of costs related to addressing the climate-related adaptation risks identified herein. Understanding that Regional programs and assets often serve multiple objectives and priorities, an attempt was made to assess and identify specific adaptation-related components of the Region's business plans and budgets, based upon the planning process undertaken by Regional staff. Adaptation-related operations, maintenance and capital plans included within the 2016 through 2024 forecast and also summarized in Attachment#4, will continue to be ` refined throughout the 2016 annual Business Planning and Budget process, commencing with refinements through the upcoming 2015 Asset Management Plan. The 2015 Asset Management Plan; scheduled for presentation to Regional Council during the fall of 2015, will highlight preferred 2016 and 2017 to 2025 asset . j management strategies for further study through joint servicing and financing studies. r Regional staff are also implementing measures, based upon 2015 budget approvals to further expand asset management planning to consider and address risk more comprehensively in the planning and optimization of Regional asset life-cycles. The 2015 approved Water Supply and Sanitary Sewerage Capital Budgets include a total $2.7 million for asset condition assessments. The 2015 Facilities' program operations budget also includes $0.2 million to enhance condition assessments conducted annually at Regional facilities. Full condition assessments, which provide information and data on each component of a facility, are essential to establishing more up-to-date, consistent and accurate baseline data sets for each Regional facility's condition, replacement value, risk profile, and life-cycle requirements/timing for repairs, rehabilitations, and r replacements. 1 These processes and resulting assessments will facilitate corporate wide decision making activities related to work prioritization and capital financial planning including considerations to address asset risks, including climate. They will also allow furtherance of risk management strategies and assessment criteria, facilitating more refined'risk ratings to Regional assets and their specific components over time. r Current overall infrastructure asset condition ratings maintain some variance in methodology and are based on information from a variety of sources, including detailed j technical assessments, higher-level assessments, and operational and design staff consultation and feedback. The accuracy and consistency of asset condition and risk ratings can be expected to further improve, as additional detailed asset/building condition assessments are completed. h L 2015 Corporate Climate Change Update 9-7 20 Report No.: #2015-J-41 Page No.: 6 In addition to funding levels noted within Attachment#4, the following sections provide further details on select adaptation initiatives which ensure. risk considerations related to: • Infiltration into the sanitary sewer collection system; • Potential for erosion and flooding; • Protection of water quantity and quality; • Monitoring and.mitigation of higher maintenance operations and rehabilitation requirements, de-icing, snow removal, erosion mitigation and drainage, dust treatments and vegetation control; • Ensuring environmental and groundwater protection at Regional landfill sites; • Ensuring climate change considerations within municipal planning and development approvals; • Emergency prevention and preparedness; and, • An increase in the frequency, duration, and severity of extreme heat events. 3.1 - Reduce the infiltration of groundwater or stormwater into the sanitary sewer collection system to mitigate flooding, inflow and infiltration risk Localized and intense rainfall activity has resulted in stormwater entering and overloading the sanitary collection system, putting a burden on the Region's sanitary sewer infrastructure and treatment facilities. The Region has taken steps to reduce inflow and infiltration (1/1) through the assessment of existing systems; gathering detailed information.on the sanitary sewer system and understanding the performance of the sanitary sewer system under extreme storm events. The 2015 Sanitary Sewerage Capital Budget includes $300,000 to conduct 1/1 studies, in various locations throughout the Region and the 9-year capital forecast (2016-2024) proposes to include $500,000 as an annual amount to ensure a continued understanding of where the Regional sanitary sewerage system may be at risk and to implement appropriate, plans to mitigate risks as part of the Region's overall long-term asset management strategy (a total of approximately $4.8 million over the 10-year period, subject to future annual assessments and approvals). The Region has also installed additional flow monitoring equipment to gather data on sanitary sewage flows and analyse rain events and tests being performed, including smoke testing, closed circuit television (CCTV) inspections and dye testing. Household drainage surveys have also been collected at Public Information Centres to gain information on affected systems, while educational information brochures have been provided to the public within affected service areas. There have been minor repairs to the system as well, including the installation of backflow gates in the diversion chambers at the sanitary sewage pumping stations and localized repair and sealing of pipe joints. Projects have been initiated in three areas of the Towns of Ajax and Whitby and the City of Pickering, including the following: Q 9 2015 Corporate Climate Change Update 21 Report No.: #2015-J-41 Page No.: 7 ® Upgrades on Laurie Road in the Town of Ajax (2013) consisted of a relief sanitary sewer and the construction of a detention tank; ® Scheduled for completion in 2015, the system upgrades on Annes Street in the Town of.Whitby include replacing the existing sewer with a 600 millimeter (mm) sanitary sewer (completed) and the construction of a detention tank (under . construction); and, ® Infrastructure upgrades in the City of Pickering West Shore Neighbourhood are required to reduce the risk of basement flooding. Phase 1 of the project included the construction of the sanitary sewer in Rotary Frenchman's Bay West Park, between Sunrise Avenue and Beachpoint Promenade (2015). Phase 2 will involve completing sanitary sewers and road restoration work in coordination with the City of Pickering in 2016 and 2017 (the approved Regional project budget is $4.7.million). j 3.2 Erosion protection watermains and sanitary sewers at creek crossings i The Region has major sanitary sewer and water distribution infrastructure at water crossings across the Region. As river and creek beds erode and meander over time, infrastructure can be exposed and left unprotected, potentially resulting in failure. As previously reported, the Region continues to develop an engineering inventory that will create a prioritized database for both watermains and sanitary sewers, identifying required replacements or remedial maintenance activities on all critical sanitary sewer and water infrastructure currently at water crossings involving creek and river valleys. An enhanced inventory and condition assessment program is required to ensure the protection of infrastructure at water crossings. This program has synergies and co- benefits as well. Not only will it reduce water losses, it will also be of benefit in meeting !' anticipated future requirements under Source Protection Plans for drinking water. . i Databases are progressing, with.96 per cent of inspections completed for sanitary k` sewer and 15 per cent of inspections completed for water supply. The condition assessment program will continue with prioritization of remediation work managed through the asset management and business planning process. 3.3 Water loss prevention and conservation: The polybutylene water service connection replacement program and water meter replacement initiative i Polybutylene is a form of plastic resin that was used extensively by the development industry for water service connections throughout the 1980's. Numerous issues were identified with the polybutylene materials and its use was discontinued. Given the need to replace deficient polybutylene service water connections, in,2011 Regional Council approved a financing plan to replace an estimated 19,900 polybutylene water service connections over a 10-year period (2012-2021). 9-9 2015 Corporate Climate Change'Update .. Report No.: #2015-J-41 . Page No.: 8 An estimated $104 million in funding will be required over 2015 to 2021 (total 10-year spending estimated at$134.1 million) to complete this significant replacement initiative, as outlined in the 2015 Water Supply and Sanitary Sewerage Servicing and Financing Study. The 2015 Water Supply Capital Budget includes $13.5 million for the replacement of the deficient polybutylene connections. In.addition, the Region's water meter inventory for 2013 includes approximately 166,992 meters at a total replacement value of approximately.$28 million. The Region has established a water meter replacement program to replace residential-sized water meters every 20 years for the purposes of maintaining data accuracy, preventing under- billing and the potential loss of revenues, and assuring accuracy in support of water conservation efforts. The user rate supported 2014 and 2015 approved Water Supply Capital Budget included $6.2 million to implement the water meter replacement program. In terms of achieving water quantity and quality protection, it should be noted that climate mitigation- co-benefits also result, as reduced water losses and conservation success will also result in reduced energy costs and GHG emission reductions. 3.4 Facilities' Adaptation The Facilities Division has responsibilities which include: ® Operating, securing, maintaining, upgrading and repairing diverse Regional facilities with an estimated total area of over 230,000 square metres; • Condition audit and inspection programs to identify and prioritize work based upon system requirements, age, condition and risk; • Facility site activities including salting, snow removal, backflow prevention and energy management; and, • Facility design and construction, including consideration of climate adaptation as part of design development (e.g. energy and water efficiencies, green opportunities, stormwater management, erosion control and standby power management etc.). The Region's building standards ensure new facilities are built at a level comparable to or higher than Leadership in Energy and Environmental Design (LEED) Silver Certification, through construction to the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) 90.1 (2007) Energy Standard. On a case by case basis, staff also consider incorporation of components of ASHRAE 189.1 (2009) for the design of high performance green buildings. Recent construction projects, including the new Fairview Lodge Long-term Care Home in the Town of Whitby and the Durham Regional Police Complex in the Municipality of Clarington, as well as major site and system renovations (e.g.-Regional Headquarters and Hillsdale Estates Long-term Care Home) have incorporated significant features which.improve facility and site climate resiliency including: - a On-site stormwater management systems and controls; �- 15 Corporate Climate Change Update 2 %3 i Report No.: #2015-J-41 Page No.: 9 • Water recovery systems and water loss control plans; • Green irrigation systems and water efficiency fixture replacements; and, ® Building envelope and site improvements which mitigate erosion and/or flooding risk. 3.5 Reciiional Roads, Maintenance Operations and Transit In the area of transportation (Regional roads, Works Depots and Durham Region Transit) climate risk is addressed through: . i ® Maintenance of operational benchmarks; ® Employment of effective proactive maintenance, refurbishment and rehabilitation programs for roads and bridges/culverts, equipment, DRT facilities, bus stops, and transit shelters, as part of the comprehensive asset management program; • Proactive measures to keep roads, parking and DRT stops free of frost and ice; ® Priming shoulders with liquid asphalt to control dust/erosion issues and utilize asphalt grindings; • Utilization and-maintenance of state-of-the-art road weather information systems to monitor weather/pavement conditions (e.g. infrared road temperature sensors) and ensuring proper training to effectively utilize the technology and analyze results; and, • Adequate ditch and road maintenance to reduce deterioration and increase drainage. i Works Maintenance Operations is responsible for maintaining 2,151 lane kilometres of paved Regional road surfaces and 216 bridges and culverts greater than three metres in size. Activities and costs influenced by higher precipitation (e.g. shoulder erosion, storm sewers), freeze/thaw cycles (pavement heaving) summer drought (dust treatments), extreme storms (cleaning, clearing vegetation), and a longer growing season (increased vegetation) include: f ® Patching of potholes, ruts and depressions (approximately 4,000 tonnes of cold and hot mix asphalt per year); ® Treatment of road shoulders, including liquid calcium. chloride and liquid asphalt to control dust and erosion; ® Maintenance of roadside visibility and safety, including tree removal and trimming; ® Cleaning/re-grading of ditches,and*catch basins and cleaning of entrance culverts (on a cost-recovery basis); ® Mowing of rural roadside grass one swath wide (two per cuffing season) and mowing of 85 hectares of urban boulevards (12 times per cutting season); ® Repair of storm sewer maintenance holes, cleaning, installing and repair of storm sewer service connections within the road allowance and visual and closed circuit camera inspection of maintenance holes and sewers; and, j • Tracking and recovery for services provided for storm sewer connections. e Winter maintenance operating costs are influenced by: the frequency and severity of j winter storm events; the extent of the road network located in urban areas; and, the municipality's service level standard. I 9-11 2015 Corporate Climate Change Update 2 Report No.: #2015-J-41 Page No.: 10 The Region has implemented innovative programs including road patrol vehicles equipped with infrared road temperature sensors and plow and sander/salter units, which provide rapid response to developing road conditions (since 2007). New technologies are also identified within the Region's Salt Management Plan, including use of liquid salt brine for pre-wetting-and anti-icing. The pre-wet salt application enables salt to work more efficiently. Anti-icing operations include hills; curves, bridges and sheltered areas prone to frost and "black ice" at intersections. 3.6 Solid Waste Management The Region's Solid Waste Management Division monitors, inspects, and remediates closed Regional landfill sites, including consultations with the public and ensuring environmental protection. Adaptation-related activities include: the inspection of former and active landfill sites; environmental monitoring and reporting; well water testing adjacent to all Regional landfill sites; and, undertaking repairs or improvements to protect groundwater resources and the environment. A key goal is to maintain water quality through the prevention of rainfall infiltration and the prevention of leachate springs around Regional landfills, a risk which could increase .with increased intense precipitation. The previously reported Brock and Oshawa Landfill remediation programs, totaling $5.7 million over 2013 and 2014 are now complete, including site contouring, cover technology, leachate control, and phyto-remediation. In 2015, the Solid Waste Management Capital Budget includes an additional $0.96 million, subject to further analysis, for the remediation or reclamation (landfill mining) of the Blackstock landfill in the Township of Scugog: The forecast also includes $2.8 million to remediate or reclaim the Scugog and Scott landfill sites (subject to future reviews and approvals). 3.7 Planning and Development Approvals The Durham Regional Official Plan is the principal planning instrument to guide the Region's growth and development to 2031. Official Plan policies also promote a more sustainable community design, providing for more compact communities with increased densities, and a more efficient use of the transportation network. Key elements of the Official Plan that will assist the Region in adapting to changes in climate include: . ® An urban system with mixed-use centres and corridors that support transit use and pedestrian movements; ® Prime agricultural areas which help community food security; ® A transportation system that is efficient and reliable and supports all modes, including transit and active transportation; and, A green land.system that protects the area's highest concentration of significant ecological and hydrological features and functions. 9-1 15 Corporate Climate Change Update 25 b I Report No.: #2015-J-41 Page No.: 11 r The Official Plan protects ground and surface water resources through wellhead protection, high aquifer vulnerability, and stormwater management policies. Policies regarding development restrictions in natural hazard areas also help to protect people and property from damage caused by flooding, as do programs funded annually through the Region's five Conservation Authorities as noted in Attachment#4. r The Durham Regional Official Plan requires Environmental Impact Studies (EIS), as part of the evaluation of development proposals that are in proximity to lands designated as a key natural heritage feature or key hydrologic feature. The EIS must evaluate adverse potential impacts and establish appropriate actions to mitigate those impacts. The scope and process for a particular EIS will depend on the nature of the proposed development, its location, and the sensitivity of the site's environmental conditions. EIS reports and other forms of environmental review may consider the impacts of climate change, trends, as well as specific localized risk factors. 3.3 Durham-Re ion Heat Alert and Response System As a result of climate change, Durham Region can expect an increase in the frequency, duration, and severity of extreme heat events. During extreme heat events there is an increase in heat-related morbidity and mortality. For the T02015 Pan Am / Parapan Am Games and through to September 30, 2015, the Health Department will be participating t in a pilot `Harmonized Heat Alert and Response System' with Environment Canada and nine public health units in the Pan Am Games footprint. As a participant-of the pilot the Health Department will be implementing a new Durham Region heat alert and response system (DRHARS). The key elements of this initiative are to: a Communicate heat warnings to local municipalities, community partners and theI 4 public; a Raise awareness about heat-related illness; a Promote protective actions to take before and during a heat event; and, a Identify, engage and support community partners who work with vulnerable populations that are at increased risk from heat and heat related illnesses., The development and implementation of DRHARS is a key adaptation step to increase resiliency among residents of Durham Region, build capacity among community partners and reduce excess morbidity and mortality related to heat in Durham Region. 3.9 Emergency Prevention and Preparedness Durham Emergency Management maintains a strong community program to prepare for and respond to natural and/or human caused emergencies including: a An effective and up-to-date emergency response structure; �. • Coordinated emergency plans and procedures; • f Regular tests of communications and alerting systems; • Annual Regional Control Group response training; 9-13 . 2015 Corporate Climate Change Update Report No.: #2015-J-41 Page No.: 12 0 An on-call Duty Officer on a 24/7 basis; 0 A designated Emergency Information Officer; ® Emergency notifications to Regional staff; 0 Operation of the Regional Emergency Operations Centre; 0 Public education materials to promote preparedness; ® Up-dated emergency contact lists and databases; 0 Courses for Regional employees; and, ® An annual Emergency Operations Centre exercise. Regional programs together or individually are also involved in emergency planning and management including the following initiatives: ® Ensuring reliable back-up power for critical facilities and systems; • Contingency and business continuity planning; • Regional policies and procedures for extreme weather events; • The Pandemic Plan detailing actions and resources required to maintain operations and essential services; • The Contingency Plan detailing departmental responsibilities for services to be maintained in the event of work stoppage; and, • Individual Departmental or program emergency planning documents and the broader Emergency Master Plan prepared for the Region by DEMO, prescribing the emergency organization and response management framework. 3.10 'Multi-year Planning The projection for the construction of adaptation-related municipal services over the 2016 to 2024 forecast period as noted within Attachment#4 includes priority adaptation actions to: 0 Replace deficient linear infrastructure to reduce the infiltration of groundwater or stormwater into the sanitary sewer collection system; 0 Twinning, looping and expansion of linear water and sewer infrastructure, including new water supply and sanitary sewerage system capacity to enhance system security and address deficiencies; ® Inflow and infiltration studies, including remedial works; a• Asset condition assessments, planning and engineering studies; o Treatment process improvements at water pollution control plants (WPCPs) to improve effluent quality; New standby power and replacements and improved alerts, response, communication and control; and, Preventative maintenance and rehabilitation investments. While a total of approximately $854 million of investments are identified over the nine year capital forecast period. (2016 to 2024), which will increase the Region's infrastructure resiliency to climate change, it should be noted that both the magnitude and timing of these investments will be subject to future annual Business Planning and 9-14 2015 Corporate Climate Change Update 27 'r Report No.: 42015-J-41 Page No.: 13 Budget planning processes and approvals and will be further refined commencing with the 2016 business cycle. 4.0 CORPORATE CLIMATE ADAPTATION: VULNERABILITY AND RISK ASSESSMENTS The Region's approved vision for corporate adaptation is-as follows: "The Regional Municipality of Durham will become more adaptive to the changing climate by developing,.implementing and ensuring the ongoing monitoring of an effective and forward looking Corporate Adaptation Plan. The Region will,enhance its ability to moderate potential damages, take advantage of opportunities, and enhance its ability to cope with the j consequences of climate changes through the integration of adaptation considerations into annual corporate risk management, asset management and business planning processes." Future climate changes can impact programs and capital assets across the organization in different ways, while the solutions for climate risk mitigation and potential co-benefits j from related climate mitigation programs, can benefit multiple program areas at onFe. The Region's-multi-disciplinary and coordinated approach, employed through each of the enterprise risk management, asset management, corporate climate change working groups, and joint studies, is beneficial and has led to significant progress in addressing r the important issue of ensuring the climate resiliency of the Regional Corporation. As part of the annual business planning process, staff from across the organization, (including the Climate Change Staff Working Group, Risk and Asset Management Teams, Joint Servicing and Financing Study teams and Regional staff from across program areas involved in the consultations.and development of individual program business plans and budgets) consider the Region's corporate vulnerability by assessing i whether: 0 Programs are susceptible to or unable to cope with the potential effects of projected climate changes; 0 Climate changes will affect the ability of program areas to-function normally; 0 Programs are equipped to manage impacts; 0 Programs are exposed to risk and to what extent,.including assessments of likelihood and consequence; Service areas are already subject to existing stress; 1 Climate change will further constrain limited resources; and, 4' 0 There are identifiable thresholds associated with a service area's ability to cope. I 9-15 15 Corporate Climate Change Update 2 8 20 Report No.: #2015-J-41 Page No.: 14 To answer these questions adequately, an understanding of the corporation's current "resiliency state" or existing adaptive capacity is required to accurately measure any vulnerability gaps and determine how and over what time period to address them. Since 2010, Regional staff has conducted several workshops and has given consideration to over 100 identified potential climate impacts, with 60 subsequently becoming part of a more formalized vulnerability review, and 26 of those being included within detailed risk assessments. Refinements are made each year and workshops to be held throughout the summer of 2015 will in turn inform the 2016 Business Planning process, including consideration by multidisciplinary teams and individual program areas during the development of individual business plans. The following table provides updated corporate climate adaptation risk impact statements, which highlight priority climate risks identified through Regional staff vulnerability and risk assessments conducted in 2014. Also included are corresponding goals meant to address these identified climate risks. More specific objectives and . strategic actions which support each goal are also highlighted in subsequent sections of this report. While priority risks identified are considered medium rather than high risks, based upon the analysis of corporate vulnerability, existing corporate controls and adaptive capacity, consequence and likelihood; risk management is,acontinuous process-and these and other potential risks are re-assessed as required to ensure the potential for escalation is both controlled and addressed. Recognizing the importance of measuring the success of adaptation initiatives, Regional staff also review performance measures and available data as part of Business and Asset Management Planning. The Region's long-standing commitment to performance measurement, including adaptation related measures, assists in the ongoing monitoring of risk. These include individual program performance benchmarks included in-Business Plans, as well as collaborative performance measures.conducted through the National Water and Wastewater Benchmarking Initiative, the Ontario Municipal Benchmarking initiative and Municipal Performance Measurement Program. Many of-these performance measures are also highlighted within the approved Adaptation Plan 2013 to 2017. 9— 15 Corporate Climate Change Update 29 Report No.: #2015-J-41 Page No.: 15 Corporate Climate Adaptation Risk impact Statements and Goals - .��_��.._�--_.�:.�� �_ _ ��„,::. 3. _ ''�rsU.,i-Z" _nt✓a= -rs. _.....Qr�^,.-�- df:E�, t G E�� 05..' >sa ` i;"_> _ - r.�z-R,�u]�b (.jl---f y� 1. r..a-.2=-'-r= r:t—.�_:T -`._n—: -. `r -,___..�. _ - T 1. Potential risks of facility/basement flooding due to on-site water retention, Reduce the infiltration of groundwater or extreme precipitation and/or stormwater into the sanitary sewer collection stormwater infiltration intathe sanitary system, sewerage collection system in flood- prone areas. 2. increased algae growth due to higher Protect water quality, prevent water losses and surface water ambient temperatures implement Source Water Protection Plans for increases risks to water treatment the Region, including proposed policies/actions' equipment, water volumes and quality. to mitigate drinking water threats. 3. Potential for contaminants spilling into the environment due to sewage system Continue to improve the,quality of sanitary treatment facility overflows and/or sewerage effluent through treatment process overland flooding causing contaminant improvements and water pollution control plant migrations (i.e. agricultural fertilizers, upgrades/replacements, continuing to ensure nutrients and pesticides, solid waste effluent meets regulatory dompliance. j landfill leachate, road salt, oil, grease). 4. Disruptions in water supply and/or Maintain effective and up-to-date emergency water pollution control plants due to plans for natural and human-cause severe storms and possible extended emergencies, power outages. I 5. Potential watermain and sanitary sewer Develop priority database including condition pipe failure due to erosion at creek assessments and corrective actions. Design . crossings,. new pipe crossing with protective measures. 6. Increased demands for maintenance, j repairs, replacements, preventative de- Formally expand asset management planning to icing and post-storm clean-up, due to consider and address risk, including climate an increase in winter freeze-thaw risk, and optimize asset life-cycles ensuring Regional facilities, sites, fleets, equipment and cycles, increased storms at or near 0°C transportation, water supply and sanitary and extreme storms affecting Regional sewerage systems continue to operate safely ' roads, facilities, parking structures/sites and effectively. and transit stops. 7. Increased risk of vector borne diseases (i.e. Lyme disease, West Nile Virus) Increase public awareness of environmental due to milder winters, higher summer health risks and projected impacts from temperatures and increased environmental health issues. precipitation/storms. E Develop, implement and pilot a `Heat Alert 8. Increased risk of heat-related morbidity Response System'for Durham Region to and mortality due to an increase in the increase public awareness of the health impacts. frequency, duration and severity of of extreme heat, build capacity among extreme heat events, community partners, and improve actions taken by local municipalities and individuals. i i 9-17 ems C;nrnnrate'Ciimate Chanae Update � n Report No.: #2015-J-41 Page No.: 16 Continuous Risk Review Investigate further.Are existing controls in place to address? Assess the effectiveness of controls. S u Modify or implement new controls as required. Re-evaluate risks with modified controls to ensure effectiveness. Investigate continuing effectiveness of controls, particularly if risks bordering high. `"`��-.N��`�"==T e Determine if modified controls necessary to avoid risks becoming wmoa < ..9.. high. n ;: rst't : -_ - ' 3. > ="=u Re-assess & rank risks to address changing.climate business Hess conditions or plans. Monitor risks for potential escalation in consequencellikelihood 71 Risks Take note of events that may change risk tolerance and reassess risks as required. Risk Management includes,the following key components within a risk management framework and process: Early warning S Identify, assess and prioritize risk. ® Ensure appropriate control processes. - 0 Promote coordination and knowledge transfer throughout organization. Effective response ® integrate risks into planning and decision making. • Reduce exposure to acceptable levels. • Ensure timely response to issues to reduce negative impacts. Increased Success' Maximize chances of achieving objectives. Improve ability to anticipate, prepare for and adapt to change. Improve resource management. 9=18 -2015 Corporate Climate Change Update 31 Report No.: .#2015-J-41 Page No.: 17 Risk Management Framework Establish the Context Identify Risks U � o Analyze Risks CZ CU :.. '... .. .. o U i C � Q E Evaluate Risks .E 0 U Rssess Risk's Treat Risks i` l: Source:ISO 31000 5.0 NEXT STEPS: ASSET MANAGEMENT RISK MITIGATION AND RESILIENCY The Region of Durham's Asset Management program continues to evolve with changing conditions, updated technical information, drivers and assumptions, as well as changes to industry best practices and the regulatory environment. k �i Regional.staff consider Regional Asset Management planning as key to establishment of a long-term and effective corporate response to addressing risk, including climate change: Next steps identified through the asset management planning process include initiatives which will enhance corporate resiliency, including: ® Additional study of climate adaptation requirements related to existing facility infrastructure and operations, design etc. to determine how climate could affect condition, useful lives and current and future requirements; ® Incorporation of additional risk managemerit strategies and improved risk L assessment criteria to develop and assign more detailed risk ratings to Regional facilities and aid decisions around work prioritization and capital financial planning; a . Refining information databases for assets and condition ratings and working towards development of a detailed technical condition assessment strategy for water supply system and sanitary sewerage system facilities as well as for Regionally-owned facilities (non-water and sanitary sewer); and, i . 9-19 2015 Corporate Climate Change Update 32 Report No.: #2015-J-41 Page No.: 18 ® Acquisition of capital asset management software to support data collection for, Facilities Management, including management and monitoring of capital and maintenance requirements, life-cycle planning, demand analysis, benchmarking, risk analysis and business and budget planning ($0.2 million approved for 2015). 6.0 CONCLUSIONS Significant climate adaptation initiatives and investments continue to be implemented each year at the Region across all program areas as well as progress in ensuring that corporate wide decision making business processes incorporate climate change considerations, priorities and actions in order to achieve long-term sustainability objectives. Connections continue to be made at all staff levels, and,process integrations are enhancing awareness of environmental and sustainability objectives which will assist in making behavioural changes within the organization. Furthermore, many linkages have been established across staff working groups and joint studies at the senior staff and management level, which assist greatly in achieving coordination and efficiency across the organization in meeting sustainability objectives. The integration of climate adaptation into business and financial management, risk-and asset management processes, which are already multi-disciplinary annual processes, enable coordinated operational, technical and financing strategies which enhance implementation and performance measurement success. The asset management planning process next steps include: furthering the establishment of a risk-related asset database within all asset classes; enhancing useful life reviews and life-cycle costing abilities; and, advancing-asset management data in support of improved long-term strategy development and business continuity planning. The asset management planning process will continue to be key to implementation of forward-looking corporate adaptation policies and programs for the operation and maintenance of assets, capital rehabilitations, and the long-term planning of new and replacement infrastructure. A significant next step will be to further risk-related asset databases for each asset class, in order to enhance: maintenance strategies; monitoring of risk; useful life reviews; and, life-cycle costing. The Region's coordinated corporate approach will assist in advancing risk and cost related asset management data, including climate related, in support of long-term strategy development, business continuity and risk management planning. .9-2A015 Corporate Climate Change Update 33 Report No.: #2015-J-41 Page No.: 19 This report has been prepared through the multi-disciplinary efforts of Regional staff of the Works, Planning and Economic Development, Health, Social Services and Finance Departments as well as the CAO's Office, Durham Region Transit and Durham Regional Police Service, in consultation with individual Department Heads who concur , with the recommendations. i R.J, Clapp, CPA, CA Commissioner of Finance Recommended for Presentation to Committee, Y G.H. CUDItt, M.S.W. Chief Administrative Officer I r Attmts. t C r k f • i i i . II f 9-21 2015 Corporate Climate Change Update Report No.: 42015-J-41 Page No.: 20 ATTACHMENT#1 CORPORATE CLIMATE MITIGATION'UPDATE 1.1 Durham Region's Energy Conservation and Demand Management Plan The Region's approved Energy Conservation and Demand Management Plan 2015 to 2019 (CDM Plan)-is anticipated to generate significant reductions in greenhouse gas emissions related to reduced energy consumption. The goals of the Region's approved CDM Plan (2015 to 2019) are to: • Enhance corporate energy awareness, communications; engagement and information sharing, including educational opportunities for staff to foster a "culture of conservation;" ® Investigate existing standards and potential for new energy-related standards to ensure an effective and-consistent approach to operations, maintenance, asset management and procurement; ® Continue to enhance energy related performance measurement, to better understand energy usage variations and incorporate specific performance measures into individual business planning and budget documentation; • Further integrate energy conservation into existing business planning and asset management analysis, including strategic assessments of specific corporate options for 2015 to 2024 Business Planning and the leveraging of external grant funding opportunities; ® Develop a.corporate-wide five-year lighting retrofit strategy for consideration, including Works and Finance staff consolidation of the existing lighting inventory, options analysis, business case analysis and comprehensive reporting through Joint Committee, of a comprehensive technically and financially feasible plan, including recommendations and timelines for Council approval; and, • Complete a retrospective assessment of the approved 2014/15 Embedded Energy Manager program, and provide future recommendations to Regional Council regarding potential implementation of similar programs across other Regional facilities and program areas. The CDM Plan vision is to attain continuous improvement in energy conservation and awareness across Regional operational areas, while ensuring that energy conservation remains a primary focus in the Region's culture and decision making, reporting and approvals processes. While action items related to each of these goals continue at various stages of development, evaluation and implementation; energy efficiency remains a primary focus for the Region as exhibited by recent successes and planned initiatives as.described in the following sections. 9-22 2015 Corporate Climate Change Update 35 I Report No.: #2015-J-41 Page No.: 21 on Electricity and Natural Gas Programs and Incentives �e2 Capitalizing V � As detailed in Report#2013-F-25 and #2013=F-84, numerous energy conservation programs and incentives are offered through electricity and natural gas local distribution companies (LDCs). These programs and incentives provide end-use customers with I incentives and technical assistance to assist with managing energy costs and consumption and implementation of energy conservation measures. Electricity programs are currently offered under the saveMenergy branding with funding from the Independent Electricity System Operator (IESO) and are delivered by electricity LDCs. Enbridge Gas Distribution provides natural gas specific programs. Currently available electricity and natural gas programs provide support and program incentives for various measures including, but not limited to: j • Funding for energy audits; • Technical support and resources to assist with identifying energy efficiency opportunities, project evaluation and measurement and verification of energy savings; • Energy efficient new building construction and major renovation projects; j • Equipment upgrades and retrofits which realize energy efficiency; • Support for building commissioning and/or re-commissioning; and, • Large-scale capital upgrades, energy management and monitoring. Under the Province's Long Term Energy Plan, conservation is a key aspect of the Province's long-term goals and infrastructure planning processes. Under the f Conservation First policy, LDCs will continue to be provided with committed funding for energy conservation programs. Regional Works and Finance staff continue to engage the Region's LDCs regarding the various program offerings and related incentives and where possible leverage LDC technical expertise and feedback as part of project evaluation and post-project measurement and verification. Energy conservation program incentives and resources are explored and evaluated for all of the Region's identified energy.conservation initiatives as they are brought forward at the earliest stages of project identification and I evaluation. While the final design and form for various energy conservation programs may still be unknown beyond 2015, program incentives, resources and technical expertise will continue to be offered to end—use customers, including the Region, for both electricity and natural gas to assist with the identification and implementation of energy conservation opportunities. Further, as part of this program development, through individual consultation, surveys and public consultative processes, Regional staff have provided feedback to its electricity and natural gas LDCs to further assist in program design. ' 9-23 2o1 cCorporate Climate Change Update 3 6 Report No.: #2015-J-41 Page No.: 22 1.3 Other Corporate Climate Mitigation/Energy & Fuel Efficiency Initiatives Through the 2015 Business Planning and Budget Process, as in prior years,•the Region continues to make energy efficiency a priority, with inclusion of numerous initiatives which are approved and planned for 2015. The initiatives described herein do not cover the full range of initiatives (Le. various projects, such as facility structure and building envelope improvements, may contain elements of energy efficiency within its scope although not explicitly defined as conservation initiatives). Regardless, they provide a sample of projects budgeted and planned for 2015, projects currently underway and nearing completion and/or projects in the investigation stages which are being considered for more detailed assessment for future consideration. Fuel efficiencies continue to be pursued across all Regional fleets including Durham Regional Police service (DRPS), Durham Region Transit (DRT), Emergency Medical Services (EMS) and Works. For EMS, all new ambulance vehicles feature an ECO idle reduction system to improve vehicle fuel consumption and reduce noise pollution and GHG emissions. DRPS fleets have achieved enhanced efficiencies through the introduction of four cylinder and hybrid vehicles into their.non-patrol fleet functions (represents 10 per cent of the fleet). DRPS has also installed inverter generators on Public Order and Forensic Identification Scene vehicles that allow for battery usage to power lighting and other operations to offset diesel generator requirements. DRT's fuel efficiency gains are reflected within the 2015 Business Plan and Budget Performance Measures as follows: 2015-Business Plan and Budget Performance Measures: DIRT Bus Emissions Bus Emissions ,T &A-05646z .2= `20F�7 E�igf'. 100% y.i - - - - 1�3;ti�S:r• 50 - C_ ..��i'i•i:.y'```u._-:Y; - ^:T'--��� - - -:ice✓:sL...v.'YD�i`� - --5_.•:art... r:3- .- #i',,..-'.�-': - `Y�vtil�i}+:ham.'_.®. s:L••- _ _ :��,_::;y.r�^.:ti's` :'[r .•. ,n�r -^;}-...- - .rIO_ •f::J:?�'-�,:.._,:�'n_;-..r-`; ''� _ :a^:d:..,.' _ - .. '=:L='.;rs, A. ....;• ii'r"J. a���-:t�_., pen.�.,:_ - v_�;;t: _ tr2. 3. o: Y.,!Y - ::E.• - -'—=Y. .:=t1Lr.?,.. ............ =fr 4zs'- -'.f-. _ •4'?+ -�.: i'-�"'i. ' - - �-:k^._.w- .sT_,- -T,-• r„r,_ __ _ .e.}_may?wL:' �"..:. l._. _ - - ay00 - c L �4- - :?Ci �.,c.�.i-. ?,.a.�3t .�� __ _ i. r i0 _�-:...:. -.r_�: -�•ii_•y`di*• _- .=^i- Y.-'tN� u� al`i t' C - ��,. asdi„^ - - a^y':T' - :..J.. - .•.v_-'cri^`:li.. -Y _------�_ 60.0 i_-'•ci” _nr@.^:v r.J�=`i'r`t^ d 450 --�Ls::..'^ - -.._rc- :=4:c:.Fr 8-.— - - .,a-.�:`+.. _ -^:f.'t., - .:ri _ - i'=z`' Ste:;: e __ =:�i`rr.;:J i Ys?�rem.= _ �i-i�3� '_ u:i7'ii n=:�:., .4te�; Vis, F=':'t`r`,: pi,•-•=':S ..1;� a.,-„- a'�'-c3^ i`rY.4'.:r'.' __ _ _ .�': _ r• _ _ NO m - -.F.�•T3r'+2:fi'e.' _ _; `.La._ .:may- �. ._.t< :-:se_: rF`>.:�.='iF __ --.;�• t�' et F;;CY 4OrC i�'('t. 100 xr'�1=.�S::E'.':Ltfi-:�•-• �=:.c_"i�.L.-.- 'T2':4a__ -`civ Fes__^:• C#__til:? —_ 3' _ _ _ _YS�� __ �sL. ..f cs - �_.,'.,•. ::fie-s -�.1' _ _ •:.y,}q:2:'1'!l.q' _ _ a•f':_ _ a'Y:.r. .(ot_M. w•.�:�• t-L"_i::' 2 .�$:-h= i...--L - (` % �,^ _4F _c:.t'F` _ .'J-':_3i•7- v`t:'r�i:"::'v _ .1: 1::_.: - _� �2:�.< l: : 30ie +ni'- t_i:.'2• _ .3..- -::SGL _ __ -a..lt E"1'n' I.vP:-.[ _ _ - - ter' �Y rt*" — - '� �z�i! - l::•::::1: G; - .'>z.: - 's-,-,- S-�_ - - `g'ic- .r �=`2C. �S_ :Sz. _t,50 17 10;'0 ites`-"= �.i- :�z �_.- xx e;'�` -r?_ -i- = t3%�, c�.c 1` r`-,,•—''.,-r ,tet;. rs-; r�,� 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 9-24015 Corporate Climate Change Update Report No.: #2015-J-41 Page No.: 23 2015 Business Plan and Budget Performance Measures: DRT Bus Fuel Economy Bus Fuel EconomyKllometrs:rriiiios 14 - _ Fuel>E o [ri- _ _ 1,85 - " - 511%s;�si::ri•_ _ _- _ .•Er - J" r: RZ 1.80 .�- •v .,_,,� re,.r�.,:s�-... ',r' d :x_ -.z - - .'cr�3..�.i:`:` ."zr:rr"._r_,;z``=�y=_AT_t^,r,,:T - - :- - - 1.75 1.70 -- - - T.rr:� _. •r5,:,_µ :--','r�. Eca. - _ `lkt ,-'�`^`-?s�3:"'-'t+=.s=';�s's`.'e.=�:%4i• "c.<;,•, - -:u..-,. .r4.-•=:-!b,_ llctt _ } " a3 4 a�:.•�_I` t(__,--7 __ _ _ _ _ _ :`-32v.._ I.--v..F;+.':'^'�- iiF-'_'Li- ::[, 60 a.Y jiyY` ii`N—.:=1- yl>".7--•-r.•a; __ ta::_ __i4u� _ a,1:`r'i�-`-:;ixA - '.Pig, .--�_r-.;.�5, _ -,.f it., _ 2 - - %:S/�-Y v"•'}':C - �:�- ..Et k.-'v y,�s;_>'i L;-i._ ..S',Ie;-%LiI�:G.� .__-. Z.�� ri��. i,`�z:'ii+i;r".'.�`- -S' .7 n= yvFt :�i:t�-+•Y'•:.-i_`ti 1.50 20M 2007 2008 2009 2010 2011 2012 2013 1.4 Other'Funding Programs Supporting Climate Mitigation Efforts Numerous programs continue to be investigated with applications being made for additional fu4ng to further implementation across Regional programs.-These include high efficiency retrofits, control systems upgrades and measurement, appliance replacements and design assistance for new construction projects and major renovations for the purposes of incorporating energy efficiency in the earliest stages of design. A non-exhaustive sample of the energy efficiency and conservation projects which will j reduce GHG emissions and are recently completed, underway or planned for 2015 (including prior-year budget approved funds and 2015 approved funding) include: I ® Water fixture replacements, lighting retrofit and Heating, Ventilation and Air Conditioning (HVAC) and boiler upgrades at Ajax Water Supply Plant (WSP); • Mechanical upgrades and lighting retrofit for the existing DRT Raleigh facility; • A variable frequency drive (VFD) replacement at Bayly St. sanitary sewer pumping j station; ® Supply air systems and return/exhaust air systems upgrades for the administration and maintenance buildings at Duffin Creek Water Poluution Control Plant (WPCP); • Replacement of tube heaters, upgrades to the HVAC system and lighting retrofit for Ajax Depots; ® Pump replacements at Beaton Farms (Oshawa) and Southwood (Ajax) sanitary sewer pumping stations and restoration of energy efficiency for low-lift and high-lift pumps across various locations; • i Lighting upgrades as part of lighting security enhancements at 101 Consumers Drive in the Town of Whitby; 9-25 2015 Corporate Climate Change Update Report No.: #2015-J-41 Page No.: 24 • A study of ventilation Bowmanville WSP; ® Exterior light emitting diode (LED) lighting retrofit at Hillsdale Terraces Long-term Care Home and various appliance replacements across Regional facilities including Long Term Care Homes (e.g. freezers and dishwashers); ® Completion of boiler replacements at both Corbett Creek and Newcastle WPCPs; ® Participation in the Enbridge RunitRight program by Hillsdale Estates and Hillsdale Terraces Long Term Care Homes and Regional Headquarters, targeting five per cent natural gas reductions through identified low-cost/no-cost measures and supported by approximately.$15,000 in Enbridge incentives; ® In collaboration with Oshawa Public Utility Company (PUC) and CLEAResult (3rd party technical reviewer), post-project measurement and verification to capture the savings associated with refurbishment and energy efficiency restoration of three pumps at Oshawa WSP; • Completion of two lighting retrofit projects at Duffin Creek WPCP with total annual project energy savings anticipated in excess of 165,000 kWh ($20;000 per year2), including replacement/installation of over 880 double lamp fixtures, and installation of LED wall packs, pole lights and occupancy sensors; ® Design and consulting work for building automation system (BAS) system upgrades at both the Durham Regional Police Service (DRPS) West and North facilities. Collaboration with both Veridian Connections and Hydro One Networks staff continues for the purposes of energy conservation program participation and project measurement and verification; and, • Work is proceeding in the study of options and strategies for resource recovery at the Courtice Water Pollution Control Plant (WPCP) as previously reported. 1.5 Duffin Creek Water Pollution-Control Plant (WPCP) Energy Conservation and Demand Management Aside from initiatives described above, significant efforts continue tc be undertaken at Duffin Creek Water Pollution Control Plant (WPCP), the Region's largest energy user, to identify energy conservation and demand management opportunities. Duffin Creek WPCP represents a significant share of the Region's total energy consumption, accounting for almost one third of the Region's electricity and natural gas consumption (full share of-facility consumption including York share). Specific initiatives to reduce energy and GHG emissions and benefit from related cost savings include: ® Continuing work on the completion of a detailed engineering study for the Duffin Creek WPCP Stage 3 Influent Pumping Station (IPS) under the saveMenergy Process and Systems Initiative (program application is subject to IESO approval). 2 Electricity savings are a function of kWh consumption reductions and for larger accounts, billed demand reductions, where charges vary by account size and LDC. For simplicity, savings estimates assume a blended cost of electricity of approximately$0.12/kWh. 9-26 2015 Corporate Climate Change Update Report-No.: #2015-J-41 Page No.: 25 ® Centrifuge technology to replace batch-operated presses to provide a more consistent feedstock which, reinforced with operational processes and monitoring enhancements, has significantly reduced fuel oil requirements in the incineration process (total annual fuel oil usage has been reduced by over one million litres compared to 2011 levels).. ® Utilization of digester gas at Duffin Creek WPCP to reduce overall natural gas requirements and the need for flaring, similar to practice at other WPCP facilities (e.g. Courtice WPCP). i r ® Power monitoring systems to assist staff with detailed analysis and monitoring of facility energy usage across unique facility loads and processes and assist the identification of additional energy conservation measures and strategy development. i ® Identification and implementation of energy conservation and demand management opportunities, driven by the Region's participation in the saveONenergy Embedded Energy Manager (EEM) program. The program has provided a dedicated staffing t resource to develop energy management plans for the facility and provide quarterly energy assessment reports while seeking to achieve minimum peak demand (kW) and cons umption'(kWh) targets as required under the program (80 per cent program i f funding provided). ® Aside from providing support and analysis, the Duffin Creek WPCP dedicated EEM j resource has identified and assisted with the implementation of,a significant number of initiatives which have already achieved energy savings including, but not limited C to: numerous no-cost energy conservation measures related to HVAC loads across various buildings on-site; decommissioning of numerous high wattage light fixtures across various buildings; and significant peak demand and energy use.reductions resulting from optimization of plant pumping and aeration processes. C L Numerous initiatives already completed are expected to provide significant savings with achievement of the first year target of 1.67 million kWh ($0.2 million per year) expected to be surpassed (verification of savings is currently under review). Given the relative success of the initiative, in partnership with Veridian Connections, the program resource has been extended to the end of 2015 and will continue to be evaluated for consideration beyond 2015 and for other program areas as identified within the Region's CDM Plan. r I 1.6 Durham Region Local Housing Corporation i' Numerous projects have also been recently completed or are planned across locations. within the Durham Region Local Housing Corporation (DRLHC) portfolio including both multi-residential and family units. A brief sample Js as follows: ® Completion of the replacement of a make-up air unit (MAU) and associated exhaust fans and replacement with an energy recovery ventilator at 655 Harwood Ave. S in the Town of Ajax in 2014. Work is underway for replacement of a second MAU at the I° 9-27 2015 Corporate Climate Change Update -4 n Report No.: #2015-J-41 Page No.: 26 site and 2015-approved budget funding of$250,:000 has been earmarked to the replacement of the remaining two MAUs. The projects are anticipated to realize annual electricity savings of over 40,000 kWh ($5,000 per year) and natural gas savings of over 50,000 m3 ($14,000 per year)3. Further, total utility program incentives for the projects, contingent on project completion in 201.5 and subject to verification of final costs, are currently estimated at $0.26 million (over 1/3 already received from LDCs) which will cover approximately 50 per cent of total project costs. ® Completion of lighting retrofits at the 103 Cameron St (Cannington) and 385 Rosa St (Scugog) DRLHC locations in 2014. The exterior and interior lighting retrofit projects, supported with almost$7,300 in program incentives, are anticipated to yield almost 14,000 kWh ($1,700 per year) in combined annual electricity savings. In collaboration with Oshawa PUC, Veridian Connections, Whitby Hydro and program delivery agent Windfall Centre, all of the DRLHC low-to-mid-rise buildings and family unit locations were participant to the Home Assistance Program (HAP). This program included site assessment and implementation of energy conservation measures, which include but are not limited to: the replacement of appliances to new Energy Star rated appliances; .installation of energy efficient light bulbs and power bars; and home insulation. While implementation was contingent on tenant uptake and assessment results for.eligibility, the recently-completed program saw the replacement of over 160 appliances (refrigerators, freezers, window AC units, dehumidifiers) across locations. The installation of approximately 4,800 energy efficient light bulbs and installation of attic insulation at 409 Centre St. in the Town of Whitby was also accomplished. Implementation provided at no charge to the Region is anticipated to yield over 0.3 million kWh ($40,000 per year) in annual electricity savings of which almost 60 per cent would be realized directly by tenants in family units who are directly responsible for their electricity.bills (the remaining portion will be realized by the Region which is responsible for bulk-metered electricity costs at multi-residential locations). Anticipated completion in 2015 of the conversion to LED exterior wall fixtures (32 units) at the DRLHC Lakeview site (1529 Ritson Rd, S., City of Oshawa) which is anticipated to yield annual savings of 18,700 kWh (approximately $2,400 per year) as well as over $5,600 in LDC-delivered program incentives to assist in offsetting project costs. o Completion of four technical site assessments in 2014 at DRLHC multi-residential locations. The assessments were undertaken in collaboration with Veridian Connections and Whitby Hydro and have assisted in identifying energy conservation opportunities and available program incentives. 'Assuming a blended effective rate of approximately$0.28/m3. 9_jW15 Corporate Climate Change Update 41 Report No.: #2015-J-41 Page No.: 27 In addition to initiatives noted above, a number of additional energy conservation initiatives are identified through the budget planning process and have been approved for 2015, including MAU replacement at 850 Green Street in the Town of Whitby and major lighting retrofits at: 655 Harwood Avenue in the Town of Ajax; 2 Nelson Street in the Municipality of Clarington; 1910 Faylee Crescent in the City of Pickering; and, 385 Beatrice Avenue in the City of Oshawa. All of these initiatives, and others currently under investigation by Regional staff of the Corporate Climate Change Staff Working .Group, Energy Advisory Sub-committee nt are key to the success of the Region's CDM Plan. Chaired by the Works Departure y g As noted within the Region's GDM Plan, energy conservation remains central to the Region's culture and best-practice decision-making, reporting and approvals processes going forward. CDM plan costs, benefits, and risks will be considered annually, and monitored and reported within the broader long-term planning and management process with the goal of continuous improvement. The Region of Durham has been recognized for its energy conservation efforts and has I' been named as a leading participant in energy efficiency and demand management programs within the Veridian Connections service territory. As recipient of Veridian's Conservation Champion award for both 2013 and 2014, the Region continues to be recognized for its commitment to energy conservation while also incurring the associated benefits of reduced operating costs, program incentives and reduced GHG I: emissions. i� 1.7 Feed-In Tariff(FIT) and Micro-Feed-lin Tariff (microFIT) Solar Protects Currently, the Region has four operational rooftop solar photovoltaic (PV) installations located at Durham Region Local Housing Corporation sites in the City of Oshawa and the Town of Whitby. All projects are operating with generated electricity sold back to the Ontario power grid under 20-year microFIT contracts. As shown in the chart following, to-date the solar applications have generated and provided over 114,000 kWh of clean, emission-free electricity to the grid while generating over$74,000 in total rmicroF.IT contract revenues. The solar PV projects are being monitored by Regional staff with performance and related feedback anticipated to assist in future potential project assessments. i E` 9-29 9nis Corporate Climate Change Update A f) Report No.: #2015-J-41 Page No.: 28 Rooftop Solar PV Generation and Contract Revenues (August 2011 to Present) 7,000 $90,000 X315 Colborne St,Whitby(kWh) 439 Dean Ave,Oshawa(kWh) 155 King St,Oshawa(kWh) 850 Green St,Whitby(kWh) 6 000 �—Cumulative Generation Revenues(All 4 Locations) $80,000 . c $70,000 5,000 $60,000 2 4,000 _=� Y: _ P _ '� ��_ , tYks�l $50,000 ani 0 V 3 000 F r a _ # i I< $40,000 6 +t r� - J�,v� �t. $30,000 U 2,000 $20,000 E" 1,000 _ $10,000 0 0 ti1b ^M N3 ^", QOd' 0 Cr �e�� 0 Vs CP Qeo 0- V9 ss` QOM poi Qeo• 0 V:R dog QOM po� Deo 4eK' Vs In considering similar technologies and applications for other Regional locations, structural enhancements to the new Fairview Lodge Long-Term Care Home and Clarington Police Complex buildings have been undertaken to ensure solar PV installation capability. As noted within the Region's CDM Plan, solar options and related technologies continue to be assessed on a case-by-case basis, as part of new build design, including technical and financial considerations and available FIT and microFIT program opportunities by the IESO. 1.8 . [Next Steps: The Fall 2015 Climate Change Mitigation and Carbon Footprint Update The Region's climate mitigation program and corporate carbon footprint and forecast will be updated in additional detail for Regional Council in the Fall of 2015, once 2014 data has been finalized and verified by Regional staff. The footprint will include adjustments as required to reflect additional or improved sources of data, and revisions' to landfill. emissions estimation methods, fuel emission factors and emission intensity coefficients for scope two emissions (electricity). The Region's corporate carbon footprint calculations and reporting through the Climate Change Update reports goes beyond the requirements of the Ontario Regulation 397/11 and covers Regional owned and leased facilities, vehicle fleets, traffic signals and related infrastructure, water supply and sanitary sewerage treatment, pumping and storage operations, as well as Regional solid waste landfills. 9-3A15 Corporate Climate Change Update 43 4 f,. 4 Report No.: #2015-J-41 Page No.: 29 The accounting of the Region's corporate GHG emissions is coordinated through the Finance Department in consultation with Regional departments and is based on established and recognized reporting protocols consistent with previous Regional Council direction. i E I 4 r: i i 4 i i 9-31 2015 Corporate Climate Chanqe Update Report No.: #2015-J-41 Page No.: 30 Attachment#2 New Climate Research A December 2013 study through the Adaptation Sub-committee of the Durham Region Roundtable on Climate Change and conducted by SENES Consultants was released as a key input to the creation of the broader Community Climate Adaptation Plan in December 2013. The report, "Durham Region's Future Climate (2040-2049) Volume 1" Executive Summary is also provided as Attachment#3. The SENES study was provided to Regional staff to reconsider implications for Regional service delivery and infrastructure objectives as part of the annual corporate adaptation planning process. The SENES study provides localized climate projections for each of the eight area municipalities across Durham Region. It was considered by staff as part of 2015 Business Planning and Asset Management planning processes. Based on the SENES Study, on average Durham Region can anticipate an increase in total annual precipitation of less than 15 per cent, however fewer snow events in winter and more summer storm precipitation are anticipated consistent with previous studies. On average; the SENES Study predicts 33 fewer days in Durham with snow and 31 more days with rain. As an example, the following figure taken from the SENES study demonstrates what the anticipated change in precipitation over each month of the year could look like for the Town of Whitby. Figure 47: Whitby— Change in Monthly. Precipitation Amounts Whitby. Change 2000-2009 to 2040-2049 250% - -;t: ::t:,_ - - U;_;^ �":';ash _ ;:tyy': ' ri>"L1Jt%-_'•1i" _:i:•'_ rv` =-�.t:ait::.�.w<,n:b�..ao`%°:'r;^r::':;i;.=.` '-''• — 200% - _..?"--r-•f �u- = 1:)C.:c'3iw -:'?T.1.''a`:5i x1" :__.'-t�•v t..t ..wi=i:�:`'--fit' 16 Q°o / ??; - -"'__"�' 'S:2�=c% 'sKz*-�_c`ti� ,[•rE`�.�i:L�.?r;4 as'-: �..z<c.,sy�k`i��"^��cS;�:{++ . _ %'i. •:�5`F C.�.- .�r��'r_ .=:is,;.._ i:ir Y-r"'i'..-.., ...a:7;is"t:::ti,. 100/ T+$a'":`.,;,-�'r:':+�Tti.i:,i'*T--_•:y_t.K�-e- __=i_Y___i•:-gY`:`r,:_'-s_`,^,'t:t[r_Lc1_'.tF•�,-,-a'.:,'.:J�_�ri--p_—t-`:�_/"- �'r 1r!.feji-;?_"%nL„=.ie�C-:r'i'-�- itn Rainfall(mm) :� r- 50% ' . _= � __- =� i :� .<•�,.�- - - +�: mi=x Snowfall(cm) � =_^-,.,=,i::its;_ _s-:�=.`__ _ - Y{,`��:�a�_=:y_'t:�E.--t_.•-==-_'--3'--�r'"�iy%:�`=}=�'•?''��::v-:<o`rrt .ter-, tJ Q% .: Precipitation(mm) 3.'_"':'>tom.c' - '.rT-': r..::�,T- _ _=Y4�:`c<-i_-`'-5';�.! __c•L�. _, � : 5,."r'. o a;3' ..�-�.'�`5i£:::=se:' =--cr3:-•r.Y: ..�.` -..r.:`s-:_:y._.._a...•zs�::E=-r4?s":::',`:2i!.:: =c"";•• -._ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Month Chart Source: "Durham Region's Future Climate (2040-2049) Volumes 1 and 2," prepared for the Durham Region Roundtable on Climate Change by SENES Consultants, December 2013, page 92 9-32 ' 2015 Corporate Climate Change Update Report No.: #2015-J-41 Page No.: 31 In winter and spring, overall average precipitation is anticipated to increase marginally with rain-increasing as snow decreases. However, management of increased freeze- thaw cycles, as previously noted, will continue to be an issue,-particularly for Regional. transportation (Regional roads and Durham Region Transit) and Facilities services. In the summer months, not only is violent storm potential anticipated to increase, but July and August rainfall is anticipated by SENES to increase by an average 67 per cent, C from 166 millimetres (mm) to approximately 277 mm on average across the Region by the 2040-49 period. Whitby, Ajax and Pickering are estimated to see increases even beyond this average over the two months, including: A 76 per cent rainfall increase in Whitby during July and August (161 mm increasing to 283 mm of rainfall) ;. o A 93 per cent rainfall increase-in Ajax (141 mm increasing to 272 mm); and, ® A 96 per cent rainfall increase in Pickering (146 mm rising to 286 mm of . rainfall over the-two. months). SENES estimates that extreme daily rainfall will increase an average of 15 mm across the Region with the highest increase in extreme daily maximum anticipated for the Whitby and Port Perry areas. Extreme Daily Rainfall Milliimetres (mm) 2000-2009 2040-2049 Change Ajax 79 84 5 Whitby 79 117 38 Oshawa 84 88 4 Clarington 99 96 -3 E Uxbridge 82 100 18 Port Perry 87 122 35 Beaverton 85 88 3 !' Pickering 81 97 16 I' Average 85 mm 99 mm 15 mm 16% More frequent extreme precipitation events can: • Increase the complexity and cost of water treatment, due to increased potential risk of waterborne illness and pollutants entering raw water resources; ® Significantly damage or potentially disable infrastructure; and, • Combined with hot days, heavy rain events can create more favorable conditions for breeding of mosquitoes that could.carry West Nile Virus. I. Water quality can also be affected by: i ® Higher water temperatures that can decrease dissolved oxygen levels and increase the growth of algae and/or bacteria; ® Lower water levels that threaten valuable wetland habitats; 2015 Corporate Climate Change Update 9-33 4. 6 Report No.: #2015-J-41 Page No.: 32. Storm runoff contaminated with fertilizers and other toxic chemicals (e.g. agricultural and urban); and, © External impacts to water quantity and quality that increase pressure on local groundwater/surface water or Great Lakes water supplies. The SENES Study also predicts that Durham's annual temperatures will increase by an annual average four degrees Celsius (°C) by 2040-49, primarily due to milder winters (predicted by 2020-49 to be on average 5.8°C warmer). Average summer temperatures are anticipated by SENES to increase 2.6 °C, with the extreme daily maximum temperature increasing by 7.1'C. The chart below demonstrated SENES predictions for the changes in the number of days below -10'C and the number of days Durham will see greater than-30°C, particularly an impact in July and August. This does not account for the Humidex Index which is also anticipated to increase 15 per cent over the warmer summer months. SENES Deport Estimated.Days in Durham Region Below -10°C and above 30°C 8 � 2 - 0 0 ' `Tv_._� ^�'�-' 4' — +• �?�" ''�T��..;a �= I fro•-r 1 ® - Dec Jan Feb Mar/'Apr May Jun Jul Aug Sep Oct Nov 0 2 R01-� -4e -6 -8 -10 =— -12 I —4--Days> 30 C —iE—Days<- 10 C Higher average temperatures combined with altered precipitation can: o Affect the types of crops cultivated and.the health of livestock and fisheries; ® Affect seasonal tourism and the viability of activities requiring specific climate conditions; Cause heat stress and decreased soil moisture and negatively affect the productive ability of several tree types and increase habitat loss; ® Put several of the animal species that live in these forests at risk of losing their habitat;and, 9-32415 Corporate Climate Change Update 47 Report No.: #2015-J-41 Page No.: 33 ® Introduce conditions that could allow certain destructive invasive species to thrive, destroying habitat for birds and other species. Hot summer days can worsen air pollution, especially in urban areas with: ® Residents likely to experience more days that fail to meet air quality standards; and, ® More frequent heat waves and lower air quality can threaten health of vulnerable populations, including the very young, the elderly, outdoor workers, and those without access to air conditioning or adequate health care. I: C is I: t i I i C: I; f f i( h I-' i; I: 9-35 nni c �„r.,,,,•�+o rlimatA rhahra 1 In�latP ',` Report No.: #2015-J-41 Page No.: 34 Attachment#3: SENES REPORT EXECUTIVE SUMMARY DuRH.A,m REG ioN FUTURE CE.MA VOLUME 1 Executive Summar The main deliverable from this project is an understanding of ghat the Region of Durliarn, currently experiences in terns of climate and what it will experience in the: future in terms of climate.and extreme weather_ This study has developed the data and information to assess the climate and extreme weather to which the Region of Durham must adapt in the near future. The report is based on data generated for a comprehensive study done for the City of Toronto Which covered a broad area including the Region of Durham. How do we figure out what tine f M Lure weather W11 be? An intemational body called the intergovernmental Panel on Climate Change (IPCC) developed projections of future greenhouse gas(GhC)emissions as early as 1999_ However,what will actually happen is the product of vert complex dynamic systems., determined by demographic development, socia-economic development and technological chanege- How emissions will actually evolve is highly uncertain. In order to try to come to grips with how ouf, t,worl€t will change, various scenarios were developed by the IPCC to provide aitemative' ideas on how the future alight unfold. These scenarios are essential as inputs to climate models- The outputs. from the climate models help examine future Impacts, adaptation and rrritdgation activities. Tine IPCC (2-000),repo I identifies the A B scenario as a credible, conservative, middle of the road f ftwre scenano that generates the highest impact on global warming for the 2W-204-9 period_ This scenario was selected for this study krVhat is a c€im to model? It is.really the only way to understand the -changes to the climate over long timescales. It simulates the madly -processes that occur in the atmosphere and oceans using complex mathematical equations. The equations used are dewed from a wide range of observations and established ;physical laws, such as gravity, fluid motion, and the conservation of energy, momentum and mass. 'These models have been used over the last 40 years to make projeoffons of future climate using assumptions about increases in greenhouse gas levels its the atmosphere. The modeIs divide the world into `boxes', and s mulate an ,average value for the weather within each box (e.g_, temperature, %Md, hurnldKyv, etc-)_ For this study-the British Meteorological Office Hadley Centre climate modell, Had(-'143, was used. The scale of the boxes in the HadCN13 model is about 300 km. This scale is much larger than that of some of the key processes that drive Durhaffs txeather; :such as convection and cloud foi-radon_ This means that mvmy climate processes have to be approxlrnated at MIS scale. It Mould take too much computer time to run a climate model with suffiiclent rr�solution (� 2 km)to represent directGy some of the W,,small-scale processes. The 35-9862—FINAL—December 2013 2 SE14ES Consultants 9-36 2015 Corporate Climate Change Update 49 • is Report No.: #2015-J-41 Page No.: 35 DURH;,,A RREGION's FUTURE C &TE—VOLLJMF I app a irrtatlons, and our iricon�plete understanding of the climate system, are a major source cf uncertainty in climate projections. ti1'Toy do, we have confidence in U.-Imate models? Climate moidels are [used on well- estal?gsicied physical laves;moreover,the science underpinning these la,,hjs and the way they.are represented in models is•continually improving. They are abPe to simulate the main features• of the current climate and Gus variability such as the seasonal cycles of iernperature and rainfall in different regions of the Earth,the forlin,Won and decay of the monsoons,the seasonal shift of the major rain belts and worm tracks; the average daily temperature cycle, the variations .In outgoing radiation at high elevations in the '. aamosphere as measured by satellites and the large-scale features observed in the ocean circulation. But, most importantly, they have been -used to simulate climate for the period 1860—2000,Mich includes the period Men. greenhouse gas emissions and concentrations rose feorn pre-industriai levels to those of the present day. The steps iriVO[ved in preparing the data, from vAiich.the infloninal ion for this report is i` exbractied,%overe as folEmvs: 1_ Simulated global climate with I3adll~y aimate Model (3DiDx3D0 km output grid and � hourr time step).- 2- tep);2_ simulated .regional climate vii the Hadley PRECDiS model (a state-of-Me- science tate-of Me- science Regional Climate Model) using Step I data (5&50 km output grid and t 30-minute time hep); 3, Simulated weather drivers over southern bntario with FReS-H ( a state-of-the- science Weather Forecast f'vlodellingSystem)using Step 2 data (4x4 km output gnd and 20-second time step,aggregated up to hour averages); 4. S`iimulated gveather details over the GTA with FReSH usiinig Step 3 data (1x1 RM output grid and 20-second time gip,aggregated up to hour averages); 5_ {prepared 14 year cIimatoloig,ie_s for specific output locations around the GTA using the Step 4 data as fellows: i L 2000-2000 driven by observed upper aii-r fields alto assess how well the FReSH Weather h4odelling System works);and ii_ 2040-2049 driven by tine PREM RCM(to assess the future period); G [ow.do 'vre know ffi at the reasutts are Lzorrect? Two specific tests were undertaken as !' folio`"Ols: 1. Simulated period 29100-2009 o using measured broad upper air rnefecroioggi E hbelds; roompared predicted versus observed data at specific go-cations;and caleu@ated the error in the iveather model output;and 351113a.L-F@NAL-December'2013 3 SEES Consultants i 9-37 2015 Corporate Climate Change Update �- �, Report No.: #2015-J-41 Page No,: 36 DURHANq REGI oWs FuTU€E CUMAT —''VOLUME 2_ Simulated Me Year 2000 * using upper air fields were simulated by the Regional CGmate Model,- compared predicted versus ohsemved data at specific locationsi;and calculated the extra error introduced.by cuing climate model_ Wl,ile all model.havie errors,the errors.from the work reported Dere are at the low end of the expected range for this type of mrrodeIling. u he data presented in this.report illustrate that the approach used for this project gives results that are better than idle best sensitivAy commonly identified for Regional CHmmlate Model analyses. The following summarizes the projected Durham legion climate forthe fature.period (2040-2049)using the Whitby location for illustrattwe purposes.- Less urposes:Less snow and more rain in winter About 116%more precipitation (snow and rainfall) overall thy;one days maxi num rainfall will increase by almost 50% ¢ the one day maximum snow will strop about 40% * the number of days of rain greater than 25 rnm will increase by 100% a there tuill be an 80%reduction in the number of days with srnop more than 5 cin January will have 146%afore•rain and 51%less snow February vdill have 217%more rain and 75% less snow Rainstorm events will be more extreme * there will be a 15D/o increase in the potential for violent storms- there 1TPT1I be a 53%increase in the potential for tornadoes July wS, haive 74%more rain August 1,01i have 79%more rain. Average annual temperatures increase of 4.01"C •_ average winter temperatures increase spy 5_BPC • average summer temperatures increase by 2.600 • ex.lrem e:daily minimum temperature"becomes less cold "ley 12°C ex remrie daily maximum temperature"becomes warmer"by a_VG Average wind speer[about the same o m marntgn hourly wends reduced a rnaximmm wind guns reduced about 1 °yo 350882,-FINAL-December 2013 4 sENES convukants �- 15 Corporate Climate Change Update Report No.: #2015-J-41 Page No.: 37 D(s1R(-GAm REG[o,,Ts FUTURE CLIMATE—"VOLUME 1 "Com.fort"remains similar i. a humidity and temperature takers together as the Humidex remains similar(vff-An 8% of present out average) for most of the year but shows increases its November (up 30%) and in May through to September (up 15%) .and pushes . past the dangerous'level(45)on several summer days Wind Chill is reduced by about i{l°Q an arrer ge but is reduced 254556 during the winter months The following summarizes the predicted Region of Durham climate for 20402WS, where we can evect�an average across Durham Region,to see- 1- ee:1_ fewer snowy events,and reduced snmv clearing requirements e ex1reme daily minimum terrtperature"becomes less cold"by 13.1':C; * 52 fewer days with temperatures below zero; 29 fewer dais with temperatures below-IWC; 2. much more summer storm precipitation during July and August and increased likelihoods of culvert and sewer capacity exceedances and basement flooding; � no change in the total amount of precipitation falling in a year; 33 fewer days with snow; 31 more days witly rant; 3. higher temperatures,more frequent summer(teat waves and increased heat.alert response requirements as foflours: average annual temperatures increase of 4.1"C in the future(2040-2049), * extreme daily maximum temperature"becomes i&srttmer P by 7_'6°C, 56 more days Wth temperatures above zero;and f1 14 more days w�ritit temperatures above 3000. it 351166:—FINAL—DeGernher 2013 5 GENES Consutbants 9-39 2015 Corporate Climate Change Update 2015-J-41 Attachment#4 Page.1 of 8 O O O O L O CO O d• LO Lf) LO CO CA N N M O -,t d d N 0 0 0 O CO O O I` O r I` I,- r CO r O N (Sl Cn 0 0 (D 0 O O O Lf) Lf) 1l- I- LO r r CO LO O O O G� Lf) Lf) I� d Lf) N N C'O r N C (3�0 rn O E.. v rn v� ti v� CF) v Cp M y 0 0 O O O N O It 0 0 0 ;t O LO N O Lf) O O O tM 0 (D 0 0 O N O LC) N O O CO U) O r Lf) O CO O O (D -a O O O O O 'qT O CO I` O CO CO O LO O OO.O U) O O O N C) I-- r (D I` r d• O I` O CY)O(O CC)) CD O Imo- LO CY) g N Lf) 'd• Cfl N ,t CO I` CD d' U) LO It l- r N O O [` O T- r O -r (D CO 1` Lf) d d r r �- r N0. ., r d 0. r r C, d N < O N d O L O L O CO O d L L L L L 2 C O O N O C' 0 M N CO 1�N c0 4. C 0 0 0 CD O o O O LO LD Lf) W M N N 0 CD -IT d O N O 0 0 O O O M 1- O r f` I` r OO r O N 0) N 0000 O I- O N U) I` I`L') r L- COUf) 0 O O LOV- L6 r O O CA NOrrc- NCTO6 CT CT CO . O r N r Cfl CX? v " (O CO CO C r CO (n GV 0 0 0 0 0 0 0 O CO LO LO N CO O CO CO L r.0 It y 'r3 M O OO O O r o O 'I OOOCOOCOCO It O 0) d z O O O O O M O O r ►` Lf) W N CO N CO Lf) O O 'CS O N Lp CT - N N C� N 1- I- Cb d' 1:I,O O 06 Lf) G ++ CD N CO O (D LO OO 0) CO M U7 'a• Lf) d 1` r N O ti N m dIt C)) N O d Ln I` CO It 't t r r r r N r CO C cr d N O N L ' Lv IL. Cn L O U i Cu O a) > d U a) rn N O > O D) N O. M � . C ` Cn (6 OL N Qa) Gc a) U ,� E E E E L O Q 0) N C C r N C O CO C p) CII C U E U- Q U M a) M C cc CL r $ a � � M w c m a) CU a) m Cu m cB �, ami m CD C: ns � 0 � 0 � = O T L m ani a,¢ cC6 (4 0 ° L aV L c6 I L- cti3 i d ¢ C a. wa � no � cn O� Q�� �2 w z0U- zM3. >0- 4- o En cn Ln O c 'a}-+ C d O 7 .� sO O 4 .O (D ,3 7 L .n � LII ++ .L.. bn CL '� C 41 O O O Cu 6A 0 E ? w .O r- = h W "(3 y 3 %0 = CG =' O in a7 ' Cu t b LSA O .o L ? w f+ 3 CU Q 'a t '0 CL CU z 4' 3 O CO QW fu C to 'II C 7 Q to C�6 °' CLCs a• N ..Q crs cn .3 4S v4-. Q 4 Q ca LY o Ca a) Cno o ,, c ;J oCa eY a:(U' Es) .(0 p �n ..0. ,O':• Q)' (U C 9H40 53 i I. 2015-J-41 Attachment#� Page 2 of 8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o CD 0 0 0 0 00 0 0 0 0 O o 0 0 0 0 0 0 0 N CDC)0 0000 I o 00 000 0 0 00 000 O o f1f dCO 4 05 c6a) d' c, d' CO O C, tin O Lf) r- d r Ltf N 0 V LO CCS r CD 0 - CO v r O � � CT) C $.dO O O O O O O O O O O O O O O O 00 O O O O O O O O O 00 O O O O O O O O O O O O $ O O O O O O O O O O O O O O O O O O O O O S rn -' N N O CO "t 1` CD h CO 0D c- OD CO P7 V) (� l- V 0 ca CNN C9 O -• coLS) ICy) CD N 0 M CD 00 CO CD r 't r C'7 CD r CL CO O d• O LO N O Ln CA CO f (D (D tom- r- M O GV I- V-7 N N N N �4 N O r r � p � N E p O O O O O O O O O O WO O 1 1 1 1 O 1 0 0 1 O 1 O 1 1 1 0 O O t' M O CO N OD O Cb 1` C9 O pq O v MN i, Mti CD m r o N IL C) 0'000 O 000 0 0 0 00 000 0 CD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD 0 C) 0 0 0 0 I 0 0 0 0 I o 0 0 0 0 0 0 0 0 0 03 M i CJD moi' OD 0) d r 'd' 00 N C6O N d r Cfl L6L6V r N r• CD (V) r CO r r C'7 r CO 0 U) O O O O O O 0 0 0 0 0 O O O O O O O O O d p 0 0 0 0 0 ,O O O O O O O C) O O O O O O O .� O O O_O O O O O O_ O O O O O O_O O O O O_ O $ O C� C7 " ct r J N c--C7 O i- ' C r C6 LC7 C� d' d• C"I O cisN m r M 'tet LO CO I- CO r O N CD d• N I� r Ce r C� O t� CD CD d O Lf) r CA to 1` ti r f- CD OO r CC) N C CO t6 r � N j O 0 CLS a) (6 UO Q C L L (u O> O OO &- a) U Q- p a a) c0 M O I E E Cca C N O LO 0- w (6 �) ca Cl 0 �0/ S- 01 C_ s r M c •` o _I 0 o c wa) r � Q o 0 CD S ° O S2 U (L6 E (n C L O N (� N /Q •� O r °'� L /0 L NE E O O N a) ,U O C O U) to O a) a) V O U w a) Q � 0 Z Cu aa) ) rn E o M a) ami 'cu cru m 6)o aa)i cu o � .o c'V �CM S a� T � cn � �Q) L E oa o �a ID aCi � � � ami N � 'F.. .G N a) a)CO Cu (6 (0 O ([S 0 Ca O (B C s... O '�.. a) �O .� L L Q., ❑ rJ c� cnu CU o' � > � � � acncn ❑ cr u) mU. � U > cn � t— o 1 ' In ++ 0 > -a e E i. E ago � m v .@ ccCo 1 L n -a s C 41 U 41 co 0 M *'w CL 3 o m Gi W •a' W n a Oi �E S i m s f` ti O ate+ CJ cII CL E i a a) m a) a)N o a W. o � > .t� 76 X . .c Y ECu .Q�;'� Q .o- >,. c 41 CJ :� a? :C a) :�'C G C Q 0 O .U)::�, Q) 4— ra ¢ c Ca 0 Lt! 0 .� LL. Cu a c.) -Lu � '� (a. a) +- � u) .�. � u) Ch r . a) —41 C 2015-J-41 Attachment#4 Page 3 of S 0 0 co (D 0 p o 0 0 0 co d N o o m Cb N r O O O O O O. O p p 11 O O U) O O O O O O to 41 0) d r O d' O r a tO Cfl O O O p i LO O y r N N co ,Cpm, CD C) o tl- 000 op o 0 OCA O "a 0 0 OooO 00 0 0 0o ti O O cl 0 C 0 C 0 O O 0 0 d' d O Chi h o7 't N (O ti LO 00 O M CD N Cn t- Cp O tom• LO r N O M O d O LO N o 'd' C� O O h h S.P N (y T N_T r O N CD 0 CD E 0) Oo O N i p O O G v coN d L � CL d0 0 O O 0 0 C) O N' p p O O o C 0 0 d CD 00 r 't U') CD L v Cn d O O O' d' T 07 O O O O O O M $ O O r T N N O O o O 0 0, CO y p p C'7 m C) "It O O_ O O O O ca c LO O O 00 r M Ch Cp T T (Q CY.) Y m oo N N 1` m CO � d' LO r ce) N 1C! CO cI LO 'd' T N O It C'7 (0 O N O tC T N T N T r LO O 0 N �cc ` a) i Cn L (D a) C (D = O T3 a) En co co t� M Q) CO .L p C m O CL a� a) a) J- .L �' O U � cn •y�—� C p Q Q. a) m � Ocn 1= s= � V a) O 0 O Q) C C II a � _� a) a) 0 = m Cn ca a) > N O p O cm U E U a � N C� L- a) (U N Cc � m 0 � CCU ll! � to (B LL a) co m e o ami ) D CO -0 c tY .� o � c° � C° w aa) � s � m o. = � cU w E ,, Q A. t— L- n. r- ca m w u m cn > a z w _ U a o r C6 75 M Z .41 ao 3 Y ra N ° t L eO O a� +E m m c mon m Ln z at4i co - n. •° •L Q 3 m m '� 3 cO o6 4- z y ,o.� O y 3 , y Q a) ci C m cOi a y A O a) L1 O G ^C3 OJ = N •v co Z 'tco N F; m O v Ln O '� iri 41 s Q a, E 'i G w N S to M a) En f6 '� cu U a) J Q H U�j •a+ L Ln a-+ •N En •fU5 a) vi G O O C V 'a a1 E o a x U +a) w s. y-. rn ca w t Q. to O 0 .c a) .a !3a G .a N � Cn 0 i �• O E U +' i ++ U c F- O ca 'i O ca In .Ca Q 0 '''vf -0 � � -tb � cuwJD N g d 41 ns £ m O w 4, cO C. C s• °� Gi r 2015-J-41 Attachment#z Page 4 of 8 ' I a• a' L L• O Q) a) a) E O EO E C C U U w CD p N O a) U U U O C6 O +p+ O - co U Y O Y O .1 a1CL A 01 c6 E N L) O. a) C L f1 U =, .i..+ U p U :p � U O 4) M a3 U) U O co a ) M ca C Q. yea LL�a�yyi >� � ` L caO -o a) O N a) C6 .p � U c a `o o O ° L L 0 j. C =' (6 >, m ` '"L" =' T cu C m .O U C U: O .V C C C E c cM c 0) Q U Com_ co D) E U ca U °' U U C� v' a) (S _ a) _ C O L a) CT E C C U L L' L L L c6 a) m o a) .Y cn U o m a) 'a T o m E m m N ami w C o m E 0 c`o .� o c c E c s= c D w � Qccw � wo- � � wUQ 02ma. d,- w � � S -a cac 'n O o 'o O o 0 o m O o o r a o } Cn o 0 0 Cl o C3) r0 O LD O O O O LLQ CO LO O O O OJ O co O O O O O r N N O Nm (D O O r- I` N O (fl O Lr O Oc CCL Cl Cl O (C N Z O d d (fl O O LfJ t- d" O (D O N U) (C) LC) C)) O O N .r- OD r N Lr) O N 0) N t-- LLQ LO CO r r U) LO Pte') CO �- L� L T r N r y y ' (6 I ca d O O O O Ch O CO O 0 CO C Cl) O (m O co LNC7 U 0 0 1 OC C 0 cm o °� «i O C,7 r rn o ch o N co N LU r O L.() M O L() r Ln c,") O LU L C6 Nit' ( f O r t` CO LU ce) r r CO Ch M r N N r r r r C F— ti� r O N r O N N U cL4 N i` O Ln U — m cu C- E O L (� m m ca a) U o 'S a) 0 > _ mL O LO a) CO caC I; !A c l a) E - 0- w=- C1 .= a) > x E L lz o X o N E_- E Q Q) U O U Y a3 U E m CL60 O CL�6 O LL6 Q a o 0 CQ p m o f U E COL (z o `� C L `� as m co C) N O U U U - wa) 0 , O p U U 7, a) N L U I: fY Eco •-pR m CO) Q a) c c 'So Qw Qo 0 0 O o O Q:p a� (6O ) paca , O CU W E -`G O O N U) rz m O K r Q -p to O C Op.. LA Q c 0 0 0 o U > p E o U O > o o m U o U 0) 0) 3 m m .L U 3 F- U s 0 2 L o a) (n a) >, w c o m E a) -8 L� a) m U o) x U as o cn o o SZ U L o E as Q D C U U c� c > U p) ccs U —L p c m -o w a CO mo as o cu > as L cu o Q u Q n a > a Q Yu �_ `a o � > a La a .� a D F- -43 E � U m o 5 a) as as o m o) U o a) � o a) a) m E m m LS O v U J m m U 6Z � n W' o rte— (1� J m LC Cn IL 2 m = 2 W 4' J 1— 2015-J-41 Attachment#4 — 00 0 0 0 0 0 0 0 0 p 0 LO 0 0 0 0 0 0 0 p o p Page 5 of 8 p N O O N O O O O O ` O O tJ) LO O u'1 O O O O uj tD Ol O O cy� n O N O O O O ul LO lD co M O M N M N CO ci d' O N '0 Ct d' I� c to 00 ry � c-i N' f� e�1 co Ln O N O 0 O O O O Ln O O O N O N m e�-1 0 On O W N �e3• tf') ul Ol 1� O Ln M N M H N N . O N O O O O O O O O O O O O p p Ln O O O O O O O Np p 00 O O O O N O O c} O O ci O O O ci �p ko O N O O 0 Ln d' M O 41 c-i d' 0 d' M N M r� O M O NO N' N d' CO' 06 N' N N - N' a) tD d w O O LL N 3 C] V C) p O O O O O O CD 4ca 0 0 o m o 0 0 0 0 v o o ° rn � m m m � N d N Q M t9 t.t) c-f MCL ' U m Q to •a p O O O O O O 0 O O 0 rto m U N ++ In O V) c-! O O O p 0 O .J a 41 bD li � NLD Dl M N 0 00 N M •� N LO M 00 O '+ p m :. .. _ •� N O_ N i41 .fir O �n •'S E +O•; O n] Cl) `" cu M O O O -0 N `n v u C O O U O 'O 0 ,� 4) i O m s- N M O U L :F+ = O O cu co41 U G 0 bD a) QS ns •a � LL Q ,E ayy N 1 O U = N L C w N ....0 i E "O Z s.. O y > 0 0 M •E o is = 'c3 L- 3 tin c o ai O +� 3 s, _+ O y_ N +� a CL a) cc •N 3 O a C m ++t w L 'O - U �-' 'O a-+ a-' O G. a N vN w cu to -O 11 —, Q) N O a) a) = D t�II fl 4) 47 N a ❑ O O Q V Q. -0 ccn c � m e v p p , a n°0. cL- _ E LO v s eri a m a) a� eo O C V4 41hA O n a OA O O O_ U N D Q' c�6 ca m 0 0 s- O N N O •~ C a O 'X. G +-: Ln o 4+ `i -J Aw Ln C O O m O C W U N N U O •� "a O o N a Q En a ° N 'c i n n °� o a ° ° to aQi n o > w � E Q a s y U a p N 0 0 v c cs o a .0 O' N O — C 41 OJ d = . E co C O CL W 4'' V E aV O ,41 y En W 41 to 0 O `V to i $ CL a O w 3 C z. .L E O ¢ y to d y In -> E y 0) N O V) E @ U - N Q1 m :N dJ m fC > N cu N cn cN a) O c Q " d a a = E v pi w E E 'O L Q p y 'O C y O> ` w CL,R O C *� ai Q. m E c d u E Li 73 o m a, V E U Q Q Q O C C j 7 m v m a m ' a Q Qj to L. c En M 4- co n ci mz .+,:. .41 c ^53: :'..:'ice•: iz ::fi s...." i. . ca :W' moo=3=_:t°:•+:o. . - :.:a�_< _ ,:. L V a� y :: 0 . 2015-J-41 Attachment#4 o e e o e e C Page 6 Of 8 N O N O O O Lr) O O N m d' O N H tr'1 N I i O O N O O O N � O N N O N i O O O O O 0 C 0 O O O 0 0 LO O d� o m m 4+ Ca N to y tD. N 0 � LL N 'a ' O O Ia Ln0 O O > Ff1 > O O O O V 4 p Q. N d0' N N . N Q N ¢ U CO ¢ O 0 O O v 0 O O Q U (a 4+ O o• O ,. �? s. y hda CSD Ln c�-i Cl) 'b O41 p ++ N C c7 O N U H O O O .N O ° En 0 c 3 ° >- 41 ai � V) c 0 En o uCL) Ln -0 bio o o a v o b° a ° ° ao ° 'n a Ce ¢ V 41 a ate. �0 C7 a Es m E °' � �r m Ln 06 a) o w oma . N N �+ O 0. O aa)i ¢ O s... � >N fl. .a �. mIn v Q aJ o co (VQ C .° o `° E a 3: m o N N d > m a M Qj n3 Q aQi O a) V)CL u Q C m � G U f En 0 g ai C o 4 ns rL ° ai L N E c v p° i to Cu CO - ¢ n Q O Ln p ate, a 41 vAi L m a°i °� m O > D m m a E U a) z a c w ¢ Q U N J > En ... : �.:�:_�.. Cu :. 9_45 :. . 2015-J-41 Attachment#4 0 0 C C C 0 C 0 o Page 7 of 8 H o m w o 0 0 0 0 0 0 0 0 rn pm o 0 +m' N to to d� ci' a0 EO— in O N p O O O O COD 0 i p ,d. O N C c00 tNA N cp0 M O CD N O O O O O O O O O O O O O O O O CD lD O O O O O O �O-. O1 O O CO H W '�+ O to N Cd N y U UD O O O 'S U N OCD O Ca y 0 O Cl O O V O O lrD dam' i v+ CL N Bim. r-i N' M v ca Q rt H cn = 0 0 0 0 0 0 0 oo o O 0 o O O U N p O OO O O .V' i v 0) rn LDdm , Ln N OM d' N toM. 41 MO 0 C CO O N U S N F d Cu T L i ru w 1V) (U aI 1 lu Q Cu C 0 Ca Ln > Q. L L fa V U U LN p S2 1 Ev- a) m a) N > +' 41 7O U CO m a) 0 -0 N V N y Q y Q CU O + y co O Q E c o L; u wf � m o ' w6 4 -43 n 0 LO = x °3 h- QM c an E u an o No Q ami �v CL) E 41 In to ° L u a S N (U O O O ca w N •y Q O O O aa)cc 4 y W 4- '� y. O Q O E y •- ++ s. C C C O "O a) N U U' N CO m o •L E ca E W 3 , L T o E a O N d _ Cu � T u (U C 3 ,+_T' 4 N O c06 = > O > > cOi, •> 2 •> m X CO X C O r N S E Ca Ca w N Q N p C O ti0 U O41 t S a7 d 41a7 Cu C O ya O O a3 L O �, +1 L a Cu ° U 61 (v wE Y O 41 M o °' °' � Q c n � Vn C o y m > i s- O ++ U �F O T a) a7 4' O N Q y � bfl C N d V N Q (a S U � "'a a) E aJ. O 00 .. 0 .� ". L .> y''VJ ':a7 41 :fa ra 9-41`: ' 2015-J-41 O o o O O o 0 0 0 Attachment#4 0 Ln 0 0 CD 0 0 0 0 C lzt page8of8 N O' O O Ln uj O 0 N cO O r N c0 00-I W d^ N l ^D li vi O N N OA N +' ' U fC Q [II U O O O O O O O ba O O. O O O O M C O O O O O O OO 'y O OO m N O H M Ln i N �n O tl co Lr N O a N m d0' M N n cN-I rl d' N N •t7 C O O O O O O O 0 0 4:2 O O O O O O O O to O O O O O O O O N a O aO koO O Nn N M � N •N N c-1 dam- En u CL) a �y N a LL N _ O CO O OO O OO O O O M O O OO O �? C M 'a O > �+ UyU O ' ` iO M cN ON � D I) e-1 0- Q N O 4- cu MIaC tL•+ Q .j i •L n 'a O p O o O O O O E fu 0 o O o 0 o O 0 � m V a 41 W O ") - vim-. lND 0 M rn N I. M v ba Ln °� H m N a /, O d' N M L > 4- CD ej c* m d N rq C bA O 41 O N ti D a N p cu Ll to u N t a �. 5 .M c x a E ro (D E ajaj 3 Oa O N O Q. ro > ca [a LL a �. S- � O O O w c� a ID C .3 M > a "a C O v1 �• ro fa �a a p S ++ ro C t6 y yam, ',i U Q O'CL W "C > U roro C O O H U "in v U J Q C U C C v Q t6 C CU O U O D Q- U N v C OCD N t, a o a ro a n ro LU a'f �° � v� m y °a C i a tL' ro �i 6a a ( v u a) 41 .� i M M ;O M n i 'L • L ro ro a L L a N to a z Z �' a) 5 t10 bn aj M s- LL CO $ "x 'x o 'x ro as = a D_ a - o ? m > 5 +caa c i mLU :3o a Cu Ln `a cu ro U 1 y. -En 7 '� •a f, fscu aa) 41 C ° a C O• U - v a Ln � N Z aCl '� .Q N H L Y _ •a L Q. L toQ. O a a ns LL .0 i >:fuo OCn ca = o a 2 a f „ 41 cu � a _O a m s 0cu p F- Q v '+' U Q N C a z U41 3 0 Ln 4-1 :O ..C' a :a a... . LU Y :+-- .. .� - :� .� >' a cB >: •fij,•:c ..mai- a... ..a..:.�. v ' "-'«n: :C3 '- 41_ 'ro 1 Qj C ro s m a .W •- '� •Q- h x. s.. C "O .� s:•..:}jO to v- ..a .'vr c.a U I— � O _ _ +a �. Q E .ul (n +� :�?..:�_ C a �. 'C-N a . O.':vi : ... S- F' -47 'Y. 1a=..::+a''': •.�` "C +0: �O. .,� ,f.�._:Z '•' ;.f�.:� .�': :�.3,,�=?.:: � �tia:'N•:;3 :C:: `=•:+.+.;0•. Q �W.. c0 / .g'y z "'ro:.ori ° o. z.� o m:`�: o a :,a ,� a .a +' a..`y° _.:'> ;o r 0 If this information is required in�an accessible format, please contact The Regional Municipality @ — 2 of Durham at 1-800.372-1102 extension 3560. Rew on e , A. Greentree, Municipal Clerk Municipality of Clarington 40 Temperance Street Bowmanville, ON L1 C 3A6 Dear Ms. Greentree: RE: Durham/York Energy from Waste Project(felOE File No,: EA-08-02) In accordance with the Notice of Approval to Proceed with the Undertaking regarding The Amended Environmental Assessment for Durham and York Residual Waste Study, Condition 3 Public Record, enclosed please find a hard copy of the-following documents: ® Letter to the Ministry of the Environment and Climate Change dated August 11, 2015, regarding Submission of Durham York Energy Centre Ambient Air Monitoring 2015, 2nd Quarterly Report ® Quarterly Ambient Air Quality Monitoring Report.for the Durham York Energy Centre—April to June 2015 (Sfantec-August 6, 2015) The enclosed documents are also available on the EFW project website at the following link: hfti)://www.durhamyorkwaste'.ca/ i Thank you, Melodee Smart, Administrative Assistant Works Department, The Regional Municipality of Durham 605 Rossland Road East, Level-5 REVIEWED U `� Whitby, _- ON LIN 6A3 ,, 905-668-4113 or 1-800-372-1102 extension 3.560 i€?=.�C�teJt11.. ,u: 13-COU::CIL C" 0 FILE Melodee.SmartCa7durham.ca y DIRECT 10111114 0A, ON 1 cor-y Tc: Encl. ❑ MAYOR NIEMi6crPS 1:1 CAO 0`COUNCIL 2 , 3 0 COMMUNITY C3 CORPORATE ❑ EitiERGEilCY 11 � SERVICESSERVICES SERVICES ❑ ENGINEERING G MUNICIPAL ❑ OPERATIONS� �! VICES CLERK'S . ' I ISE T'KING L7 SOLICITOR ❑ TREASURY SERVICES ❑ OTHER I�IPAL CLERK'S r ILE _`I i j 9-48 x• K If this information is required in accessible format, please contact The Regional Municipality of Durham at 1-800-372-1102 ext. 3560. Y"REW011 r August 11,2015 Dolly Goyette, Director, Central Region Ministry.of the Environment and Climate Change Place Nouveau 5775 Yonge Street, Floor 8 North York, ON M2M 4J1 Dear Ms. Goyette: RE: Durham/Ybrk Energy from Waste Project Ambient Air Monitoring 2015, 2nd Quarterly Report (Environmental Assessment Condition 11) MOECC Guile: to-08-02 In accordance with the approved Ambient Air Monitoring and Reporting Plan and the Ministry of the Environment and Climate Change (MOECC) Ambient Air Monitoring Guideline, the Regional Municipalities of Durham and York (Regions) are pleased to submit the 2nd Quarterly Ambient Air Monitoring Report for calendar year-2015, covering the period from April to June 2015. The report has been prepared by Stantec Consulting Ltd. who was awarded the ambient air monitoring and reporting contract for .the Regions. We trust that the report meets the MOECC's expectation and is consistent with Condition 7(4) of the Environmental Compliance Approval. The next quarterly report will cover the period from July to September 2015. 9-49 k i D. Goyette Ambient Air Monitoring 2015, 2nd Quarterly Report MOE File:EA-08-02 August 11,2015 Page 2 of 2 The Regions are available to discuss the report at your convenience. Sincerely, I Mirka Januszkiewicz, P.Eng. Laura McDowell, P.Eng. Director, Waste Management Services Director, Environmental Promotion . and Protection j The Regional Municipality of Durham The Regional Municipality of York 905.668.7711 ext. 3464 905.830:4444 ext..75077 Mirka.Januszkiewicz@durham.ca Laura.McDowell@york.ca LW/ms C. K, Hedley, Director, Environmental Approvals Branch, MOECC C. Dugas, Manager, York Durham District Office, MOECC P. Dunn, Senior Environmental Officer, York.Durham District Office, MOECC G. Battarino, Project Officer, Project Coordination, MOECC A. Huxter, Environmental Specialist, Covanta I Energy from Waste Advisory Committee (EFWAC) D. Kelly, Regional Clerk, The Regional Municipality of York D. Wilcox, Regional Clerk, The Regional Municipality of Durham Encl. is f 9-50 Quarterly Ambient Air Quality Monitoring Report for the Durham York Energy Centre a April to Jane 2®15 Durham York Energy Centre Prepared for: The Regional Municipality of Durham 605 Rossland Rd Whitby, ON LIN 6A3 Prepared by: ' Stantec Consulting Ltd. 300-675 Cochrane Dr., West Tower, Markham, ON L3R 0138 Project No.: 160950528 August 6,2015 9-51 l Sign-off Sheet i I This document entitled Quarterly Ambient Air Quality Monitoring Report for the Durham York Energy Centre-April to June 2015 was prepared by Stantec Consulting Ltd.for the account of The Region of Durham. The material in it reflects Stantec's best judgment in light of the information available to it at the time of preparation.Any use which a third party makes of this report, or any reliance on or decisions made based on it,are the responsibilities of such third parties.Stantec Consulting Ltd. accepts no responsibility for damages, if any, suffered by any third party as a result of decisions made or actions based on this report. I I ORIGINAL SIGNATURE ON FILE Prepared by (signature) Timothy bung, B.A.Sc. ' I ORIGINAL SIGNATURE ON FILE Reviewed by (signature) Y Gregory Crooks M.Eng., P.Eng. i! f` V:\01609\Active\160950528\planning\report\final\2015\2015 Q2 report\160950528 rpt 2015 Q2 Aug_6_2015.docx i I �ft �J It Project No.: 160950528 9-52 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE a APRIL TO JUNE 2015 Table of Contents ExecutiveSummary.....................................................................................................................1. Abbreviations............................................................................................................................. 1.0 Introduction..................:...............................................................................................1.1 1.1 BACKGROUND AND OBJECTIVES..................................................................................1.1 1.2 LOCATIONS OF AMBIENT AIR QUALITY MONITORING STATIONS ...............................1.2 2.0 Ivey Components Assessed........................................................................................2.1 2.1 METEOROLOGY ................................................................................................................2.1 2.2 AIR QUALITY CONTAMINANTS OF CONCERN .............................:................................2.1 2.3 AIR QUALITY CRITERIA ......................................................................................................2.2 3.0 Instrumentation Summary................................ . .......................................................3.1 3.1 INSTRUMENTATION............................................................................................................3.1 3.2 INSTRUMENTATION ISSUES......................................................:.........................................3.2 3.3 DATA RECOVERY RATES...................................................................................................3.3 4.0 Summary of Ambient Measurements.....................................:...................................4.1 4.1 METEOROLOGICAL DATA ...............................................................................................4.1 4.2 CAC AMBIENT AIR QUALITY MEASUREMENTS................................................................4.3 4.2.1 Sulphur Dioxide (SO2) ....................................................................................4.9 4.2.2 Nitrogen Dioxide (NO2) ...............................................................................4.10 4.2.3 Nitrogen Oxides (NOx) ...............................................................................4.12 4.2.4 Particulate Matter Smaller than 2.5 Microns (PM2.5) ..............................4.13 5.0 Conclusions..................................................................................................................5.1 6.0 References...................:................................. ...........................................................6.1 t-- Project No.: 160950528 l 9-53 i QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE a APRIL TO JUNE 2015 i c i DIST OF TABLES .. I Table 2-1 Summary of Meteorological Parameters Measured at Each Station............2.1 Table 2-2 Summary of Air-Quality Criteria for CACs 2.2 ..................... j Table 3-1 Summary of Continuous Ambient Air Quality Monitors....................................3.1 Table 3-2 Summary of Meteorological'Equipment.............................................................3.2 Table 3-3 Summary of Instrument Issues at Courtice WPCP Station (Predominately Upwind) ..............3.3 Table 3-4 Summary of Instrument Issues at Rundle Road Station (Predominately Downwind)...............................................................................................................3.3 Table 3-5. Summary of Data Recovery Rates for the Courtice WPCP Station (Predominately Upwind) -April to June 2015....................................................3.3 Table 3-6 Summary of Data Recovery Rates for the Rundle Road Station (Predominately Downwind) -April to June 2015 ........................3.4 ! Table 4-1 Summary of Hourly Meteorological Measurements-April to June 2015 ...........................................................................................................................4.1 i Table 4-2 Summary of Ambient CAC Monitoring Data-April to June 2015.................4.5 LIST OF FIGURES Figure 1-1 Durham York Energy Centre Site Location Plan ................................................ 1.3 Figure 1-2 Locations of Ambient Air Quality Monitoring Stations.................. ............. 1.5 I Figure 1-3 View of Rundle Road Ambient Air Quality Monitoring Station........................ 1.7 Figure 1-4 View of Courtice WPCP Ambient Air Quality Monitoring Station................... 1.7 Figure 4-1 Wind Roses for April to June 2015.........................................................................4.3 Figure 4-2 Comparison of NO2/ NOx and SO2 Ambient Air Quality Monitoring Data to Applicable Criteria ..................................................................................4.9 Figure 4-3 Pollution Roses of Measured Hourly Average SO2 Concentrations- Aprilto June 2015..................................................................................................4.10 Figure 4-4 Pollution Roses of Measured Hourly Average NO2 Concentrations- f April to June 2015................................................................................................:.4.1 1 Figure 4-5 Pollution Roses of Measured Hourly Average NOx Concentrations- C` Aprilto June 2015..................................................................................................4.13 Figure 4-6 Pollution Roses of Measured 24-Hour Average PM2.5 Concentrations- Aprilto June 2015..................................................................................................4.14 I G I r s� II Project No.: 160950528 9-54 i QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE a APRIL TO JUNE.2015 LIST ®F APPENDICES APPENDIX A S02 DATA SUMMARIES KND TIME HISTORY PLOTS...................................A.1 APPENDIX B M02 DATA SUMMARIES AND TIME HISTORY PLOTS....................................B.1 APPENDIX C N®x DATA SUMMARIES ARID TIME HISTORY PLOTS..................................CA APPENDIX D PM2.5 DATA SUMMARIES AND TIME HISTORY PLOTS................................. D.1 APPENDIX E CONTINUOUS PARAMETER EDIT LOGS.......................................................E.1 �•��-_��,•.amu: Project No,; 160950528 9-55 II QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY E CENTRE a APRIL TO JUT 2015 i ExecutNe Summary i i I The Regional Municipalities of Durham and York are constructing the Durham York Energy Centre (DYEC) which is an Energy-from-Waste (EFW) Facility intended to provide a long-term, sustainable solution to manage municipal solid waste remaining after diversion from the Regions. The facility commenced processing waste on February 13,2015 and is currently in the commissioning phase of the project. The Ambient Air Quality Monitoring Plan -Durham York Residual Waste Study (Stantec,2012), was developed based on the Regional Council's mandate to provide ambient air quality monitoring in the area of the DYEC for a three year period. An ambient air quality monitoring and reporting program was also a requirement laid out in the Provincial Minister's Notice of Approval to Proceed with the Undertaking, detailed in Condition 11 of the Notice of Approval (MOECC, 2010).The air monitoring plan was also developed to satisfy the conditions of the Environmental Compliance Approval and the environmental mitigation and commitments set out in the Environmental Assessment (Jacques Whitford, 2009). The predominantly downwind station is located along Rundle Road,south of Baseline Road. The predominantly upwind station is-sited at the Courtice Water Pollution Control Plant (WPCP).Since May 2013, measurements of the following air contaminants have been made at the two stations: • Sulphur Dioxide (SO2); • Nitrogen Oxides (NOx); • Particulate Matter smaller than 2.5 microns (PM2.5); • Metals in total suspended particulate matter (TSP); • I: Polycyclic Aromatic Hydrocarbons (PAHs); and, • Dioxins and Furans. Operation of the non-continuous monitors was temporarily discontinued on June 28, 2014 as per j Section 1.2 of the Ambient Monitoring Plan (Stantec, 2012). When the EFW facility is fully i? operational, monitoring of non-continuous monitors will resume (as specified in the Ambient Monitoring Plan). Meteorological data is also measured at the two stations. The predominantly downwind Rundle Road station measures horizontal wind speed,wind direction, atmospheric temperature, relative. humidity and rainfall. The predominantly upwind Courtice WPCP Station measures atmospheric temperature, relative humidity, rainfall and barometric pressure. Wind speed and wind direction data at the predominantly upwind location are measured and provided by the Courtice Water Pollution Control Plant, j I' Project No.: 160950528 I 9-56 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE o APRIL TO JUNE 2015 This quarterly report provides a summary of the ambient air quality data collected at these two stations for the period April to June (Calendar Quarter 2). During this quarter, a few instrumentation issues were encountered with above acceptable data recovery rates for all measured air quality parameters. Additional details on instrumentation issues are presented in Section 3.2 of this report. The following observations and conclusions were made from a review of the measured ambient air quality monitoring data: 1. Measured levels of NO2, SO2 and PM2.5 were below the applicable O. Reg. 419/05 criteria or human health risk assessment (HHRA) health-based standards presented in Table 2-2 of this report; 2. Since the Canadian Ambient Air Quality Standard (CAAQS) for PM2.5 is based on a 24-hour, 98th percentile level over 3 years whereas the PM2.5 measurement period at both stations for this quarterly report was three months, there is insufficient data collected to determine with any certainty if exceedances of the CAAQS would occur.Therefore no comparison of the measured PM2.5 data during this quarter to the CAAQS was conducted for this report, as it would not be scientifically accurate or representative; 3. In summary,all monitored contaminants were below their applicable MOECC criteria for the monitoring data presented in this report. All measured levels of all monitored contaminants were below their applicable HHRA health-based standards. II Project No.: 160950528 9-57 QUARTERLY AMBIENT AIR QUALITY (MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE e APRIL TO JUICE 2015 Abbreviations AAQC Ambient Air Quality Criteria CAAQS Canadian Ambient Air Quality Standards CAC Criteria Air Contaminants D/Fs Dioxins and Furans DYEC Durham York Energy Centre EFW Energy from Waste MOECC Ontario Ministry of the Environment and Climate Change SO2 Sulphur Dioxide NOx Nitrogen Oxides PAH Polycyclic aromatic hydrocarbons Particulate A particle of a solid or liquid that is suspended in air. PCB Polychlorinated biphenyl PCDD/PCDF Polychlorinated dibenzo-p-dioxins and dibenzofurans PM Particulate Matter PM2.5 Particulate Matter smaller than 2.5 microns TEQ Toxic equivalent quotient TEQs Toxic Equivalents TSP Total Suspended Particulate WPCP Water Pollution Control Plant Elements Cd Cadmium Hg Mercury Pb Lead Al Aluminum As Arsenic Be Beryllium Cr Chromium Cu Copper Mn Manganese Ni Nickel Ag Silver Project No.: 160950528 III 9-58 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE —APRIL TO JUNE 2015 TI Thallium Sn Tin V Vanadium Zn Zinc Miscellaneous °C temperature in degrees Celsius N/A not available 17. percent ppm part per million ppb part per billion ppt part per trillion min minimum max maximum pg/m3 microgram per cubic metre iv Project No.: 160950528 9-59 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE a APRIL TO JUNE 2015 Introduction August 6,2015 i 1 .0 fNTRODICTIC-M 1.1 BACKGROUND AND OBJECTIVES The Regional Municipalities of Durham and York are constructing the Durham York Energy Centre (DYEC) which is an Energy-from-Waste (EFW) Facility intended to provide a long-term, sustainable solution to manage municipal solid waste remaining after diversion from the Regions. The site location of the DYEC is shown in Figure 1-1. The facility commenced processing waste on February 13, 2015 and is currently in the commissioning phase of the project. A monitoring plan, Ambient Air Quality Monitoring Plan- Durham York Residual Waste Study (Stantec, 2012),was developed based on the Regional Council's mandate to provide ambient air quality monitoring in the area of the DYEC for a three year period. The purposes of the ambient air quality monitoring program are to: 1. Quantify any measureable ground level concentrations resulting from emissions from the DYEC cumulative to local air quality, including validating the predicted concentrations from the dispersion modelling conducted in the Environmental Assessment (Jacques Whitford, 2009); 2. Monitor concentration levels of EFW-related air contaminants in nearby residential areas; and, 3. Quantify background ambient levels of air contaminants in the area. Two monitoring stations in the vicinity of the DYEC were set up in April 2013. Since May 2013, the two stations have measured the following air contaminants: • Sulphur Dioxide (SO2); • Nitrogen Oxides (NOx); • Particulate Matter smaller than 2.5 microns (PM2.5); • Metals in Total Suspended Particulate matter (TSP); • Polycyclic Aromatic Hydrocarbons (PAHs); and, • Dioxins and Furans. This quarterly report provides a summary of the ambient air quality data collected at these two stations for the period April to June 2015. Project No.: 160950528 1.1 9-60 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Introduction August 6,2015 Operation of the non-continuous monitors was temporarily discontinued on June 28, 2014 as per Section 1.2 of the Ambient Monitoring Plan (Stantec, 2012). When the EFW facility is fully operational, monitoring of non-continuous monitors will resume as specified in the Ambient Monitoring Plan (Stantec, 2012). 1.2 LOCATIONS OF AMBIENT AIR QUALITY MONITORING STATIONS The selection of sites for the monitoring stations was done in consultation with the Ontario Ministry of Environment and Climate Change (MOECC) and Durham/York representatives based on the results of air quality modelling done in support of the environmental assessment for the project, the locations of nearby sensitive receptors, and general MOECC siting criteria. Two monitoring stations (one predominantly downwind and one predominantly upwind) were chosen for the ambient air quality program. The final locations of the monitoring stations were influenced by the availability of electrical power, accessibility of each location,and security. Details of the siting requirements are detailed in the Monitoring Plan. The selected downwind location is sited northeast of the DYEC in the vicinity of residential receptors predominantly downwind of the DYEC in this direction, and falls in the area where maximum annual concentrations are predicted to occur. The predominantly downwind Rundle Road Station, is located along Rundle Road, south of Baseline Road. Its location is shown in Figure 1-2. The monitoring station measures all the air contaminants listed in Section 1.1 and meteorological data.This station is referred to as the Rundle Road Station. The predominately upwind Courtice WPCP Station, is sited at the Courtice Water Pollution Control Plant (WPCP), located to the southwest of the DYEC in order to measure background air quality in the predominantly upwind direction.The location is presented in Figure 1-2.This monitoring station measures the air contaminants presented in Section 1.1, as well as meteorological data,with the exception of wind speed and wind direction,which are measured and provided by the Courtice Water Pollution Control Plant. A third Fence Line Station,which will measure non-continuous parameters (metals and total particulate matter) will be installed prior to full operation of the DYEC. As per Section 1.2 of the Ambient Monitoring Plan (Stantec, 2012), the Fence Line station will collect non-continuous parameters beginning after the Facility's commissioning period is complete, and will run for a one year period. Photographs of the Rundle Road and Courtice WPCP ambient air quality monitoring stations are shown in Figure 1-3 and Figure 1-4, respectively. 1.2 Project No.: 160950528 9-61 ODOC987 000690V 0001987 000098V 0006587 Z oo_ 0 7 peoif s°a� F o Roab f �S dl 00\10 Green f C c EU �_w 6 { o O r u Gc R°ad i (li o`+e WOOm 01 e� Id 'AdL °ad c A 1 u I Ba m a m y O - fa' r _o O a sovls -y i 1' S 8 �{anppCKRoad � g _ .11;1_ \ c d o a ,cello Goin i A � vm a 0 j p gi 4 G°�° Road r 3 .0 3 m o 5 ° I p o = 3 3 0 vi u,e a d L C Z L V L V u U a o (►��JJ o a . oyd a Q z Q1e - o o f o y Q o0 OOOC9B7 OOOZ9BV 000198V 000098V 0006SBV �±g S` '—6 2 V:\01609\Acliv\160950528\planning\d:owing\lAXO\Almosphcdc\1609.50.928_Alm_Fgl-1_58e loc.mxd Z A ReV'60c 2013.10.28 By.wales aoocvev 000z9ev 000190V 000098V 0006SBr o� U 1: pe°ti 5`O E a I- ��° BnRasd \ y ovwq ��a C s Q ... � v a � •. i ` � � s -C a) � h O oW r o = c 11 ° o>-- O O Mope o U O z c4 C w 1s- O fir- G 1 m ' HoIwp cs 4 ' g g 3 v e D .0 ro q z r' olu a _ n, U. e S Osb°tn 0 j a < 0 0 v U O d • O O O O d c 3: 3 3 8 jx a 3 � o 1 w 0 I Go g�o 0°�0 °ad 83 0 0 ; a a o o x d m . ° o m Vii' c b 8 LJ S c S n V C O it C" 11// \T- U O O O 4sB8`O�va,9 Poad �(� OOOZ981 0001M 000090V %% g° % 0005S8V U $O w\0 Acliva\16095D5?B\p>onning\ds°wing\MXD\AtmospheiicV6095052B_A1m_ftg l-?-_Rmbianl_Monilor L°amxd � o. 14 Revised:2013-10-28 8y:Beaks 14 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT F®R THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Introduction August 6,2015 Figure 1-3 View of Rundle Road Ambient Air Qualify Monitoring Station J i Figure 1-4 View of Courtice WPCP Ambient Air Quality Monitoring Station i i Projecl No.: 160950528 1.7 9-64 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE m APRIL TO JUNE 2015 Key Components Assessed August 6,2015 EY COMPONENTS ASSESSEL) 2.1 METEOROLOGY The following meteorological parameters are measured at the Rundle Road and Courtice WPCP monitoring stations. Table 2-1 Summary of Meteorological Parameters Measured at Each Station Courtice WPCP(Predominately Upwind) Rundle Road(Predominately Downwind) Ambient Air Quality Monitoring Station Ambient Air Quality Monitoring Station Wind Speed and Direction @ 20-m Wind Speed and Direction @10-m Ambient Temperature @ 2-m Ambient Temperature @ 2-m Relative Humidity Relative Humidity Rainfall Rainfall Barometric Pressure 2.2 AIR QUALITY CONTAMINANTS OF CONCERN The ambient air quality monitoring program for the DYEC includes the following contaminants specified in the Ambient.Air Quality Monitoring Plan; • Nitrogen Oxides (NOx); • Sulphur Dioxide (SO2); • Particulate Matter smaller than 2.5 microns (PM2.5); • Total Suspended Particulate (TSP) matter and metals; • Polycyclic Aromatic Hydrocarbons (PAHs); and, - • Dioxins and Furans (D/Fs). Operation of the non-continuous monitors was temporarily discontinued on June 28, 2014 as per Section 1.2 of the Ambient Monitoring Plan (Stantec,2012). When the EFW facility is fully operational, monitoring of non-continuous monitors will resume (as specified in the Ambient Monitoring Plan).Therefore, the following contaminants were not measured this quarter: • Total Suspended Particulate (TSP) matter and metals, • Polycyclic Aromatic Hydrocarbons (PAHs), and •, Dioxins and Furans (D/Fs). Projed No.: 160950528 2.1 9-65 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE e APRIL TO JUNE 2015 Key Components Assessed August 6,2015 2.3 AIR QUALITY CRITERIA Two sets of standards were used for comparison to the air quality data as specified in the Ambient Air Monitoring Plan.The first set of standards is the limits reported in O.Reg,419/05 (Schedules 3 and 6).These are compliance based standards used throughout the province of Ontario. However, not all chemicals have O.Reg,419/05 criteria, or in some instances updated health-based standards were used in the human health risk assessment (HHRH) conducted in support of the Environmental Assessment (July 31, 2009) - December 10, 2009).These health- based values,which were reported in Table 7-2,Summary of Inhalation TRVs and Inhalation Benchmarks Selected for CACs) and Table 7-3 (Inhalation TRVs and Inhalation Benchmarks for Selected COPCs) of the HHRA (Stantec, 2009)were used as the second set of standards. The previously applicable 24-hour Canada-Wide Standard (CWS) for PM2,5 of 30 pg/M3 (98th percentile averaged over 3 consecutive years) has been superseded by the new Canadian Ambient Air Quality Standard (CAAQS) of 28 Ng/m3 (98th percentile averaged over 3 consecutive years) as noted in Table 2-2.The proposed CAAQS 24-hour objective for 2020 is 27 jag/m3. A summary of the relevant air quality criteria for the contaminants monitored in Q2 2015 is presented in Table 2-2. Table 2-2 Summary of Air Qualify Criteria for CACs O. Reg 419/05 a Schedule 3/AAQC HHRA Health-Based Standard Contaminant CAS Other time 1-Hour 24-Hour 1-Hour 24-Hour Annual ' (Ng/m3) (Ng/ml) Period (pg/m3) (pg/m3) (pg/m3) (Ng/m3) Sulphur dioxide 7446095 690 275 690 275 29 Nitrogen oxides^ 10102-44-0 400 200 400 200 60 Canadian Ambient Air Quality HHRA Health-Based Standards Standards(CAAQS) r Contaminant CAS Other time Other time 1-Hour 24-Hour period 1-Hour 24-Hour period (pg/M3) (p9/m3) (lig/m3) (ug/m3) (Ng/m3) (Ng/m3) PM2.5 N/A 28 B IOC 30 Notes: A. The Schedule 3 standards for NOx are based on health effects of NO,,as NO2 has adverse health effects a1 much lower concentrations than NO. Therefore the standard was compared to NO2 in this report.However,as per the current April 2012 version of O.Reg.419 Summary of Standards and Guidelines,the standard was also compared to the monitored Nov. B. Canadian Ambient Air Quality Standard for Respirable Particulate Matter,effective by 2015.The Respirable Particulate Mailer Objectiv6 is referenced to the 981h percentile over 3 consecutive years. C. Annual Canadian Ambient Air Quality Standard for Respirable Particulate Matter,effective by 2015.The Respirable Particulate Matter Objective is referenced to the 3-year average of the annual average concentrations. D. HHRA Health-Based Standard for PMzswas selected referencing CCME(2006). 2.2 Project No.: 160950528 9-66 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE m APRIL TO JUNE 2015 Instrumentation Summary August 6,2015 ,Nc)TRUMENIATION SUMMARY 3.1 INSTRUMENTATION The measurement program at the monitoring sites includes both continuous and non-continuous monitors to sample air contaminant concentrations.The monitors were set up in April 2013,and monitoring started in May 2013. "Monitoring for respirable particulate matter (PM2.5), nitrogen oxides (NOx) and sulphur dioxide (SO2) are conducted on a continuous basis. A summary of the continuous monitors and a brief description of their principle of operation are provided in Table 3-1 below. Table 3-1 Summary of Continuous Ambient Air Quality Monitors Contaminant Monitor Principle of Operation Range Time Interval Light Scattering Photometry/Beta Attenuation-Consists of a carbon 14 source,detector and light scattering Nephelometer in a rack-mountable Thermo Sharp 5030 enclosure. The Thermo Sharp utilizes a Synchronized Hybrid continuous (non-step wise) hybrid mass! PMs.s Ambient Real-time measurement and a combination of 0-10 mg/ms 1 minute Particulate Monitor beta attenuation and light scattering technology. The unit's filter tape is automatically advanced based upon a user defined frequency or particulate loading. Chemiluminescence-Uses a chemiluminescence detection API Model 200E principle and microprocessor NO, NO2,NOx Chemiluminescence technology for ambient continuous 0- 1000 ppb 1 second Analyzer emissions monitoring (CEM). Measurements are automatically compensated for temperature and pressure changes. Pulsed Florescence-SO2 levels are measured based on the principle that S02has a strong ultraviolet(UV) absorption at a wavelength between Teledyne Monitor 200 and 240 nanometres (nm).The SO2 Labs Sulphur Dioxide absorption of photons at these 0-1000 p wavelengths results in the emission of ppb ] second Analyzer Model T100 fluorescence photons at a higher wavelength. The amount of fluorescence measured is directly proportional to the concentration of SO2. Project No.: 160950528 3.1 9-67 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE o APRIL TO JUNE 2015 Instrumentation Summary August 6,2015 Horizontal wind speed,wind direction, atmospheric temperature, relative humidity and rainfall are measured at the predominantly downwind Rundle Road Station. Atmospheric temperature, relative humidity, rainfall and barometric pressure are measured at the predominantly upwind Courtice WPCP Station. Wind speed and wind direction data at the predominantly upwind location are measured and provided by the Courtice Water Pollution Control Plant. The meteorological sensors at the Rundle Road Station are mounted on an external 10-m aluminum tower and are logged using a digital data acquisition system (DAS).The meteorological equipment includes the following: Table 3-2 Summary of Meteorological Equipment Parameter Equipment Wind Speed/Wind Direction Met One Instruments Inc.Model 034B Temperature Campbell Scientific Model HMP60 Relative Humidity Campbell Scientific Model HMP60 Atmospheric Pressure Campbell Scientific Model CS 106 Rainfall Texas Electronic TE525M A Campbell Scientific CRX1000 station data acquisition system is used to collect continuous instrument monitoring data and status codes from the ambient air quality monitors. Continuous station data is maintained in the data loggers, and data is viewed locally using a laptop and the relevant DAS software applications. Remote data transmission is accomplished by the periodic transmission of collected station air quality data via cellular phone, 3.2 INSTRUMENTATION ISSUES A few minor instrumentation issues were encountered during this quarter. A summary of operational issues.for each measurement parameter during the monitoring period is presented in Table 3-3 and Table 3-4. 3,2 Projed No.: 1609:0528 9-68 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Instrumentation Summary August 6,2015 Table 3-3 Summary of Instrument Issues at Courtice WPCP Station (Predominately Upwind) Parameter Issues Time Frame Remedial Action SO2 None NOx None PM2.5 None Unable to connect to May 1 l,2015 Reset logger on the same day. No logger remotely lost data Maintenance work at the May 13,2015 (08:00- Invalidated appropriate data. Courtice WPCP required 14:00) Courtice WPCP personnel restored Other power to be turned off, power. Rain gauge cable to datai. Noted on June 29,2015. Cable repaired on site but no signal logger cut by lawn Based on rainfall data it to logger.Rain gauge removed to mower. was likely cut June 28, shop for repairs or replacement. 2015. Table 3-4 Summary of Instrument Issues at Rundle Road Station (Predominately Downwind) Parameter Issues Time Frame Remedial Action SO2 None NOx None PM2.5 None Other Rain gauge'full of water Noted on June 18,2015. Cleared debris and replaced due to blockage from Likely blocked from June debris 10,2015, screen. 3.3 DATA RECOVERY RATES Data recovery rates for each continuous monitor at the two monitoring stations during Quarter 2 (April to June 2015) are presented in Table 3-5 and Table 3-6. Table 3-5 Summary of Data Recovery Rates for the Courtice WPCP Station (Predominately Upwind)-April to June 2015 Parameter Valid Measurement Hours Data Recovery Rate(%) SO2 2165 99.170 NOx 2165 99.1% PM2.5 2165 99.1% Temperature 2184 100.0% Pro;ecl No.: 160950526 3.3 9-69 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Instrumentation Summary August 6,2015 Table 3-5 Summary of Data Recovery Rates for the Courtice WPCP Station (Predominately Upwind)-April to June 2015 Parameter Valid Measurement Hours Data Recovery Rate(%) Rainfall 2130 97.5% Relative Humidity 2184 100.0% Pressure 2184 100.0% Wind Speed/Direction 2184 100.0% TSP/Metals N/A A N/A A PA Hs N/A A N/A A Dioxins and Furans N/A A N/A A Note: A. Monitoring of these parameters was temporarily discontinued after June 28,2014. Monitoring will resume when the Facility is fully operational. Table 3-6 Summary of Data Recovery Rates for the Rundle Road Station (Predominately Downwind)-April to June 2015 Parameter Valid Measurement Hours Data Recovery Rate(%) SO2 2175 99.6% NOx 2175 99.6% PM2.5 2175 99.6% Temperature 2184 100.0% Rainfall 1977 90.5% Relative Humidity 2184 100.0% Wind Speed/Direction 2184 100.0% TSP/Metals N/A A N/A A PA Hs N/A A N/A A Dioxins and Furans N/A A N/A A Note: A. Monitoring of these parameters was temporarily discontinued after June 28,2014. Monitoring will resume when the EFW Facility is fully operational. CA cl•� i. 3.4 Project No.: W950528 9-70 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 0 SUMMARY (.-)F AMBIFNi MEASUREMENTS The following sections provide summaries of the validated data and the validation done on each parameter. 4.1 METEOROLOGICAL DATA A summary of the maximum, minimum, arithmetic mean, and standard deviation of the hourly average meteorological parameters measured at the two monitoring stations for the April to June 2015 period are presented in Table 4-1. Table 4-1 Summary of Hourly Meteorological Measurements-April to June 2015 Courtice WPCP Station Rundle Road Station Parameter (Predominately (Predominately Units Upwind) Downwind) Temperature Max 26.1 26.2 C Min -3.0 -4.1 C Mean (April) 5.9 5.9 C Mean (May) 12.9 13.6 C Mean (June) 15.9 16.1 C Mean (Period) 11.6 11.9 C Standard Deviation 5.6 6.1 C Rainfall Max 19.7 19.5 mm Min 0.0 0.0 mm Mean (April) 0.10 0.11 mm Mean (May) 0.05 0.06 mm Mean (June) 0.25 0.27 mm Mean (Period) 0.13 0.13 mm Standard Deviation 0.82 0.85 mm Relative Humidity Max 97.6 99.9 Min 18.2 19.8 Mean (April) 65.2 67.4 % Mean (May) 67.2 68.5 % Mean (June) 75.8 79.2 % Mean (Period) 69.4 71.7 % Standard Deviation 16.5 17.9 % Project No.: 160950528 4.1 9-71 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 Table 4-1 Summary of Hourly Meteorological Measurements®April to June 2015 Courtice WPCP Station Rundle Road Station Parameter (Predominately (Predominately Units Upwind) Downwind) Pressure A Max 30,2 - in Hg Min 29.1 - in Hg Mean (April) 29.7 - in Hg Mean (May) 29.8 - in Hg Mean (June) 29.6 - in Hg Mean (Period) 29.7 - in Hg Standard Deviation 0.2 - in Hg Wind Speed B Max 41.6 37.8 km/hr Min 0.3 0.0 km/hr Mean (April) 14.2 13.1 km/hr Mean (May) 9.4 10.2 km/hr Mean (June) 9.6 8,6 km/hr Mean (Period) 11.0 10.6 km/hr Standard Deviation 7.3 6.1 km/hr Notes: A. Pressure is not measured at the Rundle Road Station. B. Wind speed at Courtice WPCP Station measured at 20-m and at Rundle Road Station at l0-m. At the Courtice WPCP Station (located near Lake Ontario), wind data were measured and provided by the Courtice Water Pollution Control Plant on a 20-m tower, while at the Rundle Road Station they are measured on a 10-m tower. Wind roses showing the directionality and speed at each location are presented in Figure 4-1. The length of the radial barbs gives the total percent frequency of winds from the indicated direction, while portions of the barbs of different widths indicate the frequency associated with each wind speed category. Winds over the three-month period at the Courtice WPCP Station occurred predominantly from easterly and west-southwesterly directions. Wind.contribution from the south was low. Higher wind speeds occurred from easterly directions, and lower wind speeds from the southwesterly directions. At the Rundle Road Station, the wind rose over the three-month period showed predominant winds occurring from east-southeasterly and west-southwesterly directions. Higher wind speeds are noted occurring from the west.. 4.2 Proled No.: 160950528 9-72 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE e APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 Figure 4-1 . Wind Roses for April to June 2015 Courtice WPCP Station (Predominately Upwind) Rundle Road Station (Predominately Downwind) at 20-m Above Ground at 10-m Above Ground NORTH\ NORTH\ 15% 15% 12% 12% ii lr 9% 9% WEST EAST WEST - EAST WIND SPEED WIND SPEED WS) Olds) M >=11.1 E3 >=11.1 0 8.8-11.1 M 8.8-11.1 SOUTH 6.7.8.8 M 5.7-8.6 3.6-6.7 so W 3.6-5.7 2.1-3.6 2.1-3.6 0.6-2.1 I 0.6-2.1 Calms:2.75% Calms:2.24% 4.2 CAC AMBIENT AIR QUALITY MEASUREMENTS A summary of the maximum, minimum, arithmetic mean and standard deviation of the CAC pollutant concentrations measured at each station are presented in Table 4-2. Also presented in this table are the number of exceedances (if any occurred), of the relevant Ontario ambient air quality criteria (AAQC) or health-based standard for each contaminant. All monitored contaminants were below their applicable criteria during the period between April to June 2015. Project No.: 160950528 4.3 9-73 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Summary of Ambient Measurements A ugust 6,2015 Nitric oxide (NO) has no regulatory criteria as discussed in Section 4.2.2 below. There are both hourly and daily AAQCs as well as Reg. 419 Schedule 3 criteria for NOx which are based on health effects of NO2.As specified in the MOECC's listing of AAQCs (MOECC,2012a) the AAQC were compared to measured NO2 concentrations in this report. However, as per the current April 2012 version of O. Reg. 419 Summary of Standards and Guidelines, the Schedule 3 criterion for NOx (MOECC, 2012b) was compared to the monitored NOx levels. A comparison of the maximum measured data to their respective air quality criteria is presented graphically in Figure 4-2. 4.4 Project No.: 160950528 9-74 e _ O UO � , e_ O N d; i- o; O N 00 O 3 \ ^ O V O N M O O �' O cV N O plLO 3 r- - W y p0 O .p U p y t O C ® 0! e O QC7 O Lo � co 00 -,I N O N 00 O N a N O O O O O Li) O O O O O a ov u W F Z C W _ O u O m 00 �. O C C M 00 N M. N 0. CO } '3 41 O O V' N ('') t� O N O 'tet V N m C7 O m a M W =, C v W N U pG e e O Lo u E o ° p N O 4) c d O� `o u") o '�; N O 00 0 No o �t O u a� u a M O u Z ` C e a o c d o �. C a N Q OT C O N Q EQ C a UUX 7 E Q D -2 xxU ED C C C C d W W C d C N N N N d O d N N N d O Z C 0 OaC �n 0 Z V th e O Uo m v y 1 b, 7 D a, � Q� m vii 10 - N a '" a a uo m O gz a Q > >, Q oO (D d � Z E m W E C p m 0).0 a) N O .. O u E > v Q LIO Q. ,— N O ON. C14 FLo E d c L h N D D a d O O � N hQ t- a 9-75 _ ® 3 c rn ' o 0 0 0 0� oo z o Cr � o; o0 o N o C6 c 0 3 c y O O W 0 V Z p ° QI 9 W 0 = O a, = g L N d O .t. r i i r i i r ; N O n O NN C Q CO O q' LO Cl) 'V' O <t LO 9. U a Q � _ W v CN N O; N 'V; Q C'? O N OD I 'V; coI co •3 N LO O 't -O rt LO d Z O I, O p CO O N O Q o � w a U W _ Z V > U o !3l IL ,} z �t C oe N ._ C O �► u Eo ° o o N O W N a r r r r O V C6 O M OLo Lo Q C U v u a Z ~ O LU CO ,_ lx g d C d C ! '> d _ a N d 0 Q C '� N Q; �� C '� N' Q p O ' uS uS E 0 c c c -d E c c Ck. d dC x d d d d C x a W N N d O d wN 'C v> N Z C O = ° u t D O U M ° m w a m m o 0 � � t � N 'Od' N K } E N m � L Q U ° E O v am m ® Q x a ¢ 0 0 z N d � z E rn W = m C: E o ta a ° Q O Q N N v1 Q: O ON LU o ` a d 'D N N dCL N V)i Q t- �1 9-76 C _ O a O � E O N CO L �O CT O CT CT Q- M -,R CT O CT O Q OC 3 v \ r-, 0, Lo O O c i N M N N Z `O N N M oi r Z 01 `C 3 c r W H p u Z O > Of O C O .2 .s O lk c O > n O 0 O M -,TN N Q O w O M .1 N w Q a M "ItN O N N N N N Z LA O N NCV N O Z Q 0 ILU z WO - cc) 'o O LO O N (V fV CV Z i O CV N N CV ON Z w� Q u m W O` .. W pU w u o a, a O "� u E >- p f o o ' vf Lo CD -0 -0 `o `o � 17 `o `o `o `nN Z' O — u V a z m ad O u _ `= o o o a m "O' '> a O' '> 0 0 '> 0 U- v C 0 mp C o p� O vl 0 0 ` 'X 0. 0 0 0 O 'X x 0 0 0 W C N N .D O O N N N N p O p C N N N N p O Z C CCC W t O C = O c v p C O Q M C m V -) a r v z z Q (5 -- s Q u c n Cf m o C, a meQ = Q z z v z Eco C: m W -�- E � a O O h O JD aw E > Q u7 Q O N N o W �17 O N D o Q N D ? u b) z 0 EO z 2 dN V) < Z o a 9-77 e O c� 0 q ^ o chi "O g ry o 0 0 0 3 0 o, o N o ° ° m m O O C v .0 6 LLA p U U U A N C ay o0G a) � U b e x ® o c o 0D O P Z a1 C �0 > cq O u-) r-, O co a, VC; t a . O v -o i � LO 10 LNov p o CL Eo ` LU U m o W O h N o O . () P . N (J C) > Q cm .e 0 N o ' ao " ° o o °i N c6 c6 o aqui o —C16 I c ? 0 ui T 0 O 'x v U z0 z hid 3 c o v u E a� a u ;o� >- O 5a % > O -, N LO a cy: o r . 0 .a aao N0v, c U ° N u a 0 c Im U Q s D e• O ui n W •C n C n O. O Q. O O N _ F U "- U N O Q a, c a C a j' N" O Ni -0 =' j•, �, ,O N 'a N O p> x a a a a c µ x a a a a c N m W C a C 0 0 0 N' a. O a O 0 0 0 w a O O o c N0 Z C Q CL op Fd 0 o ZQ _ O v_0 _ U � E E Z < Oe j OO V) cc U o G `r , 'D O o O P = va >- (Dt ® o N _0 O a ® um a0 � c n 'n O Q E t.L 0- u hu p h N m d E d 0 a m m Z o°' O Q = CL O •6 N •a a- aai Q N o O m a U Z E m Q P W + C C m O•0 N p 6 Q ®) N E > a1 E > v Q Q u> Q N c? j 0 r c ad O N N u O j 0 � O `� CO d QO L Lo E O ? x } U U Q a Z P a) OD 0 N vOi Q d O 2 Q m U 9-78 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE-APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 Figure 4-2 Comparison of NO2 / NOx and SO2 Ambient Air Quality Monitoring Data to Applicable Criteria 800 700 P, 600 •AAQC/HHRA Health- 01 1 Based Standards 2500 R 0 400 Maximum Measured Concentration at Courtice WPCP Station 300 pq U 200 Maximum Measured Concentration at Rundle Station 100 0 Hourly S02 24-Hour S02 Hourly NO2 24-Hour NO2 Hourly NOx 24-Hour NOx Detailed discussion for each measured contaminant is presented in the following sections. Data summaries are presented in Appendix A for sulphur dioxide for each station and month as well as time history plots of the hourly and 24-hour average SO2 concentrations. For the hourly and 24-hour averages, the Ontario AAQCs of 690 pg/m3 and 275 pg/m3 are shown as blue lines on each plot..As shown in these figures, measured ambient SO2 concentrations at both stations were well below the criteria. The maximum hourly and 24-hour average concentrations measured at the Courtice WPCP Station during April to June 2015 were 103.8 and 23.5 pg/m3 respectively,which are 15%and 9% of the applicable 1-hour and 24-hour ambient air quality criteria. The maximum hourly and 24-hour average concentrations measured at the Rundle Road Station during this quarter were 79.3 and 14.8 pg/m3 respectively,which are 11%and 5%of the applicable 1-hour and 24-hour ambient air quality criteria. Pollution roses of hourly average SO2 concentrations measured at the Courtice WPCP Station and Rundle Road Station are presented in Figure 4-3.The pollution rose plots present measured hourly average contaminant concentrations versus measured wind direction (over 100 wind sectors). Pro-,'ect t.o.: 160950528 4.9 9-79 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 For the Courtice WPCP Station, higher hourly concentrations were measured when winds were blowing from the east-northeasterly direction. For the Rundle Road Station, the maximum measured hourly concentration occurred for east-southeasterly winds. Figure 4-3 Pollution Roses of Measured Hourly Average SO2 Concentrations e April to June 2015 Courtice WPCP Station (Predominately Upwind) Rundle Road Station (Predominately Downwind) 0 0 .�96 gg6 330, b,� 30 330 8% 30 590 7% 300 60 300 ` 60 270 90 270 90 240 120 240 120 216 150 186 210 150 Concentration (ug/m3) Concentration 180 030-105 010-30 05-10 01-5 00-1 (ug/m3) 030-105 010-30 05-10 01-5 00-1 Nitrogen oxides (NOx) are almost entirely made up of nitric oxide(NO) and nitrogen dioxide (NO2), Together, they are often referred to as NOx. Most NO2 in the atmosphere is formed by the oxidation of NO,which is emitted directly by combustion processes, particularly those at high temperature and pressure. Exposure to both NO and NO2 can result in adverse health effects to an exposed population. NO2 is the regulated form of NOx. Similar to other jurisdictions (e.g., Alberta Environment, World Health Organizafion),the O. Reg.419/05 Schedule 3 standards for NOx are based on health effects of NO2, as health effects are seen at much lower concentrations of NO2 than NO. In this report, because NO2 is the regulated form of NOx, the AAQC were compared to measured NO2 concentrations (as per MOECC 2012a). However, as per the current April 2012 version of O. Reg.419 Summary of Standards and Guidelines, the Schedule 3 NOx criteria were also compared to the monitored NOx concentrations (see Section 4.2.3 below). 4.10 Project No.: 160950528 9-80 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 Data summaries are presented in Appendix B for nitrogen dioxide for each station and month as well as time history plots of the hourly and 24-hour average NO2 concentrations. For the hourly and 24-hour averages, the Ontario AAQCs of 400 Ng/m3 and 200 dig/m3 are shown as blue lines on each plot. As shown in these figures, measured ambient NO2 concentrations at both stations were well below the criteria. The maximum hourly and 24-hour average NO2 concentrations measured at the Courtice WPCP Station during this quarter were 65.3 and 27.3 tag/m3 respectively,which are 16%and 14%of the applicable 1-hour and 24-hour ambient air quality criteria. At the Rundle Road Station, the maximum measured hourly and 24-hour average concentrations were 63.6 and 23.6 tag/m3, which are 16%and 12%of the applicable 1-hour and 24-hour ambient air quality criteria. Pollution roses of measured hourly average NO2 concentrations are presented in Figure 4-4.The measured hourly average concentrations at the Courtice WPCP Station were higher for winds from northwesterly to northeasterly directions. For the Rundle Road Station, higher measured hourly average.concentrations occurred for winds blowing from the west. Figure 4-4 Pollution Roses of Measured Hourly Average NO2 Concentrations —April to June 2015 Courtice WPCP Station (Predominately Upwind) Rundle Road Station (Predominately Downwind) 0 0 CP Xr — 330 1"— _6%. -. _ 30 330,----* -,30 300!/ r/ / `. \' 60 300/ / �`\ \ ',\60 270 i + J 190 270( _ j i I 90 . 120 240 '. -. � `�__� : 240 x, / % /120 / 210\,. — 150 210 — — '150 ~ TSD Concentration 180 Concentration (ug/m3) (ug/m3) 050-100 020-50 010-20 05-10 00-5 050-10D 020-50 p10-20 OS-10 ❑0-5 Projed No.: 160950528 4.11 9-81 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 i ;l.a Nitrogen Oxicle" (N("),;) Data summaries are presented in Appendix C for nitrogen oxides for each station and month as well as time history plots of the hourly and 24-hour average NOx concentrations. For the hourly and 24-hour averages, the Ontario Schedule 3 criteria of 400 ug/m3 and 200 pg/m3 are shown as blue lines on each plot.As shown in these figures, the maximum measured ambient hourly and 24-hour average NOx concentrations at the Courtice WPCP Station were below the criteria during this quarter. The measured concentrations at the Rundle Road Station were also well below the criteria. As shown in Table 4-2, the maximum hourly average NOx concentration measured at the Courtice WPCP Station was 124.7 Ng/m3,which is 31%of the 1-hour ambient criteria. The 24-hour average NOx concentration measured at this station was 44.1 Ng/m3,which is 22%of the applicable 24-hour air quality criteria. At the Rundle Road Station, the maximum hourly and 24-hour average concentrations measured during this quarter were 99.3 and 28.3 pg/m3,which are 25%and 14%of the applicable air quality criteria. Pollution roses of measured hourly average NOx concentrations for the Courtice WPCP Station and the Rundle Road Station are presented in Figure 4-5. In Figure 4-5, higher measured hourly average NOx concentrations at the Courtice WPCP Station occurred for winds blowing from the northwesterly to northeasterly directions. At the Rundle Road Station, higher measured hourly average concentrations occurred for westerly and easterly winds. 4.12 Projed No.: 160950528 9-82 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE®APRIL TO JUNE 2015 Summary of Ambient Measurements August 6, 2015 Figure 4-5 Pollution Roses of Measured Hourly Average NOx Concentrations e April to June 2015 Courtice WPCP Station (Predominately Upwind) Rundle Road Station (Predominately Downwind) 0 0 330/ •,30 330;/ — —',,30 0 300 i �: 9�r -.� . \\60 300 �� `� \ \60 270 90 270 f ' 90 240\\`\\\. i /120 240\ \ "E� � f j�� ' i /120 210'--_ -,-150 150 Concentration 180 180 (ug/m3) Concentration 0100-330 1350-100 020-50 010-20 00-10 (ug/m3) 0100-330 050-100 020-50 010-20 00-10 Data summaries and time history plots of measured 24-hour average concentrations are presented in Appendix D for PM2.5 for the Courtice WPCP and Rundle Road Stations. The maximum measured 24-hour average PM2.5 concentrations at the Courtice WPCP and the Rundle Road Stations were 20.3 Ng/m3 and 64.7 pg/m3 during this quarter. It should be noted that since an exceedance of the criteria for PM2.5 requires the average of the 98th percentile levels in each of three consecutive years to be greater than 28 pg/m3 (CAAQS) or 30 pg/m3 (HHRA standard) whereas the PM2.5 measurement period at both stations in the report was three months, there is insufficient data in a quarter to determine with any certainty if exceedances of the CAAQS/HHRA criteria would occur. Discussion of PM2.5 measurements with respect to the CAAQS/HHRA criteria will be provided in the 2015 annual report, at which time sufficient data will have been collected to make preliminary comparisons. Project No.: 160950528 4.13 9-83 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE o APRIL TO JUNE 2015 Summary of Ambient Measurements August 6,2015 Pollution roses showing the measured 24-hour average ambient PM2.5 concentrations versus direction are shown in Figure 4-6 for both monitoring stations. The maximum measured concentrations occurred for northerly to easterly winds for the Courtice WPCP Station. For the Rundle Road Station, higher measured 24-hour average concentrations occurred for westerly and easterly winds. Figure 4-6 Pollution Roses of Measured 24-Flour Average PM2.5 Concentrations-April to June 2015 Courtice WPCP Station (Predominately Upwind) Rundle Road Station (Predominately Downwind) 0 330 3301 030 / r \ 300 300 /�,4°0 \~`•`\� \60 270 � � 90 270 1 90 2 40` \ : , 20 240 \ ` _ % /120 \ ~`� --f%/ /1 \ . 210' ` �i''150' 210 - concentration _ _T90— 180 concentration (ug/m3) 1320-35 010-20 05-10 02-5 00-2 (ug/m3) 1320-65 1310-20 05-10 02-5 00-2 4.14 Project No.: 160950528 9-84 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE—APRIL TO JUNE 2015 Conclusions August 6,2015 This quarterly report provides a summary of the ambient air quality data collected at the two monitoring stations located predominantly upwind and downwind in the vicinity of the DYEC for the period April to June 2015. The following observations and conclusions were made from a review of the measured ambient air qualify monitoring data: 1. Measured levels of NO2,S02 and PM2.5 were below the applicable O. Reg. 419/05 criteria or human health risk assessment (HHRH) health-based standards presented in Table 2-2 of this report; 2. Since the Canadian Ambient Air Quality Standard (CAAQS) for PM2.5 is based on a 98th percentile level over 3 years,whereas the PM2,5 measurement period at both stations for this quarterly report was three months,there is insufficient data collected to determine with any certainty if exceedances of the CAAQS would occur.Therefore no comparison of the measured PM2.5 data during this quarter to the CAAQS was conducted for this report, as it would not be scientifically accurate or representative; 3. In summary, all monitored contaminants were below their applicable MOECC criteria for the monitoring data presented in this report. All measured levels of all monitored contaminants were below their applicable HHRA health-based standards. Project No.: 160950528 5.1 9-85 QUARTERLY AMBIENT AIR QUALITY MONITORING REPORT FOR THE DURHAM YORK ENERGY CENTRE e APRIL TO JUNE 2015 References August 6,2015 Canadian Council of Ministers of the Environment (CCME), (2007). Guidance Document on Achievement Determination. Canada-Wide Standards for Particulate Matter and Ozone. Revised (PN 1391)(978-1-896997-74-2 PDF) Canadian Council of Ministers of the Environment (CCME), (2012). Guidance Document on Achievement Determination. Canadian Ambient Air Quality Standards for Fine Particulate Matter and Ozone (PN 1483)(978-1-896997-91-9 PDF) Jacques Whitford, (2009). Final Environmental Assessment, December 4,2009 Ontario Minister of the Environment (MOECC), (2010). Environmental Assessment Act, Section 9. 'Notice of Approval to Proceed with the Undertaking. Re:The Amended Environmental Assessment for Durham and York Residual Waste Study (EA File No:04-EA-02-08) Ontario Ministry of the Environment (MOECC), (2012a).Standards Development Branch, Ontario's Ambient Air Quality Criteria, April 2012. (PIBs 6570eOI) Ontario Ministry of the Environment (MOECC), (2012b).Standards Development Branch, Summary of Standards and Guidelines to support Ontario Regulation 419/05-Air Pollution- Local Air Quality (including Schedule 6 of O. Reg 419/05 on Upper Risk Thresholds), April 2012 (PIBs 6569e01) Stantec Consulting Limited, (2009). Final Environmental Assessment, Appendix C12:Site Specific Human Health and Ecological Risk Assessment Technical Study Report, December 4, 2009. Stantec Consulting Limited, (2012). Ambient Air Quality Monitoring Plan-Durham York Residual Waste Study, May 8,2012 Project No.: 160950528 6.1 9-86 APPENDIX A SO2 DATA SUMMARIES AND TIME HISTORY PLOTS 9-87 ..........0 0 0 0 0 0 0.............. E coi ry f • o 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 o a o 0 n n.+.�vin m Hopi<mooi nm n n N Nn em Hca ^m ....Nmn<i �o'n,no ri raJ'-q rn7 r n^i n.+nm nvn n nmrmi ii am.mi r7.ai•+nn v.mi m n o[ 'o^�~m nnA c'n nn.mi.i.^+� oc mn N mer<�'ri ri.mi.v nnvo'rynv ry ^'^oa m m ry m r a.i H� •��+m N•+m m v�9 n N N n..m N N n ^ n ri c..^7.i.oi Nrm n n rvrvm nn N.+nry nti ''�Q c'c ^ m .�nrn3a� �.�.nMr.i.min n r•+.-....m n �^�o c 1; f qq � n m.i n m.. nm m..m rvnn �n rv.-i N.i r.iv rvm m m m 0 E f 6 .4 n o -�m m m ry N N N.� r N m m N m m N m G 7 ai 6 N m :n N.yo m cry .:o.naa ri A.A 6ev rv.+..A i A ' m. N o m n o.'1<•.m e n N N ry•.•+ n N m m N c E C s f f a 9-88 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 E .�.+ E � a F m eHm����o vni� ri vwlw d,-7 r ry anmry n no mo mho . r1 ry m n n n n m N n o o w n.oi n.t 2 n o o.7 19 Iq n n.t .'�1p n n�n mmn a nmN r�n n.+m.i��m n m w.J rm.�•a•+M^S"� ry n n n n n n N�n n n n n n n n n n ry n n n n n n n S r n . a m�N'n,�mem mnrrn���rvum.ai�n rvv7��.cinn rv.+.i.i.i.J rymm�H g ry n�n�n nn nn rl n.tiN�vni ri.a.i of a.i wi ri ri n n na rryio�m��.me ai n�m w 9 omi r7 ninry�me r.(ry n .i.J.inn n .i rl n a.wi d n omod'^�o m dT Mro.nanmm��..i��.qqa�ianrm.'�yi.e. .i nnn.i.ino�o�'rv^mon ry c m ryryn mmy`'n.i.i o.ni vryi.ai.i m.d m.ni rn7n m m no ryyi nm n n�'�ry n.irv�r n�o o w on a ry e m'7 rim m c m m��.ia morin n m onr7�nino.io ran mnri riri mv�i�n��� rv��.�' uorva.mi-i..�i.m:ono n m n m d main r a m�N u.i�.rvi y.J r�u`ii oM2rv.i14 000.in'`Ym -9 f nnnim a m 44 n gown n.�.~:�Jn oroid.i�o o.oia n"%�o r $ n ` E NN rmi v`�i oirvm o m,114 U o �ry v d n m m.ai n r o A'.�.rl.oini.ima m Z O F Nry a s nm mrnn�m nri F nni.i n.3 tri mn rP7 ri.�+no no�'o^mon ry dv c a c rarf m n nor mnm m.ai�i n'.wi.i o�o 'n^r�m'om v n H H i 9 �D n mrhry n m n n n o N.J w.io..nn.mi rmi a..o n H i n Nm n m e nm n onn�non.�i'inmo.n m.n�: tim ofd•� rim n n on.i n.. •+ o _ omits nn m e nn n Man„ m m.a:.i.o:n.in rv�.i.mi.l.c+ n,w;n E E u 0 9-89 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 c o 0 0 0 0 0 0 0 o E m E.oi li f a orv..o co•.ma o nnm oo d.i umi n nv ry A n ry n n n ry n n n n n ry n ry ry ry ry n n n n n n n o.�n mrm-no oma do n.m:o~�ry ear .44 ..mo 0ouio0omo -oDom „ri..nn rom c o n o.c o o o.R„ndv ..oi v..0 006 o..0 0 0.:oryo P.+ocrt Ma rio 0 000..a ormiom a v o.. ' �o..aoo.:ohm 000nomood0000nmor3o my non g' N 00000..0 00 ov o.io d o 0 o n vmio m.oi min �n o n 0o0co..o ..n00000..~�o6o.m:vannvm ^gym o.. � m o..0 0 omio�P nc oo o rvc o ..0 0 E m ryo m n o m u a e c on o o o..o ....od 00 o E o..o 66,406.♦o norvoo m mo F i 0 0-1.6 0 0 0 6 46 o o c a .n vP�"n.io oa no 00.0�n000... �o o.+�ryNM orn m�v v o 1- n.v o�nc ori o..on com n d�io vo mmmo m n n Z 'o�mo<no g 900 o maoo� om m - -omrva.no 000moonn ao�o� ry ..m n n � o o..A 6 n o 6 Iz 6664 66 mi i o..o n'iry -.m n < 9-90 0 0 0 0 0 o m o 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 o E m E^^ Z yr ^^NNNo.7 r o a m.(o riNummrmn-n rminn n m„ y N o o o o m m N N o o d o 0 0 0 o N v m v vmo N..tei r.i r n o a o �uninwcNimq„��o�e v`^in°' .m:uNrenein�oinmvn� n ry n n n ry n n n n ry n n n ry n H n n n qqn n n n n o � ..um m e m m oo a000 n o Nom v win riN.M.m�n wom ,� N.Ni en mm m m�Ndo 0 oo.rvi n rd m conndnrv.{n onto m nuo da mm oa odo.�noe�ra vNi.mirvrvn.i rv.� mom ^` ne.nN nn o0o exon .nidoem�cNi„ o nno oon a mno votn�rnr.vi'.7rn n m o` m I'�erd�eaddonn o0 o.^io i'�Nn a�Nrninn..rmiti ^ne m neo n.ma"vm�'dvloo.i.Nia ednnoNNria mrin.l n.i ro7n ^4.Nao r g' m n�°�°4nm.�mN o r7nnan nonny„hrlrvrvNi.iry ri m�v� 'n'n`mO ep ry n.o.v orn7.J.rv:on noN 9nuRi M nnri.iNn.i ryoN m n ori enm„e���ryommoonti o N<NvNiH 12i3n.of 2 ryN m mneam�Nami.to vniNdon.-ion%ui°i uNi vni rinnm.Niun N: ^ �o n ^ n 3 m oow��ci o�evi a amn.miN m�ommvnrv.oi.i vmlT o^!N a G E E �n.qn venom eri�Y No n.to o nm:.�o eavni Nr3r nnn '�' am�'o v .i. mu q omi on n�oNNn �nmm nN.N.wuia r�o c '^ r � n n wO f a� n vi�Nommmm�nm n.+noeoon u�ommrr rf nn r:.n � d.i r7uddaai d.i.J.i d.m..3.miduddmmrvrvn.:.:ri mom v .. C a o 0 0 0 0 0 o n m a e n n n n n n ti N m n oummmm�No o oo ooa o om i o nHm.mm .o..a o o oo mmvv.�rv..nrv., mom �+ m o omw®mm 0000mmoo �uNvm.e:n.�inn� mom 0 ommomm�"oa oa o00 0 ''u voi voim n nry nlNrn mom ^ o X s` ooemm�eNN"oe000... .N7Nrvnnaan� mom 9-91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6 6 0 0 0 6 0.6 E .+ E ^ E n..o o o^6 o.nrv.�..o.... '^^mo n.ry 6 0 0 6 0 6 6 0 .6 6 6 0 0 0 0 0 6 n o ^^n.�inn n 6 0 000 0 60 66 m^....0006 mo w g v ^n^ry NnN 600066 66 a.7n n.+.....o mo^ .P:N m•'n n'�'. 0 0 0 0 0 0 0 0 0�...:^ .mi n r m ri ry..i o..o 0 0 0 o a ..nnrvnNN 60000000 ...m....�do66 moN a m n n n ry n n ry Ax 6 6.0 6 0 0 0^m n.. o. = " �mnNrv� ^ 066600 .^^rv^^6006 ^ .. S n " "'�mNmNmn „0066660 6°:�r::.�aoo6 mao., 2 - :��m ^ nmy� 0006 ^ 6o.9.rn7�66m6 ry ......6 .a7mmm��n0 ry r �:i�n o 6 rv6o6o000 66Non..o6^.. a m c f ryr7nNa my6 A F ..0 000000 oou�o 0om.. mum�'a n 0 a Nnn^rvr� ..A..00 .66n^^^6N 6 6e66� Nnrv.y+rvrvry ..6000000 ...nO.. ra r e r ..0 0 0 6 0 0 0 0 0 0..0 ^......Nen -.0600000 000..0..00^o n06 o 6 ..o 0 6 0 0 0 o m......nenli A..6666660 6 600.+0.700..o rvoo "' o ...0 6 6 0 6 6 0.6 ry 6.......O m o n n ^mNN ^6060..6 66.m. ^660 6^ 6 e E u 9-92 v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o v v o 0 o e E E'�^ -o v o 0 0 0 o v v v o 0 0 o v o 0 0 0 0 o v o o v o o v o 0 0 o m o 0 o n o .v o v o 0 0 0 o 0 0 0 0 0 0 0 0 vo 0.............o v 0.v o o 0 o e n 114 n '1 rJ0000mn2 v.jo ruin noai nom o o�o Id, n ry n ry n n n n n n ry n n n n ry ry n n ry n ry n ry n o r"1 o e o o v o 0 0 0 0 0 0 0 o a o 0 0 o e o a o.i v9i m o o g m a o 0 o a o o o v o 0 0 0 o v o 0 oao oao d o 0 0 0 o n o ...........0....a ate.m . .66 d o.......0 0 0 0 0 0 0 0 0 0 0 0 o a r H m H o 0 yN0000mo•"��eoaoo..00'noaaoe000a,a Noo a � ' 000 0 0000�od 00070000 mq�o oonooeo "•aeaoomoo "aoo�0000rvo o a � eo1o'dno�m00009.aa., 000�a rvoo ddoo�o..o oa000.., .aoen0000"o 000..oooa0000 ooa000. aaoo 000..aro "° IqRqq rv000enao9" 0000a0000` a 8 0000mo 00000ao ooeo�oaoo` �meo c f otioa '°oa000000�oaa�oon000` Ao a n o rt o m. .......00 ..0000000.. moron �+ o 0 f i n o m�+�o�aod...o.40o'000.o o rvdovIR m .. .�.�o qr�u .....oao.. 000000vov. n c o r r .66.�..o..o 000000d............. 6000000 o.i..000 oao oaooa00000 ..00 •^ o a' 6.6 00000 0.,o 0 o v o o v o 0 0 o d a o 0 o .66 3 z` i 0 0 0 0 0 0 0 0 oao 0 0 0 0 o a o a o 0 0 0 0 0 0 6 0 n o .66 0..................0 o..... .i o .666666 0 odovvvoo 000 000vo v.. m.ioo a B .666 0...4....o.........0...... E E u u f 2 i 9-93 Figure A-1 Time History Plots of Measured Hourly Average and 24-Hour Average S02 Concentrations-Courtice (WPCP) Station SO2- Measured Hourly Average Concentrations $ao - April to June 2015-Courtice goo AAQC -: - i 600 500 ,0 400 m 300 i c 200 0 100 otih otih otih otih o'�h otih O,yh oyh O,yh Oyh o\ti\� \titi\� \titi\� h\ti\� h\titi\� h\titi\� h\3ti\� °\, Date SO2-Measured 24-hr Average Concentrations- April to June 2015-Courtice 300 AAQC 250 200 c 0 150 4+ to c 100 a) V c 50 U ':�tea.- — _ <-••. r a< ..-_ .t y_.-= .m �:n�� O,h O,h O,h Ooh Otih Oyh Otih Oyh Otih Otih h\may °\ti °\� Date 9-94 Figure A-2 Time History Plots of Measured Hourly Average and 24-Hour Average SO2 Concentrations- Rundle Road Station SO2- Measured Hourly Average Concentration - April to June 2015- Rundle Road 800 j 700 E600 II 500 I Cr c 400 m 300 c 200 u 100 0 O`�� py Oyy Oyu Oyy Oy4' �\yti9 y\� h\"ti�ti �10,ti 10\'Vo\ti 10\"o�ti Date SO2-Measured 24-hr Average Concentration- 300 April to June 2015- Rundle Road AAQI-- r -- -- - - 250 m 200 c M 150 M a+ 5 100 u c u 50 0 O'y� oy� oy� oyh oyh Oyh oyh oyh oyh oN \T, Ib\ti�\� Date 9-95 APPENDIX B NO2 DATA SUMMARIES AND TIME HISTORY PLOTS 9-96 0...0 0 0 .o a o.0 0 0 .0.0 0 o a o.o E m o q F a o 0 0 0 0 0 0 0..0...0 0 0000 o a o a o 0..0 0 ry o o v a ry ry noon. �p'o omim n.i rr�rJn d^�H n n n n ry n n n n ry n n ry n n ry ry ry ry ry n n n n n o�n o R.J m o ovio e,q.e nrriq .n:�a.m:ram n rf r m gnmy�q. eyoNyq y�y rvma�ry w��on n n n e��e e ^ mom °' m menrvmN nm�m ��rm'r�Nen�<Qm�mm:� a'u �:�n:°HN nrv�noo::iry r<mmmm9m°: m voiN ria n n q qon ry a ri.i. q y r7 o m'R a mn ^ qn �mri o o.R 'Aa o��rlommn n ry avmnnmanry N n m .r d my o om o n drorlSni�r^i v a m rvrri r3rimn '9 rni m 4 nn o nrvn m o o^i ns.�.inn ami r'nc magi mn m 1O n -o. 0 E cn o rv'r uhi� o v a m.oimmriy n .rvmmnm `^ n a ma vci.ia o ro7nn m nPym m n c.+m mh v3 na o n r.in mcg m ynn m a ' f y m m yNm mq r; yN2u _ .. ..n „pt!nn.d .!nl y ynN oa n via q�u qrq Amoy e t ti nn a n "' an 14 me.r^.m u 6 a z m-iT m o mm mrrmnmm r" n 3 `'`' ° mnmvmnmem� E E €E C 9-97 ooe0000 000000.. 0000ae0000 Ear E oam0000000000aooaoao0000000ooe. �P rsnn 4r� e � m 9ai�aqoq en n N o m o d o qo u o v nm.nm ry a y m o m ryo a rym n q m o^ w 7 w o d o o N vq q q g o.�m v vmi r�r ry m ono ti n o m w m q N�"r'1 N w,nommrym v nui�NnoNe.7 vi mm��e�vo�mnmm v' N n ymv+v�m n m nm v e �ryvo�'y rim m a ohm o m q�oo _ rgmv�ryn ry �aim v m .. mom:o�noco n m e d O1 m ' n N~n ry o ems:d m n n o o ryi�o o n o o n o o n o n m mgM.inH vni rni.m+� �o moq o 0 oa s o 0 0o m.ni y m m S' ti.-1 ooi�o o mno nnoa a oa o0 0 0o m.m3q mry m v r n m e w,ry m o m o o n o o N o q�Q,v+m�o m orniif o nn oorygo 0o n oa m o q'o^ryryn e N da.n uoi 6 m n ry y n n�o o m oa a m o0o no ^Noa ^ m F n'a0 m'�ry.o muRSA void 0 oo.7 n't q.t a o a o.N rrv�'om ' d E f q ulna �n�ym muryg m.� v;v' oe mnn inu mr�m? RS Q1mn4n14 a S a �mm ry u T�ev o Idrvy�m wt..o nm o m H oN q f nNv m^ mea°i n.v vle comm yo c m.. en�„4can .,m n a"tfim%��°le..nnn o m '^yon m ., i i a z .+m nn v no o n ..n ..n m•moo..m a . mmnm.�nmc.7e m nti.7 N.y nmogo$rn.� non mm.. v m..mmmm mo am mo�rN.n� o om 9-98 o...o v o v o o v v o v. o o.v v o.v... E m F w w mvrw'rn�rmrmnnnn m r''q.e ry ..m...q..r. n 0 0 0 o v o .......o...4........ .... y u a m y y w q e g o m ry n m ro o v� wm.nnw., wwnm..nrvn�� n..n r�Invmvn NN mmmor�o.�m iJ�vtirv:v n vm n�.w.v'.3 rmnm m -� S a nj uol um nnvn a n �ry n nw .. .nn mgnN a'n.N:gn .,.gni mmrjn m m ,z'n'i m. gtim onw n.oanry m.r mod vcq~ nm o men.~:vwl uyin Na .a w.• nm ^qqn °� od„ oma 6- .4 r4+o r o o o. w m��ioryryv+m w m on. w m g o.0 .0..„o.o o v v m o m oo v w ... o 0 0 o m o m oyi 0o v o.a.q+� o�nonoaoo 0000moeoarJ o.7 m 00..oormr�n ... ..........r� oo n w .. ^ n j .o wo oorJ 4.owo.J oo........ my muoiun �� w f 0 0000 oowmor ono . o d..o oy�nua n'gv n '$ v A n F f .u0000�' qN oo o.. o�.�.o. oa m m.r�'ry n m o.v..o m n n e w c WO f �.7nNo 0o rim ..nou`Yicn omqi d u won A< m G - o ry vo o a y y o n.o n ry g o m www o 4.{r'y'nNo��Nmv•in o�'ri du ry ry n wn rvw v. wol'+o.-r n n �r n.�+ni n w n 3 ••m w � w n m i�� n n •r n m w Z 4 2 ' r•N m.��w n ry w. n w w w w ry c ry � Z w w w m o y y n w o rim w y g a a n N o e s n m w, w n o w n.� o .. w .. o v."I n m •' o _ E E o 9-99 : 6 :i ;„6w ;; ; 2m§:2;=:§;;2=G@;�:n;,�;n 2■§=2;;::§�_�=§r,--I a;:: =;4:�;;�::__§_,;„§;,__:,,,,]; ,;;; _ ! =:;;:;___,16§:;;2,=;=�:;;;_;§§ ■§;2 ] =;7§§2:;§;=»;22`=�:=;; .. ., ;2;;: :§l:;2;,;=«;§2;:-3q = :q;;; :;:_ .� . ;_ :;: 9—] OO 0 o m o 0 0 0 0 o m o 0 0 0 0 0 0 o E o E e ry n - o 0 0 0 0 0 0 o a o 0 o a a o 0 0 0 0 0 0 0 0 o a e o o a o a rvn v ma nn rvr�i o o�n n n.m mo ae nmrvnvio ahmq ynge ..rv`nryoq., nnrvrvnrvry rp�nrvnnnn rvrvnrvnnnn n�„ n..n �j mg1mS°�q `��^ < amn m:qn < � nm'1a.rv<-•i.i dnv my^ydory��"�'.�`,��° � ryue n�lo.JR .�t.iHry n m nn nnn.^.'�' :�tir�a dNunonu n rn�'tiryr o m °. q n nnn n�nm�m....^'•fin u mm��'mon tin�mn o n q fi mm� qm �yu.q:�ti n mo.iN v<�'vyimnv<t of ti'n"^'�d m n <.g' m qi lnn 0 y.qa m.qq a.nmgnn�m myga rm•1.+y"It vi�yun � F f .^.Li.'=a<nnrvn��nry n unryam« n um:a�No ry n .7��n ..�nn�^. n,�mmn• n�rvn .. mnm.. "' °' � `o E n°1 nnnn c i E E o s'$s< 9-101 ............................... E n r ry E v N nrvrvnrvnry nnnnnnnn nnnnnnnsan��� 212 n• 11Ini ""amyl '�s n m a ry n'2.ma n�m N on n o�nno �ry�Hm.7mti my o r �"o�" amryry�ar�N m �� Y �°Q • X02 nu�iNN n�r.ie3me rvmn o tivn'+ry aHor rm.''.mio rNir N ^ti rym " n d�d..N''Q ti r7 rynao"i o�.n.ia..rv.ia Nom N�onNN � N O u ogvn o..<oom�t�000 n n � o q„m q ti m N o-12 R m a o n n n „ N f ^ E f . rN.'.�o�tivo Nmmn onN,i��ti�voimar..od 'o^non '� N � O E 2 maminnn.reN n C F a „..1 �tiryz naN�mo .�N mn Ora�� �men O��e nmou�i on ONS n o 6 Z u 4 .i.� O .� m 3 9-102 Figure B-1 Time History Plots of Measured Hourly Average and 24-Hour Average NO2 Concentrations—Courtice (WPCP) Station NO2-Measured Hourly Average Concentrations 450 - April to June 2015-Courtice 400 E 350 300 _. c 250 200 150 . u 100 j c , G 50 0 JL 44;uk! -464w] O,h O,h O,h O,� OO,h O,h QIP O�� O,y 41 6T 4,11 Date ' NO2- Measured 24-hr Average Concentrations- April to June 2015-Courtice 250 m E 200 m =L (- �" 150 r- .0 .r 100 c d U c 50 U otic' otic' otic' otic' otic' otic' otic' otic' otic' otic' ti \ti\ti y\yti\ti \�ti\ti h\�ti\ti o\�o\ti o\To\ti \�o\ti Date 9-103 Figure B-2 Time History Plots of Measured Hourly Average and 24-Hour Average N02 Concentrations- Rundle Road Station NO2- Measured Hourly Average Concentration- April to June 2015- Rundle Road 450 .� 400 ` 350 AAM 300 - c 250 200 c 150 v 100 c 50 otih Otis' otic' otic' otic' otic' Otis' otic' otic' otic' o\ti\� \titi\� \titi\� \ti\ ti\ ti\ ti\� \ti°\� °\ti°\T \3°\T Date NOZ-Measured 24-hr Average Concentration- April to June 2015- Rundle Road 250 , M E 200 -� AAW 150 O f0 s 100 a� U C 50 O ti, }_f" .F _�a.x'�t -&1`"'< <`.4.i-a� ��rP ,.s � ._;Af, otic' 0, (S ootic' otic' otic' otic' otic' otic' 4,0 Date 9-104 APPENDIX C NOX DATA SUMMARIES AND TIME HISTORY PLOTS 9-105 :............................... all.;;;y2;§m#]2222;2;;; ,�a;a:2222;;;a;�;��„�,�n;;„��■;�n =G ;k;; ©112; ;2=2 . .�2;;222;=:=;;,§2:=&=,2n]; ■� � , G _;_;_]; ®@nG .1166 • JE 9—] OG 0 0 0 0...0 ...o.....0 G a m f . �lv 0 m url v v.�.m+rvt a m o......0 .........3..'��me n �Nti"$,9i.m.r°4. 1O..v mry«�mm.'ti.'3' om:a�P.'v"•ootm�e ""'tanmm.9d�nm .91 a n m M .�r ..... .:�mm�." :am aa•`�:+:+H:"''�«��n .. ....a... �'am«gym m m .. .....m...n°3�m�.m m Id 14 NIlzAtP21., .. .a o. ..:.". •� E 3 .m o�u�v°iIn vi w did.rm�'omia�oiif.a v.v mm��.Iti Rn n.mn."^�.m `^ c a O f 9n,^.8m�3rvm�� -------------n o�Nn 3 .maAd,4 a� ry�m ona a m'� i a 5 m R.ci o-k'R tim o.. ti o C en o.. 9-107 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .o a o o a o 0 0 0 o E ry E$^ - ............................... 000 ooao omooaaoo oa ooao ooa.v nrm�-c r.lunn o mm .4 o mm m m n^..7emNyv�rvno ry ".'r1v v�.°.m�nnm n n numie u<n a om„ n n n n n n ry ry n n N n n n n n n n n n n n ry ry ry n n ry n ry M1 n n am z6� iNv o 4 m moo a o„R.a oo'o H m o a o a o m o o n o o 0 0 0 0 0 0 o n o m o n 'm n o n 0 0 0 o a o m o u o n o n...... o4 o... o-+.o............m oo m m n ^ e 00 doom" rva000 oo�Q�� " m neon c f n d,46666 • �.m.n....o.+m c o�iom o m N o n N Q m `^ m a F .J mmm no.+m rvmomo c n m„rl m�'mti a g'N m eo„o rmiv c-1 R .. a cl 4 L .. m .+ c 9-108 0 o m o 0 0 0 0 0 0 0 0 0 0 0 o m o m o 0 0 0.o E m Env rv.. E - o 0 0 o m o o m o o a o 0 0 0 0 0 0 o m o 0 0 0 0 0 0 0 0 0 0 manmmm..m.R m 9,umi3nN�tory 2m.vi`.I�nn24"'Qv n ry n ry ry r n n ry r n n ry ry n n n n n r`y n n n ry ry n o r� Nm o� n ry n o m.qi�o rym�ao iJ.Jn o..nn mO ^ n .�v,hn oym v,r��o a�m omm vK oma o p o m v N q a .ohm o n a Nti m n o v x.114 m.J yiy 2 m °� g1tiyrvu f q ti �, aqm elm vnmoNv�uo^7^ u c E f ®cm. Nnri"' v rho nn n n n o n '1 o,. c m o 9 o ry E E c 9 i f 9-109 ............................. "n vu�n.n m mmmmn�nO1nrv�ev^i<nm mn.m.�mm n n ry n n ry n n n n ry ry n n n n n n n n n ry n n ry n.�n ^^n n.°�n�nR�°"r�v m r ^�`n'�.ei ..nn mw�•o~m n n..ii o..^+.. n nn.�vrvn otiNn �nry nnrrin�n 'n^��m 2 - M�P�n emm., ^ n ^^nom. .. E I f e M.o �N^ry oa. <mo ""eo a menNrvN ��n n <mm.+ n ` n r ^.�.n m.�m �+�. n.+.• .� n nnrvn.. n m m '3 6 O n ^.�n .� ••••u n .r m n n .. m � Z 2 3 a Is 1.,nm ^m q m d., E E - 9-110 0 0 0 0 o a o 0 o m o v o 0 0 0 0 0 0 0 0 o m o o E m o 0 0 0 o a o a o 0 o m v o o v o 0 0 0 0 o a o 0 0 0 0 0 0 0 h mvion v.:aim g q v.qn h v!rim �Aee.� a �A6mnmvm�m ti�m"mm�A��Am m nnnnrvrvn nrvnnnnnn nnnnnnnrvi'�nouano'a I '"Q�"•"Mor" �a�wo��" r`�mnnN n�m m om 21 on a ry^.a-W.4 rym m R no �:mulry v u `?eo" q ryumnu.l a m ^I ..nryry v, yo nm.y a,r.�c n, e ry®Nti^ mm.+^a m �ry o�onaflr " ^ n m v.i rmi mm n .n:.7 om..amldmrmiu u ryw 'v 3 mein ry.. "'nn.7yhh vimryn�u G .�n E S rv.^�v nroim n'........ mm v n n " mria d o ry o4 n "q m 929 n�.m..e an. q v m z n o rJou n�im n ut onouono n n .. 9-111 Figure C-i Time History Plots of Measured Hourly Average and 24-Hour Average NOx Concentrations-Courtice (WPCP) Station NOx- Measured Hourly Average Concentrations - 450 April to June 2015-Courtice 400M E 350 MOE Criteria . 300 c 250 0 200 _ 150 v 100 i U° 50 0 OO,hO,h O,� Oyg O,yti Q, Oyg Oyh QP o\ti Date NOx- Measured 24-hr Average Concentrations- 250 April to June 2015-Courtice M E 200 s 150 o 40 M 100 Y c d O 50 pp 0 ooh Otis otih otih otih Ooh oyh Oyh otih QIP°\y\� I�\tiy\� �\may\� `'\y\� �\ Date\may\� �\3y\� �\y�\� � ISP\� 9-112 Figure C-2 Time History Plots of Measured Hourly Average and 24-Hour Average NOx Concentrations— Rundle Road Station NOx-Measured Hourly Average Concentration- 450 April to June 2015- Rundle Road i 400 = _ E 350 Ilr1t�FC( i rilyri� 300 c 250 o I 200 150 U 100 - c p 50 �► nL +4l� > L11�► 1f , QP Q, 4ZO py p,� O'y� pyo pyo ti\� ti\� ti\� ti\ti ti\ti ti\ti ti\ti o\� o\ti o\ti 4 y\ti h\3 \ti o\ti 10\'4 Date NOx-Measured 24-hr Average Concentration- April to June 2015- Rundle Road 250 , M 200 - - -- c 150 0 4 La 100 v v C U SO 0 Ooh O,h O'y� a\ti\ti \titi\ti \�ti\ti h\ti\ti y\yti\ti \�ti\ti \�ti\ti \�o\V 4T 41\�o\ti Date 9-113 APPENDIX D PM2.5 DATA SUMMARIES AND TIME HISTORY PLOTS 9-114 : ;=2;:»g:;22=2G;2;,=222=72;2;; ■;;5 - :,5;„X222;2;222n2;=;22:n222:: . ! ..,�� . g�za. 2�2 . ; _ n0..: q;2:;222=&;2, =:;;;2=;;;:=;22,;2]=,22;:2:k2 a;G! . .q.�,]2;;G;==;;2=-1.1 22=; ■. , , : ! . ! 9—l ] 5 E^ E v n f ry n.a o 0 0 0�ry a o n o 0 0 0 o ry ry o 0 o ry a o 0 o v�o ry�� ' �'uum�'nm odnrymvP'�a o�'oovni n.��n o r„o 'n^moa ' n r N ry n o m n ry o d e a o o ry g ry 9 n o °' m qn monn«o.o:�voo v.io �on o„vn�'d o o m rP�'o 1 o e n o m w e o v ^+ ^ onnri o dry d un+roi o�n o o�o o.aia nme o.oim ry N e o ^ .2 f ry r�i vn�'a o n a nvo�'u o�v o.Pi�a ry��nov�oa rai.Jo n a $ �d � E 3 Z „ oecni ri ran'u o�.7o a ryao o v oo.mi.�+an m v dr�i e.min riNn.-1m o ao n.m o0 orP�i a o a.iem „ m `19 v o` F i - rynr�vi u.i av'imryo ri�rvoonm o.�v ootionn n e ry vmrydnon .1 o'� n _ q onry a nry.. ry n ry m a.ni rtry�m.. m o m 'a maa ryryo„�voom m .. a ry e 6166 6 6 z 6 o 4�4 ooeo���n ne ry N m m.J m o a m a c E E v J 9-116 E y n o E< f m ay.i rim 12 vo.J u o 2mmn4 mm�nvm't q.vii 00000da «00000ednn0000e00000 mn.. nn«n«nn «n«nnrvnn nnrvn«nnnnrv��r nr�avo.. �o rymry n�ryU vm.�van �m m « o�oo:°�Hn� v e�� ..Q��somoora rvoa ro' a o�a:�a"'^ omoro„oomo "'n< m : Mo��o^�oae`oo��"• ono.ao��o:o < a����"'-an o "•"'"�000..ommo..o m m � nna. eon nom omon��oo�e.:a�o<� 000rvmmo m�am a.i.niom a N'�.�iaaoP oo oov«mono �Hm m e o 0 o N eeon� ..o m o o T ry m o 0 o e n c o o v n m " o0 0 0„o ci o vr�'am m opo v ry o�o aea o �.Pa"om �` m ; f E f v o« n o ry y ono n o n o 066 onmo ry n ry o onry ora.ryiro H o 4 1!o ti ti ry o F i r ri a m m o n n m o o nom n � o v. n o d n m a r3,rm:.v: nye m aoreoe�.�i�a oe.2o nc�i v ^' a 9 a o z e..... nn rvmn V+ n o aao«nn ane 0 _ Eck g n n 9-117 Ery 11 E,n^. ^ F rie rv.+ n a ry o o n nn m v.rry�q..mi PJ000 oo.q.n my n n n�l a n- n Q n T. m v,�mmn'n v v Pgnr'�n v w 1'7m a r�riv nrv.ni u4i r:m m'e�'1 0 8 �'! ri�c dnn�ai ri rl v nrirl.iri a qw mqo n.mi v�bim rni w rv�'H oi�.'o�nm qh rim tigmo v1v Na ci m r R q-1 'Rgnq mN'� n .�i 16.m lim a� �im� rI, e q m,Jn p goNq�o$e °ryr"I.21 .10 � �mnm�rero�mm e< .moi.6 e h rym<a rvr7 a -- .. mn e m ..no ina m�nnnm no m v nm nn ..m.mn c nqa a a'i ri nvia n.m:n �o ti . nq nme Mo my o..m.. o mm r -odd m .J„n mm�v..~ ...oia�..'rgmu�em m:oQ riorvi n mho„ 2 E f 0 o6 a ry m v .:o �qry �'e q mm�n coma a v,a� n a m.. n�vei o m 4„d d emm m d omf m rni v o v m m m o ry n 12n H2Hm.aa 1oo9e.. oti nmN ngrmia c a eq ggnuvimnv�...roan ^ .. qm 9-118 E c g �q o riH n mry�n v pe�'a.1d ru.' �ti� mrm�vi Irl.iome rM1c n v ry m mn u n.+mo�'m"n n.. nn n v n n n n ry n n n ry n ry ry n ry n ry ry ry ry n ry n ry n n n r7 n ..ry <v n n�^me nn ti v ^rrva n v f�m mn hyo oven .7 n n ,. mm nn my v n nn n ry q 222 P a R mm ^ F �q�ryn rd^l r^ nn elm u IL g ..rv.. r'�r .. v .. n .n'"�..�12.. ..I Ir .. sff< s 9-119 E'I v, E^" E �rmmmm m e � Nnam ne'n N pnm a nm a rva m '^o� �o ,.rvrvrvrvnrvrvrvnnrvnrvrvrvrvrvrvnrvrvnrvrvrvnrvnry �n n e r1 m.im _n cl n..a 4pmNvN yo9 a e u4�'imr n m R me nrJewum.N unm mi oRi Rnn�'It P n .1i d ri ��r�e��er��am�N wpm N�;amNNaahm ?R� e.in d.i vpi a r ryu m o u �um�m NNN rhe v m °` 274 m< emro p 'R '-qmnm o n n d a m m R u ry r N e m 9 m a m n a v uni o orvm m n'7 R�«�Rm n mnu��J�i n rvRv�i.i m K n N n O .a.gym uie N.-�o^l.�.i uuhi�o m„mrv�R�H ti v K ri.7u L P E ` 'Io..mpvminn �'nnnN�mii.i.�vrvenmu a vu�'i.i.im N Rtinc`vNn:vinoRr�n rr vmeH'I miNq C!'I a nnn N N < o ry N m n ui aN F r� ey 2 < tJ vi Nmm d e nyn pmmnmev'Yi�RdmNe n<i.�rim ^�ei :1 ' r3.-i vi rJti ,c uiy� nrvmm mNm dNdmNe nNm.J�� m N v v ma+ mm vmi nu�N mnmry v.+�+u m m m r -� r n aNNmapn „ mn onN c N mu<.�..0 N Z Iq cc Nn mmNNuc Nm .+.�u �a n m V uud v um mmn -NpnNnmm .ri.im mma” �ymmm"Zaem'�e4� m E E Y 9-120 Figure ®-1 Time History Plot of Measured 24-dour Average PM2,5 Concentrations— Courtice (WPCP) Station PM2.5- Measured 24-hr Average Concentrations- 25 April to June 2015- Courtice m E 20 15t' c10 0 O,� \�OO�� o\tiy\� 4-1`1 oath\may\� 9-121 Figure ®-2 Time History Plot of Measured 24-flour Average PM2.5 Concentrations Rundle Road Station PM2.5 a Measured 24-hr Average Concentration. April to June 2015 e Rundle Road 70 m 60 E 50 c 40 ro 30 c a) c 20 U 10 0 O�� O,h O�� O,� O,h O,h Ooh O,h Ooh Ooh Dat`� 9-122 APPENDIX E CONTINUOUS PARAMETER EDIT LOGS 9-123 ea;; gg !y7/ i4!4 ;aB4a@ . , • ::;e �=,e�■ , . ))}} )})})) � }/\/ //}\/\ \ 9—] 24 \ !!!} !# ! ■;;@ aa@@m; 7777 7777$! 9-125 3 - e -- sa - 'p,goo SSaSB LLf� �a'f fd,o QS8S 888888 f f g'a f f or d x x x x x 3 E E E E E E E E E E F F F r ig 9 baa 3'0 0 W ___'c� 9126 f { . §» §! | _ : - \ }!!! �!! � �li !■a � . - !. •/\__))// • ƒ/ \\)§ } . ` - \ 7 \ � � { } � � - � � 9-128 c ie - E " E E � c — t 9-129 1 i f 1 ' L L L Q L t Q 0 0 0 0 0 0 0 0 f f 00 0 0 0 0 0 0 00 t 0 0 0 0 00 O 00 O Q V J1 rtl °�m N N N am-I N N N N • N N N Q N N N toil , 9 V d d V 3 0 m m m r= rs ec c c c x x x x x x x x L L > C E £ E E E E E E V E o E c u :.L L n n n r _ •E o oc l7 -- � 9-130 9-131 tr N O .e O E E 0 27 Q v c u C a `o c c � t n 3 r •eye o •� e"e� Z' L� 7E V 0 0 0 vi 0 0 0 M O 00 0 r N� 0 0 O O O O r� 0 N ry 0 0 e N 0 0 ti ry 0 0 m m 0 0 m 0 vvvim ..i c.. ua v w epi 0 c C C C C G C C C G C 2 E 2 2 E E 2 2 E E 2 2 E E 2 2 E E S E F F F F F F F F F F e �n �nnmm o E 9-131 tr i o y E I E Ir r 0 I° o u i i J i W n — n El m � — n �9 I6 N IWC wl El o E ' o rj�� c iry 1C 'w 9®732 Z o - E ' c = 3 3 ¢ o 0 a ° E a O o C - = c n Eo = '^ o E �' _ cl E m 0 E k`a a` c m a a _ Y O E v � E e im = c a w - - a c O V u S — K a a ` E E z' c = 3 v � w a ° E E E n Eo ot. _ a E m 0 a` m E a E E z v c ¢° E71 _ c - w c O V u S — K a E E _ � a W D V �n v1 d 6 D i t i i E - E 8 3 ' s ( . o � E i� I i oO ' N Z s � I`z> � a b I= iE In I{: o v o c 1> u a !� ¢ uc > E �o -E E' EI - C o; as a o E o a WNEON m u 'U cl E m v > o c a u u x E Eo e C a a� EI i E a` t o : n n a`(S 'c If this information is required in an accessible format, please contact The Regional Municipality of Durham at 1-800-372-1102 extension 3560. i Region ' G i i A. Greentree, Municipal Clerk { Municipality of Clarington 40 Temperance Street . Bowmanville, ON L1 C 3A6 i Dear Ms. Greentree: G RE: Durham/York Energy from Waste Project(MOE File No.: EA-00-02) In accordance with the Notice of Approval to Proceed with the Undertaking regarding The Amended Environmental Assessment for Durham and York Residual Waste Study, Condition 3 Public Record, enclosed please find a hard copy of the following documents: Letter to the Ministry of the Environment and Climate Change dated August 11, 2015, regarding Submission of The Regional Municipality of Durham's Waste Diversion Program Monitoring Report for 2014 • The Regional Municipality of Durham Waste Management Annual Report 2014 • Letter to the Ministry of the Environment and Climate Change dated June 8, 2015, regarding Submission of The Regional Municipality of York's Waste Diversion Program Monitoring Plan • The Regional Municipality of York 2014 Annual Diversion Report The enclosed documents are also available on the EFW project website at the following link: httr)://www.durhamvorkwaste.ca/ 4 I, Thank you, _ Melodee Smart, Administrative Assistant FREEVIDWED I STR9DE UT90�9 Works Department, The Regional Municipality of Durham 605 Rossland Road East, Level 5 B - Whitby, ON LIN 6A3 ORIGINAL.TO: 905-668-4113 or 1-800-372-1102 extension 3560 ❑ FILE OIRLC,IOJ IORMATMelodee.SmartCc�durham.ca COPY TO: ❑ MAYOR ❑ MEMBERS ❑ CAO Encl. I OFCOUNCIL i ❑ COMMUNITY ❑ CORPORATE ❑ ENIERGENCY SERVICES SERVICES SERVICES ❑ ENGINEERING ❑ MUNICIPAL ❑ OPERATIONS ILANCES CLERK'S PLA ❑ SOLICITOR ❑ TREASURY SERVICES ❑ OTHER M. MUNICIPAL CLERK'S FILE 9-135 August 11, 2015 L- i Kathleen Hedley, Director, Environmental Approvals Branch Ministry of the Environment and Climate Change 135 St. Clair Avenue West, Floor 1 The Regional Toronto, ON M4V 1 P5 Municipality of Durham and Works Department Dolly Goyette, Director, Central Region 605 Rossland Road East Ministry of the Environment and Climate Change PO Box 623 Place Nouveau Whitby, ON L1 N 6A3 5775 Yonge Street, Floor 8 Canada North York, ON M2M 4J1 Phone: Dear Ms. Hedley and Ms. Goyette: 905-668-7711 1-800-372-1102 RE: DurhamNork Energy from Waste Project Submission of the Regional Municipality of Durham's Waste Fax: Diversion Program Monitoring Report for 2014 905-668-2051 Environmental Assessment Condition of Approval Number 10 Email: MOECC File #: EA-08-02 works a@durham.ca In accordance with Condition 10 of the Environmental Assessment (EA), the Regional Municipality of Durham (Region) submits the www.durham.ca Annual Waste Diversion Report titled Annual Report 2014 Waste Management Division for the activities and progress towards C. R. Curtis, P.Eng., MBA diversion during the 2014 year. Commissioner of Works The enclosed Annual Report 2014 Waste Management Division summarizes the results of the at-source diversion programs on page 42. This table illustrates an overall waste diversion rate of 53 per cent for the Region. Curbside and multi-residential waste diversion rates for the Region's area municipalities maintain an average 56 per cent diversion rate. Improving diversion at the Region's waste disposal sites continues to be an area of focus as diversion is holding at 33 per cent, up one per cent from 2013. 'Service Excellence If this information is required in an accessible format, please contact for our Communities" 1-800-372-1102 extension 3560. 9-136 i K. Hedley and D. Goyette The Regional Municipality of Durham's Waste Diversion Program Monitoring Report for 2014 MOECC File No,: EA-08-02 August 11,2015 Page 2 of 2 Highlights of the 2014 year include the following: • Enforcement of solid waste collection programs through the Regional solid waste collection By-law 46-2011. j a Continued roll-out of the multi-residential a-waste recycling collection program. ® Reuse Day pilot program in partnership with local non-profit/charitable organizations was made a permanent program. ® Battery Collection Program. • End of landfill operations at Brock Landfill. i In accordance with EA Condition 8.8 (e), the Region Will submit the subject report to the Energy from Waste Advisory Committee for information concurrently. In addition, the 2014 annual report has been posted on the project website (www.durhamyorkwaste.ca) and r public website (www.durham.ca/waste) We trust that this report meets the Ministry of the Environment and Climate Change's (MOECC) expectation as outlined in the EA Notice of Approval. If you require any further information, please contact the undersigned. Sincerely, i I Mirka Januszkiewicz, P.Eng., MASc., MBA Director, Waste Management Services LW/ms c. C. Dugas, Manager, York Durham District Office, MOECC P. Dunn, Senior Environmental Officer, York Durham District Office, MOECC G. Battarino, Project Officer, Project Coordination, MOECC L. McDowell, Director, Environmental Promotion and Protection, The Regional Municipality of York ' Energy from Waste Advisory Committee (EFWAC) D. Kelly, Regional Clerk, The.Regional Municipality of York D. Wilcox, Regional Clerk, The Regional Municipality of Durham �1 r i 9-137 j' 1 If this information is required in an accessible format, please contact The Regional Municipality 1 - 4 { of Durham at 1-800-372-1102 extension 3560, i Y0A Region A. Greentree, Municipal Clerk Municipality of Clarington 40 Temperance Street Bowmanville, ON LIC 3A6 i Dear Ms, Greentree; j RE: Durham/Ygrk Energy from Waste Project(MOE File No.: EA-08-02) In accordance with the Notice of Approval to Proceed with the Undertaking regarding The Amended Environmental Assessment for Durham and York Residual Waste Study, Condition 3 Public Record, enclosed please find a hard copy of the following documents: Letter to the Ministry of the Environment and Climate Change dated August 10, 2015, regarding Submission of June 2015 Complaint and Inquiry Logs • June 2015 Project Team Direct Contact Log • Letter to the Ministry of the Environment and Climate Change dated July 23, 2015, regarding Submission of May 2015 Complaint and Inquiry Logs • May 2015 Project Team Direct Contact Log • Letter to the Ministry of the Environment and Climate Change dated June 22, 2015, regarding Submission of April 2015 Complaint and Inquiry Logs I • April 2015 Project Team Direct Contact Log I The enclosed documents are also available on the EFW project website at the following link: C http://www.durhamyorkwaste.ca/ Thank you, Melodee Smart, Administrative Assistant ,M Works Department, The Regional Municipality of Durham 605 Rossland Road East, Level 5 REVIEWED BY_Whitby, ON L1N 6A3 ,. ORIGhePL70: 905-668-4113 or 1-800-372-1102 extension 3560 ❑ C;r,IN ;I. r ,�N ❑ FILE Melodee.Smart0 durham.ca olr7rcnaN iiia !{rYaN COPY TO: i ❑ MAYOR ❑ MEMBERS ❑ CAO Encl. OF COUNCIL ❑ COMMUNITY ❑ CORPORATE ❑ EMERGENCY SERVICES SERVICES SERVICES ❑ ENGINEERING O MUNICIPAL ❑ OPERATIOIjS ' SERVICES CLERK'S PLANNING ❑ SOLICITOR ❑ TREASURY SERVICES ❑ OTITP 9-138 r' i d LO L (A T T O1 N c CL �p 47 W QT T +J c C q � � T W O O (6 N O N j f) m y v c �0 O N m c N a) o O E a) LU a) o N 3 c N N 3 Y C O d C'= O N 0 p. oar a } w Q } C C A N O N 4- 7 N p N O 6) O sr3 w N O N 'O C 'p N Qb w i 6) O O N a) N C �E O N N 00 U N O p, O> a) ii a N CC D O i o- C V p C C eco a) + cca10 to d) y 3 a) N y O �y7o' 0^ p C 3a) 0 CN7w O . - N a0 E QS r-—. N E. O EpQ— �NO-NfNN+ C � TaE E o 0- 0 :3 �d 'IE� o i'd)) ;at0 cif4 4 N ?,a.'�ti C bl W�" O N 4 T C C N C N l6 4 E2 'O E (tf 0 •C O O C N �•4- O (6 O c �'� o `m aim o r'� F � E `° ��t °� N �•Ct l6 O N t 0.+' p 00 6) 7 4) N'�LgO a'a a)CD O C N a) 9Ua� ac) tiQ C7 t9,- ac) ? ccaL° - (dEan Ea c A m mo e a7 c as coa ILD OC N O G w CL— cr OCL U'n. OQ) Npdp)UN ) O E N dO - C CL 0 91 .O�3 C C ENEQ '' . E N 00 cmO(V E= C 0 EN E Oo X(6 O o.n 0 C a E A V �Q Lw.. O!-ar-s N a .0 W O ID N a� (a a) a)am O J CU O p- C O C. a) N' 8 C O C N C C C O N 'C p(6 N N O T C C y7 Y E rnC Qo Tc d m S BOE � EE (6 US E V �. U Nr O o a. a A � 7)C) 9-139 T N R v r, o 40- ro U L W O O N 3 a> v_� rocvc ° o N Ero o m cu m V '�roC 5d3QO°32 ro m>to = v'ro E m23:mo O -cN>..+LY+ +`oEC0+L OCm !2 0U U oIIE C 0EroO -(z E v•o4)oo0W 0Eao0 4e �dd oo tam3_i Q_N °nv �°o4�Q300cEL-vU > 'oo aro0a�Vro E C'.i'��i/. —a.tOa�i `mcOo) w Ec'C ccaai nval 3roiaoui3ro caroroUQL7v�Oo>)s�dE.. ,O> w C00Y � oN CL 0 oU rooG E z= 3 >000CL .Y �m -0z E c ro Lo 7 O Cro 6 co, p w• O 0O - N 1� Qw [2 Eo WO 0 `oo6Ec' oC� Om � +=• Q1 y Q';.0 N aI 3:p N �• N O O N yO � E'�' a) T >JR C U N.aO.§� p d� U N � f � Ey so � � 0:F3ZZ �a� > o2ca a ro rn o b arm i�.� 0 Qv a °is o� 0 > ro v m E 5 ma)- o�� E.ca3`'t0 oL � caom EtNco `°� . QE o r` -0,5-0 c a�= o >o Nn 0 y ro 0 �o Z o?w E 8 ro � 3 > a ai$� ��b E� Davi a`aiU avi f°°ate � � N D 24 y000am �ioo� cca�U 3a� o ESE ro� 00, O Ei O N 0 0 0 U U U 0 0 0��q7 L O O N K O 5 E O ro C N O N ro'O ro a 4 (V_— Z U E Fn M �i U r'c- U fA U CA 4i Ic n.. C O CL e N (A O a +' d p � H � ' I Z I d U H Q) I Q 9-140 O C � 0 m 7 7 Oc a? i° 7 -a t1 aci > 3 3 c C) N 3 m c U o N,p N co Eo a� o c v o w�€ o¢ ym W EE �c v iu 3N y co ° E Q Y 9 8 � >- ° o c Id cE0c,--.3 moo E N occ0 � r' �- E ' mai 3 E! � `° c*- 0 �° o p is �nC a T 70 O N 6 N mom° c N U °.Ca U U T 4G 0 b Y 7 a U N ro.o.o a,ItC;.: .fico„¢... c No. cca�� > n �°to5'6om op ° y ao - co .c �o :ECL- 0 ° E 3ya� a) R ocv � c C v ° 3E005Lai � cNao w 3'G aoc�i E m* aaoianc a�iaZ c aiE E �� t N oSN:GoEoroc � rnL 7 � 0 o !� a N r c N o oc r- -0 >°, >, coiuim v cnNoE �yco'ro 0, v~°- Eo Ecoromo 0 E x >00 CLa)CL U c o ami o aci �� aCL ami N m' S6 N N.0 w E Y T ~ T r r O N N N f-• o�n� - c X � Ooo c 0) -2 can-2 N ro E c P3 a w m- u•o cv 'o m>- N E m+° m e 2 rn o CL -0 3 w��0 1L o�Ds c �� c o o a� c a� a� I- 4 I- 1- U o•❑ o•m d 0. 4 0 ,C at .cr c 43 C C a N C CL U ). 0 cu L N. r a a E 0 0 n v. E H o U N a O : U � 0 C U 'm "O E o °- r a� v 'a a; A u =- N 9-141 i M y � d �n LO C w N N � O o ai o T N O U E'o N• ? p O cox rna m c W n L N y o 03 0 coCUU) 0a) vi O W o o a } 3 2 o 2 7 y j c a Y 3 N �=�u�cod a I 0 o f c o o c o -x rn v !d m o c o T3 � o mom oa c' eO o N rnR = cq� oZT � .c Q ol°Y o N civ 0 0 0 0 c 0 mcc� vi °� coio o m =� 5ro3ro� oE .000 c i O c � ;aoo0 ' m ~Oa � � �c R E 0 m m E V(,; o o. a o E c Ta ro� o ti. N= 0 c Q T as in arnrnm c o €o io c roE cco �o asoma CL �Lo No :Nirn o .4: OHI tC. c t0 a O N N 0'0'S~ U 7T N C O ,p t, N O �Qw E t. N O O N;p ]p N O*' 4.) .c f0'c c6 N :G zC Q T 0 AI N L > Tw b ' O 7•O O'C A Z 0 •O N 4� `off=c•ao m•+- c� c.c E rn o >`o -0cM,y. 0 U) ao " oQ0 noo oc3 ��v° occ aoi E o� � moc z °' ca o Y N N c 70i T O '•EG'O p7 Y U E Y T N � O w N 0 0 0 N c L 0 4' c ,N a0 C N N+5 C N O L= U (N6 .0C O O N E - 0 .c a0+ O o m N 0 0 0 0 C 0 N I-• {- r-Cl N M 4� F- n. U f-•C N U a a a� U.c�-•W� �.. N N 6 O 0 0 0 l6 N U 0o o� E (1S � r- N N O ° y N a oc 0L Q � •a W c tr- N O co c• E R 0 O arc o oT� oc0 za�ic (} C rna00— c N �iw m .c- N coa o `c ` E_ u m._ f -m � N o s .c mo�c {v r- m .- 'r o iut °> m o U1 E N cEo o pp zv � ao m o Tw o o c $ L 8 4roc04 00 9 o 0 3a o rn? Q O O O N 0 � O r lff L T a p > � t�a�im � Dai 3 o wE `n 3�o E. G o o f- > 3 "'o: O CN.q � o - N"CNM { V > N a E C �'� p aci 3 ov 0 vroior- Cc aps•_.- Em..0tp 10m 3 > �:�t0 o m O c c N tr- 0 0 0 E0 0 0 > E c o N ani O 0'0 N .. N a N15 U C c w as O E 0 c c o s �., S LL N C S r N cV fM a d' (J(D h ctl U �-• H W (u V N a O o 'a R 'a 9-142 � is Q. Q 5 a) m a a v- r N O) 'a L �ro C •fl N O Y C O� 4} C O, '7' J---C N O a% t., T 'O N a. T O 3 N O C t.. N N 3 ;C .5 8 Q rna>i o fl Q12 r y -' o � o E �v c Ep•y+'^- g o 0 0 0 `o_ v 3 ro E c�a v'S o'S O hoc � > � � a) o� Q c °) c � o y o3 coN roNrn- ro L �0 c o E E o O Q or' p 1 L'3 °� E o v a) E s_,E ai 3 Q .00.0 dF a 0 E N o=� �� Q E oU c O b Ea E as o c ro o n o Tcv c o o f E 0)> N m m m m w o ro m m CD c d k o c 1d rnm � o ��0 �ti�� a carte w :3 a) OcoE� 2Em gc N O' y O) � N y'Cj O W� O O :�w-� d Y U C a m EoFa� ;: o'to)voa � E ba Q1sw9cN cayi �� o d � NroD0 roo � ro a) cNma '3 c sofa � N > � 3a rn. oc oa .. c a) ro c �' nc roc Koro 03 t° y r ao roo = a anio N0 > ncrnC n y0c� > oU� pro. " c o a c ro O N 41 a N ro ro N C C p,a) N'C - N �OO ,Op'OD O ` • v- > y > N N•C 0 O a) 3 y 0 S' m 4- N,p ro 0 ro O N p, maoi > Oo `-04)ic0q W n'ca� � ¢ ��� owca y w � GNI 3Q0co�� rn �.o � L� 0 �� �NoE`F w oxo N a 7.CI E :p ° E 07 a c N T O N 0 0 3 �f 0 0 Q c aniE o o �,� r m` ccn aci E? w�>- 0. c N a°)i > ro E � Qo Qoc Em� nc�tn yt_Arov >-,Em y3oEt a E)Ecmo �a `ma � m � 3 °c3 >� S �� ccLayi ooacis3 07 s.. a 4 N C.O a) ro E ro O U C ro N > C•C a C 0 7 -0 0 O ca QZ� ro ro Edi E rn(D rn Q ro d c a) ro �� � DJIF2E � N y 0 d• �E= ro a) ro oma m 0 a) o c v NTE EI�v c °kc c�ia Eq v¢ }c w aa) n c`a t�-t� rnco��Q uoi mvv�o-Y to c .0 aci > a) �cE of C c ro oc ro 3 E o LLo y C ca o .O o)a� O y12Z oa) E (Do !s N ro O'O) Q Q O O N b1 O—.0 ,U v��N ro� E � . Gyjl s m � rn m a);a Q aJ�+ C y C•p w N N O OZ NN c O)O Q ro 00 a € E 3 c ro� y ro ,-7 roy a E t>a3c3E 't_30 o O 3 c te)Ec aNt Q � c t i O m aw o"' o 49 E 0 000 F > c8 gym w66 o Z O= a) Q•O` Tw ?� C O Qy E3a)� � Eca oo 'i N Cr'3 U Ao Y Q C� :t O % aI e- N N N zF Uo ,a 'O O O 41 � � d 9-143 t i d b a i i I o I o o LO� f a E k N G y�y � I I a k c CL c� e N W LZ 'o U � E E i o a c �a ''E E E " a a N N C O O O ,p�j r c�7 O > V a E V O O C w O +�+ v v ACL CL E �. v > > E E p O 49 9-144 is F° I' W) 50N N N N Ll CL co 06 t- a w m m C co `o pCfm °o a c = a U rn co EW = , d d d d o O` d c c ro L > y o Q n c p c m o an d c Np w o C W Q E 3 Q E1 c 3 nen c c 3 d > E o n O W �_ 0 0 md0� °�' W mIs :a20E oocco � ok. a� cofl,c do N. Q m3 � oNopaa�i n �am � � � 3cina�i tr^d m _ asp c E c� � ofmin o fl �w m 2.2 0Z 'O po (�t�JwcU .. oc� y dyry .E co dG3dN atr p N U d C O O .fl08 3: b +r7 O y 0 _ j N N O co N N C �,.Q O N N O,Q Z'u W GSj N lII w N a y Y O E V nb U n,N 3: d U 2 'g,3 d N f�,�4 o w•- cm na d O S' �� dmns� ui� � adi a�ioZLL� cco E E � � a2U `oo CL •� n a ro 8 >,Q,E � c"N r:.o n m = t � oro•o� � (GDy fl cA o ') � 6< � � c�� E a o o TE aro ti. �Y'cd�> •Y�f C+-d+' md 3d ip m'0C•031 > � > d`N LN(uQ W N UD naUdd NC i] fYdT�dOU VC r- ON 4- w EEooN o a 46 d n W E- 4 L, oo o cCoco o c pCL � € � m o7Emm a) 00)to nS � : 0mo � aU� 0. �p Cl. c aa) o d d 0 o Ern E `-'E � V U C N C .�w O E Upa d .� Nro N ? L w d d— N d •• ?' E U E C O >:a o c m C. Toc° 0 a�i � •c(J1 a�o E t Ol N C d O N N d 1 C n a d N II. (6� O N 0-0 Q. C7 0co d N d dG 0 C d '�ij (V ocoEto 'nro O X30) zA � �� c ro o•�' N Q c � N EIS 'N >,U U(0 d N 0 U).0c cu d) Q O d E Y v c E o a 3 ca m W ca m U aEi v O > cc o NCD 3 U d o a n- 10 u> a C) da+ � N N 9-145 � r N M ' I LO La LO N r C) C N N N w N A r (V T T T I b w m c v 3 c ro a yCy Ln L �o oa �o QN. QTc 3 mo T 00110 ova-L ELasommm ni.r O lllY ova ani vi W ter~aoi W M vQ � dro o as w7 � oXa >•n ` EoUv 'dn� a V off" m e 0 vi o 'a>� 0)c Lo c O Q > ' i s r- 0:3 > y o 3 o?i S,-0a >r o� id ro � 'D0 my� vooi � E'oEyow €� C 0. 8 iG�1 0 ca�.0 E a.cr 7^ 80- �A , Eo w0 >,- E .ro, N aQioFi c -co., ocNa O. Q•>_LD to y. C'p 7 O OI N �. i n mY Ec 3,m n F o / o �O � o T uic 'om o_ a jaO0 OOmECL c cn.a, W I�1 >+O to U N N T 7.O J, 'D L— 8 TJ a� Lc 8,0cafl L rnc� o LOoco- m c Ev� oma> TE— Ewt .. ° N`aoS yc , o wOUoo m o a) o o o Eooo-�nacrnC'Om~ es ~>'WcN >1 T•Vrn9,Nca� .i pvN v Urov O o „w C U C w UO 4rNc- 0 Oa) - ns cOa QOE_ �oao5.~O 0 C II - aE) c o.0 Ex CL �d o c Lo m y m N ca N Y O N N om.O— �• O) a) p aI Mo Rf O �j cr . E w a� o O E O as .� 0 T= o (D oQo to c Ic o (,D a) to c aa) 0 Y C, -V m m rnU'c � U ` ..c N N X -: c a O = . 0 E W N N a L O y 'U Q .0 `a3 N w N m O � C v c o Lo E9 D o rn 0- w - a Nw0 o N >'y •� O is C � h V c° oo W a a��a� � via .fie t �Us� X o c :o, v"'' cw Sas ° E c N O O.o i-• O 3 i. ca a IN W.O O c m m coo � yII E:F; �a'y F 3 0.5 -0 m °Z ca E ca ? 10 d t7 � > � W o -T) 3 N G! 10 O O NN N 0 9-146 I' U) m H C. La v o -ca c ,,, caam cN � O 'o o Q O V a YN cC ow@ao E= = ooo ,r-- .0oA o L f2m a)G � ° n °a cc tp d) Q C�0_ m� ocaS oa>� d aai v °�w >a2'ro oa: o E oEQ it�omw c x oU R! cn � c`yca E C CEXoo`.,� cnma� vW o om +.• �p W, >,ao o � nuc 8�Uc °� c �U� a� c8� cci �U 41 c m O cT N o ° a m'° U"'� °w WEm +" Q 4 a� c -sa U c , o o cw ° a> d N 00 En o E mL mco Sworn>- c0ma- mw rn� d � � cE y cw D aNia�cimd�.3 °��'maaiaci Pd ca m cn d a) > rn� U m c Ew o m '.� 4.. � mNoUN ,��. rn ? E N o0 N � c co aai m+3 a �°0;�z 0 'o, 0 S:-�;s +a"0 >> E ❑� R, E � aai C o t o c �° E co�.�� rnac c c c 2 a v > ;- c B `Q+ 2MEflc10 E � k � a maNi u�iE �W` Qa � nm� �mlro- 0E !I) aEi�P o N c o� o ° ate«° °LL E° °Uiu ra= E N 7 d no om a ca y m N�O u3 c -i'U ° w m OEO @ E m 3 d U) c9 c m X o c a� aci a Cc,-, 0 aai> aro m c m o v;w- ywo O1 o._=:'-;2 rnnm > c U -g Fo N E rn rn o a o E g L E w y o o Q o rn m fl v o m m U 0 a c Q' UZn �d� �° c c a� m�w y ctic'E o aEi ccamEo -a: 0.0 ' c omOU a) OUco Y ro 5 C 'a cr C O G. v e N 'U 0 O a p O U h z w U � O O � d 9-147 C2 I ' t � 2 i w I § � � ■ . CLR � . ; . . � I § � � 2 § m o 0 0 o g 7 2 3a© 2 ƒ § g§2 * § E 5 ® mss ; » &{/C:l � $]f°7/) (D C)a) ° /k4 4 t k =k ;%2$® � /MC) \/ . [ [ § ( « 5 t . £ � 8 0 � .. f. CL ® ID 2 e e � \ 0 ® � � § § \ \ k E E § / g § \ • 2 2 / k § ° w / 2 J E k r ) ■/ / §- § § S k \0 0 % ty F Ek k k k k k k 9-148 \ R e e R e e 1 M1 If this information is required in accessible format, please contact The Regional Municipality of Durham at 1-800-372-1102 ext. 3560. Ybr Region June 22, 2015 Chris Hyde, Manager, York Durham District Office Ministry of the Environment and Climate Change 230 Westney Road South, 5'h Floor Ajax, ON LIS 7J5 Dear Mr. Hyde: RE: Durham/York Energy from Waste Project, Submission of April 2015 Complaint and Inquiry Logs MOE t=ile##: EA-08-02 The Regional Municipality of Durham, the Regional Municipality of York and Covanta are pleased to provide the Durham York Energy Centre April 2015 Complaint Log. We trust that this meets the Ministry of the Environment and Climate Change's (MOECC) expectation. If you require additional information, please contact the undersigned. Sincerely, Mirka Januszkiewicz, P.Eng. Laura McDowell, P.Eng. Director, Waste Management Services Director, Environmental Promotion and Protection The Regional Municipality of Durham The Regional Municipality of York 905.668.7711 ext. 3464 905.830.4444 ext. 75077 Mirka.Januszkiewicz@durham.ca Laura,MCDowell@york.ca LW/ms c. S. Thomas, Issues Project Coordinator, MOECC P. Dunn, Senior Environmental Officer, MOECC G. Battarino; Special Project Officer, Project Coordination, MOECC A. Huxter, Environmental Specialist, Covanta Energy from Waste Advisory Committee(EFWAC) D. Kelly, Regional Clerk, The Regional Municipality of York D. Bowen, Regional Clerk, The Regional Municipality of Durham Encl. 9-149 i • � � N tO 0 N M Q 0 aI LO �0 j E ?� al-0 G N O W O+- Gv< s Q ' >0 -0 E 0 N E� 0 0 0 o M>' N3o2a£i � `a L !t! o m ro c m aoi ro vi O c �w W c .00 b co o ?ro ro m ro m i Lir V al C U y 0 `I C ro C :03 f N cn va0 Cobi Law} o �v cGu � •�� �fu T�0 (D do (00 aa) i,•N rnro co•o �Q �� H t m w aam a) o I 3 O .O ro N O a..?, 3� U` H� vO roUO•aO m m U—t a L N C E FL m T'C m � N ro•p U� a ro coO � 36c C �o 12 c y aN ,F W.0 a o >- O U s � o N m=� E q) `y Wsrooro a� 5 'a � O3 td 0 � � ro 0 a � m >tp 3 ! o ° > N01 I o U °= En•w 3U) ° 0 0 E � caxE E Q �0)oCo L w N F- 0 v -0d0a o .0.YoO S Lo C CG W N a c>6 N N 'L G _ O O _ O' c N N Vc'a 0 o v _ (D R N o ,a O O O o C, C i cr 'o 0 r- m L) 0 D A to m m 9-150 i GANARASKA REGION CONSERVATION AUTHORITY I MINUTES OF THE FULL AUTHORITY May 21, 2015 t FA 03/15 1. Welcome and Call to Order The Chair called the Full Authority meeting to order at 7:15 p.m. MEMBERS PRESENT: Forrest Rowden, Chair- Town of Cobourg Wendy Partner, Vice-Chair- Municipality of Clarington Raymond Benns - Township of Alnwick/Haldimand Mark Lovshin -Township of Hamilton John Fallis - Township of Cavan Monaghan Jeff Lees - Municipality of Port Hope Heather Stauble - City of Kawartha Lakes Willie Woo - Municipality of Clarington ALSO PRESENT: Linda Laliberte, CAO/Secretary-Treasurer Mark Peacock, Director, Watershed Services Greg Wells, Manager, Planning and Regulations Clark Merritt,-Sandaraska Horse Riders Club Members of the public c ABSENT WITH REGRETS: Theresa Rickerby-Town of Cobourg Louise Ferr ie-Blecher - Municipality of Port Hope I ALSO ABSENT: 2. Disclosure of Pecuniary Interest I None ' f' 3. Minutes of Last Meeting ( is FA 12/15 MOVED BY: John Fallis SECONDED BY: Mark Lovshin THAT the Full Authority approve the minutes of the April 16, 2015 meeting. CARRIED. i 4. Adoption of the Agenda Willie Woo announced the "Why and How to Implement Low Impact Development (LID) and Climate Adaptation Considerations for Stormwater Management (SWM) Practices" 9-151 Minutes FA 03/15 Page 2 seminar being presented by the Region of Durham and its Conservation Authorities on June 15, 2015. Wendy Partner requested a discussion on the Union Rod and Gun Club fill proposal as they are looking at bringing a significant amount of fill to the site. Heather Stauble requested that 2 items be brought forward for information. FA 13115 MOVED BY: Ray Benns SECONDED BY: Willie Woo THAT the Full Authority adopt the agenda as presented. CARRIED. 5. Delegations a) Clark Merritt, Sandaraska Horse Riders Club Clark Merrit gave the background of the event to the members and presented a cheque to the Board in the amount of $5,400.00. Mr. Merrit also announced that due to health reasons, this would be the last year for the event. The Board thanked Mr. Merrit for all that he has done over the years. FA 14/15 MOVED BY: Heather Stauble SECONDED BY: Mark Lovshin THAT the Full Authority receive the presentation for information. CARRIED. 6. Presentations None 7. Business Arising from Minutes None 8. Correspondence FA 7. Angelo Lombardo and Gisele Hatton, Ontario Federation of Anglers & Hunters, re. OFAH Ganaraska Forest Centre Conservation Dinner, letter of thanks. FA 8. Mark Fisher, City of Kawartha Lakes, re. 2016 Budget Consideration There was a brief discussion as to how the City of Kawartha Lakes correspondence would affect the budget. The members stated it may have little impact on the budget. FA 15/15 MOVED BY: Heather Stauble SECONDED BY: Willie Woo THAT the correspondence item FA 7 and FA 8 be received and filed. CARRIED. 9-152 Minutes FA 03/15 Page 3 9. Applications under Ontario Regulation 168/06: Permits approved by Executive: FA 16/15 MOVED BY: Mark Lovshin SECONDED BY: Wendy Partner i THAT the Full Authority receive the permits for information. CARRIED. 10. Committee Reports: None j I 11. New Business: a) 2015 Budget FA 17/15 MOVED BY: Mark Lovshin SECONDED BY: Willie Woo I THAT the Full Authority approve the 2015 Budget. CARRIED. 12. Other Business a) Wendy Partner brought up concerns in regards to the Union Rod and Gun Club proposing to import fill for the reconstruction of a berm. She asked for an update on a meeting that was held with staff. Staff reported that the club has been given the new large fill policy and that this policy will be in effect for a large importation of fill. Staff further stated that the area is regulated and a site visit will have to be scheduled with the GRCA ecologist to determine the extent of the wetland located adjacent the berm. It was noted that the fill is to raise the height of the current berm that has decreased over the years. The size of buffers required for wetland protection was also discussed. b) Ray Benns announced Don Campbell's retirement from Lower Trent CA and a barbeque will be held on Friday, June 5, 2015 beginning at noon. r c) Heather Stauble brought forward Head Water Hikes around Pigeon River and Fleetwood CA's that will occur this weekend. She sent an email out earlier today regarding this event. She also stated that the Settlers Landing Wind Farm project has received approval and that this approval will be appealed as will the Sumac Wind Project approval. t d) Willie Woo thanked staff for attending the How To in10 event at the Bowmanville Public Library last weekend e) Forest Rowden brought the Conservation Ontario Annual Report "Risk to Resiliency" to the attention of the board. 9-153 Minutes FA 03/15 Page 4 13. Adjourn The meeting adjourned at 8:00 p.m. on a motion by Mark Lovshin. t P� l aC I]A�0" CHAIR CAO/SECRE - REASU ER 9-154 GANARASKA REGION CONSERVATION AUTHORITY MINUTES OF THE FULL AUTHORITY June 18, 2015 FA 04/15 1. Welcome and Call to Order The Chair called the Full Authority meeting to order at 7:15 p.m. MEMBERS PRESENT: Forrest Rowden, Chair-Town of Cobourg Wendy Partner, Vice-Chair- Municipality of Clarington Raymond Benns - Township of Alnwick/Haldimand Mark Lovshin - Township of Hamilton John Fallis -Township of Cavan Monaghan Theresa Rickerby-Town of Cobourg Louise Ferrie-Blecher- Municipality of Port Hope Jeff Lees - Municipality of Port Hope Willie Woo - Municipality of Clarington ALSO PRESENT: Linda Laliberte, CAO/Secretary-Treasurer Mark Peacock, Director, Watershed Services Greg Wells, Manager, Planning and Regulations Jeff Moxley, GIS Coordinator Ken Towle, Ecologist Jessica Mueller, Hydrogeologist Steve, McMullen, Forest Recreation Technician t Amy Burke, Senior Planner, Special Projects, Municipality of j Clarington Josh Griffin, GIS student, SSFC Chris Hahn, GIS student, SSFC j Spencer Comfort, GIS student, SSFC I Members of the public ABSENT WITH REGRETS: Heather Stauble - City of Kawartha Lakes E ALSO ABSENT: The Chair introduced the staff and guests present. 2. Disclosure of Pecuniary Interest None 3. Minutes of Last Meeting i FA 18/15 MOVED BY: Wendy Partner SECONDED BY: John Fallis THAT the Full Authority approve the minutes of the May 21, 2015 meeting. 9-155 CARRIED. Minutes FA 04/15 Page 2 4. Adoption of the Agenda Additional items were added to the agenda: 1) Two items were added under correspondence FA 9. D. Tinmouth re: Wilcox Road Parking FA.10 D. Bean re: Wilcox Road Concerns 2) Orono Crown Land Presentation 3) Eagleson Landfill/Brookside Creek under permits for discussion 4) Item under"in Camera" FA 19115 MOVED BY: Ray Benns SECONDED BY: Jeff Lees THAT the Full Authority adopt the agenda as amended. CARRIED. 5. Delegations None 6. Presentations a) Orono Crown Lands Sir Sandford Fleming College (SSFC).Student Project Josh Griffin, Chris Hahn, and Spencer Comfort, GIS student, SSFC presented their project which includes a trail head map, brochure and a web based story map. The Board members thank them for their presentation and commented on how well the project was completed. FA 20/15 MOVED BY: John Fallis SECONDED BY: Wendy Partner THAT the Full Authority receive this presentation for information. CARRIED. b) Port Granby Nature Reserve: Realizing the Vision, Amy Burke, Senior Planner, Special Projects, Municipality of Clarington. Amy Burke, Senior Planner, Special Projects, Municipality of Clarington gave a presentation to the Board summarizing the Port Granby Nature Reserve project, the Port Granby Business Plan and its proposed implementation. The Board asked questions in regards to the presentation. FA 21/15 MOVED BY: Mark Lovshin SECONDED BY: Wendy Partner WHEREAS the Port Granby Nature Reserve Proposal sets out a proposed framework for the implementation of the Ecology First Full End Use Concept Plan, including the ownership and management of the subjects lands, WHEREAS this approach is supported by the local residents of the community of Port 9_15 Granby, Minutes FA 04/15 Page 3 THAT, the Full Board of the Ganaraska Region Conservation Authority supports the submission of the Port Granby Nature Reserve Proposal to Natural Resources Canada. CARRIED. a) Dealing with Giant Hog Weed Ken Towle, Ecologist, gave a presentation on identifying and clearing giant hogweed at j one of the Ganaraska's conservation areas. i FA 22/15 MOVED BY: John Fallis SECONDED BY: Louise Ferrie-Blecher THAT the Full Authority receive the Giant Hogweed presentation for information. CARRIED. c) GRCA Private Well Inventory Jessica Mueller, Hydrogeologist, provided a presentation to the Board outlining details of the private well inventory program. FA 23/15 MOVED BY: Jeff Lees SECONDED BY: John Fallis THAT the Ganaraska Region Conservation Authority receive this presentation for information purposes. CARRIED. 7. Business Arisinq from Minutes None 8. Correspondence FA 9. Debbie/Steve Tinmouth re. Wilcox Road Parking Lot "P4"West Forest Marker 4 FA 10.Diane Bean re. Wilcox Road Parking Lot FA 24/15 MOVED BY: Mark Lovshin SECONDED BY: Willie Woo j I` THAT the Full Authority receive the correspondence for information. CARRIED. i` E 9. Applications under Ontario Regulation 168/06: Permits approved by Executive: FA 25/15 MOVED BY: Mark Lovshin r' SECONDED BY: Wendy Partner THAT the Full Authority receive the permits for information. CARRIED. 9-157 h Minutes FA 04/15 Page 4 Permit Application require Full Authority discussion: a) Brookside Creek/Eagleson Landfill Greg Wells, Manager of Planning and Regulations, presented a staff report which updates a 2011 staff report on the County of Northumberland project. FA 26/15 MOVED BY: John Fallis SECONDED BY: Ray Benns THAT the Full Authority grant approval for: Development associated with the placement of fill for the purpose of contaminant attenuation due to leachate derived impacts associated with an adjacent closed landfill; diversion of existing stream flow to the west by extension of an existing culvert; new channel construction and modification of an existing intermittent stream channel through installation of rock riffles, all as described in the April 13, 2015 application package prepared by Golder Associates (Project No. 08-1122-0102/6500), and the plans listed on Schedule A; Subject to the following conditions: 1. That prior to any on-site development as defined in the Conservation Authorities Act, sediment and erosion control devices and measures as specified in Part E (Section 01570) of Attachment J of the aforementioned report noted be implemented to prevent the release of sediment from the work area, and maintained until such time as the site has been adequately stabilized and revegetated. 2. That the flow of Brookside Creek be monitored to determine whether impacts to the flow regime of the Creek have been affected due to the proposed valley fill; 3. That should baseflows of the creek be shown to decrease due to the proposed filling activities, the measures contained within the contingency plan listed in Schedule A be undertaken. 4. That all areas of exposed soil be re-graded and stabilized with vegetative cover following construction. 5. That throughout the duration of this permit the Owner retain a Qualified Person(s) as defined in the Environmental Protection Act to ensure all of the terms, conditions and procedures of this approval are carried out. 6. That the Qualified Person review written documentation for each fill source site and confirm in writing to the GRCA that the material being received is acceptable for use at the fill site, prior to receipt of that material at the site, by meeting Table 2 SCS Industrial/Commercial/Community Use of the Ministry of Environment Soil, Ground Water and Sediment Standards for Use Under Part XV.1 Of the Environmental Protection Act, version April 15, 2011. 9-158 Minutes FA 04/15 Page 5 b the Qualified Person of the receipt of an soil 7. That the GRCA be notified y p Y sample(s) analysis which indicates that such sample exceeds the Table 2 (Industrial/Commercial/Community Use) criteria and confirm the steps acceptable to GRCA that will be taken to remove any materials from the site which have exceedances, and undertake confirmatory to ensure it has been removed. i 8. That the Owner consents to authorize representatives of the GRCA, to enter onto the lands in order to undertake any surveys, examinations, investigations or inspections for the purpose of ensuring that the work(s) authorized by this permit are being and have been carried out according to the terms and conditions of this permit. i 9. That compensation for the loss of stream channel/valley be provided to the GRCA in the amount of $50,000 to be used for a habitat creation/restoration project, prior to the expiration of this permission. CARRIED. 10. Committee Reports: G a) Ganaraska Forest Recreation Users Committee Minutes, June 4, 2015 FA 27/15 MOVED BY: Wendy Partner SECONDED BY: Willie Woo F THAT the Full Authority receive the Ganaraska Forest Recreation Users Committee Minutes from June 4, 2015 for information CARRIED. 11. New Business: None I 12. Other Business None 13. In Camera f FA 28/15 j MOVED BY: Wendy Partner SECONDED BY: Jeff Lees i THAT the Full Authority move into camera. CARRIED. FA 29/15 MOVED BY: Ray Benns SECONDED BY: Mark Lovshin THAT the Full Authority move out of camera. 9-159 CARRIED. Minutes FA 04/15 Page 6 FA 30/15 MOVED BY: Mark Lovshin SECONDED BY: Theresa Rickerby THAT the Full Authority receive the confidential staff report of June 4, 2015 for information CARRIED. FA 31/15 MOVED BY: Theresa Rickerby SECONDED BY: Wendy Partner THAT the Full Authority Board direct staff to contact the landowners to work at resolving the issues, and; FURTHER THAT the Full Authority authorize staff to seek legal support should this be required. CARRIED. 14.Adjourn The meeting adjourned at 9:20 p.m. on a motion by John Fallis. CHAIR CAO/SECRETARY-TREASURER 9-160 D - 1 To the Mayor and Members of Council, REVIEWED BY oRIGIMAL TO: After speaking with my neighbours, it has come to my attention that there are E few ncerng regarding the proposed zoning at 3238 Concession Rd 3. 11UNCIL a FILE D ❑ CO �� �J IPIFORIMATION - i 1 would like to address these concerns below. c0P410. ❑ MAYOR ❑ MEMBERS ❑ CAO OF COUNCIL ❑ COMMUNITY ❑ CORPORATE ❑ EMERGENCY SERVICES SERVICES SERVICES ❑ ENGINEERING CJ MUNICIPAL ❑ OPERATIONS Concerns of Neighbours for Proposed Zoning 3238 Concession Rd 3 SERVICES CLERK'S ANNING ❑ SOLICITOR ❑ TREASURY SERVICES El OTHER I.1 � '0540QYK 15 Frequency of EventsMUNICIPALPCLERK'SFILE 3 /Y1 7,64.9 aiS-6 0// Please keep in mind that this is the family's home and therefore will be entertaining events that are special. Our family has decided to offer this unique property to the region to desired target market - a generally more mature, older group in a higher income bracket (as outdoor weddings/ events are at minimum triple the cost of an indoor venue). I have no desire to disturb my family home, orchard or neighbours and will be keeping the wedding/night events to a minimum. Maximum one event per weekend...for a short window of time weather permitting - usually during the months of june/july/august with a possibility of a late may/early september. E Our home has been in the family since 1834. It is a cherished, beautiful place and it is my intention to entertain events that coincide with the core values of my parents who live on this property. It is not a free for all with the public. You choose the client as much as the client chooses you and your venue. I treated all of my restaurants as an extension of my dining room - inviting my guests to a dinner party every night. The farm will have the same appeal of being invited to have your event here...an extension of our family's hospitality and home. My focus is not only on weddings but luncheons, summer dinners, any event that would promote the farm, the productions and promote local tourism. i Please see the comments below from a luncheon we hosted for the Durham Region and the Pan Am Games this summer. 1 Hi Lesle, I wanted to get back to you before now ori your email..to say how very much I was impressed with your event! It was my pleasure. You are definitely one of the most refined professional event hosts I have experienced, and I will be recommending you for further Durham events in the future. !' You and your family are lovely and such wonderful people in your community. We are fortunate to have you as part of our Region. f 10-1 Thank you for everything you did to ensure it was a relaxing enjoyable experience for all. I hope to see you again soon Lesle. Sincerely, Nancy Nancy Rutherford, MCIP, RPP Manager, Economic Development Agriculture and Rural Affairs Planning and Economic Development Department I have an expert team that is well versed in event coordination and are extremely professional. I would be onsite at all events orchestrating every detail. 1 have no intention of turning my parents home into a wedding facility. Evening events would have limited use of the venue space - shutting music off by 12 and guests off premise by 12:30 as this is a family home and working apple orchard. The size of the event will vary, as will the size of the tent. The average wedding size would be 100 to 180 Parking East driveway is the only acceptable entrance to the event. West orchard laneway and main driveway will not be accessible for guests. Parking attendants will be onsite to help guide/valet cars. This will be built in to the cost of the event and is not an option. Bussing in of guests will be the desired mode of transportation from the local hotels (packages will be offered to the guests encouraging a safe/easy/controlled way to escort guests to and from the event) Usually a bus will pick up guests at 10:30 and 12:15. Keys to us service will be organized for each event as well. Most guests prefer to leave their car at home/hotel and secure other modes of transportation No parking of recreational vehicles or motor homes will be allowed Traffic Directions to the farm will be sent via 35/115 down the 3rd Concession to avoid an excess of traffic for neighbours. The east driveway will be the only access to parking with attendants guiding in cars. Street parking is NOT and option and will NOT be allowed. The main driveway will have a simple sandwich board stating where parking is located. Concessions will be made to ensure that Hwy 2/42/Concession 3 route is NOT used nor recommended. Again refer to Parking - as many guests do not drive. Noise Landscaping at the end of the property to the road facing our neighbours will help contain the noise and block any view. It will also create a boundary along with the trees/hedges and orchard already in place. Please see attached landscaping plans. 10-2 j. The tent will be set back 65m from the road. Speakers will be placed facing eastbound away from the direct route of neighbours or as decided by by-law office Only professional DJ's will be allowed, accountable for their behaviour and licensed. Will follow all Clarington by-laws for noise with decibel measuring Music will be finished by 12/12:30am as decided by bylaw office I will also give my neighbours a schedule of events in advance as well as the type of event being held. I will be accessible to each neighbour for any concerns or questions before/during and after the said event. My sister's family lives across from the farm and has young children aged 5 and 8. My parent's reside at the farm year round.. 1 have no desire to disrupt life in our neighbourhood. Instead, I am hoping to bring an awareness to our amazing facilities, beautiful farm and local talent. Sincerely, Lesle Gibson 416.407.3274 i r� r h f' j I' j' 10-3 1' : } I 1 1,. I It It 10-4 t { \I , : : c: t • i • , , i tt i ; • t i , 1 I 1 i t I - , — : , : I s _— —_—:_—�—.� .__._. �___._�_—._ �—' -- – - .,.! d'l� •t'..� j It � 1' ...{ ._ ..:,,. i i, , i I i ,v ' !1 \T—jf—� � s'�.�� • -<,•,a••,i is , , L , : i a 7 ; i t v 10-5 ClarbgtOfl Planning services Public Meeting Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. i Report To: Planning and Development Committee j Date of Meeting: September 14, 2015 Report Number: PSD-041-15 Resolution Number: i File Number: COPA2015-0003 and ZBA2015-0011 Dy-law Number: Report Subject: Applications by Lesle Gibson to permit an outdoor wedding and event venue Recommendations: 1. That Report PSD-041-15 be received; 2. That the proposed applications by Lesle Gibson to amend the Clarington Official Plan (COPA 2015-0003) and Zoning By-law (ZBA2015-0011) continue to be processed including !' the preparation of a subsequent report; 3. That the Durham Regional Planning and Economic Development Department be forwarded a copy of Report PSD-041-15 and Council's decision; and 4. That all interested parties listed in Report PSD-041-15 and any delegations be advised of Council's decision. C I r i 12-1 Municipality of Clarington Report PSD-041-15 Page 2 Report Overview Lesle Gibson, owner of Events by Grace, has submitted applications to amend the Clarington Official Plan and Zoning By-law to permit an outdoor wedding and event facility on Prime Agricultural lands along Concession Road 3, Clarke. The site plan submitted illustrates dedicated areas on the existing farm to accommodate temporary tents, portable washrooms and parking for events. The Municipality is seeking public comments on the proposal. 1 . Application Details 1.1. Owner: David Gibson 1.2. Applicant: Lesle Gibson 1.3. Agent: EcoVue Consulting Services Inc. 1.4. Proposal: To amend the Official Plan and Zoning By-law by adding site- specific policies and regulations to permit an outdoor wedding and`event venue, including: • A designated area for wedding ceremonies and other events accommodating up to 250 guests; • Temporary reception tents and washroom facilities; and • Food services provided by outside local catering companies. 1.5. Area: 32 hectares (venue area is 2.1 hectares) 1.6. Location: Part Lot 34, Concession 3, former Township of Clarke 3238 Concession Road 3 2. Background 2.1. The applicant submitted applications to permit an outdoor wedding and event venue on an existing farm parcel in the former Township of Clarke. The applications were deemed completed on June 26, 2015. 2.2. The applicant's family is in a partnership that owns and operates Algoma Orchards and the subject lands were the location of the former apple packing plant for the business. The farm parcel is used for apple production. 2.3. The applicant owns Events by Grace, an event planning business with 20 years experience. The request comes forward as a result of high interest for outdoor wedding and event venues. 2.4. A detailed site plan (Figure 1) and a Planning Justification Report were submitted with the applications. Should the applications be approved, Staff will continue processing the concurrent Site Plan Application (SPA 2015-2013). 12-2 Municipality of Clarington Report PS®-041-15 Page 3 Figure 1: Proposed Site Plan I 11 II I I I , I , Storage I I Barn 2 I , Ex.Orchard I 1 I I To Remain I I Ex.Orchard 1 I To Remain 1 I / r— i Implement !- Shedap , -----V--4 Storage 7— Barn 1 i Grav�eJ,lledArea I'— / Ex.Orchard To Remain jPortable Washroom tit I + Trailers ProposedReception Tent Proposed Catering TentIProposed Area for Orchard Themlpd lob Events/Ceremonies ; 1XI Ex.Orchard 121 I To Remain jEx.Orchard Idl To Remain I I IFUcI I tr I 1 I W1 li%. I Ic I I 1 � I /W I Concession Road 3 ' X W N '14 ZBA 201"011 12-3 Municipality of Clarington Report PS®-041-15 Page 4 3. Land Characteristics and Surrounding Uses 3.1 The subject lands are currently in agricultural production, and are occupied by a single detached dwelling (Figure 2) and several agricultural buildings related to the apple farming operation. 3.2 The surrounding uses are as follows and shown on the aerial photograph (Figure 3): North - Existing agricultural lands and residential dwellings South - Existing agricultural lands and residential dwellings, a tributary of Wilmot Creek, and the Canadian Pacific Railway corridor East - Existing agricultural lands and residential dwellings West - Existing agricultural lands and residential dwellings Figure 2: Photograph of the Proposed Reception Area on the Subject Lands all W m Proposed Event Area r 9) a LO Q - . CONCESSION ROAD 3 CY)T y Ln LD C'J Co m cN 1�' 2 12-4 i Municipality of Clarington Report PSD-041-15 Page 5 4 4. Provincial Policy 4.1 Provincial Policy Statement I Prime Agricultural Areas shall be protected for long-term use for agriculture. Permitted uses include agricultural uses, agriculture-related uses and on-farm diversified uses. Proposed agriculture-related uses and on-farm diversified uses shall be compatible with, and shall not hinder, surrounding agricultural operations. "On-farm diversified uses" are defined as uses that are secondary to the principal agricultural use of the property, and are limited in area. On-farm diversified uses include, but are not limited to; home occupations; home industries, agri-tourism uses, and uses that produce value-added agricultural products. "Agri-tourism" means those farm-related tourism uses, including limited accommodation such as a bed and breakfast, that promote the enjoyment, education or activities related to the farm operation. j< 4.2 Greenbelt Plan The Greenbelt Plan is not applicable. I. 5. Official Plans 5.1 Durham Regional Official Plan i' The Durham Region Official Plan designates the land Prime Agricultural. Within Prime Agricultural Areas a full range of agricultural, agricultural-related and secondary uses shall be permitted. is Uses accessory to the principal agricultural use of the property are permitted, including small-scale home occupations and home industries, and kennels, provided such uses do not alter the principal use of the property for agriculture. In addition, small-scale uses secondary to the agriculture use, that produce value-added agricultural products, such.as cottage wineries, and agri-tourism uses, such as bed and breakfast establishments, farm vacation homes, and farm tours are permitted as secondary agricultural uses, provided such uses are directly related to, or exclusively devoted to the existing farm operation. Area municipal official plans shall include detailed policies to limit the scale and number of secondary agricultural uses, and include policies to address compatibility with surrounding uses. New secondary agricultural uses, other than home occupations/business, bed and breakfast establishments and farm vacation homes, will only be permitted when the area municipal official plan has been amended, or where a site specific zoning by-law amendment has been adopted in accordance with the policies of this Plan. 12-5 Municipality of Clarington Report PSD-041-15 Page 6 5.2 Clarington Official Plan The Clarington Official Plan designates the land Prime Agricultural. Prime Agricultural Areas shall be used only for farm and farm-related uses including the use of land, buildings and structures for nurseries, the growing of crops and the raising of livestock, some on-farm diversified uses, specifically home-based occupations and limited home industry uses are permitted. Seasonal farm produce stands may also be permitted provided the produce is grown locally. However, wedding and event venues are not identified. 6. Zoning By-law Zoning By-law 84-63 zones the subject lands "Agricultural Exception One (A-1) Zone" which permits agricultural uses and a single detached dwelling. The current zoning does not permit the proposed use. 7e Summary of Background Studies 7.1 Planning Justification Report, Ecovue Consulting Services, May 12, 2015 The report provides an overview of the subject property and the proposed outdoor wedding and event venue. The proposed outdoor wedding and event venue will consist of the following items: • Designated area outside for wedding ceremonies and other events such as, engagements and retirements for a maximum of 250 guests/patrons; • Reception tent brought in for each wedding/event (size may vary); • Temporary bathroom facilities brought in for each wedding/event; and, • Food services provided by outside local catering companies. No washing of dishes or preparation of food will be conducted on site. The Planning consultant provides an analysis of applicable policies from the Provincial Policy Statement and finds that the proposed use is consistent with the Rural and Prime Agricultural policies that permit on-farm diversified uses, including agri-tourism uses. The consultant demonstrates that while the use is located on a active farm, the venue will be secondary to the principal agricultural use; will not take lands out of agricultural production; and no permanent structures are proposed. The venue will relate to the orchard and rural setting and feature local produce. The venue will not hinder surrounding agricultural operations and minimum distance separation criteria are satisfied. The proposal was reviewed against the Durham Regional Official Plan and was found to conform to the policies that permit farm-related tourism uses and promotes the enjoyment education or activities of the farm operation. The consultant highlights the current and proposed policies of the Clarington Official Plan. While the current plan does not explicitly permit the proposed venue, the use satisfies the 12-6 i Municipality of Clarington Report PSD-041-15 Page 7 Plan's goal to encourage and support the agricultural industry as an important part of the Municipality's economic base. The proposed venue will increase local tourism with guests and tourists from Clarington area and beyond. The proposal supports local economy, including area businesses, such as florists, caterers, bakeries, DJ's, photographers, hair salons, officiants, restaurants, bed and breakfasts, inns, golf courses, and portable washrooms companies. An Official Plan Amendment is required and the proposal is consistent with the direction of the draft Official Plan (2015). A Zoning By-law Amendment will be required to permit the outdoor wedding and event venue on a portion of the property. The Planning Justification Consultant is of the opinion that the proposed development represents good planning. The development will not remove land out of agricultural production, will support the agricultural industry and rural economy, and is compatible with surrounding land uses. 8. Public Notice and Submissions !' 8.1 Public notice was given by mail to each landowner within 120 metres of the subject site. The public notices for this application were mailed on August 14, 2015, and the appropriate signage outlining the applications was installed on the subject lands along Concession Road 3 and Gibson Road. 8.2 At the time of drafting this report, Staff have received one request for further information on the files. Four neighbouring property owners have contacted staff in objection and/or have raised the following concerns: • Noise impacts and loud music; G` • Concerned/questioned at what time the events will end; • Requesting clarification on the number of other permits required ie. health, liquor etc.; • Object to the potential of frequently scheduled weddings/events; • Traffic concerns given road alignment (s-bend) to the west and increased volumes; • Liquor license will promote noise and dangerous activities; • Lack of on-site parking and potential for on-street parking; • Proposed uses do not fit in with character of the area; and • Former packing plant was self-contained, however this use would impact neighbours. g. Agency Comments f' 9.1 Regional Municipality of Durham Regional Planning finds that the proposal conforms to the Durham Regional Official Plan as the use appears to be an agri-tourism use which is directly related to the existing apple I` orchard farm operation, consistent with Regional and Provincial Policy direction. The lands are within a "High Aquifer Vulnerabiltiy Area" however the Region does not 12-7 i Municipality of Clarington Report PSD-041-15 Page 8 consider the proposed use a high risk to groundwater. The Region also concurs that the proposal is consistent with the Provincial Policy Statement. The findings of the Planning Justification Report have been accepted, including the minimum distance separation calculations to determine setbacks to neighbourhing agricultural operations. Regional Works has no objections as the site is privately serviced and Concession Road 3 is under the jurisdiction of the Municipality of Clarington. Regional Health has no objections however will require the submission of a Special Events, Package at least 30 days in advance of the event. The proposed Official Plan Amendment is exempt from Regional approval. 9.2 Ganaraska Region Conservation Authority The Conservation Authority reviewed the proposal at the preconsultation stage and determined they have no objections to the requested use. 10. Departmental Comments 10.1 Engineering Services Engineering Services has no objection to the proposed amendments to the Official Plan and Zoning By-law. However, prior to site plan approval, the applicant will be required to satisfy the Engineering Services Department regarding the following concerns and conditions: • Traffic Control and Entrance Improvements; • Grading and Drainage; and • Parking. Engineering highlights that any entrances used for the event business will require improvements to accommodate a 6.0 metre, two-lane driveway, including illumination. Costs and securities will be the responsibility of the applicant. Sightlines at the entrances must be assessed and improvements completed, such as removal of vegetation. The provision of on-site parking will be reviewed in greater detail to ensure there are adequate spaces for guests. These items must be resolved prior to site plan approval. 10.2 Operations Department Operations has no objection to the applications however offer the following comments: • On-street parking will not be considered an acceptable practice. Concerns exist for on-street vehicular and pedestrian safety as well as damage to the roadway pavement edge and narrow gravel shoulders. 12-8 Municipality of Clarington Report PSD-041-15 Page 9 • The installation of a streetlight at the driveway entrance to each proposed venue is recommended. Streetlighting will help to improve vehicular movement safety at the driveway entrances during the evening. • Concession Road 3 has a surface treated application that is in average condition. Details respecting the proposed volume of vehicular traffic to this venue are required for roadway improvement and maintenance planning. • Sightlines from the driveway entrance will need to be reviewed. The clearing of existing obstructions or vegetation may be required to improve roadway entrance safety. 10.3 Buildinq Division The Building Division has no objections to the proposed Official Plan Amendment and Rezoning, and acknowledges that site plan approval is required. Building permits for the temporary tents exceeding 60 square metres will be required. 10.4 Emergency and Fire Services i The applicant has indicated that food will be prepared offsite and delivered to the venue. However, should food be prepared on site, a commercial cooking suppression and venting system may be required. 10.5 Accessibility Committee The Committee reviewed the site plan and has offered comments relating to parking, pathways, washrooms and lighting. Should the rezoning application be approved, these site plan related comments will be reviewed with the applicant. 11 . Discussion E 11.1 Both Provincial and Regional land use policies have evolved to permit agri-tourism uses, provided they are secondary to the principal agricultural use and limited in area. The uses must be compatible with the surrounding agricultural area. 11.2 The proposed Clarington Official Plan (2015) includes policies that would permit agri- tourism uses however these polices have not been approved, thus the need for an Official Plan Amendment. Should the proposed Clarington Official Plan policies get approved, requests for agri-tourism uses, in conformity with said policies, will require a Zoning By-law Amendment application and Site Plan approval to establish regulations for the uses and consider the site specific characteristics of the proposal. 11.3 Planning Staff have reviewed the Planning Justification report and concur that the proposed applications are consistent with the Provincial Policy Statement and the Durham Region Official Plan and the Official Plan Amendment will continue to implement the objectives of encouraging and supporting the agricultural industry as an important part of the Municipality's economic base. Promoting agri-tourism uses adds value to a 12-9 i` l Municipality of Clarington Report PSD-041-15 Page 10 farm operation, provides supplemental income, provides opportunities to sell directly to the retail market, as well as opportunities to educate the non-farm population about farming and allows the farmer to increase brand recognition by promoting and marketing their own agricultural products. 11.4 Staff have been contacted by area neighbours with concerns that can be summarized into four themes. Staff have reviewed these comments internally and provide the following: Frequency of Events The outdoor venue would be operating on a seasonal basis from May to September, weather depending, with the peak in July and August. Most events will be held on Saturdays, with some bookings occurring on Fridays and Sundays, and less often during the week. The applicant expects to hold approximately 4 major events per month. Noise Typically, events will require the use of microphones, speakers and typical disc jockey equipment. The applicant indicates that music will generally end by midnight, following which guests would be departing. The applicant has agreed to shift the tent location and to direct all sound equipment to the north and east, away from neighbouring properties. The existing orchards and foliage will assist in reducing noise impacts. Staff would recommend that the Zoning By-law Amendment provide a minimum front yard setback of 65 metres to ensure the venue area is located well away from the road and neighbours. Staff would also recommend that the site plan be revised to locate washrooms and catering tents south of the event area to function as additional buffers. Providing plantings as a buffer can also be explored with the applicant during the site plan process. Traffic Engineering Services has determined that the capacity of Concession Road 3 is not a concern. The average daily traffic count is 1,519 with the latest count completed in 2014. Assuming the worst case scenario of approximately 125 trips in and out of the venue, the traffic count would increase by 16% on an event day. However, daily volumes and peak period volumes remain low. The level of service would remain at an excellent level. Staff recommend that all guests and staff use the most easterly driveway, reserving the central and westerly driveways for emergency use only. The applicant also agrees that guests can be directed to and from the site via Highway 35/115 which will alleviate traffic impacts on immediate neighbours. These logistics can be relayed to clients of the applicant and can then be communicated to all guests in advance of events. These 12-10 i Municipality of Clarington Report PSD-041-15 Page 11 provisions can form part of the site plan drawings and agreement that would be j registered on title. Parking i The applicant has indicated that all required parking can be accommodate on the site. The site plan illustrates 75 parking spaces, while the applicant has indicated that the maximum number of guests would be 250.. The applicant is satisfied that 75 parking spaces is sufficient and highlights that some events would including shuttling of guests from area hotels, further reducing the need for onsite parking. Staff are further satisfied that the farm provides ample opportunities for on-site parking between rows of trees in the orchard. Should a problem arise with parking, `No Parking' signs could be posted. 11.5 All taxes owing to the Municipality of Clarington have been paid in full. 12. Concurrence E i Not applicable. 13. Conclusion The purpose of this report is to provide background information on the proposed outdoor I' wedding and event venue submitted by Lesle Gibson. Staff will continue processing the application including the preparation of a subsequent report upon resolution of the identified issues. 14. Strategic Plan Application Not applicable. f r k c I' 12-11 I' i r Municipality of Clarington Report PSD-041-15 Page 12 Submitted b -- y : �- Reviewed by: David 'Crome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Anne Taylor Scott, Planner II, 905-623-3379 ext. 2414 or ataylorscott(a clarington.net 71 The following is a list of the interested parties to be notified of Council's decision: EcoVue Consulting Services Inc. Lesle Gibson and David Gibson Deborah Mathias Teresa L. DeCicco Jim Kamstra Barry Staples Michael Allen ATS/CP/df 12-12 Clarington IIII I Planning Services Public Meeting Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-042-15 Resolution Number: I File Number: ZBA2015-0004 By-law Number: Report Subject: Public Meeting Report for a General Amendment to Zoning By-law 84-63 Recommendations: 1. That Report PSD-042-15 be received; 2. That the Zoning By-law Amendment contained in Attachment 3 of Report PSD-042-15 be approved; 3. That the Durham Regional Planning and Economic Development Department be forwarded a copy of Report PSD-042-15 and Council's decision; and 4. That all interested parties listed in Report PSD-042-15 and any delegations be advised of Council's decision. 1 f i F e �i II f i 12-13 Municipality of Clarington Report PSD-042-15 Page 2 Report Overview The Planning Services Department is proposing a General Amendment to Zoning By-law 84- 63. The proposed General Amendment intends to: - Clarify a number of Definitions and General Provisions. - Provide revisions for consistency with the Kennel Licensing By-law 2013-025. - Introduce General Provisions for Special Events, Refreshment Vehicles, Visitor Parking for multiple residential unit developments, 0.3 metre reserves, Temporary Sales Offices and Model Homes. - Restrict the establishment of residential units within storefronts in the "General Commercial (C1) Zone. - Permit pet care as a home occupation. - Delete some of the provisions regarding the removal of the holding symbol. 1 . Background 1.1 On June 22, 2015 Staff introduced the proposed general amendments to Zoning By-law 84-63 contained in Attachment"! through report PSD-037-15. The purpose of these amendments is to address consistency with recently adopted amendments to the Kennel Licensing By-law 2013-025, Refreshment Vehicle By-law 2015-016 and Special Event By-law 2014-020. In addition, a number of amendments are proposed to provide greater clarity and consistency to the interpretation of certain zone provisions and regulations. The proposed amendments are described in Attachment 1. 1.2 During the review of the proposed general amendments, and following the June public meeting, staff identified 3 additional amendments that are proposed in Attachment 2. The additional amendments are subject to this second public meeting and will: • Restrict residential units within storefronts in the core commercial areas of downtown Bowmanville, Courtice, Newcastle, and Orono; • Permit pet care as a home occupation; and • Delete some of the provisions for the removal of a holding symbol. 2. Public Notice and Submissions Notice of the public meeting for the proposed amendments contained in Attachment 1 and 2 were provided in accordance with the provisions of the Planning Act and the Municipality of Clarington Official Plan. Notice for the proposed amendments contained in Attachment 1 was placed in the Clarington This Week and the Orono Times on June 3 to 23, 2015. Notice for the proposed amendments contained in Attachment 2 was placed in the Clarington This Week and the Orono Times on August 19, 2015 to September 9, 2015. 12-14 Municipality of Clarington Report PSD-042-15 Page 3 3. Public Submissions 3.1 Five general inquiries were received requesting further clarification. Three Kennel owners contacted Staff to express concern that people operating Dog Daycares were not subject to the same requirements as Kennels under the Kennel Licensing By-law 2013- 025. One of the Kennel owners reiterated his concerns at the Public Meeting on June 22, 2015. Two Kennel owners expressed that they felt that Dog Daycares were caring for more than 3 dogs at a time. Staff did advise the Kennel Owners to contact Animal Services if they wished to lodge formal complaints. One Kennel owner suggested that Dog Daycares should be formalized in the Zoning By-law and all felt that they should be subject to the same licensing requirements as Kennels. 3.2 A letter of objection was received from Clark Consulting Services on behalf of Deborah Mathias in regards to the proposed provisions for Special Events (Attachment 1, Item 54). The major concern.is limiting the potential for agri-tourism in the rural area. It was requested that the Agricultural Zone be included in the proposed Special Events provisions. The letter discusses policy Section 13.4.2 in the proposed Official Plan which encourages on-farm diversified uses consistent with the Provincial Policy Statement which encourages the promotion of recreation, tourism and other economic opportunities in rural areas. Ms. Mathias also spoke at the public meeting to reiterate the concerns in the letter and to state that she was concerned the proposed Special Events provisions may disqualify a proposed a ri tourism use she was preparing a zoning amendment application for. C 3.3 An enquiry was received respecting the change to the Holding provision and whether this I would change environmental considerations related to removal of an 'H' prefix. 4. Agency Comments 4.1 Regional Municipality of Durham The Region of Durham sought clarification for the definition of Site Alteration (Attachment 1, Item 37). Inconsistencies were noted with the proposed definition and the one that is provided in the Region of Durham Official Plan. The definition was modified for I consistency with the exception to items that pertain to the Oak Ridges Moraine, as Zoning By-law 84-63 applies to lands outside of that feature. Modifications are highlighted in Attachment 1. The Durham Region Health Department had requested a provision be added to the Special Events provisions (Attachment 1, Item 54) that requires the organizer or vendor to obtain approval from Durham Region Health Department prior to an event. Staff I' discussed this request and determined it was not necessary as municipal staff and the Clarington website direct individuals to contact Durham Region Health Department to determine if additional approvals are necessary. Approvals would only be required if food and/or personal service vendors were operating as part of a Special Event. Durham Region Health Department approval is also a requirement of the Special Events Permit process for events that will have a minimum of 500 attendees at a given time. L 12-15 Municipality of Clarington Report PSD-042-15 Page 4 The Durham Region Health Department also requested a provision to be added to the regulations for Refreshment Vehicles and Carts requiring inspections before the start of operation (Attachment 1, Item 55). This request was discussed with Staff from the Durham Region Health Department and it was determined that it was not necessary as their requirement is secured for in the Refreshment Vehicle Licensing and Permitting processes. 5. Departmental Comments 5.1 The proposed amendments contained in Attachment 1 were circulated to the Engineering Services Department, Building Services, and Clerks Department for review. Staff provided insight in refining many of the proposed amendments. Changes that have been made to address Staff comments and those from the Region of Durham noted in Section 4.1 are highlighted in Attachment 1. 6. Discussion 6.1 Clarification Amendments As the Zoning-By-law is used by staff, developers and property owners, we become aware that certain provisions and regulations may be misinterpreted, or are difficult to understand. Clarification of the wording of various definitions and provisions are proposed. The format of the regulations for Accessory Structures is also proposed to be revised to a table format which is consistent with the Oak Ridges Moraine Zoning By-law 2005-109 and has proven to be simpler to understand. Many definitions which have been provided within site specific Zoning Regulations are proposed to be relocated to the more appropriate Definition Section of the By-law to avoid duplication. Diagrams used to illustrate defined terms in the Oak Ridges Moraine Zoning By-law 2005-109 are also proposed to be added. A number of revisions have been made based on Staff comments and additional review which are highlighted in Attachment 1. While most changes are minor in nature, 2 of the proposed changes are notable. Item 1 which discusses changes to the definition of "Apartment" indicated that reference to "senior citizens" would be deleted as we cannot regulate who lives in an apartment building. Through our review it was determined that the definition of"Senior Citizens' Apartment Building" and reference to it within site specific exception zones should also be removed from the Zoning By-law. This item is further described in item 36 of Attachment 1. Removal of"Senior Citizens' Apartment Building" meets the intention of the discussion in item 1, Attachment 1 which was provided in the previous public meeting report PSD-037-15. Another change is to the definition of"Lot Frontage". Staff had proposed a simplified definition that was based on a proposed "Lot Centreline" definition (see item 31, Attachment 1). The definition was further tested and determined that it would not be feasible for calculating the lot frontage on some irregularly shaped lots. A definition consistent with the definition contained in Zoning By-law 2009-105 for the Oak Ridges Moraine is now proposed, including a diagram which depicts how the definition is interpreted. 12-16 Municipality of Clarington Report PSD-042-15 Page 5 6.2 Kennels & Pet Care The definition of Kennel is proposed to be revised for consistency with the Kennel By-law 2013-025. The definition of Private Kennel is proposed to be deleted. The permitted uses in all zones have been examined to determine which sections require the removal of the Private Kennel use as it is now redundant since the Responsible Pet Owners By-law 2013-024 adequately regulates the number of pets residents are permitted to have. Commercial Kennel will also be replaced with a new Kennel definition that is consistent with the Kennel By-law. One of the new additional amendments proposed in Attachment 2 (item 2) is the addition of Pet Home Care as a Home Occupation. Pet Home Care will allow people to care for, groom, and train household pets as a home occupation for not more than 24 consecutive hours at a time. The Pet Home Care will only be permitted to accommodate a maximum of 3 dogs, including the owner's dogs. This is consistent with the Kennel Licensing By- law 2013-025. If a resident wishes to operate a Dog Daycare that accommodates more than 3 dogs at a time, they will need to be appropriately zoned for the use of a Kennel and meet the requirements of the Kennel Licensing By-law. This should address the concerns noted by the Kennel Owners discussed in Section 3.1. 6.3 Special Events i A General Provision is proposed to establish the regulations for permitting a special events use. The definition of a special event needs to be updated for consistency with the Special Events on Private Property By-law 2014-020. Removal of details specific to the temporary use that is no longer relevant also needs to be considered. The special events definition should be modified to include private special occasion celebrations to recognize weddings, birthdays, anniversaries, etc. so that there are no conflicts when providing Planning Services review of Building Permits and Licenses for compliance to the Zoning By-law. k The intent of this proposed provision will allow for public special events to occur where I they are traditionally held such as schools, and churches; or on sites that would be designed to accommodate larger groups of people (eg. Shopping plazas). _The proposed regulations will also allow non-profit organizations to host special events on all lands with the exception of Environmental Protection Areas. Special events will be limited to a total of 7 days in a calendar year and will not allow for Site Alteration. If a land use is proposed that is an ongoing land use, it would not be considered a Special Event. i In regards to Ms. Mathias concerns noted in Section 3.2, the Planning Services „ Department has recognized the need to provide on-farm diversified uses in keeping with the Provincial Policy Statement through the inclusion of policies in the proposed Official Plan. Once the Proposed Official Plan is approved, the Municipality will need to implement further provisions within the Zoning By-law. Although a use may be permitted in the Official Plan, given the nature of the use, it is possible that it may only be permitted by site specific zoning. It will need to be determined which on-farm diversified uses can be permitted, as a right, while providing protection of agricultural uses and our prime 12-17 Municipality of Clarington Report PSD-042-15 Page 6 agricultural lands. It would be premature to include regulations in the Zoning By-law ahead of the adoption of the proposed Official Plan. Ms. Mathias did submit a rezoning application on August 7, 2015 which proposes a type of agri-tourism, which includes meat preparation and sales, and events such as weddings. It is expected that the proposed business would operate for profit for more than 7 days in a calendar year. The proposed Special Events provisions would not exclude consideration of Ms. Mathias proposal as it is likely the proposed uses would be treated as a site specific exception within the Zoning By-law provided she receives approvals. 6.4 Refreshment Vehicles The definitions from the Refreshment Vehicle By-law 2015-016 will be added to Section 2 with modification to specify that food and beverages are offered for sale. A list of licensed Refreshment Vehicles was provided by the Clerks Department. The locations were reviewed to determine appropriate locations to permit the use as of right. It is proposed to add stationary refreshment vehicles as a permitted use to the following zone categories: Hamlet Commercial (C3), Special Purpose Commercial (C4), Service Station Commercial (C6). It is proposed to recognize existing stationary refreshment vehicles located in other zone categories. The General Provisions will also restrict the location of refreshment vehicles to a parking area. It is assumed that refreshment carts will operate on municipal boulevards which are not subject to the Zoning By-.law. A General Provision is proposed which would permit mobile refreshment vehicles and refreshment carts to operate in association with a special event. 6.5 Visitor Parking There are currently no provisions for visitor parking for multi-dwelling residential, such as apartments and block townhouse developments or mixed-use buildings. Through the Site Plan approval process, Planning Services staff have requested an additional 0.25 parking spaces per unit for visitor parking for such developments for a number of years. This request has been accommodated by the development community, however it should be included in the Zoning By-law. 6.6 0.3 Metre Reserves Typically a 0.3 metre reserve is established along the side lot line of a lot abutting an arterial or collector road allowance to restrict access to the public street in the case of a ,corner lot. Having a block of land between a lot and the public street has resulted in incorrect interpretations that a corner lot does not require an exterior side yard setback. A regulation is proposed to clarify that where a 0.3 metre reserve is used, it does not eliminate the need for an exterior side yard. 12-18 Municipality of Clarington Report PSD-042-15 Page 7 6.7 Temporary Sales Office and Model Homes Section 3.24 a. of Zoning By-law 84-63 which speaks to construction trailers has been interpreted as permitting a sales trailer for new home sales within a plan of subdivision. This section does not regulate model homes, parking, timeframe, or the need for agreements to be in place. A new section is proposed to be added to regulate this use, consistent with the Oak Ridges Moraine Zoning By-law provisions. i 6.8 Dwelling Units in Storefronts j i The ability to convert storefronts into dwelling units was brought to Staff's attention during the review of the proposed Zoning By-law amendments. The details for this issue can be reviewed in Attachment 2, item 1. Currently the Zoning By-law would permit dwelling units to be established in any building that contains a permitted non-residential use within the "General Commercial (C1) Zone" with no direction as to the location within the building. This zone and special exceptions that reference the permitted uses are applied to the core areas of downtown Bowmanville, Courtice, Newcastle and Orono. In order to retain and encourage commercial store front uses, which are traditional in these areas, a regulation is proposed to prevent residential uses from occupying the street facing portion f of the ground floor of a building. Residential uses will still be permitted in association with other non-residential uses, but if on the ground floor they will be restricted to the rear j portion. 6.9 Holding Zone Section 3.11 of Zoning By-law 84-63 identifies what uses are permitted on properties where the zoning is preceded by the letter 'H'. This section also indicates when a (H) Holding Symbol may be removed. There are policies in Section 23.4.3 of the Official Plan dealing with the removal of the letter 'H' from a zone which are more fulsome than the regulations in the Zoning By-law. This section of the Zoning By-law should only detail what uses are permitted while the (H) Holding Symbol is applied and should not detail specifics as to how to remove the symbol as there could be various reasons for application of a (H) Holding Symbol which is typically based on the characteristics of a specific site. The proposed provisions contained in Attachment 2, item 3 are consistent in format to what is provided within Zoning By-law 2005-109 are being revised to bring j Zoning By-law 84-63 into conformity with the Official Plan. 7. Concurrence Not Applicable i 8. Conclusion In consideration of all agency, staff and public comments, it is respectfully recommended that the proposed General Amendment to Zoning By-law 84-63 be adopted. 9. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan to continue- with improvements to streamline development approvals. 12-19 i Municipality of Clarington Report PSD-042-15 Page 8 Submitted Reviewed by: j, by. Dav rome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Tracey Webster, Senior Planner, 905-623-3379 ext. 2415 or twebster(d�cla rington.net Attachments: Attachment 1 — Proposed Zoning By-law Changes from June 22, 2015 Public Meeting with revisions (under separate cover) Attachment 2 —Additional Proposed Zoning By-law Changes subject of public Meeting September 14, 2015 (under separate cover) Attachment 3 —Zoning By-law Amendment The following is a list of the interested parties to be notified on Council's decision: Sandra Kranc, City of Oshawa Ronald Moore Christopher Harris, Township of Scugog Laura Norton-Stephens Judy Currins, City of Kawartha lakes Jean-Marc and Junivan Theriault Sue Bernardi, Town of Port Hope Liz White Ahmen Duale Wolf Klose Grzegorz Januszyk John Palmer George McNamb Tim Tuft Otello Molinaro Mike Newey John Hoekstra Michael Clay Daryl Bottema-Adkins Ari Rotman Sharon Bairgrie Sarkis and Micheline Amidi Victor Hanc Jr. Cathy Ivany Victor Hanc Sr. Superdog Central Inc. Steve Neal Kathy Blundell Tony Oppedisano Catherine Bolahood Linda Van Gester Charity Agadzi Delaine Harrison Bob Clark Mario Polanco Cano Deborah Mathius Helen White Kevin Byrne Steven Haines Kelly Fox Brent and Coleen Monk Deb Clark Sarah Amaral Jan Burton Georgia Zois Carol Ann Samms Angie Scott Joshua Wall Tom Seton Cliff Curtis Andrew Tedford Joan Loudfoot CP/TW/df Marmatakis Marinos Douglas and Denise Wilkins Mary and Samuel Guest Russell Maxwell 12-20 Attachment 1 to Municipality of Clarington Report PSD-042-15 Proposed Zoning By-law Amendments Item Zone Provision Issue _ Proposed Solution Proposed Modification (in bold) & Proposed Deletion (stroke- E ) 1. Amend definition of The Development Charge By-law Revise the definition for APARTMENT BUILDING APARTMENT states that an apartment contains consistency with the Shall mean a separate building containing }hr 4 or more dwellings which have a common entrance BUILDING 4 or more dwelling units. Development Charge By-law. from street level and the occupants of which have equal rights to the use of all common halls, ager stairs, and/eelevators, ander yards, and amenity areas. This definition may innlurle a denier nitizens The definition refers to a senior citizens apartment building. We Delete the reference to a senior cannot regulate who lives in a citizens apartment building. building. 2. Amend definition of The definition states that it is a Replace the word dwelling with BOARDING OR ROOMING HOUSE BOARDING OR dwelling, where a BOARDING OR the word building. Reference Shall mean a dwelling building in which more than 2 and less than 6 bedrooms intended for use as ROOMING HOUSE ROOMING house typically j rooms rather than persons. separate living accommodations, without kitchen facilities, are rented. Shared bathroom, kitchen contains more than one self- and living facilities may be provided. The building may include a dwelling unit for the proprietor contained unit. Rather than and/or his agent , restricting the number of residents, With ReGGssaFy fLJFRishiRg6 in return foF menetaFy GeMpensatien, te meFe than two persens but Ret mer,-_ the definition should restrict the , number of rooms. , similar nemmernial er instit Lienal use defined er nlassified heroin Section 14.1 a. v) refers to a Replace the term "Boarding Section 14.1 a. "Boarding House" rather than a House" with the term "Boarding or v) A BeaFding heuse boarding or rooming house; and "Boarding or Rooming House". Rooming House". The Parking Space Requirement Replace the term "Boarding and Parking Space Requirement Table Table refers to a "Boarding and Lodging House" with the term Residential Lodging House" rather than "Boarding or Rooming House". (ii) Boarding or Lodging House One parking space for each dwelling unit plus one space per "Boarding or Rooming House". A guest room provided for separate living accommodation. resident of a Boarding or Rooming House should not be referred to as a guest. 3. Add definition for a There are 2 similar definitions Remove the definitions from the CLUB HOUSE FACILITY CLUB HOUSE within exception zones. exception zones and provide a Shall mean a facility accessory to a golf course, golf driving range, or aR indeor golf driving raRge, or a FACILITY common definition within Section private club which may include uses such as a eatingpro-shop, eatinestablishment snack bar, banquet Other uses also have club houses (e.g. golf course, gun club) 2 facility and alounge/recreation area. Add private club. Delete the definition of CLUB HOUSE FACILITY from Section 6.4.25 a. and 6.4.83 a. iii) 4. Add a definition of a There is a common definition of a Add the CONVENTION CENTRE CONVENTION CENTRE CONVENTION CONVENTION CENTRE in definition to section 2; remove the Shall mean an establishment having facilities for meetings, seminars, exhibitions, workshops, and other CENTRE Section 23A.1 and 23E.1. This definition of a CONVENTION similar activities to serve participants but does not include sleeping accommodations. definition needs to be relocated to CENTRE from sections 23A.1 Delete the definition of CONVENTION CENTRE from Section 23A.1 and 23E.1 Section 2. Properties zoned C5 and 23E.1; and add the use of a (Holiday Inn) and C5-14 (Rona convention centre to section 18.1 Add the following sections site on Baseline) have been b. and section 20.4.14c. 19.1 b. xix) A convention centre. contemplated to permit a 20.4.14 c. xxx) A convention centre. Convention Centre. This use had been interpreted as an assembly hall. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting Pagel Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification in bold) & Proposed Deletion (strik„_4hrough) 5. Add definitions for These definitions will enable Add a definitions to Section 2 CONDOMINIUM CONDOMINIUM, Section 3.9 to be revised to Shall mean a building or grouping of buildings in which units are held in private ownership and floor space, COMMON include a provision allowing for facilities and/or outdoor areas used in common are owned, administered and maintained by a corporation ELEMENT dwellings to have frontage on a created pursuant to the provisions of the appropriate statute. CONDOMINIUM, and common element roadway which CONDOMINIUM, COMMON ELEMENT COMMON has access to a public roadway ELEMENT Shall mean spaces and features owned in common by all shareholders in a condominium and may include ROADWAY common element roadways, walkways, sidewalks, parking and amenity areas. CONDOMINIUM, COMMON ELEMENT ROADWAY Shall mean a right-of way for vehicular access that is privately maintained by a corporation created _ _ j pursuant to the provisions of the appropriate statute. F 6 Add definition of a The definition of a Relocate the definition from CREMATORIUM CREMATORIUM CREMATORIUM should be Section 6.4.64 Shall mean a building or structure fitted with appliances for the purpose of cremating human remains located within Section 2 under the Funeral, Burial and Cremation Services Act, as amended. Ancillary uses may include a chapel or other operational functions related to a cemetery. The reference to the Cemeteries Reference the Funeral, Burial and Delete the definition of CREMATORIUM from Section 6.4.64 a. i) Act needs to be removed as it was Cremation Services Act, the repealed in 2012 and consolidated definition will be consistent with with the Funeral, Burial and the one provided in the act. Cremation Services Act. 7. Add definition of a ! The definition of a Drive-Through The definition used in the M01, Drive-Through Facility should be located within M02 and MP1 zones is the Shall meaR the use of land, buildings or struGtures, or paFt thereef, to provide or dispense produGtS OF Facility Section 2. clearest definition. romninin'`v in motor �iohinloo Inno4orl in � c4�r+Linn Ino ' There are multiple definitions within The definitions in the C1-3, C1-12, � i� �ed On a sta ki ,y !a exception zones. C1-25, C1-30, C1-33, C1-34, Cl- The definition of "Drive-Through Facility" was added to Section 2 by By-law 2015-008 40, C149, C1-54, C1-32, C2-9 C1-56, C5-14, C6-12, C-8, C-9 will Delete the definition of Drive-Through Facility from Sections 23A.1, 2313.1 and 23E.1 remain and examined through the Comprehensive review. 8. Amend definitions of Need to distinguish difference Any wording to the definitions to DWELLING "DWELLING", between apartment-in-house and clarify these dwelling types were Shall mean two (2) or more habitable rooms, designed or intended for use by one household family, in "DWELLING, a duplex or semi-detached constructed. Unlike the apartment which sanitary facilities and one kitchen are provided for the exclusive use of the household family, in DUPLEX" dwelling. We want to track in house definition which which a heating system is provided, and, which has a private entrance from outside the building or from a and "DWELLING, apartments-in-houses to ensure references a conversion. common hallway or stairway inside the building. For the purposes of this By-law a dwelling does not SEMI-DETACHED" the fire and building safety of include a tent, trailer, mobile home, or a room or group of rooms in a boarding or rooming house, a hotel, to exclude an existing apartments-in-houses. motel, motor hotel or camping establishment. For the purpose of this definition, dwelling shall also mean Apartment-in-house. dwelling unit Section 35 of the Planning Act prevents municipalities from distinguishing between people who are related and people who are unrelated Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 2 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution _ Proposed Modification (in bold) & Proposed Deletion (6tFAke4hFG"h) Delete reference to the word DWELLING DUPLEX family Shall mean the whole of a building that constructed with is divided vertically or horizontally dividing walls creating 449 two separate dwellings, each of which has an independent entrance either directly from the outside or through a common vestibule. DWELLING, SEMI-DETACHED Shall mean a building constructed to be separated vertically into two separate dwelling units, connected by a common wall above gfeund orand below ground GenReGted undergFOURd by footing and fouRd , each of which has an independent entrance directly from the outside of the building and each of which is located on a separate lot. For the purpose of interpretation, this definition shall not be annlioahlo to But does not include a dwelling _ unit to be erected_next_t_o or added onto_ an_existing sipl fam+l -detached dwelling � thin the p� ",no 9. Add a definition for There is a definition of a semi- DWELLING, LINKED DWELLING, LINKED detached dwelling in Section Add a definition for DWELLING, Shall mean a building constructed to be separated vertically into two separate dwelling units, connected LINKED to Section 2 and modify 12.4.31 which is describing a link underground by footing and foundation and does not share a common wall above ground each of section 12.4.31 to rename the dwelling. This definition is to be permitted use to linked dwelling which has an independent entrance directly from the outside of the building and each of which is located relocated to Section 2 and and remove the definition from on a separate lot. renamed DWELLING, LINKED. the section. 12.4.31 URBAN RESIDENTIAL EXCEPTION (R1-31) ZONE Notwithstanding Section 12.1, only aserni-aceaT linked dwelling may be permitted on those lands zoned R1-31 on the Schedules to this By-law. The placement of buildings and structures shall be subject to the zone regulations as set out in Section 12.2. For the purposes of thisy.e visien,ision a semi_detashed , outside of the building., and! eaoh of whioh is Iodated on a eparate lot 10. Add a definition for Section 3.16 Parking Space There are two definitions of DWELLING,INN, STAG - HOUSE - - z�n DWELLING, Requirement Table is proposed to stacked townhouses within Shall meaR GRe of a group of three eF more attached dwelliRg units whiGh aFe separated veFtiGally and/e STACKED be revised to add a requirement multiple exception zones. It is . TOWNHOUSE for visitors parking for multiple unit proposed to utilize the most residential developments. The common definition for Section 2 The definition of "Dwelling, Stacked Townhouse" was added to Section 2 by By-law 2015-030. table will need to reference a and then delete it from the definition. Currently there are exception zones. The statement Delete the definition of "Dwelling, Stacked Townhouse" from sections 14.6.25 a. i), 14.6.26 a. i), 14.6.31 definitions of stacked townhouses that stacked townhouses "front on a. i), 14.6.35 a., 14.6.41 a. i), 14.6.42 a. i). within exception zones either a public or private street" is proposed to be removed as it could reduce flexibility for design. There are examples of stacked townhouses that front onto parkland, open space and parking areas designed in combination with other built forms i (e.g. Apartments) Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 3 Proposed Zoning By-law Amendments Item j Zone Provision Issue Proposed Solution Proposed Modificationin bold) & Proposed Deletions# +I 1�) 11. Amend the definition Simplify the definitions j Utilize the definition of `restaurant' EATING ESTABLISHMENT of EATING from Zoning By-law 2005-109. Shall FneaR a building E)F part ef a building V.fhere feed is offered for sale eF seld te the publiG feF immediate ESTABLISHMENT. The term `eating establishment' , should be updated to `restaurant' ,; but dees net Amend the definition when the Zoning By-law is of EATING reviewed comprehensively. The Shall mean an establishment where prepared food and beverages are offered for sale to customers. ESTABLISHMENT, current term is cross referenced TAKE-OUT to EATING ESTABLISHMENT, TAKE-OUT reference EATING in multiple sections and other Shall mean an eating establishment where tables and/or counters for the Refreshment vehicle By-law) ESTABLISHMENT municipal by-laws e.g. use of customers are not provided. _ 12. Definition of There is a common definition of an Relocate the common definition ENERGY INDUSTRY ENERGY INDUSTRY ENERGY INDUSTRY in the M02, of an ENERGY INDUSTRY from Shall mean an establishment that have focuses on the development, commercialization and/or ML1 and ML2 zones. Sections 2313.1, 23C.1 and 23D.1 demonstration of energy products and services,.T"is may 'Includinge assembly, manufacturing, and delete the definition from fabricating or processing activities that are not offensive or not likely to be effeR i"o by reason of the The phrase "or not likely to be I each section. Simplify the amount of noise, smoke, odour, emissions, or vibration produced, thter, but exGl dos A but not offensive" would be difficult to wording of the definition. including a recycling facility, material sorting or dismantling, a waste management or processing facility, regulate. or a waste incineration facility . ire evc.l��rlr�rl Delete the definition of ENERGY INDUSTRY from Sections 238.1, 23C.1 and 23D.1 13. Definition of There is a common definition of an Relocate the common definition ENERGY- RELATED ENERGY-RELATED ENERGY-RELATED in the M02, I of an ENERGY-RELATED from Shall mean a use within a building, or structure that is directly involved in the administration, ML1 and ML2 zones. Sections 23B.1, 23C.1 and 23D.1 distribution, research and development, testing, or production of energy and energy related and delete the definition from products. _each section. 14. Add a figure for For clarity a figure will help depict I Add a figure based on what is FIGURE 1 ESTABLISHED the definition. provided in the Oak Ridges DETERMINING ESTABLISHED BUILDING LINE BUILIDING LINE, Moraine Zoning By-law 2005-109 STREET/PRIVATE ROAD RESIDENTIAL, AVERAGE SETBACK COMMERCIAL AND INDUSTRIAL ZONES -- -- REQUIRED ___-- __-- FRONT C -- -- W YARD � E. SETBACK p, W ESTABLISHED/EXISTING FW BUILDINGS fy F � I i 15. Add definition of an This is a term referred to in Add definition to Section 2. ESTABLISHMENT ESTABLISHMENT multiple locations within the by- Utilize the definition from Zoning Shall mean A a building, structure and/or area of land within or on which any activity referred to in this By- law. By-law 2005-109. law is conducted. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 4 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-through) 16. Definition of FAMILY Section 35 of the Planning Act The definition of family is r.^, "ALT prevents municipalities from proposed to be deleted. , distinguishing between peoplePeFSE)RS whO Reed not be related by blood, . legal , living together as a SiRgle who are related and people who The following terms are toGase ,� home, shall meaR Ret more thaR two persons livipg are unrelated replaced as follows: puFpese ef this by law, the defi.n.itien ef family shall Ret • "Single family dwelling" to ;n^Iude gFe„n hemes as defined heroin "single detached dwelling" • "Single family detached Replace the word "family" with "detached" in sections 5.2.5, 6.4.15, 6.4.27, 6.4.35, 12.4.27, 12.4.37, dwelling" to "single detached 13.4.17 dwelling" Replace the word "family" with "household" in Sections 6.1 a. iii), 6.4.1 a iii), and 12.4.26. Replace the word "family" with "household" 17. Definition of There is a definition of FITNESS Delete the FITNESS CENTRE FITNESS CENTRE FITNESS CENTRE CENTRE in the MO1 Zone and in definition from the MO1 zone. Shall mean an establishment that provides equipment and building an whiGh facilities for recreational or Section 2 Modify the Section 2. athletic activities, including exercise classes, and shall asse^;ated facilities si,^h as a sauna and solar'um LTJ J�'dTCICGCrTAGTTfCIG a��L1�TT'CfJ-lTJL1L7T'ICrQTICTJOTQTfCII'7T. Delete the definition of FITNESS CENTRE from Section 23A.1 18. Definition of FLEA There is a definition of a FLEA Relocate the definition of FLEA Section 2 MARKET MARKET in the A-65 zone. A flea MARKET FROM A-65 to Section FLEA MARKET market is listed as a permitted use 2. Shall mean an establishment for occasional or periodic sales activity where floor space is rented or in the C4-11 and C4-13 zones but licenced to ten or more ��nr�ed-individual sellers offering goods, new and used, and where the space is undefined. allocated to each individual seller is not physically separated by walls which extend from the floor to ceiling from the space allocated to other individual sellers. Delete the definition contained in Section 6.4.65 b. as follows: Only those structures which existed on January 29, 1996 are permitted. No new structure or any expansion to a structure is permitted. F=E)F the puii:peses of thi-S subseGtOOR, a flea market shall mean an establishment for E)GGasienal eF perie sales aGt1Vity where fleein spaGe is rented OF IiGeRGed te teR oF maFe i i Rrelated individual selleFS OffGFORg 19. GARDEN SUITE The R1-65 zone contains a Delete the definition from the R1- Revise Section 12.4.65 as follows: definition of GARDEN SUITE that 65 Zone Notwithstanding Sec-tion 12.1, those 11-ands zoned R1-65 on the Schedules to this By-law may, in addition is the same as the one in Section to the other uses permitted in the R1 Zone, be used for a Garden Suite in accordance with the following 2. zone regulations: The parking requirement table Add Garden Suite to the parking a. Defin;tk, does not have a category for requirement table. , Garden Suites so 2 parking SiGk and disabled peFsen whiGh *6 IeGated on the side E)F Fear yard ef a pFepeFty GeRtaiRiRg a single spaces would be required for this detaGhed dwelling. use. It would be appropriate to -ba. The Garden Suite shall be removed on or before January 30, 2016. apply the same parking Parking Space Requirement Table requirement that is applied to an Residential apartment in house. (v) a) Apartment-in-house or Garden Suite One parking space Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 5 Proposed Zoning By-law Amendments Item Zone Provision Issue Pro o ed Solution Pro osed Modification m bold Proposed Deletion c*M;k " * w^...." 20. Definition of GOLF There are 4 similar definitions of a--Provide a common definitions in GOLF DRIVING RANGE DRIVING RANGE Golf Driving Range within 10 Section 2 and remove the Shall mean an outdoor facility operated for the purpose of developing golfing techniques, including exception zones, 8 of which have definition from the 2 current miniature golf, but excludinges golf courses. And GOLF DRIVING � RANGE, INDOOR expired. exception zones. GOLF DRIVING RANGE, INDOOR Shall mean an enclosed facility operated for the purpose of developing golfing techniques but excludes golf courses. Revise section 6.4.58 as follows: Regulations — Buildings i) Front Yard (minimum) 35 metres Fer the purpose of this seGtOOR, Golf DFiViRg Range is defined as a fa6lity fei,the purpose of developipg golfing +onhniq roc innli ding miniature golf, b t ovnli ding golf not ir000 e f Revise section 6.4.83 as follows: 7 Defini4iono Gelf Driving Range� Shall mean an eutdeOF faGility opeFated for the purpose of developing gelfing teGhniq roc innli d'Rg Miniature golf, b it ovnli jades golf not Arses Indeer Golf Driving Range: Shall rneaR aR eRGlesed faGility eperated fei:the purpese of devele, golfing tonhniq goo but eXGI deG golf GeUrses. J_ _ Delete Section 6.4.25 a. 21. Definition of GROUP Section 35 of the Planning Act In recognition of the noted HOME prevents municipalities from contraventions, Group Homes Shall meaR a SiRgle heusekeepiRg WRit iR a dwelling in whiGh three te teR resideRtS, exG!ud'Rg Staff andie distinguishing between people have been interpreted as a Single family, live as a family URder reSPE)Rsible sup-, visiei, _eRsistent with the FequirernelltS Of t who are related and people who Detached Dwelling which makes are unrelated with respect to the this definition redundant. The permitted to 10Gate within 300 metres of anether greup herne. Furthermore, eRly ORe gFOLAp heme hOWSORg occupancy or use of a building. definition should be deleted. elemeRt high sGheel aged Ghi!dFeR may be IOGated within the aFea served by aRy publiG_ Zoning By-law 84-63 currently olomeRtaFy or ii Jnior high onhool defines a Group Home which does Group home is permitted as a distinguish between related and use in the A-16, RH-2 and R1-6 Delete section 6.4.16, 9.3.2 and 12.4.6 for Group Homes unrelated residents. This zones. These exception zones definition also applies a 300 metre are to be deleted and the maps Amend Schedule 3 for 138 Queen Street, 23 Lovers Lane and 89 Church Street from 'R1-6' to 'R1 and separation distance between updated. for 2005 Green Road from 'A-16' to 'A' group homes which is discriminatory under the Ontario Human Rights Code. The Amend Schedule 6 for 1652 Taunton Road from 'RH-2' to 'RH separation distance could restrict the ability of group home residents to live in the neighbourhood of Amend Section 12.4.36 by deleting the words "group home". their choice. i I Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 6 Proposed Zoning By-law Amendments Item J Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-through) 22 HEIGHT OF the definition. p p provided in the Oak Ridges FIGURE 2 Add a figure for For clarity a figure will help depict Add a figure based on what is I � DETERMINING HEIGHT OF A BUILDING OR STRUCTURE BUILDING Moraine Zoning By-law 2005-109 -- -- FLAT ROOF FRONT W GRSIDE ADE �i� RIDGE 1/2_. M 1/2F• EAVE IP ROOF _ W Ch OR FRONT SIDE GABLE ROOF GRADE. RIDGE OF DECK LINE ., EAVE MANSARD ROOF OR :FRONT SIDE GAMBREL ROOF GRADE i RIDGE. I 1/2 1/2 F.AVE SALT BOX ROOF - -� SAVE FRONT1 P SIDE GRADEi 23. HOME The number of children cared for : The issues will be resolved by Adult Home Care OCCUPATION has been questioned in the past. implementing a similar format to Shall mean a home occupation that provides temporary care and companionship to senior citizens The Day Nurseries Act does not what is provided for in Zoning By- and/or adults with disabilities on a regular basis for a continuous period not exceeding 24 include children residing in a home law 2005-109. The definitions of consecutive hours. to be included in the number of "Adult Home Care", "Caterer" children cared for. "Children's Home Care", "Home Caterer Craft", "Home Occupation", "Light Shall mean Aan establishment in which meals are prepared and delivered for consumption off the Teaching of art or craft has been Equipment" and "Light Equipment premises. The term caterer does not include an eating establishment. interpreted as individual instruction Service", will be added to Section i and includes recreational 2. Children's Home Care activities. The purpose of limiting Shall mean a home occupation that provides temporary care and education of children on a instruction to individuals is to regular basis and for continuous periods not exceeding 24 consecutive hours. prevent parking issues. Home Craft Esthetician services have been Shall mean the crafting of small items Gemposed of fabrir., wGed or eaFthen Materials that are interpreted as similar to made by hand or with the use of small tools, suGh as potter_,, Glothing, hirdhou-SeS _.nd mailbox hairdressing and should be clarified in the definition. Home Occupation Shall mean an occupation or business that is carried on on aGrordanGe with al pFovisiens of this Catering has been interpreted as By-law, within a dwelling as accessory to a permitted residential use. permitted Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 7 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strikethrough) hrough) Light Equipment Shall mean #hand tools, small power tools, portable equipment, and machinery containing a small engine, such as air compressors, augers, automotive tools, cleaning equipment, light compaction equipment, concrete and masonry equipment, floor and carpet tools, gasoline generators, chain saws, jacks and hydraulic equipment, lawn and garden tools, ladders, moving equipment, painting and decorating equipment, pumps, scaffolding, welding equipment, sporting equipment, party supplies, and other similar tools and accessories. Light Equipment Service Shall mean Aan establishment where light equipment is serviced or repaired. HOME OCCUPATION aGGessery use. IRVGIven;8Rt iR a home eGGUpatieR is limited to the Fnembers ef the family residiRg FeF the purposes of this by law, heme eGGUpatiOR shall be limited to-. pFefessffiGRal or admiRistrative OffiGes; pmdUGtien, ; the teaGhiRg ef art OF Graft Felated I > I 3.12 HOME OCCUPATION a. Permitted Uses i) adult home care; ii) business, professional or administrative office; iii) caterer; iv) children's home care; v) home craft business; vi) instructional service for an individual rv7wimum of three students at one time; W4 light service shop; an-d viii) personal service:; and ix) repair and retail sales of antiques b. Excluded Uses i) furniture str-opping refinishing; ii) light equipment service; iii) motor vehicle body shop; iv) motor vehicle repair garage; and v) retail sales, with the exception of antiques and home craft products. c. Regulations ! The following regulations apply to dwelling units wherein a home occupation is permitted: i) The home occupation is limited to the members of the household residing in the dwelling unit, plus one additional person. ii) There shall be no display, other than a sign erected in conformity with the By-laws of the Municipality, to indicate to persons outside that any part of the dwelling unit or lot is being used for a purpose other than residential. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 8 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-through) ii) Such home occupation shall be clearly secondary to the main residential use and shall not change the residential character of the dwelling unit nor create or become a public nuisance due to the levels traffic, parking, noise glare, dust, odours, or vibration and hours of operation. iii) Such home occupation shall not interfere with communication signals.televosi„n „r radio reGep#, of otherns in adja Gen+ b uild'Rgo Gr StF Gt pro vi iv) Not more than twenty-five (25) percent of the total floor area of the dwelling unit shall be used for the purposes of the home occupation use except in the case of a "Bed and Breakfast or Vacation Farm Establishment” and such home occupation shall be conducted within the principal residence. v) Parking shall be provided in accordance with Section 3.16. vi) There shall be no outside storage of goods or materials associated with a home occupational use. vii) An adult home care may accommodate a maximum of five adults that do not reside in the dwelling at one time. The rear yard of the dwelling may be used as accessory to the adult home care establishment. ix) A children's home care may accommodate a maximum of five children, not including the owner's children. The rear yard of the dwelling may be used as accessory to the children's home care. x) The rear yard of the dwelling may be used as an accessory to the instructional service of an individual. 24. Delete the definitions The Zoning By-law needs to be Review the definition of Kennel in KENNEL, GOMMERGIAL of KENNEL, consistent with the Kennel By-law 2013-025 and identify COMMERCIAL andLicensing By-law 2013-025. This zone categories that permit > "KENNEL PRIVATE by-law no longer distinguishes commercial and private kennel er gain. and create a between a commercial or private and delete the use. Replace ' PRIVATE definition of kennel. The responsible pet commercial kennel with kennel. Shall mean a buildiRg OF StFUGtUFe wheFe meFe than thFee degs aFe kept bFed er traffiRed fer the peFsenal, KENNEL. Replace owners by-law restricts the reGFeat,enal use of the QWRer of the lands Unnn Whish nU Gh kennel 66 I + d the permitted use of number of pets residents are KENNEL Commercial and permitted to keep, therefore, the Shall mean a building or structure within which four or more dogs or cats or other- demestiG Private Kennel in the definition of a private kennel is aniafs are being bred, kept or boarded for profit and includes any associated lands. relevant zone redundant. Replace Commercial kennels with Kennel in the following sections categories with the 6.1 b. v), 6.4.14, 6.4.14 a), defined term of Delete Private Kennel in the following sections Kennel. 6.1 b. xi) 6.4.1 b. v) 25. Amend the definition The current definition states that Delete the statement that LANDSCAPED OPEN SPACE of LANDSCAPED landscaped open spaces must be indicates this area must be Shall mean the open unobstructed space from ground to sky at finished grade on a lot aGGess;ble-by OPEN SPACE accessible by walking from the accessible from the street. w al 'Rgfrem the seet;shish the let is IeG which is used exclusively for landscaping, and includes street. This does not take into any surfaced walk, patio, deck or similar area no more than 200 mm above finished grade, at its highest account landscaping that is not point, but does not include any driveway or ramp, whether surfaced or not, any curb, retaining wall, accessible from the street. parking area or any open space beneath or within any building or structure. 26. Definition of a There are 12 exception zones that Delete the definition from the Delete section 6.4.64 a. i), 15.4.21 a.i), 15.4.22 a. i), 16.5.11 a. i), 16.5.15 a.x), 16.5.20 a. i), 16.5.21 a. i), LANDSCAPING contain a definition of a exception zones. 16.5.22 a. i), 16.5.26 a. i), 16.5.27 a. i), 16.5.39 a. iii), 20.4.13 a. i) STRIP LANDSCAPING STRIP that is the Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 9 same as the definition contained in Section 2 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion ( ) 27. Amend the definition This definition could be updated to Delete the reference to `coin LAUNDRY, COIN OPERATED of LAUNDRY, COIN- delete the term `coin-operated' as operated' and include a full Shall mean a commercial establishment building OF GtFUGt„r^ where the service of Gein operat laundry OPERATED the machines may accept bills and service laundry. cleaning ,,, Ghines, using only water, detergents and additives, aFe-is made available to the public feF the cards. It could also permit a full service laundry. Delete the words "coin-operated" from the following Sections 14.6.24 L i) c), 15.4.19 b. viii), 16.1 b. ix), 16.5.17 a. viii), 16.5.35 b. xiii), 16.5.46 c. iv), 16.5.56 c. ix), 17.1 b. v), 17.5.2 a. iv), 22.4.8 b. iv), and _ 22.13.2 b. x) 28. Add definition of There is a definition of a LONG Relocate the definition of LONG LNG TERM CARE FACILITY LONG TERM CARE TERM CARE FACILITY that is TERM CARE FACILITY to Shall meaR a faGility regulated threugh the MiRiStFy of Health and LeRg TeFm Care, or aRy SuGGesser-,� FACILITY and delete within the R4-34 zone which is Section 2 and delete the provides aGGemmedatien for people requiring a broad raRge of 24 heur health GaFe, perSeRal Gare and the definition of also referenced in the R4-35 zone. reference to the definition in the suppeFt Gare within a swpep,4sed and seGLJFed setting and where GE)FAmen faGilifies for the preparatien Nursing Home This definition is more current than R4-34 and R4-35 zones. Delete GORSUMPtieR ef feed are provided and GOMMOR IOURges, reGreation reoms, the definition of Nursing Home. the definition of Nursing Home. arsenal serviGe may also be provided j The definition of "Long Term Care Facility" was added to Section 2 through By-law 2015-030 NURSING HOME IiGeRsed undGTTfT- ' I 1GTV'U"I c� Homes AC�almTfended Delete the definition contained in Section 15.4.35 a. i) and 15.4.36 a. i) which references the definitions in _ 15.4.35 (definitions to be relocated for Retirement Home and Underground Parking Structure) 29. Add a figure for For clarity a figure will help depict j Add a figure based on what is FIGURE 3 LOT, CORNER the definition. provided in the Oak Ridges DETERMINING A CORNER LOT Moraine Zoning By-law 2005-109 STREET/PRIVATE ROAD STREET LINE I BUILDING ,p O 30. Amend the LOT The definition of LOT COVERAGE Modify the definition of LOT LOT COVERAGE COVERAGE has to be read together with the COVERAGE to include Shall mean that percentage of the lot area at finished grade covered by all buildings or structures: definition definition of BUILDING which does structures. above ground level, but dees Ret ORGIude that peFtien of the let area whiGh is OGGHpied by a building or not consider platforms, such as An decks, as lot coverage. outdoor swimming pool, and a patio or deck no more than 200 mm above finished grade, at its Exclude patios and decks under highest point, shall not be considered as a structure for the purpose of calculating lot coverage. Decks and patios that are less 200 mm (8 inches) above grade. Where a lot is divided into more than one zone, the lot coverage in each zone shall be calculated than 200 mm (8 inches) above j as it applies only to that portion of the lot that is located within the specific zone. ,^A ;a Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 10 grade have been interpreted as a this paragraph, the let ------ eaGh Zone applies and shall be deemed to apply enly te that landscape feature. PG14iGF�UGh lot that is IGGated within said Zgp,— Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution _ Proposed Modification (in bold) & Proposed Deletion (s� l� ± h) 31. Amend the LOT Traditionally, front yard setbacks As an attached garage typically LOT FRONTAGE FRONTAGE for dwellings were 6 m which requires a 6 m setback it is Shall mean the heFiZORtal distanGe betweeR the side let IiRes measured parallel to and 6.0 metres ba definition. Add a made determining lot frontage on proposed that this consistent from aleng the fFORt let line. WheFe the front let IiRe is net a straight "Re E)F where the side let IiReG are not definition for LOT cul-de-sacs and lots with curved setback be applied across all paFallel, the let fFORtage is to be measured by a line paFallel te the E;hord of the lot fFoRtage drawn tl CENTRELINE street easy to determine. zones for the frontage calculation. a peint there'R distant ficem the fFE)nt let line equal te the requiFed depth ef the fFeRt yaFd. For the purpes-es Since Front yard setbacks range I ef this Ry law the Ghord of the lot frORtage is a straight IiRe jeoning the two peints where the side lot I*% from 3 m to 6 m, it has been more The definition will be revised in the fFE)n+ lot limo. confusing to determine the lot the same format as what is frontages throughout different provided in Zoning By-law 2005- nLet > " zones in the Municipality. Typically 109 and a figure will be provided the garage requires a minimum 6 ml for clarity. street nnMplies with the minimi Im let frnr,+G��G �f��eapq�Gablo�ne. setback. As there is often aShamean the ^7 Y j different minimum setback, or front Or the prGjeCtion Of the ot measured ong a ght ne drawn ar to the stanGe between the side lot lanes of a ' ot c;entreline at 6 metres from yard depth between the house and ,, j } ® front ,,,, ,;„„ j the garage this has caused confusion determining where the LOT CENTRELINE frontage measurement is to be Shall mean a straight line joining the midpoint of the front lot line and the midpoint of a line drawn taken from. parallel to the rear lot line setbaGk 10 metres from the Fear lot line along the side lot lines. FIG 11 RE4 10 h4®tre5 �� 0 Metres � I I ' I � I i c 1 I I Lot I Frontage v, m g The minimum straight-line distance between the side lot lines measured along the front lot line of a lot. Where the front lot line is not a straight line or where the side lot lines are not parallel, the lot frontage is measured along a line parallel to the chord of the lot frontage and set at 6 metres from Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 11 i the front lot line. The chord of the lot frontage is measured as a straight line joining the points where each side lot line intersects the front lot line. Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-through) h) 32. _ - Figure 4 Determining Lot Frontage ARI P Er,, E A y BUILDING I REQUIRED FRONT YARD SETBACK 33.; Definition PARKING There are 3 similar definitions of Relocate the definition to Section PARKING STRUCTURE STRUCTURE an UNDERGROUND PARKING ! 2 and rename it Parking Structure Shall mean a part of a building which is provided and maintained for the purpose of parking vehicles, STRUCTURE in the R4-29, R4-30 so it can also be used for Parking whiGh is geReFally IOGated below fiRished gfade and shaft may include parking spaces, parking aisles and and R4-35 zones Decks. access ramps, common areas for stairs and elevators, storage areas for tenants, and mechanical rooms. Delete the definition in section 15.4.29 a.i), 15.4.30 a.i), 15.4.35 a. iii) Delete 15.4.36 a. i) which references the definitions in 15.4.35 (definitions to be relocated for Long Term Care Facility and Retirement Home) 34. Definition There is a common definition for Relocate the definition from the RESEARCH AND DEVELOPMENT FACILITY RESEARCH AND RESEARCH AND exception zones to Section 2. Shall mean an establishment used for the purpose of conducting pure and applied research and DEVELOPMENT DEVELOPMENT FACILITY in the experimentation and includes such facilities as administrative offices, laboratories, lecture rooms, display FACILITY M01, M02, ML1, ML2 and MP1 rooms, pilot units, simulating equipment and the like and service and machine shops to serve the research zoned and development facility. Delete the definition from 23A.1, 2313.1, 23C.1, 23D.1, 23E. 35. Definition There are 4 definitions of a Provide a common definition of RETIREMENT HOME RETIREMENT RETIREMENT HOME within 5 RETIREMENT HOME in Section Shall mean a residential facility, licensed by the Retirement Home Regulatory Authority, that provides HOME exception zones (R3-26, R4-23, 2 and delete the definition in the accommodation in suites primarily for retired persons or couples. Such suites shall not have a stove or R4-32 and R4-35) exception zones and a reference range and shall have separate entrances from a common hall. Common facilities for the preparation and to the definition in the R4-35 consumption of food are provided. Common lounges, recreation rooms, medical care facilities and zone. ancillary uses such as a beauty salon, barber shop or tuck shop may also be provided. A definition of "Retirement Home" was added to Section 2 by By-law 2015-030. This definition will be replaced to acknowledge a grammatical error. Delete the definition contained in section 14.6.26 a. ii),15.4.23 a. i), 15.4.32 a., 15.4.35a. ii) Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 12 Delete 15.4.36 a. i) which references the definitions in 15.4.35 (definitions to be relocated for Long Term Care Facility and Underground Parking Structure) Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification in bold & Pro osed Deletion StFik^-t4,.-^nw 36. Definition of SENIOR We cannot regulate who lives in Delete the definition and replace CITIZENS' APARTMENT PARTMENT B III DIN CITIZENS' an apartment building the term `Senior Citizens' APARTMENT Apartment Building' with , BUILDING `Apartment Building' in the Urban RegiGRaI eF MuniGipal GoveMments er agenGies, or by PUb1iG subSGFiptien er donation, er by an Residential Exception (R3-26), GOmb2natien theFeef. Urban Residential Exception (R4- 22) and Urban Residential Replace the term "Senior Citizens' Apartment Building" with "Apartment Building" in sections 14.6.26 b. Exception (C1-38) zones. iv), 14.6.26 c., and 15.4.22 b. i) Delete the term "Senior Citizens' Apartment Building" in section 16.5.38 b. iv)_ 37. Definition SITE The proposed Section 3.28 Provide a definition based on SITE ALTERATION ALTERATION references Site Alteration. what is provided in the Oak Shall Mmeans activities such as filling, grading and excavation that would change the landform and natural Ridges Moraine Zoning By-law vegetative characteristics of land, but does not include, 2005-109 a. the construction of facilities for transportation, infrastructure and utilities uses, by a public body, or bfer greater certaiRty, e i) activities or works the renenctr„ntien repair er maintenanne of a drain approved under the Drainage Act, and _ --_ ii) the_carrying out of agricultural practices, on land that continues to be used for agricultural uses. 38.! Add a figure for For clarity a figure will help depict Add a figure based on what is FIGURE 5 TYPES OF YARDS, the definitions of front, side, rear, provided in the Oak Ridges TYPES OF YARDS following the exterior and interior side yard. Moraine Zoning By-law 2005-109 definition of YARD, (INTERIOR) SIDE ------------ ---------- - ---- `�-- STREET /PRIVATE ROAD � EXTERIOR SIDE LOT LINE A � EXTERIOR Q SIDE, YARD a a - � O REAR BUILDING FRONT a YARD YARD INTERIOR O W SIDE YARD w w sx IN'T'ERIOR SIDE LOT LINE � I I Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution _ Proposed Modification in bold & Proposed Deletion (-StF. � 39. Add a figure for For clarity a figure will help depict Add a figure based on what is The figure has been moved to Section 3.28 (see Item 50) VISIBILITY the definition. provided in the Oak Ridges TRIANGLE Moraine Zoning Bir-law 2005-109 Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 13 3.1 c. The Regulations — Accessory Buildings, Structures and Uses table provides regulations for accessory structures. Where a zone category is not identified in the table, the i accessory building/structure and use shall comply with the parent zone regulations where specified. REGULATIONSACCESSORY Type of Total Lot Total Height Yard Setbacks Structure coverage accessory (max) Interior Exterior (max) Floor Area Front Rear (max) Side Side Rural Residential, Agricultural and Environmental Protection Zones (where permitted) 1.2 m 120 m2 with 3 metres or a minimum with a floor 0 m to a lot area of 2 area equal to common or less than wall of-a- 10%o hectares 10/o of lot 10 m Zone seri- Zone Building or area 2 Regulation 1.2 m deta ed Regulation Structure 90 m with a 4.5 metres garage-with lot area less with a floor a detached than 2 hectares area greater garage on than 10 m2 an abutting lot Swimming Not Applicable Not Not Zone 1.2 m 1.2 m 1.2 m Pool Applicable Applicable Regulation Urban Residential Zones 0.6 m 3 metres with a Accessory 0.6 m floor area Buildings equal to or less Not or 6.0 m from Om to a the Accessory than 10 m2 Permitted Building or 10% of lot area 60 m2 0.6 mm common tstreetline o a Structure 4 metres Accessory wall of a detached with a floor Structures semi- garage with detached a garage area greater Zone than 10 m2 Regulation garage door facing the exterior side yard. Swimming Not Applicable Not Not Not 1.2 m 1.2 m 1.2 m Pool Applicable Applicable Permitted Commercial, Industrial or Major Institutional Zones I 3 metres 50% of with a floor ground floor area less area of a than 10m2 Not Zone All uses Not Applicable principal Permitted 1.2 m 1.2 m Regulation building to a 4.5 metres maximum of with a floor 60 m2 area greater than 10m2 Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 14 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike -throu ) 40. Revise the Lot Is a 6.0 m exterior side yard Modify the exterior side yard Coverage, Floor setback necessary for a detached setback to require a 6.0 m Area Height and yard garage when it does not provide setback when there is a garage requirements for driveway access from that yard? door facing the exterior side yard. accessory buildings This will provide adequate space and structures and The fence enclosure by-law for a driveway in front of garage uses. requires a 1.2 metre setback for j doors. swimming pools in all yards Add a 1.2 m setback for This regulation is difficult to read. swimming pools in all yards for consistency with the fence enclosure by-law Simplify the format of this section to be consistent with Zoning By- law 2005-109. I 41. Revise Yard The provision does not state that Clarify that the projections apply 3.1 j. iv) Balconies, canopies, unenclosed porches, steps, patios, ramps, or decks attached or directly Requirements for these projections apply to to abutting structures. abutting the principle or main building; either above or below grade; may project into any required Accessory Buildings, structures that are attached to or front, side, or rear yard to a distance of not more than 1.5 metres, but in no instance shall a required side Structures and Uses accessible from the dwelling (a yard be reduced to below 4�00.6 metres; Section 3.1.j.iv) deck may not be attached to the regarding permitted house but may still be a walk out). projections: When structures are detached or not accessible from the dwelling they are treated as accessory structures and the setback provisions of section 3.1.g are applied. The provision does not state if this Issue 2: Clarify that the applies to stairs above and below I projections apply to both above grade. There have been different and below grade structures. interpretation son if the projection allows stairs providing access to a basement, usually containing a retaining wall or an extended foundation. The provision does not indicate j Add ramps as a permitted accessible ramps as a permitted projection. projection. It has been interpreted that ramps are treated as decks. A 1.2 metre side yard setback is Reduce the setback to 0.9 metres not sufficient to provide a step to a to accommodate a projection for door within a side yard. one step (riser). Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 15 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (s#Fil ) 42. Section 3.4 Dwelling This section permits dwelling units Due to the discrepancies with the Sen+inn 3.4 DWELLING UNITS BELOW GRADE Units Below Grade below grade provided there is a Ontario Building Code, it is minimum window area located recommended to delete 3.4. NetwithstandiRg any PFEWlSIORS Of thiS By law te the Gontrary, above the finished grade equal to to have all eF part of their total floor area IGGated partially belew fiRished grade, shall be peFmitted subje-c4 10 percent of the total floor area of • the dwelling. This section further specifies that living rooms, dining a. SUGh dwel!'Rg shall have a MiRiMUM WiRdew area IGGated above fiRished gFade equal to 10 peFGe rooms, kitchens and bedrooms the flooFarea of the-dwelling.;and must have 10 percent of the b. eaGh ef the following FOOMS shall have a i i Rdow area IGGated above fiRished grade equa4e window area above finished 'I!1 nernent of the flnnr area of c,�nh room: grade. The Ontario Building Code • regulates the amount of light i\ Living ream - which must be available for living ' rooms, dining rooms and bedrooms. This requirement varies dependant on the age of iii\ Kitchen and the dwelling. 43. Section 3.9 Frontage This section only permits existing Add a section that would permit 3.9 FRONTAGE ON IMPROVED PUBLIC STREET, UNASSUMED ROAD AND PRIVATE RIGHT-OF- on Improved Public buildings to access a private right- dwelling units within a common WAY Street, Unassumed of-way. This does not account for element condominium to front on Road and Private private right-of-way access for free a private right-of-way. a. Improved Public Street Right of Way hold dwelling units are located within a common element No person shall erent any building or structure shall be erected in any Zone, after the date of passing corporation which do not front a ef thus By la , unless the lot HPnn `"'high cUnh building OF str,,nt,,re is to he erented fronts upon an public street. improved public street, maintained year round, and further, that 66,nh building nr ctruGture nmmplies with the sethaGk nreVisinns of this By lay.f n b. Unassumed Street NetwithStand'Rg the previsiens of SeGt*E)R 3.9 a. to the GeRtrary, the previsiens of this By law shali Ret prevent the erentinn of a permitted "Buildings or structures are permitted on an unassumed street provided they are on a lot in a Registered Plan of Subdivision. where a subdivicien agreement has beeR enteFed 'RtO With the MuniGipality and registeFed on title, whereURder the street eF streets will c. Private Right-Of-Way i) , to the date ef passage of this By law OR a lot whiGh does not have fFORtage on an improved publIG stFeet, eF OR a lot whiGh fFORt- en a- private right of way registered OR title and previding lega4 s ngress and egress te d publiG stFeet, the preV'SieRS ef this By law shall Rot apply to Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 16 _ Proposed ZoningBy-law Amendments Item Zone Provision ! Issue Proposed Solution Proposed Modification in bold & Proposed- Deletion StFik m w h-.A building or structure constructed prior to the date of the passing of this By-law+s that is not located on an improved public street, or is located on a private right-of-way, may be enlarged, altered or renovated and an accessory structure may be constructed, provided the use is permitted i in the zone in which it is located. the date ef passage ef this By law, WhiGh dOeS Ret have fmntage OR . I -d publiG street and SUGh lot has te a pFivate perpetual Fight of way registered en title whiGh provides legal UMT E)ss and egress to an impreved PWbI!G street, the provisiens of this by law shall not apply to permissible 1R the ZGRe OR whiGh it is leGated, and that all ether appliGable previslens of this by !a are nomplierl wit".A building permit may be issued for a lot created prior to the date of the passing of this By-law for a lot that has access to a private right-of-way provided the use is permitted in the zone in which it is located. d. Private Street Netwithstanding the pmvisiens of SubseGtien 3.9 a. above, the previsiens ef thus by law a building or structure may be permitted on a lot which has frontage on a Private Street where such Private Street existed at the date of passage of this by-law, or where such street is shown on a site plan approved under the Planning Act Nur swaRt to By law 2010 139 ofof vrtheeT n of N GStle, as ar"'r-ended or aRy UGGesser thereto. 4. Section 3.14 Multiple Is it necessary for us to enforce Specify that the zone limit is not 3.14 , Zones on One Lot setbacks from a zoning boundary intended to be a limit for defining ef the said let shall be used OR aGGGrdaRGe with the Zone PFeViSieRS of this By-law for the appliGable ZE)Res on the same property. yard setbacks. Utilize the established hereunder. Where a let is divided ;nte more than GRe ZGRe the ZGRe boundary shall not be wording from By-law 2005-109 to make this provision easier to general provisions E)f thi —1 1 ith the exGeptieR being, that where a P0050R of the said lot is zen read. all other reopents with the provisions of the Environmental ®retontlep /CP\ 7 .... ether .....N........, .. �„ the h„vv,vv,�.� yr z„ -. Where a lot is divided into more than one zone, under the provisions of this By-law, each separately zoned portion of the lot shall be used in accordance with the use provisions for the applicable zone. All buildings, structures and uses shall conform to the applicable zone regulations for that zone as if each separately zoned portion was a lot. However, a. no lot shall have more than one dwelling on the whole of the lot except as specifically permitted by this By-law; and/or b. where this By-law limit divides a property, provided the use of that portion of the lot conforms, this By- law limit shall not be a zone limit for defining yard setbacks, except for the setbacks required in Section 3.21. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 17 Proposed Zoning By-law Amendments Item Zone Provision Issue ! Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike_thr-o gh - _ _ - - 45. Amend Disabled This section permits the width of ' Amend provisions to specify that 3.16 b. i) Each disabled peFsoRs accessible parking space shall be a minimum 4.5 metres wide and 5.7 Parking Spaces 3.16 disabled parking spaces to be spaces need to be paired. metres long.,-upJess-When paired together two or Fnere disabled persons paFking spaG8s are IeGated b. i) reduced from 4.5 metres to 3.4 Replace the word "disabled" with in Whigh Gase eaGhaGe shall he minim„mthe width can be reduced to 3.4 meters where two or more spaces "accessible". The definition metres wade and 5.7 metres long' with provided a 1.5 metre access aisle is located between the abut each other. This section was "Parking Space, Disabled paired spaces. intended to reduce the width for Persons" will be renamed spaces which are paired as they "Parking Space, Accessible". PARKING SPACE, DISABLED PERSO SACCESSIBLE: would not function appropriately in Shall mean a parking space that is designed and identified to be used by persons with a disability. _ odd numbers. 46.1 Revise section 3.16 It is unclear that 30% of the front Relocate the regulation for c. Parking Space Sizes c) Parking Space yard must remain landscaped, landscaped open space to its i) Each parking space shall be a minimum of 5.7 m by 2.75 m. Sizes regardless of the number of own subsection and clarify. ii) Where the two outdoor parking spaces for single detached, semi-detached and/or townhouse units parking spaces provided for single are provided side by side the combined minimum width of the two spaces may be reduced to 4.6 m detached, semi-detached and/or townhouse units. iii) Parkin spaces provided in the front and for detached semi-detached and/or townhouse 9 p p Y , units must not reduce the minimum landscaped open space within the front yard below 30 percent. iv) Parking space size perpendicular to a landscaping strip having a minimum width of 3.0 metres may be reduced in size to 5.2 metres in length by 2.75 metres in width. I 47.; Revise Section 3.16 There are currently no provisions Introduce requirements for 0.25 Issue 1: Parking Space for visitor parking for multi-family spaces per unit for visitor parking Residential Requirement Table units. Planning staff have in multi-residential developments. (i) Apartment, Four-plex, Six-plex, or 1 Bedroom Apartment - 1 space per unit. requested 0.25 parking spaces per Need to specify the requirements Converted Dwelling House unit through the review of for linked and stacked 2 Bedroom Apartment - 1.25 spaces per unit. development applications. This townhouse. request has been accommodated Apartment containing 3 or more bedrooms, four-plex, by the development community. Delete the provision for Senior converted dwelling or triplex house - 1.5 spaces per unit. Citizen's Apartment Building The table contains a requirement Plus 0.25 visitor spaces per dwelling 10% of which are to Senior Citizen's Apartment be barrier free parking spaces. Building. We cannot regulate who lives in a building which makes this regulation redundant. Linked Townhouse Two parking spaces per dwelling. Stacked Townhouse Plus 0.25 visitor spaces per dwelling 10% of which are to be barrier free parking spaces. Senler Citizen's Apartment Building l +� n�o�n.,;arking space for oanh fele dwell ellinn i ini+ OF fra Gtien h Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 18 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-thro..ivh) 48. Section 3.16 i. iv This provision only permits Delete the portion of this section Within all Residential Zones a fr„r,t interior Side „r P Y p p , parking spaces and areas shall be permitted within a-,TOT,�t Parking Area parking within a front, rear or that is redundant. Fear any yard provided that no part-of any parking area, other than a driveway, is located closer than one Location on Lot interior side yard. Parking may be metre to any street line, or within a sight triangle. provided within an exterior side yard for a corner lot. 49. Section 3.16 k. Use A portion of this provision restricts Specify that the restriction is in addmfieR to the fe ithin any Agricultural Zone, a maximum of two (2) commercial of Parking Spaces the number of commercial motor unrelated to a farm use. motor vehicles, unrelated to a farm use, as defined under the Highway Traffic Act, as amended, or two and Areas vehicles and school buses that (2) school buses may be parked or stored on any lot provided that any such vehicle shall not be parked or can be parked on lot within an stored within 5 metres of any interior side or rear lot line, and provided that, where such lot line abuts a Agricultural Zone. It is assumed Residential Zone, or a lot which has a residential use thereon within 15 metres of such common lot line, that this provision was intended to the minimum setback from the common lot line shall be 10 metres. restrict commercial motor vehicles for uses that are unrelated to a farm use. 50. Section 3.21 c. This provision requires a 300 More consistent with the format 3.21 SETBACK REQUIREMENTS Setback metre setback from a non-farm used in the Oak Ridges Moraine Notwithstanding any provision of this By-law to the contrary, the following minimum setbacks shall apply to Requirements related residential building to an Zoning By-law 2005-109 which the specified buildings and structures: agricultural building housing references the MDS formulae a. All buildings from an Environmental Protection (EP) Zone unless such building is located upon a lot livestock. This setback is not rather than a required distance. located within a registered plan of subdivision or a plan of subdivision draft approved prior to the date consistent with the current of passing of this By-law. 3 metres A definition of Minimum Distance Minimum Distance Separation b. All buildings from watercourses not located within an Environmental Protection (EP) Zone. 30 metres (MDS) formulae which may Separation will be added to NeR farm Felated residential buildings from existing agF'GUItHral buildings, heUGiRg Iive6tGGk and not require a setback which is more or Section 2. ;a ed en the same let. 300 metFes less dependent on the type and number of livestock that is d. No residential, institutional, industrial, commercial or recreational use, located on a separate considered. This section also lot otherwise permitted by this By-law shall be erected or enlarged unless it complies with does not consider the MDS the Minimum Distance Separation Formulae. requirements between new or expanding livestock or manure e. No livestock facility shall be erected or enlarged unless it complies with the Minimum facilities adjacent and existing or Distance Separation Formulae. approved developments. f. Subsection i) shall not apply to a residential building constructed on an existing lot or a lot within a registered plan of subdivision. g. Subsection ii) shall not apply to a livestock facility located within the limits of a settlement area. d. Natw2thstandiRg the foFegeing, the pi:evisiens of SubseGtien G. shall net apply to Fesidential buildings IeGated OR existing lets ef reGOFd er lets with'R a registered pIaR of subdivisiGn OF plan Of SUbdiViSiOR approved, prior te the date ef passiRg ef thiS By law. NEW shall they apply where an agFOGLAuFal building housing IffiVeSteGk as IeGated withiR the 15mits of a Hamlet or, the Urban Areas Of G(AfftiGe, , d. No residential or institutional use shall be located closer than 30.0 metres from any railway corridor. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 19 Proposed Zoning By-law Amendments Item _ Zone Provision Issue Proposed Solution __ I Proposed Modification (in bold)_ & Proposed Deletion (strike-*fin) Section 2 MINIMUM DISTANCE SEPARATION FORMULAE Shall mean a A-guideline established by the Province to minimize nuisance complaints due to odour and thereby reduce potential land use conflicts by determining appropriate separation between livestock and manure storage facilities and neighbouring non-agricultural uses, including residential, institutional, industrial, commercial, or recreational uses. 51.1 Section 3.22 Visibility There have been different Borrow from the Oak Ridges Add a definition to section 2 as follows: j Triangles and interpretations from applicants on Zoning By-law 2005-109 which VISIBILITY TRIAGLE Section 3.1 j. vi) which lot lines are referred to in has a clearly written provision to Shall mean a triangular-shaped area of land abutting an improved public street, public lane, or this provision clarify issues the issues. This private street that is required to be kept free of obstructions that could impede the vision of a In cases where a sight triangle has provision will be expanded upon pedestrian or the driver of a motor vehicle exiting onto or driving on the improved public street or been dedicated to the Municipality to exclude lands that have been private street. of Region, it is not necessary to dedicated for a visibility triangle protect for an additional visibility triangle as the sight lines have been calculated and secured for. Section 3.1.j.vi) speaks to the Section 3.1.j.vi) will be revised to 3.27-2 VISIBILITY TRIANGLES location of accessory buildings, remove portions dealing withOn a GOFRGF 10t, where land for a visibility triangle has not been dediGated to the read ' , structures and landscaping on visibility triangles. within the triangle spaGG fE)Fmed by the street lines and a line dFawn fFem a point iR 9Re stFeet line te a residential lots that are located POiRt iR the ether street line, within 3 metres of the streetline Reference to lane will be omitted , as which may impede vision. This from Section 3.22 the definition of , provision should be applicable to Lane will be added to section 2. , Re land shall all zones. It would be appropriate . to incorporate this provision with the visibility triangle provision, as it a. visibility triangle shall be determined as follows: is not necessary to restrict features for 3 metres along the i. the visibility triangle adjacent to an exterior side lot line, where a sight triangle has not entire street frontage. already been dedicated to the road authority, shall be the area enclosed by each of the street lines measured to a point 7.5 metres back from the intersection of the street lines, and a It has been interpreted that diagonal line drawn between these two points; visibility triangles do not apply to lanes. ii. the visibility triangle for a driveway, or right-of-way shall be the area enclosed by the line along the limits of the driveway and the street line measured to a point 3 metres back from the intersection of the street lines and the limits of the driveway, or right-of-way and a diagonal line drawn between these two points. i Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 20 Proposed Zoning_ By-law Amendments Item Zone Provision _ Issue Proposed Solution - Proposed Modification (in bold) & Proposed Deletion (rtrmkp-4hr,,..�h) b. Within a visibility triangle: i. no building or structure shall be constructed, no motor vehicle, trailer or recreational vehicle shall be parked or stored; ii. no fence shall be constructed with a height greater than 0.75 metres; iii. no landscaping feature, including shrubs or trees, are permitted that would impede vision between 0.75 metres and 2.5 metres of height; and iv. No parking space or driveway shall be permitted within a visibility triangle formed at the intersection of any combination of improved public streets, public lane, private streets, or rights-of-way. 3.1 j. vi) Fences, freestanding walls, flag poles, clothes poles, diving boards, antennae, light standards, and similar accessory structures and appurtenances, and hedges, trees, and shrubs are permitted in accordance with Section 3.272, but ;R the Gase of a reoT ial 7nte�riroFlethTr`e situated in aRy residential metFes of any street line wheFe SUGh StFLJGtLJFe, hedge EK ebstruGtiGR W211 irnp-ede ViSieR between a height eIzene, no StFUGtUFe, hedge or obStFUGtien that as mere than 0.75 metres On height is peFFnitted WithiR 3 any t. FIGURE 7 DETERMINING VISIBILITY TRIANGLES STREET/PRIVATE ROAD sm>,WAu -7.5m I - STREET LINE E (EXTF,RIOR SIDE LOT LINE) �. VISIBILITY TRIANGLE ON A CORNER LOT a° yW VISIBILITY TRIANGLE ADJACENT A DRIVEWAY 3m -/ w E r ET F DRIVEWAY [� a l0 PROPERTY LLNESm ff i Section 2 Lane, Public Shall mean a street or road under the jurisdiction of the Corporation of the Municipality of Clarington, having a right of way width of 10 metres or less which is maintained so as to allow normal vehicular access to garages and parking spaces on adjacent properties throughout all seasons of the year. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 21 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed_Modification (in bold) & Proposed Deletion (stribe -thFGt[ h) 52. Add a Section for 0.3 Technically a 0.3 metre reserve is A new general provision will be 3.286 0.3 METRE RESERVES metre reserves located between a lot and a road added for clarification. a) A 0.3 m reserve shall be considered to be part of the abutting Public Street. allowance. This has resulted in b) Notwithstanding subsection (a) above, a 0.3 m reserve shall be considered to be part of the incorrect interpretations that a lot for the purpose of measuring an exterior side yard setback. corner lot does not require an exterior side yard setback. 53.1 Add a Section for Section 3.24 has been interpreted A new section similar to one SECTION 2 Model Homes and as permitting a sales trailer which j provided in the Oak Ridges MODEL HOME Temporary Sales had been intended to permit a Moraine Zoning By-law 2005-109 Shall mean a finished dwelling that is used as an example of a product offered for sale to Offices construction trailer. This section is proposed. Definitions for a purchasers by a realtor, builder, developer, or contractor; which.-?he dwelling may be furnished does not regulate parking, time j Model Home and Temporary but not occupied as a residence while being used as a model home. frame, or the need for agreements ! Sales Office are proposed to be to be in place. added to Section 2. TEMPORARY SALES OFFICE Shall mean a mobile home or a permanent building, including a model home, used exclusively by a realtor, builder, developer or contractor on a temporary basis for the sale, display and marketing of residential lots and dwellings within a draft approved subdivision or condominium plan. 3.25 TEMPORARY SALES OFFICES AND MODEL HOMES a. A building permit for a model home in a draft approved plan of subdivision may be issued provided that: i. the model home is located in the draft approved subdivision plan; ii. the developer has entered into a subdivision agreement with the Municipality; iii the developer has entered into an agreement with the appropriate public authority regarding the provision of sanitary sewer and water services; and iv. the model home complies with the regulations of the zone in which it is located. b. A temporary sales office for a draft approved subdivision or condominium plan may be located on lands within the draft approved plan. The temporary sales office shall be removed or cease operation no later than 2 months from the date of the sale of the last lot within a plan of subdivision of unit within a plan of condominium or the occupation of the last dwelling. i c. A minimum of eight parking spaces shall be provided for a model home or a temporary sales office. 54. New regulations for Our department has been asked Add a provision to permit special RECREATIONAL COMPETITION, MOTORIZED Special Events and to sign building permit applications events. Definitions should be Shall mean any temporary buildings for tents and temporary structures provided for private special , but shall Ret inGlude autemebile i or structures (Tents) for events such as Ribfest, private occasion celebrations to Paces_nrraGeG nr GeMpe+i+inns in"nlviRg aRy other type nr form of mn+prized vohiolo -�� _: __:::r__ _ '= e::; ~v using motorized vehicles for the purposes of erected for a special backyard weddings, etc. I recognize weddings, birthdays, competition in.,nl„inn or,nrF nn,-I,n+hnr,ronrno+innol on+i„ifie event. Definition of anniversaries etc. The definition sport, entertainment or recreation, and may include tractor pulls, snowmobile races, motorcycle/moto- PUBLIC SPECIAL j should be updated to remove cross events, and automobile races. EVENT, PRIVATE j details that were specific to the SPECIAL EVENT, temporary general provision. SPECIAL EVENT and NOT-FOR- Definitions for Special Events Shall meaR aR 8VeRt, open to the public will also be , provided for consistency with the sempetition. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 22 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (stFike_through) PROFIT Special events are defined Special Events By-law.A "the GE)mbiRed te-t-al d-11ratiOR of all Special ORGANIZATION to however, the corresponding definition of"Not-for-Profit Even.tts held en ene ppepeFty shall net eXGeed 68V8R (7) days OR a GaIeRdaF year eXGept *R the case of-a. be added. Definition General Provision was temporary Organization" is proposed which , MUGOG festival GF other Special EveRt Gapa j of RECREATIONAL and deleted on July 28, 1989. The is consistent with the definition of , in COMPETITION to be new provision will provide "Charity" found in the Special of ne longer than throe (3) days on rine nrenerty in r.elenrdaF year° modified and consistency with the By-law 2014- Events on Municipal Roads By- renamed 020 for special events on private law. A regulation is proposed of NeWGastle, aRY School Beard eF aRY public autheFity ORG'udillg any Department ef the RegioRal MOTORIZED property. that would permit a charitable , RECREATIONAL j event on agricultural land. COMPETITIONG9mmi unity GentresAct shall he deemed ``'' be FF'' �s For consistency with Zoning By- SPECIAL EVENT, PRIVATE p law 2005-109, special events exclude a "Motorized Recreational Shall mean an event, the duration of which is temporary in nature, for the purpose of celebrating a Competition". The definition of special occasion which is not open to the public and is not conducted for profit or gain. "Recreational Competition" will be SPECIAL EVENT, PUBLIC changed to match. The term Shall mean a cultural recreational educational or similar event including fairs festivals and "Recreational Competition is not carnivals, the duration of which is temporary in nature. It is open to the public and may be utilized elsewhere in Zoning By- conducted for profit and gain. The term special event shall not include a motorized recreational law 84-63. competition. NOT-FOR-PROFIT ORGANIZATION Shall mean a registered charitable or registered not-for-profit organization that operates for cultural, educational, or religious goals, social welfare, recreation, amateur sport or any other similar community initiative for any purpose except profit. 3.239 SPECIAL EVENTS a. Public Special Events are permitted: i) On a lot owned by a public authority, school, college, university, or place of worship. ii) Within a Zoological Park iii) Within a Commercial or Industrial Zone b. A private or public special event hosted by a Not-for-Profit Organization is permitted in all lands, except those zoned Environmental Protection; c. A private special event is permitted on any lot where a residential use exists and is permitted. d. Regulations for Special Events: i) A Special Event permit must be obtained from the Municipality, if applicable. ii) The combined total duration of all special events held on one lot shall not exceed seven days in a calendar year. iii) In any Commercial or Industrial Zone, the parking area may be used for a special event provided that the number of parking spaces remaining is not reduced below 75% of that required by Section 3.16 for the commercial or industrial uses on the lot. iv) Special events, where a permit has been issued by the Municipality are not subject to the parking and loading space requirements set out in Sections 3.13 and 3.16. v) A temporary building or structure is permitted provided it conforms to the setbacks set out in Section 3.1 c. vi) No Site Alteration is permitted. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 23 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion ( r.4e_+hre .eaH) -- 55. New provision for Currently refreshment vehicles The definitions from the MOBILE REFRESHMENT VEHICLE Refreshment have been permitted by the Refreshment Vehicle By-law will Shall mean a vehicle used exclusively for the sale of prepared food and beverages, designed and Vehicles and Carts. Municipal Licensing By-law in be added to Section 2 with intended to move from one location to another on a regular basis and on short notice and may locations where the Zoning By-law modification to specify that food include facilities for cooking. permits an eating establishment and beverages are offered for provided the refreshment vehicle sale. STATIONARY REFRESHMENT VEHICLE is at least 60 metres from another A list of licensed Refreshment Shall mean a vehicle used exclusively for the sale of pirepar-ed food and beverages, which may eating establishment. The Vehicles was provided by the contain cooking facilities; must be parked or placed in a specific location in order to operate; and Refreshment Vehicle By-law was Clerks Department. The although it may be moved at the end of the work day, or to various different locations on a daily revised in February 2015 and the locations were reviewed to basis, it cannot close down and relocate on short notice. Clerks Department recommended determine appropriate locations in Report CLD-002-15 that staff to permit the use as of right. It is REFRESHMENT CART initiate a zoning by-law proposed to add Shall mean any non-motorized vehicle used exclusively for the sale of prepackaged food and amendment to: beverages, which does not include facilities for cooking. �— Define refreshment vehicles as Mobile refreshment vehicles as a 3.3019 REFRESHMENT VEHICLES AND CARTS • ere Gted ar+e+�/er a type of land use only permitted use to the following a. A mobile refreshment vehicle and/or refreshment cart may be operated in permitted where the zoning ' zone categories: Hamlet associationed with a special event, provided that all licenses and permits, required under the specially permits it. Commercial (C3), Special Special Event and Refreshment Vehicle By-laws have been obtained. Purpose Commercial (C4), • Limit stationary refreshment Service Station Commercial (C6) b. A stationary refreshment vehicle shall only be located in a defined parking area, vehicles as an ancillary land use in certain commercial It is proposed to recognize c. The location of the stationary refreshment vehicle shall not reduce the minimum number zones. This would restrict the existing mobile refreshment parking spaces. refreshment vehicle to lands I vehicles in the General i with an established commercial Commercial (Cl) Zone for 181 Add to Sections 18.1 b. xiv) 19.1 b. xfx) and 21.1 b iv) (C3 C4 and C6 Zones): use. King Street East (Jr's Handmade Stationary Refreshment Vehicle as an accessory use to a permitted use. Sourdough & Hanc's Friews), 205 • Provide for refreshment King Street East, Bowmanville Add to Sections 16.1 b. xxviii), 16.5.35 b. xx), and 22A.4.2 a. i), 7 b. (C1, C1-35, C8-2, RC) vehicles on lands where a (Chipmonks), 34 King Avenue Stationary Refreshment Vehicle provided the property was identified in a Stationary Refreshment special event is being held East, Newcastle (Wingmees), Vehicle licence issued by the Municipality prior to [insert the date of the passing of By-law 2015- 122 King Street East OXX] and the property has continuously been identified in an annual Stationary Refreshment • Provide for "grandfathering" of Bowmanville (My F Word), Vehicle licence issued by the Municipality since that date. existing refreshment vehicle General Commercial Exception Revise SeGtoon 18.4.6 as follows: sites. (C1-35) zone located at 1540nn� CT r�ini EXCEPTION ZONENetwithstandiRg SeGtion 18.1, these lands zened G3 6 en the SGhedules to this By law mayin addition to 4�.4:. HAMLET EXSP iia �� �n Highway 2, Courtice (Stuttering Johns) and in the Large Formatusespermes and ' Commercial Exception (C8-2) andStationaryZene' Refreshment VehiGle provided the property was identified an a Zone (GJ Grill on Wheels locatedonary establishment; efreshment VehiGle IiGenGe issued by the Mun"Gipality prier to [insert the date of the at Canadian Tire), Rural Cluster passing of By-law 2015-OXX] and the property has rentinuously been identified On an annual (RC) Zone (1406 Taunton Road, Stationary Refreshment VehiGle !ArenGe issued by the MuniGipality sinGe that date. The plaGernent Hampton (Speedy Spudz) Revise the Hamlet Commercial Revision to Section 18.4.6 was determined to be unnecessary as the current exception permits Exception (C3-6) Zone to uses permitted in the C3 Zone. The use of a Stationary Refreshment Vehicle is being added to the recognize the only existing Stationary Refreshment Vehicle C3 Zone. Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 24 Proposed Zoning By-law Amendments Item Zone Provision Issue Proposed Solution Proposed Modification (in bold) & Proposed Deletion (strike-through) located at 2363 Taunton Road (Nofty's Chips), currently zoned Rural Cluster RC. The refreshment vehicle at this location has been licensed since 1980. It is assumed that refreshment carts will operate on municipal boulevards which would not be subject to the zoning by-law. A General Provision is proposed which would permit mobile refreshment vehicles and refreshment carts to operate in association with a special event. The General Provisions will also restrict the location to a parking area 56. Add Long Term Care Long Term Care Facilities and Add Long Term Care Facility and 15.1 a. Residential Uses Facility and Retirement Homes are similar in Retirement Home to Section 15.1 ii) Long Term Care Facility Retirement Home to building form to apartment a. iii) Retirement Home the Urban buildings which are permitted Residential Type within the Urban Residential Type Replace the term Nursing Home Replace the term "Nursing Home" with "Long Term Care Facility" in Section 14.6.26 b. ii) and c.; 12.4.3; Four (R4) Zone Four (R4) Zone. It would be with Long Term Care Facility in 12.4.26; 15.4.20 a., b.iv) and c.; 15.4.25 a.; 15.4.32; ; 16.1 b.xii); 16.5.38 b.ii) appropriate to add the uses to this the relevant zone categories and zone category. exception zones. 57. Replace "Bakery Replace the term "Bakery shop" with "Bakery" in Section 16.1 b. ii) shop" with "Bakery" 58. Delete the regulation The regulation contained in Delete Section 16.1 c. G. HOLDING ZONE wheFe the zone symbel shown en a SGhedule te this By law is pFeGeded by the lette for the Holding Zone Section 16.1 c. is redundant as the (H) the use of the lands shall be limited te dwelling units existing at the date ef passing ef the By law. The in the General requirement is covered by the (H) Holding symbel may be removed upon GeURGil being satisfied that the uses to be permitted will be Commercial (Cl) General Provision for a Holding nor�d��T­ Zone Zone in Section 3.11 Note: Text that is highlighted in yellow are proposed revisions since the June 22, 2015 Public Meeting. Page 25 Attachment 2 to Municipality of Clarington PSD-042-15 Proposed Zoning By-law Amendments — Notice for September 14, 2015 Public Meetingj Item j� Zone Provision Issue Proposed Solution ! Proposed Modification (in bold) & Proposed Deletion (strike-*gin) 1. General This Zone applies primarily to the Add a regulation that would I Add the following regulation to 16.2 REGULATIONS FOR RESIDENTIAL USES Section Commercial (Cl) core areas of Bowmanville, prevent dwelling units from Zone Newcastle and Orono. It currently establishing within a storefront. c. Dwelling units may be permitted in the rear portion of the ground floor, or on the second floor or permits dwelling units to be above. Where a dwelling unit occupies a portion of the ground floor, a permitted non-residential established in buildings that use must occupy all of street facing portion of the building. contain a permitted non-residential i use. It does not specify the location within a building for i residential uses. It is possible for j a store front to be converted into a residential use. 2. Home Occupation The number of children cared for The issues will be resolved by Adult Home Care has been questioned-in the past. implementing a similar format to I Shall mean a home occupation that provides temporary care and companionship to senior citizens and/or The Day Nurseries Act does not what is provided for in Zoning By- 1 adults with disabilities on a regular basis for a continuous period not exceeding 24 consecutive hours; include children residing in a home law 2005-109. The definitions of to be included in the number of `Adult Home Care" "Caterer" Caterer children cared for. "Children's Home Care" "Home ! An establishment in which meals are prepared and delivered for consumption off the premises. The term Craft" "Home Occupation" "Light caterer does not include an eating establishment. Teaching of art or craft has been Equipment""Pet Home Care" interpreted as individual instruction j and "Light Equipment Service" Children's Home Care j and includes recreational will be added to Section 2. Shall mean a home occupation that provides temporary care and education of children on a regular basis activities. The purpose of limiting and for continuous periods not exceeding 24 consecutive hours; instruction to individuals is to prevent parking issues associated Home Craft j with larger groups. Shall mean the crafting of small items composed of fabric, wood or earthen materials that are made by hand or with the use of small tools, such as pottery, clothing, birdhouses and mailboxes. Esthetician services have been interpreted as similar to Home Occupation hairdressing and should be Shall mean an occupation or business that is carried on in accordance with all provisions of this By-law, clarified in the definition. within a dwelling as accessory to a permitted residential use. Catering has been interpreted asI Light Equipment permitted Hand tools, small power tools, portable equipment, and machinery containing a small engine, such as air compressors, augers, automotive tools, cleaning equipment, light compaction equipment, concrete and A number of homeowners i masonry equipment, floor and carpet tools, gasoline generators, chain saws,jacks and hydraulic j conduct small-scale pet sitting ! equipment, lawn and garden tools, ladders, moving equipment, painting and decorating equipment, j or grooming home businesses pumps, scaffolding, welding equipment, sporting equipment, party supplies, and other similar tools and j with no greater impact than j accessories. ! hairdressing or the maximum i number of pets permitted by the Light Equipment Service Responsible Pet Owners By-law j An establishment where light equipment is serviced or repaired. 2013-024. Note: Text displayed in italics are proposed changes subject to the Notice of Public Meeting issued for the Public Meeting on June 22, 2015. Text displayed in bold are proposed changes subject to the Notice of Public Meeting for the Public Meeting on September 14, 2015. Text displayed in strikeout is existing text from Zoning By-law 84-63 that is proposed to be deleted. Attachment 2 to Municipality of Clarington PSD-042-15 ................................... .................-T ........­_.___­­­­_..____........ ..................... ............... ......... ...... ............................. ........... ............. Pet Home Care Shall mean a home occupation that provides temporary care, grooming and training of dogs or cats for continuous periods not exceeding 24 consecutive hours. HOME OCCUPATION Shall Fnean aR E)GGUpat'eR whiGh is GaFried OR, aGGGFdaRGe with the pFGVRS;GRS Of the by law, as an thin aGGesseFy use. !RVelvemeRt in a hGme GGG61pation is limited to the members of the family FesidiRg i dwelling unit plus a maximum ef ene additiGRal peFSE)R. For the purposes E)f this by law, herne GGGUpatien shall be limited te: prefessional er adMiRistrative GffiGeS; prEAUGtiGR repair and retail sale ef antiques, aft, GFa#, eF hobby items; the teaGhiRg of art Or Gra# relatpd skills;the repair of small househeld applianGes;babysitting er day n Wed that ne moFe than a w 1 total E)f five GhildFen, six years of age or yGunger, are aG-GGFnrnc)dated at ORe tirne; and a baFber sho ' P haiFdressiRg establishment, A barber shep,-G�r hairdFessing establishFneRt shall GRly be Gensidered a home GGGUpa OR where it is Garried on by merribers of the family resid.R9 in the dwelling and where no additional peFSGR is erripleyed. 3.12 HOME OCCUPATION a. Permitted Uses i) adult home care; business, professional or administrative office; W) caterer; iv) children's home care; v) home craft business, vi) instructional service for an individual; vii) light service shop; viii) personal service; ix) pet home care; and x) repair and retail sales of antiques. b. Excluded Uses i) furniture StFipping refinishing; light equipment service; iii) motor vehicle body shop; iv) motor vehicle repair garage; and v) retail sales, with the exception of antiques and home craft products. c. Regulations The following regulations apply to dwelling units wherein a home occupation is permitted.- vi) The home occupation is limited to the members of the household residing in the dwelling unit, __� _ __ _ _ _' _L plus one additional person. Note: Text displayed in italics are proposed changes subject to the Notice of Public Meeting issued for the Public Meeting on June 22, 2015. Text displayed in bold are proposed changes subject to the Notice of Public Meeting for the Public Meeting on September 14, 2015. Text displayed in strikeout is existing text from Zoning By-law 84-63 that is proposed to be deleted. i Attachment 2 to Municipality of Clarington PSD-042-15 ii) There shall be no display, other than a sign erected in conformity with the By-laws of the Municipality, to indicate to persons outside that any part of the dwelling unit or lot is being used for a purpose other than residential. iii) Such home occupation shall be clearly secondary to the main residential use and shall not change the residential character of the dwelling unit nor create or become a public nuisance due to the levels I traffic, parking, noise glare, dust, odours, or vibration and hours of operation. iv) Such home occupation shall not interfere with communication signals. vii) Not more than twenty-five (25) percent of the total floor area of the dwelling unit shall be used for the purposes of the home occupation use except in the case of a "Bed and Breakfast or Vacation Farm Establishment"and such home occupation shall be conducted within the principal residence. vi) Parking shall be provided in accordance with Section 3.16. viii) - There shall be no outside storage of goods or materials associated with a home occupational use. j viii) An adult home care may accommodate a maximum of five adults that do not reside in the dwelling at j one time. The rear yard of the dwelling may be used as accessory to the adult home care establishment. ix) A children's home care may accommodate a maximum of five children, not including the owner's children. The rear yard of the dwelling may be used as accessory to the children's home care. x) A pet home care may accommodate a maximum of three dogs, including the owner's dogs. ! j The rear yard of the dwelling may be used as an accessory to the pet home care. jA) The rear yard of the dwelling may be used as an accessory to the instructional service of an individual. 3. Holding Zone Section 3.11 includes a provision i Delete the portion of the section 3.11 HOLDING ZONE j which indicates when a (H) which speaks to the criteria for Unless otherwise specified within the respective zone regulations, where the zone symbol shown on a Holding Symbol may be removed. removing a (H) Holding Symbol. j Schedule to this By-law is preceded by the letter (H), until such time as the (H) symbol is removed Similar policies are contained in Revise the balance of the section from the land by amendment to this By-law, no land shall be used and no building or structure Section 23.4.3 of the Municipality for consistency with the Oak shall be constructed, enlarged, or used for any purpose other than for the purpose of continuing of Clarington Official Plan. The ; Ridges Moraine Zoning By-law the existing use, or for the purpose of conservation. the use of the lands ohnn he limited to existing conditions for lifting an (H) symbol 2005-109. Fesidential w6es, and Genservatien, ferestpy, are a policy issue for the Official existed at the time the ZE)R*Rg By law was ameRded to apply the (H) Helding Symbel. The (H) Holding i Plan. This change brings the BySymbol may be rerneved upon GeunGil being satisfied that the uses to be permitted will be adequately - I law into conformity with the Official ( sePV'Gedthe lands to be used have adequate ' Plan. This section should only ! , prier uses of W'fl net pFevent the use of that the lands and pF()peE;ed uses will be adequately detail what uses are permittedPFGteGted frern any physiGal er man made hazard GF Genditions aGGeGiated with the lands, while the (H) Holding Symbol is , have been eX8Guited applied to lands. with the MuniGipality of Glaringten and the QwneF has,satisfied all ef the requirements of the Regional MuniGipality of DuFharn with FeE;peGt te the p ef sewer and water 6eFViGes and Regional reads aentered in+e any nenessary agFeements in +hic regaFd Note: Text displayed in italics are proposed changes subject to the Notice of Public Meeting issued for the Public Meeting on June 22, 2015. Text displayed in bold are proposed changes subject to the Notice of Public Meeting for the Public Meeting on September 14, 2015. Text displayed in strikeout is existing text from Zoning By-law 84-63 that is proposed to be deleted. i I i I Attachment 3 to Municipality of Clarington Report PSD-042-15 CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW NO. 2015- being a By-law to amend Zoning By-law 84-63. I WHEREAS the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63. i I NOW THEREFORE BE IT RESOLVED THAT the Council of the Corporation of the Municipality of Clarington enacts as follows: 1. By-law 84-63 is.amended as set out in Sections 2 through 72 of this By-law. 2. Section 2 - DEFINITIONS, is amended as follows: a) The following definitions are deleted: "FAMILY", "GROUP HOME", "KENNEL, COMMERCIAL", "KENNEL, PRIVATE", "NURSING HOME", "SENIOR CITIZENS' APARTMENT BUILDING", and "SPECIAL EVENT". b) The following definitions are added: ADULT HOME CARE 4 Shall mean a home occupation that provides temporary care and companionship to senior citizens and/or adults with disabilities on a regular basis for a continuous period not exceeding 24 consecutive hours. (; i CATERER Shall mean an establishment in which meals are prepared and delivered for consumptionoff the premises. The term caterer does not include an eating establishment. CHILDREN'S HOME CARE Shall mean a home occupation that provides temporary care and education of children on a regular basis and for continuous periods not exceeding 24 4 consecutive hours. E. 12-21 CLUB HOUSE FACILITY Shall mean a facility accessory to a golf course or a private club which may include uses such as a pro-shop, snack bar, banquet facility and a lounge/recreation area. CONVENTION CENTRE Shall mean an establishment having facilities for meetings, seminars, exhibitions, workshops, and other similar activities to serve participants but does not include sleeping accommodations. CONDOMINIUM Shall mean a building or grouping of buildings in which units are held in private ownership and floor space, facilities and/or outdoor areas used in common are owned, administered and maintained by a corporation created pursuant to the provisions of the appropriate statute. CONDOMINIUM, COMMON ELEMENT Shall mean spaces and features owned in common by all shareholders in a condominium and may include common element roadways, walkways, sidewalks, parking.and amenity areas. CONDOMINIUM, COMMON ELEMENT ROADWAY Shall mean a right-of way for vehicular access that is privately maintained by a corporation created pursuant to the provisions of the appropriate statute. CREMATORIUM Shall mean a building or structure fitted with appliances for the purpose of cremating human remains under the Funeral, Burial and Cremation Services Act, as amended. Ancillary uses may include a chapel or other operational functions.related to a cemetery. DWELLING, LINKED Shall mean a building constructed to be separated vertically into two separate dwelling units, connected underground by footing and foundation, and does not share a common wall above ground, each of which has an independent entrance directly from the outside of the building and each of which is located on a separate lot. ENERGY INDUSTRY Shall mean an establishment that focuses on the development, commercialization and/or demonstration of energy products and services, including assembly, manufacturing, fabricating or processing activities that are"not offensive by reason of the amount of noise, smoke, odour, emissions, or vibration produced, but not including a recycling facility, material sorting or dismantling, a waste management or processing facility, or a waste incineration facility are excluded. Page 12 12-22 I ENERGY RELATED: Shall mean a use within a building or structure that is directly involved in the administration, distribution, research and development, testing or production of energy and energy related products. ESTABLISHMENT Shall mean a building, structure and/or area of land within or on which any activity referred to in this By-law is conducted. i FITNESS CENTRE Shall mean an establishment that provides facilities for recreational or athletic activities, including but not limited to body-building and exercise classes. FLEA MARKET i Shall mean an establishment for occasional or periodic sales activity where floor space is rented or licenced to ten or more individual sellers offering goods, new and used, and where the space allocated to each individual seller is not physically separated by walls which extend from the floor to ceiling from the space allocated to other individual sellers. GOLF DRIVING RANGE Shall mean an outdoor facility operated for the purpose of developing golfing techniques, including miniature golf, but excluding golf courses. GOLF DRIVING RANGE, INDOOR Shall mean an enclosed facility operated for the purpose of developing golfing techniques but excludes golf courses. HOME CRAFT r Shall mean the crafting of small items that are made by hand or with the use r of small tools. KENNEL Shall mean a building or structure within which four or more dogs or cats are being bred, kept or boarded for profit and includes any associated lands. k LANE, PUBLIC Shall mean a street or road under the jurisdiction of the Corporation of the Municipality of Clarington, having a right of way width of 10 metres or less which is maintained so as to allow normal vehicular access to garages and parking spaces on adjacent properties throughout all seasons of the year. LIGHT EQUIPMENT Shall mean hand tools, small power tools, portable equipment, and machinery containing a small engine, such as air compressors, augers, automotive tools, cleaning equipment, light compaction equipment, concrete and masonry equipment, floor and carpet tools, gasoline generators, chain saws, jacks and hydraulic equipment, lawn a.nd garden tools, ladders, moving equipment, painting and decorating equipment, pumps, scaffolding, welding Page 13 12-23 equipment, sporting equipment, party supplies, and other similar tools and accessories. LIGHT EQUIPMENT SERVICE Shall mean an establishment where light equipment is serviced or repaired. MODEL HOME Shall mean a finished dwelling that is used as an example of a product offered for sale to purchasers by a realtor, builder, developer, or contractor, which may be furnished but not occupied as a residence while being used. MINIMUM DISTANCE SEPATARTION FORMULAE Shall mean a guideline established by the Province to minimize nuisance complaints due to odour and thereby reduce potential land use conflicts by determining appropriate separation between livestock and manure storage facilities and neighbouring non-agricultural uses, including residential, institutional, industrial, commercial, or recreational uses. MOBILE REFRESHMENT VEHICLE Shall mean a vehicle used exclusively for the sale of food and beverages, designed and intended to move from one location to another on a regular basis and on short notice and may include facilities for cooking. NOT-FOR-PROFIT ORGANIZATION Shall mean a registered charitable or registered not-for-profit organization . that operates for cultural, educational, or religious goals, social welfare, recreation, amateur sport or any other similar community initiative for any purpose except profit. PARKING STRUCTURE Shall mean a part of a building which is provided and maintained for the purpose of parking vehicles, and may include parking spaces, parking aisles and access ramps, common areas for stairs and elevators, storage areas for tenants, and mechanical rooms. PET HOME CARE Shall mean a home occupation that provides temporary care, grooming and training of dogs or cats for continuous periods not exceeding 24 consecutive hours. REFRESHMENT CART Shall mean any non-motorized vehicle used exclusively for the sale of prepackaged food and beverages, which does not include facilities for cooking. RESEARCH AND DEVELOPMENT FACILITY Shall mean an establishment used for the purpose of conducting pure and applied research and experimentation and includes such facilities as administrative offices, laboratories, lecture rooms, display rooms, pilot units, Page 14 12-24 simulating equipment and the like and service and machine shops to serve the research and development facility. SITE ALTERATION Shall mean activities such as filling, grading and excavation that would change the landform and natural vegetative characteristics of land, but does not include. a. the construction-of facilities for transportation, infrastructure and utilities uses, by a public body; or b. activities or works under the Drainage Act; and C. the carrying out of agricultural practices, on land that continues to be used for agricultural uses. SPECIAL EVENT, PRIVATE Shall mean an event, the duration of which is temporary in nature, for the purpose of celebrating a special occasion which is not open to the public and is not conducted for profit or gain. SPECIAL EVENT, PUBLIC Shall mean a cultural, recreational, educational or similar event including fairs, festivals and carnivals, the duration of which is temporary in nature. It is open to the public and may be conducted for profit and gain. The term special event shall not include a motorized recreational competition. STATIONARY REFRESHMENT VEHICLE Shall mean a vehicle used exclusively for the sale of food and beverages, which may contain cooking facilities; must be parked or placed in a specific location in order to operate; and although it may be moved at the end of the work day, or to various different locations on a daily basis, it cannot close down and relocate on short notice. TEMPORARY SALES OFFICE Shall mean a mobile home or a permanent building, including a model home, used exclusively by a realtor, builder, developer or contractor on a temporary basis for the sale, display and marketing of residential lots and dwellings c' within a draft approved subdivision or condominium plan. VISIBILITY TRIANGLE Shall mean a triangular-shaped area of land abutting an improved public street, public lane, or private street that is required to be kept free of obstructions that could impede the vision of a pedestrian or the driver of a motor vehicle exiting onto or driving on the improved public street or private. street. c) By replacing the titles of the following definitions as set out below: j "PARKING SPACE, DISABLED PERSONS"with "PARKING SPACE, ACCESSIBLE"; "LAUNDRY, COIN OPERATED" with "LAUNDRY"; and Page 15 12-25 "RECREATIONAL COMPETITION" with "RECREATIONAL COMPETITION, MOTORIZED". d) By replacing the following definitions as set out below: "APARTMENT BUILDING Shall mean a separate building containing 4 or more dwellings which have a common entrance from street level and the occupants of which have equal rights to the use of all common halls, stairs, elevators, yards, and amenity areas. BOARDING OR ROOMING HOUSE Shall mean a building in which more than 2 and less than 6 bedrooms intended for use as separate living accommodations, without kitchen facilities, are rented. Shared bathroom, kitchen and living facilities may be provided. The building may include a dwelling unit for the proprietor and/or his agent. DWELLING Shall mean two (2) or more habitable rooms, designed or intended for use by one household, in which sanitary facilities and one kitchen are provided for the exclusive use of the household, in which a heating system is provided, and, which has a private entrance from outside the building or from a common hallway or stairway inside the building. For the purposes of this By- law a dwelling does not include a tent, trailer, mobile home, or a room or group of rooms in a boarding or rooming house, a hotel, motel, motor hotel or camping establishment. For the purpose of this definition, dwelling shall also mean dwelling unit. DWELLING DUPLEX Shall mean the whole of a building that was constructed with vertical or horizontal dividing walls, creating two separate dwellings, each of which has an independent entrance either directly from the outside or through a common vestibule. DWELLING, SEMI-DETACHED Shall mean a building constructed to be separated vertically into two separate dwelling units, connected by a common wall above and below ground, each of which has an independent entrance directly from the outside of the building and each of which is located on a separate lot. But does not include a dwelling unit to be erected next to or added onto an existing single detached dwelling. EATING ESTABLISHMENT Shall mean an establishment where prepared food and beverages are offered for sale to customers. Page 16 12-26 i EATING ESTABLISHMENT, TAKE-OUT Shall mean.an eating establishment where tables and/or counters for the.use of customers are not provided. HOME OCCUPATION Shall mean an occupation or business that is carried on within a dwelling as an accessory to a permitted residential use. i LANDSCAPED OPEN SPACE Shall mean the open unobstructed space from ground to sky at finished grade on a lot which is used exclusively for landscaping, and includes any surfaced walk, patio, deck or similar area no more than 200 mm above finished grade, at its highest point, but does not include any driveway or ramp, whether surfaced or not, any curb, retaining wall, parking area or any open space beneath or within any building or structure. I LAUNDRY Shall mean a commercial establishment where the service of laundry, cleaning, using only water, detergents and additives, is made available to the public. LOT COVERAGE Shall mean that percentage of the lot area at finished grade covered by all buildings or structures. An outdoor swimming pool; and a patio or deck no more than 200 mm above finished grade, at its highest point; shall not be considered as a structure for the purpose of calculating lot coverage. Where I a lot is divided into more than one zone, the lot coverage in each zone shall be calculated as it applies only to that portion of the lot that is located within the specific zone. LOT FRONTAGE The minimum straight-line distance between the side lot lines measured along the front lot line of a lot. Where the front lot line is not a straight line or where the side lot lines are not parallel, the lot frontage is measured along a line parallel to the chord of the lot frontage and set at 6 metres from the front lot line. The chord of the lot frontage is measured as a straight line joining the points where each side lot line intersects the front lot line. i r r Page ,17 12-27 FIGURE 4: DETERMINING LOT FRONTAGE p�vgo� 4D BUILDING REQUIRED FRONT YARD SETBACK RECREATIONAL COMPETITION, MOTORIZED Shall mean any competition involving sport and other recreational activities using motorized vehicles for the purposes of entertainment or recreation, and may include tractor pulls, snowmobile races, motorcycle/moto-cross events, and automobile races. RETIREMENT HOME Shall mean a residential facility, licensed by the Retirement Home Regulatory Authority, that provides accommodation in suites primarily for retired persons or couples. Such suites shall not have a stove or range and shall have separate entrances from a common hall. Common facilities for the preparation and consumption of food are provided. Common lounges, recreation rooms, medical care facilities and ancillary uses such as a beauty salon, barber shop or tuck shop may also be provided. Page 8 12-28 e) By adding the following figure to the definition of ESTABLISHED BUILDING LINE, RESIDENTIAL, COMMERCIAL AND INDUSTRIAL ZONES: FIGURE 1: DETERMINING ESTABLISHED BUILDING LINE i STREET/PRIVATE ROAD AVERAGE SETBACK REQUIRED FRONT YARD a SETBACK E� F1 W ESTABLISHED/EXISTING W I BUILDINGS f) By adding the following figure to the definition of HEIGHT OF BUILDING FIGURE 2: DETERMINING HEIGHT OF A BUILDING OR STRUCTURE .�. FLAT ROOF FRONT , SIDE ' GRADE �� RIDGE 112 ------------- E_ W EAVE HIP ROOF U OR FRONT i SIDE GABLE ROOF GRADE � RIDGE ROOF DECK LINE --T----- =EAVE MANSARD ROOF Ch OR FRONT SIDE GAMBREL ROOF GRADE � I RIDGE -1/2 jEAVVE- FRONT SALT BOX ROOF i SIDE GRADE i' Page 19 12-29 I. g) By adding the following figure to the definition of LOT, CORNER: FIGURE 3: DETERMINING A CORNER LOT STREET/PRIVATE ROAD STREET LINE �S 7a BUILDING 'lrp. O h) By adding the following figure after the definition of YARD: FIGURE 5: TYPES OF YARDS I --------------------------------------- STREET/PRIVATE ROAD EXTERIOR SIDE LOT LINE i EXTERIOR I , W i SIDE YARD f ,a h a O REAR i BUILDING FRONT E' 04 YARD i i YARD 0 i i i I a i INTERIOR SIDE YARD INTERIOR SIDE LOT LINE I i I 3. Sections 3.1 c., d., e. and g. are replaced as follows: 3.1 c. Regulations —Accessory Buildings, Structures and Uses table provides regulations for accessory structures. Where a zone category is not identified in the table, the accessory building/structure and use shall comply with the parent zone regulations where specified. Page 110 12-30 REGULATIONS ACCESSORY , STRUCTURES , USES Type of Total Lot Total Height Yard Setbacks Yp 9 Structure coverage accessory (max) max Floor Area Interior Exterior (max) Front Rear (max) Side Side K w Ruralesacienttalro'i�gculturaldr� rmzenx1?rte . o 'Zones( ► ere i 120 m2 with a 3 metres witha floor area 1.2 m minimum lot equal to or or area of 2 less than 10 0 m to a Accessory hectares 2 common Building or 10%of lot area m Zone 1.2 m wall with a Zone 2 Regulation Regulation � Structure 90 m with a detached 4.5 metres lot area less wi h a floor garage on than 2 area greater an abutting hectares than 10 m2 lot Swimming Not ANot Not Zone Pool Applicable Applicable Applicable Regulation 1.2 m 1.2 m 1.2 m Urban Res�dentialZQi�es 0.6 m 3 metres with a Accessory 0.6 m floor area equal Buildings or 6.0 m from to or less than Not Om to a Accessory 10 m2 Permitted common the streetline f Building or 10%of lot area 60 m2 0.6 m wall with a to a k detached Structure 4 metres with Accessory detached garage with a floor area Structures garage on greater than Zone an abutting a garage 10 m2 Regulation lot door facing the exterior side yard. j Swimming Not Applicable Not Not Not 1.2 m 1.2 m 1.2 m Pool Applicable Applicable Permitted �- � � C mmercl nc�ustr I Q f�1VIaor�1 _ �t t oal�nes �� f 50%of 3 metres with ground floor a floor area area of a less than �` 2Not Zone All uses Not Applicable principal 10m Permitted 1.2 m 1.2 m Regulation building to a 4.5 metres maximum of with a floor 60 m2 area greater than 10m2 Page 11 12-31 4. Section 3.1 j. iv) is replaced as follows: "Balconies, canopies, unenclosed porches, steps, patios, ramps, or decks attached or directly abutting the principle or main building; either above or below grade; may project into any required front, side, or rear yard to a distance of not more than 1.5 metres, but in no instance shall a required side yard be reduced to below 0.6 metres; 5. Section 3.1 j. vi) is replaced as follows: Fences, freestanding walls, flag poles, clothes poles, diving boards, antennae, light standards, and similar accessory structures and appurtenances, and hedges, trees, and shrubs are permitted in accordance with Section 3.27. 6. By deleting Section 3.4 (DWELLING UNITS BELOW GRADE) and renumbering the remaining sections.. 7. By replacing Section 3.9 FRONTAGE ON IMPROVED PUBLIC STREET, UNASSUMED ROAD AND PRIVATE RIGHT-OF-WAY as follows: a. Improved Public Street No building or structure shall be erected in any Zone, unless the lot fronts upon an improved public street, maintained year round. b. Unassumed Street Buildings or structures are permitted on an unassumed street provided they are on a lot in a Registered Plan of Subdivision. C. Private Right-of-Way i) A building or structure constructed prior to the date of the passing of this By-law that is not located on an improved public street, or is located on a private right-of-way, may be enlarged, altered or renovated and an accessory structure may be constructed, provided the use is permitted in the zone in which it is located. ii) A building permit may be issued for a lot created prior to the date of the passing of this By-law for a lot that has access to a private right-of-way provided the use is permitted in the zone in which it is located. d. Private Street A building or structure may be permitted on a lot which has frontage on a Private Street where such Private Street existed at the date of passage of this by-law, or where such street is shown on a site plan approved under the Planning Act. Page ( 12 12-32 8. By replacing Section 3.11 HOLDING ZONE as follows: "Unless otherwise specified within the respective zone regulations, where the zone symbol shown on a Schedule to this By-law is preceded by the letter (H), until such time as the (H) symbol is removed from the land by amendment to this By-law, no land shall be used and no building or structure shall be constructed, enlarged, or used for any purpose other than for the purpose of continuing the existing use, or for the purpose of conservation." 9. By replacing Section 3.12 HOME OCCUPATION as follows: "3.12 HOME OCCUPATION a. Permitted Uses i) adult home care; ii) business, professional or administrative office; j iii) caterer; iv) children's home care; v) home craft business; vi) instructional service for an individual; vii) light service shop; viii) personal service; ix) pet home care; and x) repair retail sales of antiques. b. Excluded Uses f i) furniture refinishing; ii) light equipment service; iii) motor vehicle body shop; iv) motor vehicle repair garage; and r v) retail sales, with the exception of antiques and home craft products. j j C. Regulations The following regulations apply to dwelling units wherein a home occupation is permitted: i) The home occupation is limited to the members of the household residing in the dwelling unit, plus one additional person. ii) There shall be no display, other than a sign erected in conformity with the By-laws of the Municipality, to indicate to persons outside that any part of the dwelling unit or lot is being used for a purpose other than residential. iii) Such home occupation shall be clearly secondary to the main residential use and shall not change the residential character of the dwelling unit nor create or become a public nuisance due4o the levels traffic, parking, noise, glare, dust, odours, or vibration and hours of operation. ' iv) Such home occupation shall not interfere with communication signals. Page 113 12-33 v) Not more than twenty-five (25) percent of the total floor area of the dwelling unit shall be used for the purposes of the home occupation use except in the case of a Bed and Breakfast or Vacation Farm Establishment and such home occupation shall be conducted within the principal residence. vi) Parking shall be provided in accordance with Section 3.16. vii) There shall be no outside storage of goods or materials associated with a home occupational use. viii) An adult home.care may accommodate a maximum of five adults that do not reside in the dwelling at one time. The rear yard of the dwelling may be used as accessory to the adult home care establishment. ix) A children's home care may accommodate a maximum of five children, not including the owner's children. The rear yard of the dwelling may be used as accessory to the children's home care. x) A pet home care may accommodate a maximum of three dogs, including the owner's dogs. The rear yard of the dwelling may be used as an accessory to the pet home care. A) The rear yard of the dwelling may be used as an accessory to the instructional service of an individual." 10. By replacing Section 3.14 MULTIPLE ZONES ON ONE LOT as follows: "Where a lot is divided into more than one zone, under the provisions of this By- law, each separately zoned portion of the lot shall be used in accordance with the use provisions for the applicable zone. All buildings, structures and uses shall conform to the applicable zone regulations for that zone as if each separately zoned portion was a lot. However, a. no lot shall have more than one dwelling on the whole of the lot except as specifically permitted by this By-law; and/or b. where this By-law limit divides a property, provided the use of that portion of the lot conforms, this By-law limit shall not be a zone limit for defining yard setbacks, except for the setback requirements of Section 3.21." 11. The title of Section 3.16 b. is replaced with "Accessible Parking Spaces". 12. Section 3.16 b. i) is replaced as follows: "Each accessible parking space shall be a minimum 4.5 metres wide and 5.7 metres long. When paired, the width can be reduced to 3.4 metres, provided a 1.5 metre access aisle is located between the paired spaces." 13. Section 3.16 c. is replaced.as follows: C. Parking Space Sizes i) Each parking space shall be a minimum of 5.7 m by 2.75 m. ii) Where the two outdoor parking spaces for single detached, semi- detached and/or townhouse units are provided side by side the combined minimum width of the two spaces may be reduced to 4.6 m. Page 114 12-34 i iii) Parking spaces provided in the front yard for detached, semi-detached and/or townhouse units must not reduce the minimum landscaped open space within the .front yard below 30 percent. iv) Parking space size perpendicular to a landscaping strip having a minimum width of 3.0 metres may be reduced in size to 5.2 metres in length by 2.75 metres in width. 14. Section 3.16 e., "Parking Space Requirement Table' Residential (i) is replaced as follows: Apartment, Four-plex, Six-plex, or 1 Bedroom Apartment- 1 space per unit. Converted Dwelling House 2 Bedroom Apartment- 1.25 spaces per unit. Apartment containing 3 or more bedrooms, four-plex, converted dwelling or triplex house - 1.5 spaces per unit. Plus 0.25 visitor spaces per dwelling, 10 % of which are to be accessible parking spaces. 15. Section 3.16 e., the "Parking Space Requirement Table' Residential (ii) is amended by replacing the term "Boarding or Lodging House' with `Boarding or Rooming House"; deleting the word guest after the word "per"; and adding the words "provided for separate living accommodation" after the word room. 16. Section 3.16 e., the "Parking Space Requirement Table' is amended by replacing Residential (iv) as follows: "(iv) Linked Townhouse Two parking spaces per dwelling and Stacked Townhouse Plus 0.25 visitor spaces per dwelling, 10% of which are to be accessible parking spaces". I 17. Section 3.16 e., the "Parking Space Requirement Table' Residential (v) is amended by adding the words "or Garden Suite' after "Apartment-in-house' 18. Section 3.16 i. iv) is amended by replacing the words "a front, interior side or rear" with the word "any" before the word "yard". 19. Section 3.16 k. is amended by deleting the words "In addition to the foregoing provisions" in the first line; and by adding the words "unrelated to a farm use' after the word "vehicles," in the second line of the third paragraph. I. i Page 15 12-35 20. By adding the following Section and renumbering the remaining sections: "3.19 REFRESHMENT VEHICLES AND CARTS a. A mobile refreshment vehicle and/or refreshment cart may be operated in association with a special event, provided that all licenses and permits, required under the Special Event and Refreshment Vehicle By-laws have been obtained. b. A stationary refreshment vehicle shall only be located in a defined parking area. C. The location of the stationary refreshment vehicle shall not reduce the minimum number parking spaces." 21. Section 3.21 c. is replaced as follows: d. No residential, institutional, industrial, commercial or recreational use, located on a separate lot otherwise permitted by this By-law shall be erected or enlarged unless it complies with the Minimum Distance Separation Formulae. e. No livestock facility shall be erected or enlarged unless it complies with the Minimum Distance Separation Formulae. f. Subsection d. shall not apply to a residential building constructed on an existing lot or a lot within a registered plan of subdivision. g. Subsection e. shall not apply to a livestock facility located within the limits of a settlement area. 22. Section 3.21 d. is replaced as follows: No residential or institutional use shall be located closer than 30.0 metres from any railway property line. 23. By adding the following Section: "3.23SPECIAL EVENTS a. Public Special Events are permitted: i) On a lot owned by a public authority, school, college, university, or place of worship. ii) Within a Zoological Park iii) Within a Commercial or Industrial Zone b. A private or public special event hosted by a Not-for-Profit Organization is permitted in all lands, except those zoned Environmental Protection; C. A private special event is permitted on any lot where a residential use exists and is permitted. d. Regulations for Special Events: i) A Special Event permit must be obtained from the Municipality, if applicable. Page 116 12-36 ii) The combined total duration of all special events held on one lot shall not exceed seven days in a calendar year. iii) In any Commercial or Industrial Zone, the parking area may be used for a special event provided that the number of parking spaces remaining is not reduced below 75% of that required by Section 3.16 for the commercial or industrial uses on the lot. iv) Special events, where a permit has been issued by the Municipality are not subject to the parking and loading space requirements set out in Sections 3.13 and 3.16. v) A temporary building or structure is permitted provided it conforms to the setbacks set out in Section 3.1 c. vi) No Site Alteration is permitted." 24. By adding the following Section: "3.25 TEMPORARY SALES OFFICES AND MODEL HOMES a. A building permit for a model home in a draft approved plan of subdivision may be issued provided that: i) the model home is located in the draft approved subdivision plan; ii) the developer has entered into a subdivision agreement with the Municipality; iii) the developer has entered into an agreement with the appropriate public authority regarding the provision of sanitary sewer and water services; and iv) the model home complies with the regulations of the zone in which it is 'located. b. A temporary sales office for a draft approved subdivision or condominium plan may be located on lands within the draft approved plan. The temporary sales office shall be removed or cease operation no later than 2 months from the date of the sale of the last lot within a plan of subdivision of unit within a plan of condominium or the occupation of the last dwelling. C. A minimum of eight parking spaces shall be provided for a model home or a temporary sales office." i 25. Existing Section 3.22 VISIBILITY TRIANGLES is replaced as follows: "3.27 VISIBILITY TRIANGLE a. A visibility triangle shall be determined as follows: i) the visibility triangle adjacent to an exterior side lot line, where a sight triangle has not already been dedicated to the road authority, shall be the area enclosed by each of the street lines measured to a point 7.5 metres back from the intersection of the street lines, and a diagonal line drawn j between these two points; j Page 117 12-37 t ii) the visibility triangle for a driveway, lane, or right-of-way shall be the area enclosed by the line along the limits of the driveway and the street line measured to a point 3 metres back from the intersection of the street lines and the limits of the driveway, or right-of-way and a diagonal line drawn between these two points. b. Within a visibility triangle: i) no building or structure shall be constructed, no motor vehicle, trailer or recreational vehicle shall be parked or stored; ii) no fence shall be constructed with a height greater than 0.75 metres; iii) no landscaping feature, including shrubs or trees, are permitted that would impede vision between 0.75 metres and 2.5 metres of height; and iv) no parking space or driveway shall be permitted within a visibility triangle formed at the intersection of any combination of improved public streets, public lane, private streets, or rights-of-way." FIGURE 6: DETERMINING VISIBILITY TRIANGLES STREET 1 PRIVATE ROAD ...::. ::•::•::•::•.::::::..::::::::......:...• :•;;;:•;..............•..:.::.....................::.: ;::;:;;.;:>;;;;:;,s;;:;;;sm�wALx:....:..:.:...::.:::.•:.: . T i STREET LINE E i (EXTERIOR SIDE LOT LINE) VISIBILITY TRIANGLE ON A CORNER LOT O VISIBILITY TRIANGLE ADJACENT A DRIVEWAY 3m H- 11 i I H DRIVEWAY W :2 E I PROPERTY LINE I 3m I-- 26. By adding the following Section: "3.28 0.3 METRE RESERVES a. A 0.3 m reserve shall be considered to be part of the abutting Public Street. b. Notwithstanding subsection (a) above, a 0.3 m reserve shall be considered to be part of the lot for the purpose of measuring.an exterior side yard setback." Page 18 12-38 27. Sections 5.2.5, 6.4.15, 6.4.27, 6.4.35, 12.4.27, 12.4.37, and 13.4.17 are amended by deleting the word "family" and replacing it with the word "detached. 28. Sections 6.1 a. iii), 6.4.1 a. iii), and 12.4.26 are amended replacing the word "family" with the word "household". 29. Sections 6.1 b. v), 6.4.14, and 6.4.14 a), are amended by deleting the word "commercial" before the word "kennel". 30. Section 6.1 b. ix) (Private Kennels) and 6.4.1 b. v) (Private Kennels) are deleted. 31. By deleting Section 6.4.16 (AGRICULTURAL EXCEPTION (A-16) ZONE), 9.3.2 (RESIDENTIAL HAMLET EXCEPTION (RH-2) ZONE) and 12.4.6 (URBAN RESIDENTIAL EXCEPTION (R1-6) ZONE) (Group Homes) 32. Sections 6.4.25 a), and 6.4.83 a) are deleted (definitions of Golf Driving Range, Indoor Golf Driving Range, and Club House Facility). 33. Section 6.4.58 is revised by deleting the last paragraph (definition of Golf Driving i Range). 34. Section 6.4.64 a. is deleted (definitions of Crematorium and Landscape Strip). 35. Section 6.4.65 b. is revised by deleting the second paragraph (definition of Flea Market). j 36. By replacing the term "Nursing Home" with "Long Term Care Facility" in Sections 12.4.3; 12.4.26; 14.6.26 b. ii) and c.; 15.4.20 a., b. iv) and c.; 15.4.25 a.; 15.4.32; 15A; 16.1 b. xii); and 16.5.38 b. ii). 37. Section 12.4.31 URBAN RESIDENTIAL EXCEPTION (R1-31) is replaced as c 4 follows: "Notwithstanding Section 12.1, only a linked dwelling may be permitted on those lands zoned R1-31 on the Schedules to this By-law. The placement of buildings and structures shall be subject to the zone regulations as set out in Section 12.2." 38. Section 12.4.36 is amended by deleting the words "group home". I Page 19 12-39 39. Section 12.4.65 URBAN RESIDENTIAL EXCEPTION (R1-65) ZONE is replaced as follows: "Lands zoned R1-65 on the Schedules to this By-law may, in addition to the other uses permitted in the R1 Zone, be used for a Garden Suite until January 30, 2016." 40. Section 14.1 a. v) is amended by adding the words "or rooming" after the word "boarding". 41. Sections 14.6..24 i. i) c), 15.4.19 b. viii), 16.1 b. ix), 16.5.17 a. viii), 16.5.35 b. xiii), 16.5.46 c. iv), 16.5.56 c. ix), 17.1 b. v), 17.5.2 a. iv), 22.4.8.b iv), 22.13.2 b. x) are amended by deleting the words "coin operated". 42. Sections 14.6.25 a. i), 14.6.26 a. i), 14.6.31 a. i), 14.6.35 a., 14.6.41 a. i), and 14.6.42 a.i) are deleted (definition of Dwelling, Stacked Townhouse). 43. Sections 14.6.26 a. ii), 15.4.23 a. i), and 15.4.32 a., are deleted (definition of Retirement Home). 44. Sections 14.6.26 b. iv), 14.6.26 c., and 15.4.22 b. i) are amended by deleting the words "Senior Citizens"' before the words "Apartment Building". 45. Section 15.1 a. is revised by adding the following: "ii) Long Term Care Facility; and iii) Retirement Home." 46. Sections 15.4.21 a.i), 15.4.22 a. i), 16.5.11 a. i), 16.5.15 a.x), 16.5.20 a. i), 16.5.21 a. i), 16.5.22 a. i), 16.5.26 a: i), 16.5.27 a. i), 16.5.39 a. iii), and 20.4.13 a. i) are deleted (definition of Landscaping Strip). 47. Sections 15.4.29 a. i), and 15.4.30 a. i) are deleted (definition of Underground Parking Structure). 48. Section 15.4.35 a. and 15.4.36 a., which references Section 15.4.35 a., are deleted (definitions of Long Term Care Facility, Retirement Home and Underground Parking Structure). 49. Section 15A. MAJOR INSTITUTIONAL (P1) ZONE is revised by adding the word "urban" in front of the word "residential" in Sections 15A.2 c iii) and iv); and by deleting the definition of "Residential Zone" in Section 15A.3. 50. Section 16.1 b. is revised by adding the following and renumbering the balance: "xxviii) Stationary Refreshment Vehicle provided the property was identified in a Stationary Refreshment Vehicle license issued by the Municipality prior to September 21, 2015 and the property has continuously been identified in an Page 120 12-40 annual stationary Refreshment Vehicle license issued by the Municipality since that date." 51. Section 16.1 c. the last sentence is deleted (Holding Zone). 52. By replacing the term "Bakery shop" with "Bakery" in Section 16.1 b. ii). 53. By adding the following new Subsection to Section 16.2 REGULATIONS FOR RESIDENTIAL USES: "c. Dwelling units may be permitted in the rear portion of the ground floor, or on the second floor or above. Where a dwelling unit occupies a portion of the ground floor, a permitted non-residential use must occupy all of street facing portion of the building. 54. Section 16.5.3 GENERAL COMMERCIAL EXCEPTION (C1-3) is revised by adding the word "urban" in front of the word "residential" in Sections a., a. ii) b), a. iv) c), and a. iv) d); and by deleting the definition of"Residential Zone in Section a. vii) b). 55. Section 16.5.35 b. is revised by adding the following: "xx) Stationary Refreshment Vehicle provided the property was identified in a Stationary Refreshment Vehicle license issued by the Municipality prior to September 21, 2015 and the property has continuously been identified in an annual stationary Refreshment Vehicle license issued by the Municipality since that date." I 56. Section 16.5.30 General Commercial Exception (C1-30) Zone is revised by adding the word "urban" in front of the word "residential" in Sections (1) b. ii), (1) d. iii), and (1) d. iv), and by deleting the definition of"Residential Zone" in Section 16.5.30 h) iv). 57. Section 16.5.32 General Commercial Exception (C1-32) is revised by adding the word "urban" in front of the word "residential" in section (2)a. ii); and by deleting the definition of"Residential Zone" from section.(3) c). 58. Section 16.5.38 b. iv) is deleted (Senior Citizen's Apartment Building). i 59. Section 18.1 b. is revised by adding the following: "xiv) Stationary Refreshment Vehicle as a permitted use" 60. Section 19.1 b. is revised by adding the following and renumbering the balance. "iv) A convention centre; and xvii) Stationary Refreshment Vehicle as a permitted use." i 61. Section 20.4.14-c. is revised by adding the following and renumbering the balance: "ii) A convention centre." Page 121 12-41 I" j Y 62. Section 21.1 b. is revised by adding the following: "iv) Stationary Refreshment Vehicle as a permitted use". 63. Section 22A.4.2 is amended by adding the following and.renumbering accordingly: "i) Notwithstanding Section 22A.2 b. a Stationary Refreshment Vehicle provided the property was identified in a Stationary Refreshment Vehicle license issued by the Municipality prior to September 21, 2015 and the property has continuously been identified in an annual stationary Refreshment Vehicle license issued by the Municipality since that date." 64. Sections 23A.1, 23B.1, 23C.1, 23D.1 and 23E.1 are deleted. 65. Schedule "3" is amended by changing the zone designation from: "Agricultural Exception (A-16) Zone" to "Agricultural (A)", as illustrated on the attached Schedule "A-I". 66. Schedule "3" is amended by changing the zone designation from: "Urban Residential Exception (R1-6) Zone" to "Urban Residential Type One (R1) Zone", as illustrated on the attached Schedule "A-2". 67. Schedule "3" is amended by changing the zone designation from: "Urban Residential Exception (R1-6) Zone" to "Urban Residential Type One (R1) Zone", as illustrated on the attached Schedule "A-3". 68. Schedule "3" is by changing the zone designation from: "Urban Residential Exception (R1-6) Zone" to "Urban. Residential Exception (R1- 12) Zone", as illustrated on the attached Schedule "A-4". 69. Schedule "6" is amended by changing the zone designation from: "Residential Hamlet Exception (RH-2) Zone" to "Residential Hamlet (RH) Zone", as illustrated on the attached Schedule "A-5"." 70. This By-law shall come into effect on the date of its passage, subject to the provisions of Section 34 of the Planning Act. BY-LAW passed in open session this day of , 2015. Adrian Foster, Mayor C. Anne Greentree, Municipal Clerk Page 122 12-42 This is Schedule "A®1 " to By-lave 2015- passed 015passed this day of , 2015 A.D. 0 w J O m Z 0 Z Qi J U STEVENS ROAD j N X ! ®Zoning Change From"A-16"To"A" i Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk E t s Z 0 STEVBIS ROAD S�Vp�S ROAD (. 3 STEVERSROAD m 4�gHM'� a 5 qY? TONN AVE I N OR pRH ,H.HVJAY2 A BONAT}bNCRE4 Iz g oZBA 2015.0004 t' Bowmanville SCHEDULE 3 2005 Green Rd 12-43 L This is Schedule "A-2" to By-lawn 2015-- , passed this day of , 2015 A.D. Sri � CO ®Zoning Change From"R1-6"To"R1" G Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk F F� PEES v�Es� y k�Nc Qy G�5 <1A v F J Q`�o FFr � EMANST FST ��� yG�cyS a T 3 ROEN\GKDR\'Je R��T N T o` FgsT 5^ w � C Q w � L Z8A 2015-0004 Bowmanvil le Y w ��P g����SCHEDULE 3 Queen Street 12-44 This is Schedule "A-3" to By-law 2015- , passed this day of , 2015 A.D. 0 z I-- w w w w TREET w � w m CLQ- W LIBERTY PLACE ' I I I E N CARLISLE AVENUE ®Zoning Change From"R1-6"To"R1" I i • r .+ f Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk CONCESSION STREET WEST CONCESSION ST EAST ¢ z CON I NS EErWES O, 5 ECTJ� �w TRUDEAU DRIVE0z SMARCWDO CRE �~ � TRUDEAU DRNE ti cyLRcyST ,��¢ C MERRYFIEL /fiNOSTR<'V y��� ,�QY2O� cTOrySTRF I:. W Q O FT REACHT F`ST ��� HGROti STRFF a � rc T c ZBA 2015-0004 sc Bowmanvil le WF SCHEDULE 3 ya<<�vcT <23 Lovers Lane i' 12-45 This is Schedule "A-4" to By-law 2015- , passed this day of , 2015 A.D. cy� Rey ST O� O� C� Q- 4O /Q% O��P SFT N T ®Zoning Change From"R1-6"To"R1-12" Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk � e � kiHG,SrkP ,� PP="0 TOHST c PTW�' QPC T Psr �P`r HHHeH ��t,I STHPPr a I � K Pq L� 2 QPPP o`,� ~PC`�H�ro k� sT ,�e RPPr Ric. 02 Q. ,�eP CHH'pC � 0 0= HST zo w N 2 .W w W JQQ' d}R y CHURCH STREET Y �P PFT rPf �� 2y ZBA 2015A00, Bowmanville OP Poi KING SEETEA.SCHEDULE$ 0 89 Church St 12-46 This is Schedule "A-5" to By-law 2015- , passed this day of , 2015 A.D. TAUNTON ROAD C r N C D � ®Zoning Change From"RH-2"To"RH" i • i Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk I TA ON ROA III-- TAUNTON ROAD O Q T Y O Of U o w' LEVARD z O J = � O FIFIM � O W o LL ty A( W U O U ZBA 2015-0004 BowmanVil SCHEDULE 3 U52 Taunton Rd 12-47 Cla r*W1 I Planning Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 i Report Number: PSD-043-15 Resolution Number: File Number: ZBA 2015-0007 By-law Number: Report Subject: A Rezoning Application by 1351739 Ontario Limited to Amend Zoning By-Law 84-63 to Permit the Severance of a Residential Lot Fronting on Townline Road, Courtice Recommendations: 1. That Report PSD-043-15 be received; 2. That the Zoning By-law Amendment application submitted by 1351739 Ontario Limited be approved as contained in Attachment 1 to Report PSD-043-15; 3. That once all conditions contained in the Official Plan with respect to the removal of the (H) Holding Symbol are satisfied, and that provisions are made for the dedication of the open space lands to the Municipality of Clarington, the By-law authorizing the removal of the (H) Holding Symbol be approved; 4. That the Durham Regional Planning and Economic Development Department and Municipal Property Assessment Corporation be forwarded.a copy of Report PSD-043-15 and Council's decision; and 5. That all interested parties listed in Report PSD-043-15 and any delegations be advised of Council's decision. r is 12-48 Municipality of Clarington Report PSD-043-15 Page 2 Report Overview This is a recommendation report to rezone lands located on the east side of Townline Road North, north of Nash Road in Courtice. The subject property is currently zoned as "Agricultural (A)" and a Zoning By-law Amendment has been prepared to rezone this property, in conformity with the Official Plan, in order to allow for the property to be severed and create two 17.26 metre frontage residential lots to accommodate a single detached dwelling on each. 1 . Application Details 1.1. Owner/Applicant: 1351739 Ontario Limited 1.2. Agent: D.G. Biddle and Associates Limited 1.3. Proposal: To rezone from "Agricultural (A)" to an appropriate zone to facilitate the severance of one lot, into two 17.26 metre frontage residential lots 1.4. Site Area: 0.28 hectares 1.5. Location: Part of Lot 35, Concession 2 former Township of Darlington, 85-87 Townline Road North, Courtice 1.6. Within Built Boundary: Yes 2. Background 2.1 On December 19, 2014, 1351739 Ontario Ltd. submitted an application to the Durham Region Land Division Committee to sever the subject property (LD 027/2015). Clarington Staff confirmed that the lands would require approval of a zoning by-law amendment prior to making a recommendation on the land division application as the lands are not within an urban residential zone. After considering all comments the Land Division Committee tabled the application for up to two years to allow the applicant to consult with Clarington and Central Lake Conservation Authority staff. 2.2 On March 24, 2015, D.G. Biddle and Associates Ltd on behalf of 1351739 Ontario Ltd submitted an application to rezone the subject property from "Agricultural (A)" to facilitate a severance and permit two single detached dwellings on 17.26 metre frontage lots (Figure 2). The application was circulated for comments and deemed complete on May 26, 2015. The public meeting was held June 22, 2015. 2.3 An Environmental Impact Study was prepared and submitted with the rezoning application. The report evaluates the natural heritage features present on and near the subject lands. Natural heritage mapping indicates the presence of the Harmony Creek and valley system, and part of the Provincially Significant Wetland complex identified by the Ministry of Natural Resources. The limits of the wetland mapping relative to the subject land is shown on Figure 1. 12-49 arfTnTMIWITMOSINIT011• • • ' • • • t "RAF T -9 F'7r _l :. _ AM ` lrt A_� i x .f + ,t tLa �(_, PA, Ministry of Ulp Natural !LL. Resources AN .t �4�4 .I .:"'ars— i ■ l Owl ' 4ti_ `� `` r� fl f j• ���j :fili!> j A _ y Ly Municipality of Clarington Report PS®-043-15 Page 4 I Land Characteristics and Surrounding Uses Figure 2 — Key Map of Subject Property 0 z M 0 11 Prop osed!Driveway, c Proposed Exisfin Property to fo House __- g be severed �--:/House Road Widening ___ Existing Sheds Property to Proposed ,--- � be retained rProposgd'Driveway y N ZBA 2015-DOD7 3.1 An abandoned residential dwelling is located on the property (Figure 3). The subject lands are primarily flat, except for a slope area at the very rear of the property where it drops off significantly into the Harmony Creek Valley. Harmony Creek and its wooded valley are located at the eastern end of the property. The subject lands contain a manicured lawn, treed property lines in the north and south and wooded area to the east. The woodland includes a steep slope leading to Harmony Creek and the associated floodplain. Mapping from the Ministry of Natural Resources indicates a portion of a Provincially Significant Wetland is located on the subject lands and continues to the east. 12-51 Municipality of Clalrington Report PSD-043-15 Page 5 3.2 The surrounding uses are as follows: North - Rural Residential Dwellings South - Rural Residential Dwellings East - Rural Residential Dwellings and Provincially Significant Wetland West - Kingsway College, a private secondary school campus Figure 3 — Existing Residential Dwelling on Property .J. 4. ProvuncW PoUcy 4.1 Provincial Policy Statement The Provincial Policy Statement identifies settlement areas as the focus of growth. Land use patterns shall be based on a mix of uses that efficiently use land, resources and infrastructure. Opportunities for redevelopment and intensification are encouraged and natural features shall be protected. Municipalities must provide a variety of housing types and densities, and a range of housing options that are affordable to the area residents. Compact and diverse developments promote active modes of transportation such as walking and cycling. The subject application is consistent with the Provincial Policy Statement. 12-52 Municipality of Clarington Report PSD-043-15 Page 6 4.2 Growth Plan for the Greater Golden Horseshoe The subject property is located within the built boundary. Population and employment growth will be accommodated by directing a significant portion of new growth to the built- up areas through intensification and efficient use of existing services and infrastructure. A minimum of 40 percent of all residential development occurring annually within each upper tier municipality is to be located within the built up area. The subject application will satisfy the objectives of the Growth Plan. 5. Official Plans 5.1 Durham Region al.Official Plan The Durham Regional Official Plan designates this property as a "Living Area". Living Area lands are predominately intended for housing purposes. Under the Durham Regional Official Plan Development applications in Living Areas shall encourage: compact urban form, use of good design principles and convenient pedestrian access to public transportation, educational facilities and parks. The proposed rezoning conforms to the Durham Regional Official Plan. 5.2 Clarington Official Plan The subject lands are predominantly designated "Urban Residential', with the rear of the property designated "Environmental Protection" to reflect the location of a Provincially Significant Wetland, a Significant Woodland, Cold Water Stream and Significant Valley lands. The Urban Residential lands are predominately intended for housing purposes. As the lands are within 120 metres of a natural heritage feature, an Environmental Impact Study has been conducted to define the development limit. Townline Road is a designated Type B Arterial Road. Private access points should be limited to one for every 80 metres of road. The proposed rezoning conforms to the Clarington Official Plan. 6. Zoning Bye-law 6.1 Zoning By-law 84-63 zones the subject lands as "Agricultural". This zone does not allow for the creation of two urban residential lots, hence the need for a zoning application. 12-53 i i Municipality of Clarington j Report PSD-043-15 Page 7 i 7. Summary of Background Studies 7.1 Environmental Impact Study, Niblett Environmental Associates Inc., December 2014 The study identifies key natural heritage features including a significant valley and a woodland. Although Ministry of Natural Resource and Clarington Official Plan mapping indicate the presence of a Provincially Significant Wetland extending to this property, the study found only a sugar maple forest without any indication of a wetland on the subject lands. i The outermost, or most restrictive buffer on the development envelope, is the 10 metre setback from the dripline of the mature trees above the top of bank. The study also provides recommendations to mitigate construction impacts. These recommendations would be implemented as part of the Land Division Agreement and monitoredduring the final approval stage. 7.2 Noise Impact Study, D.G. Biddle & Associates Limited, March 2015 Noise mitigation measures are recommended as a result of traffic noise generated by Townline Road including the requirements for central air conditioning and upgraded building components. The recommendation will be implemented during the final approval of the land division application and at the building permit stage. 8. Public Submissions i t 8.1 During the public notice period, Staff were contacted by the neighbour to the south who has no objection to the development of 2 single detached dwellings. 8.2 At the Public Meeting held on June 22, 2015, no members of the public provided any verbal submissions on the application. 9. Agency Comments 9.1 Regional Planning and Economic Development Regional Planning has no objections to the proposed rezoning provided the recommendations of the Environmental Impact Study and Noise Impact Study are endorsed and implemented. f, Regional Works has jurisdiction over Townline Road and has no objections. They indicate that water, storm and sanitary services are available along Townline Road North. There are currently three sets of service connections.to the site, including one to the existing dwelling. The applicant will be required to pay for the cost of the removal of one set of connections, and will be required to confirm whether the service connection to the existing dwelling will be reused or abandoned. Other comments have been provided to the applicant as part of LD 027-2015. 12-54 f Municipality of Clarington Report PSD-04315 Page 3 Durham Region Transit and the Transportation Planning section indicate the rezoning does not present significant Regional transit or transportation impacts. 9.2 Central Lake Ontario Conservation Authority The Conservation Authority is satisfied that the natural heritage features and the natural hazards have been appropriately identified and mapped. The Conservation Authority requests that all hazard lands, natural features and buffers be zoned Environmental Protection and dedicated to the Municipality of Clarington. The Central Lake Conservation Authority will not support the creation of a new lot that fragments natural features or hazard lands. 9.3 Regional Health The Durham Health Department has advised that they have no objection, in principle, to the proposal. However, it is their recommendation that, as a condition of any approval, the properties be serviced by municipal sanitary sewer and municipal water. Any well(s) and septic systems located on the property must be properly abandoned. 9.4 Other Agencies The City of Oshawa, Canada Post, Enbridge Gas, and Rogers have no objections to the rezoning. 10. Departmental Comments 10.1 Engineering Services Clarington Engineering has advised that they have no objection in principle to the rezoning and that prior to final approval of the related land severance application, the applicant will be required to satisfy the Engineering Services Department regarding the following concerns and conditions: Grading; • Drainage; ® Parking; and • Noise Attenuation. 10.2 Emergency and Fire Services Emergency and Fire Services have reviewed the application and have no objection. 11 . Discussion 11.1 The applicant is requesting permission to rezone the subject property from "Agricultural (A)" to facilitate a severance and permit two single detached dwellings. 12-55 Municipality of Clarington Report PS®-043-15 Page 9 Currently, there is an abandoned single-detached residential dwelling in the middle of the property however, the applicant plans to remove the existing dwelling from the property once granted the Zoning By-Law Amendment, in order to facilitate the land division and construction of two new dwellings. 11.2 The Environmental Impact Study and the Noise Impact Study were reviewed. Staff and agencies accept the findings of the submitted studies. The findings of the Environmental Impact Study were confirmed during the July 13th site visit. The Conservation Authority concurred with the applicant's environmental consultant that there is no Provincially Significant Wetland conditions present on the site. In fact, wetland areas may only be present in the vicinity of Harmony Creek, if at all, which is approximately 10-15 metres east of the property. While Ministry of Natural Resource Staff have not yet confirmed the revised limits of the Provincially Significant Wetland, Conservation Authority Staff are satisfied.that the proposed development limit, being a minimum of 10 metres from the dripline is conservative and that once the wetland is re- evaluated, the development limit would not be impacted (Figure 4). Figure 4: Constraint Map from Environmental Impact Study iW low jr, a i t;L r \,1 ti \ ?1 .r't•`.�•�- =� �----1: �,f3t J( J I I �� �� -r' �{;r;� 1•r 1'\ g•,.,.15 r,, I,+�t`5` .' , 1 -.-�� 3 _ `(11. ,(��., yam: {�. , ,•1 •til, '�P il FIGURF 1:VEGETAl10N COMtdUNITIES & CONSTRAINTS PR_6U:Y A A7 Lot 35 Can S Ocningtcn Tawnstiip • c.«x I.M-wcl<, -�-'30ni _ -- Municipo7ty of C!orirgton —tO", "'-�`�•• — ^y••—^ Nork rsm°rt<,:.m sort.. - -- Aurcro Oisl,irt �:(a«.Ffere°.e.ee_<) veSetnlen CemrrniY 50 N16H I r'C N RONMEUTIL ASSOCIATES INC rn v.n'Uef.ec 12-56 Municipality of Clarington Report PSD-043-15 Page 10 11.3 Based on policies of the Clarington Official Plan, Council adopted parkland and open space by-law, and Municipal Land Acquisition Strategy, staff requested the open space lands be identified in a separate block to be dedicated to Clarington (the feature limit plus the 10 metre buffer to the dripline). The applicant has objected to this request and did not provide a reference plan identifying the Open Space Block as requested, but rather provided the plan shown in Figure 5. The reference plan proposes to create 2 lots being Part 2 and Part 4, while Parts 1 and 3 are the required road widenings to be dedicated to the Region. Part 4 includes all of the natural heritage features, hazards lands and buffers as the applicant prefers to keep all open space lands together with Part 4 in private ownership, versus placing them in a separate block and dedicating to the Municipality of Clarington. Staff recommend that the Zoning By-law Amendment proceed, however, Clarington Staff will request through the land division application that the reference plan be amended to place the open space lands in separate block to be dedicated, otherwise the land division will not be supported by staff. Also, staff recommends that the (H) Holding Symbol not be lifted until the lands are dedicated. Figure 5: Draft Reference Plan ,K>xn�s PLAN 40R �J t..0 .ufnrz ria.—, —�.wn _•c........................:.a.. xa4L xf R1w ix.ti.l E wC. ._t.l<a EJ Y, rt :t PART 2 - 0 t J::E h CF SI "'F ti C� PART OF LOT 35, CONCESSION 3 tj' !i .:0'.Y ALL OF.+R CEL Z K=^'F THE 5.'a,TH ML RTD!',F LAT!:.C.'MCCSVrv1 ) T ^`: GECGVAPkC TCMI:5HP CF OARUNCT(k) e MUNIGPAUTY OF CLARINCTON h �EFAO•IAE VU%ICIPALFrf CF O.:RHAU �a :C ♦.._. �m _. Ex vtC. d.Cnu C)i AA CC , :L PART 4 tu'f O 5h Z� LEGEND amu' I� ✓ ..,._f.1 :T., �t I_ -[ N^fliUu C ..., / Li 57ANCE�I.OTES-4E1R1^w...w rr _ A/ trr�5• wt4 »j 4 TErRATIC4 ATA' V' -.� I SUUR�VEYCIR'S CERTIFICATE •-- �w,u•+'•�•• GEAwHG NOTES IVAN II.WAUACE 12-57 f I i Municipality of Clarington Report PSD-043-15 Page 11 11.4 The attached Zoning By-law Amendment would place the developable lands in the Urban Residential Type One (R1) Zone while the balance of the lands being non- developable would be placed in the Environmental Protection (EP) Zone. The R1 zone would allow for the severance to proceed, provided the open space lands are placed in a block to be dedicated, and create a suitable building envelope for a single detached dwelling on each proposed lot. 11.5 Should the Zoning By-law Amendment be approved, Clarington Planning Staff can provide suitable conditions of approval for the concurrent Land Division application (LD 027/2015) that is currently before the Region of Durham Land Division Committee. 12. Concurrence — Not Applicable j 13. Conclusion i In consideration of all agency, staff and public comments, it is respectfully recommended that the application to rezone the subject lands to permit the severance of a residential lot be approved.. 14. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan. I Submitted by: �' � �� Reviewed by: ` ��CKSA, Davi J. Crome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Anne Taylor Scott, Planner II, 905-623-3379 ext. 2414 or ataylorscott@clarington.net Attachments: Attachment 1 — Proposed Zoning By-law Amendment The following is a list of the interested parties to be notified of Council's decision: Michael Fry, D.G. Biddle and Associates Limited 1351739 Ontario Limited Exequiel Gamboa Juanata & Maribel Pita Juanata ATS/CP/df 12-58 E` Attachment 1 to Municipality of Clarington Report PSD-043-15 Corporation of the Municipality of Clarington By-law 2015- being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for the Corporation of the Municipality of Clarington Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for.ZBA 2015-0007; Now Therefore Be It Resolved That, the Council of the Corporation of the Municipality of Clarington enacts as follows: 1. Schedule `4' to By-law 84-63, as amended, is hereby further amended by changing the zone designation from: "Agricultural (A) Zone" to " Holding - Urban Residential Type One ((H)R1) Zone"; and, "Agricultural (A) Zone"to "Environmental Protection (EP) Zone" as illustrated on the attached Schedule `A' hereto. 2. Schedule `A' attached hereto shall form part of this By-law. 3. 'This By-law shall come into effect on the date of the passing hereof, subject to the provisions of Section 34 of the Planning Act. By-Law passed in open session this day of , 2015 Adrian Foster, Mayor C. Anne Greentree, Municipal Clerk 12-59 This is Schedule "A" t0 By-law 2015- , passed this day of , 2015 A.D. Js S 1• '' e 1 , _ „'?dY''•���';�r rid•r'a't A;1:1. I Z ".'•iso,. J "'•' `" "S1 4 • N • ®Zoning Change From"A"To"(H)R1" Zoning Change From"A"To TV' Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk 13 • .anam'xmwr � � e " n o � § f N Courtice ZBA 2015.0007 SCHEDULE4 12-60 Clad"n Report Planning Services If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-044-15 Resolution Number: File Number: PLN 38.4.1 By-law Number: Report Subject: Courtice Main Street Community Improvement Plan — Terms of Reference Recommendations: It is respectfully recommended that the Planning and Development Committee recommend to Council the following: 1. That Report PSD-044-15 be received; 2. That the Courtice Main Street Community Improvement Plan process and approach be accepted and the consulting proposal call issued; 3. That Staff provide a recommendation for the retention of a consulting team in accordance with the Purchasing By-law; 4. That the costs be charged to Unclassified Administration — Professional Fees account# 100-21-211-00000-7161 with 90 percent recovered from the General Government C Development Charges Reserve Fund; and 5. That all interested parties listed in PSD-044-15 and any delegations be advised of Council's decision. i i 1' 12-61 Municipality of Clarington Report PSD-044-15 Page 2 Report Overview Community Improvement Plans are studies that derive their powers from the Planning and Municipal Acts. Once a Community Improvement Plan is complete the Municipality can provide incentives through a number of financial mechanisms, carry out land assembly and direct public works to promote development, redevelopment and improve urban infrastructure. Council directed Staff to initiate a Community Improvement Plan for the Courtice Main Street area in May 2015. 1 . Background Part IV of the Planning Act describes the steps a Municipality must undertake to designate community improvement areas and develop community improvement plans (CIP's). The Official Plan sets out community improvement goals, objectives, policies and generalized study areas. The Regional Corridor along Highway 2 from Townline Road to Hancock Road is identified in the Official Plan as Courtice C1 a first priority community improvement study area. It was added as part of the amendment for the Courtice Main Street Secondary Plan (Amendment 89). _ fit;=1` � ry ; •i ilr i _l i...1 - — '-- r' 1 _1 P l:r.'ir�= --T - ':���f tl`r:''. :. r1 :i�,i}'I r r C'. � "1�,�.� Legend f � � -{ r•- t1�3 �' 1,�--++•�-1I'S'i;TtS`J�`? tt,,1. � 51'—x ®Community Improvement Project Area r NASHROAD� Courtice Urban Area Boundary iTV - I?�1�=� _2_..�- _ + �.�, °kl�__ 'i �'.t�:..• i.iu1 i'#�i�1�`i t'�n_ !'.11�_ _:� , ,, h Ml- -o%V1TjO I} 3• f �F" ---, tii. -rtt 'nw 1 � �.. � 1 ;..__:S_IS?l ��-1` � •¢1'"�-, .s;aG;.. � � � i�7{�( }_, ,a��j-�.' \ �,.,f�'��i.j��R('!'J�]�}� i � : -� - �� )TY •�, (�...r� Fr r'l•�^ " _ _ -t:�I�I�I�G� 4 f+.t :Zc ...IlIItA;;.•' _ : ,� )f-r7 �. .�/-l�_�'t-- ;5:�?��:C/.j'�'''' V C fi, r;;� � r'.} �._ !i � �r� '✓:a- C- �_�: ft;l�;`Faj� �sy . UiUI � tv�; 2. Community Improvement Background As part of the Official Plan Review, a special study on Courtice's Main Street was completed. This Master Development Plan guided the policy direction of the Courtice Main Street Secondary Plan and Urban Design Guidelines which Council adopted in January 2013, the Region adopted in February, 2014 and was fully approved by the Ontario Municipal Board November 28, 2014. 12-62 Municipality of Clarington Report PSD-044-15 Page 3 The purpose of the Courtice Main Street Community Improvement Plan (CIP) is threefold: • To build upon the clear direction set out in the land use policies and urban design guidelines of the Official Plan for urbanization as a mixed-use Regional corridor. • To enable the Municipality to respond to increased development interest and community growth in Courtice by establishing a framework of financial incentives to promote property consolidations, redevelopment and intensification along the Highway 2 corridor. • To develop an implementation plan for the Black Creek Trail. To achieve the purpose of the Courtice Main Street Community Improvement Plan, staff have prepared the draft Terms of Reference. It will guide the study process and serve as the basis for the proposal call to retain a consulting team. 3. CIP Process and Approach The CIP process consists of three stages, each with public and Council consultation. 3.1 Stage 1 - Identifying Community Needs 4 The Courtice Main Street Master Plan, Secondary Plan and Urban Design Guidelines have established the basis of the Community Improvement Plan. The Secondary Plan in j combination with the Reaional Corridor will form the basis of the study. The CIP focus will be about development and financial incentives. i The community support shown during the development of the Secondary Plan and Urban Design Guidelines will be built upon, and set direction for preparation of the CIP. Council has already approved the Secondary Plan and Urban Design Guidelines. Council has directed staff to prepare a Community Improvement Plan based on these documents, and the request made as part of the Development Charges By-law public meeting. The comments of business owners and land developers for incentives to realize the goals and objectives set out in these studies will be considered when developing the incentive j programs. l 3.2 Stage 2 - Draft Incentives and Programs The second stage is to draft the CIP incentives/programs according to community i findings, the adopted planning policy and identify opportunities to realize the vision set out in the Secondary Plan and Urban Design Guidelines. Analysis of financial tools and programs best suited to incent development while maintaining financial sustainability for the Municipality is key. Staff will report back to Council with draft recommendations for designating a specific community improvement project area, actions, programs and E' implementation steps. Details for incentive-based programs, marketing strategy and monitoring programs will be developed along with an Action Plan for the allocation of resources and implementation of the recommended programs. i' 12-63 Municipality of Clarington Report PSD-044-15 Page 4 The final draft of the CIP will be circulated to the Ministry of Municipal Affairs and Housing and Region of Durham, interested parties, and presented at a formal public meeting. Any necessary revisions will be incorporated into the CIP to be forwarded to Council for adoption. 3.3 Stage 3 - Implementation The last stage focuses on implementation through marketing, financing and monitoring. Marketing programs will be established to raise interest in and stimulate uptake of each program. This will include ongoing screening, reviewing and approval of applications for financial assistance and administering agreements and issuing financial assistance payments. Financing incentives will be addressed as part of the capital budget process. The monitoring program will continually address implementation and service delivery to make the process business friendly and implement any necessary adjustments. 4. Retention of a Consultant Staff from Planning and Finance Departments are engaged in major projects and it would not be possible to accelerate the Courtice Community Improvement Plan without the retention of a consultant. Additionally, this work will require additional expertise from a consulting team that is familiar and versed in the financial incentives that can be implemented. One of the key tools to be considered is a version of tax increment financing. This type of program phases in property taxes by means of grants based on the change of assessed value of the lands. Typically it would average 50 percent of the change in taxes owed on the lands but be phased in gradually. In addition, there are many other forms of incentives such as those identified as part of the Region's Revitalization Program and additional mechanisms that could be offered through Development Charges. The consulting team will be expected to carry out a Best Practices Analysis of the various financial tools available and match them to Courtice's needs and the municipal financial framework and its long term health. A consultant familiar with municipal finance, development project financing and experience in the preparation of Development Charge Background Studies and by-laws will be a requirement of the consulting team make-up. In addition, expertise and familiarity of the consulting team with planning policy and community improvement programs will be a requirement. It is anticipated that a consulting team with this blend of expertise will be able to search out the "best practices" that exist across the Province and provide innovative value-added variations to the scope of work and recommend financial tools that will fit the identified need. It is estimated that the CIP Consultant contract will be in the range of$50,000. As the proposal for this CIP is targeted towards specific development incentives, it is very clearly linked to growth related initiatives. As a result, any costs are eligible for funding from development charges at 90 percent. The balance of the funding must be covered by non- development charge sources. It is therefore recommended that the costs be funded from Unclassified Administration-Professional Fees account number 100-21-211-00000-7161 with the 90 percent funded from the Development Charges-General Government Reserve Fund. 12-64 Municipality of Clarington Report PSD-044-15 Page 5 Once the proposals from consulting teams have been received they will be evaluated by the in-house steering committee based on the qualifications and criteria set out in the proposal call and in keeping with the Purchasing Bylaw. A recommendation report on retaining the consulting team will be provided from the Purchasing Division, as per the process set out in the by-law. 5. Public Consultation Amongst other criteria, the Consultant's proposal, will be evaluated on their proposed public engagement process and communication strategies. The previous studies have already engaged the residents, property and business owners. Over the past few years there have been 4 workshops, 5 public information centres and 6 council opportunities, plus a Regional Council meeting dealing with the vision for, planning policies and urban design guidelines for the Courtice Main Street. As a minimum the CIP will include consultation meetings: • An Introductory Public Open House to introduce the CIP study process; and show case how the Secondary Plan and Urban Design Guidelines could be spurred by CIP incentives to develop sooner; • A public open house to present the Community Improvement Plan; and • Statutory Planning Act Public Meeting. Other possible public consultation events can be recommended by the respondents including, but not limited to other stakeholder input through, Community Cafes, Open Houses, etc. The report on retaining the consulting team will include a description of how the public will be engaged. 6. Concurrence This report has been reviewed by Nancy Taylor, Director of Finance and Tony Cannella, Director of Engineering Services who concur with the recommendations. 7. Conclusion It is respectfully recommended that Council authorize a Consultant proposal call based on the process set out in the Purchasing Bylaw and as outlined in Report PSD-044-15. 8. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan, specifically to facilitate new jobs and the provision of affordable mixed housing types. r i i i 12-65 Municipality of Clarington Report PSD-044-15 Page 6 6 f Submitted by: Reviewed by: f Da id . Crome, R.P.P. Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Faye Langmaid, Manager of Special Projects, 905-623-3379 ext. 2407 or flangmaidc@-clarington.net The following is a list of the interested parties to be notified of Council's decision: Jeff Goldman FL/jp/df 12-66 cla ring.ton Planning Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-045-15 Resolution Number: File Number: ZBA 2014-0013 By-law Number: Report Subject: Application by Zemer Holdings Ltd. to rezone lands to permit an apartment building at 50 Martin Road in Bowmanville Recommendations: 1. That Report PSD-045-15 be received; 2. That the Zoning By-law Amendment application submitted by Zemer Holdings Ltd. be approved as contained in Attachment 1 to Report PSD-045-15; 3. That once all conditions contained in the Official Plan with respect to the removal of the (H) Holding Symbol are satisfied, including a site plan agreement that provides for: a) Construction of a temporary sidewalk along the east side of Regional Road 57 from the subject site to Aspens Springs Drive if the development proceeds in advance of the reconstruction of Regional Road 57; b) Construction of a trail, publicly accessible if feasible, to provide a pedestrian connection for this development to.Rhonda Park, the interior of the neighbourhood I and ultimately a connection to the downtown; c) An Environmental Impact Study addressing the proposed storm sewer connection to Rhonda Boulevard and the pedestrian trail; and d) An appropriate design and provision of easements to facilitate shared access connection between the approved entrance and a minimum of four parcels to the north the By-law authorizing the removal of the (H) Holding Symbol be approved; 4. That the Durham Regional Planning and Economic Development Department and Municipal Property Assessment Corporation be forwarded a copy of Report PSD-045-15 and Council's decision; and 5. That all interested parties listed in Report PSD-045-15 and any delegations be advised of Council's decision. h 12-67 Municipality of Clarington Report PSD-045-15 Page 2 Report Overview This is a recommendation report on a rezoning application by Zemer Holdings Ltd. to permit an apartment building containing 71 units at 50 Martin Road in Bowmanville. The proposed zoning by-law amendment would permit an apartment building on the subject lands. The zoning by-law will create a suitable building envelope for the apartment building with site specific regulations including vehicular and bicycle parking, amenity space, relationship to Martin Road and maximum height. Since a site plan application has not been submitted or approved, there will be additional conditions imposed for removing the Holding (H) symbol relating to pedestrian connectivity, environmental impacts, urban design and shared access arrangements. 1. Application Details 1.1. Owner/Applicant: Zemer Holdings Ltd. 1.2. Agent: D.G. Biddle & Associates Ltd. 1.3. Proposal: To rezone the lands from the existing Urban Residential Type One (R1)Zone to an appropriate zone to permit the requested use. 1.4. Area: 1.3 hectares. 1.5. Location: 50 Martin Road (Regional Road 57), Part of Lot 14, Concession 1, Former Town of Bowmanville (See Figure 1). 1.6. Within Built Boundary: Yes 2. Background 2.1 Zemer Holdings Ltd. purchased the subject lands in June 2011 and a pre-consultation meeting was held with staff and agencies in August 2011. The rezoning application was initially submitted April 7, 2014. It was subsequently revised and additional information was submitted allowing the application to be deemed complete in August 2014. 2.2 The applicant hosted a Public Information Centre on December 3, 2014. A summary of the comments heard at Public Information Centre is included in Section 7 of this report. 2.3 The Public Meeting under the Planning Act was held on January 19, 2015. Since that time, the applicant prepared a revised submission to address staff, agency and public comments. The revisions include modifications to parking and amenity space, and the building envelope was revised slightly. The revised servicing plan illustrates a new storm sewer-extending easterly down the slope and through Rhonda Park to connect to an existing stormwater management facility. 12-68 Municipality of Clarington Report PSD-045-15 Page 3 Figure 1: Site Map 26 s� 62 N r a N 105 9-L < 67 TREWIN LANE 103 0 30 h^ v v NN r 101 C 99 N34 97LO Q95 O 38 93 39 109 107 z Rhonda Park 92 91 105 0 42 103 Aspen W 101 Springs af 99 4697 �iW.11 o 86 ti Plaz84 95 93 aha �a a 91 1 a� oapu o 81 89 0 0Aftdl.L ' 79 a Blaisdale 87 °H aa a Montessori _j 77 � oaa School O a a ,. • m 75 HARTWELLAVENUE ° 80 •;il a as 4a a aJa�a a a o 73 79 a 0 O = 71 Aspen � 77 springs v o o N p o o�7tl N o m o v N o 69 75 Centre t2 O M - CO N N N N N r W co N 73 44 67 DOREEN CRESCENT 71 cc 46 65 69 0 48 M m �N N N N N°' r Vi56 63 59 � ti mo 53. 51 ZBA 2014-0013 2.4 The preliminary site plan submitted with the application illustrates a proposed 71-unit apartment building fronting onto Martin Road. As the site slopes significantly to the east, the preliminary building plan has a walk-out basement with a fagade of 4 storeys along Martin Road, and 5 storeys at the rear (east side) of the building (See Figure 2 — Preliminary Elevations). 2.5 The following plans and studies in support of the application have been received and are reviewed in this report: • Planning Justification Report • Traffic Impact Brief • Environmental Impact Statement • Phase 1 Environmental Site Assessment • Functional Servicing Report • Geotechnical Report 12-69 Municipality of Clarington Report PSD-045-15 Page 4 Figure 2: Preliminary Elevations I, JL I i 67 JR- WIT Ii - i WEST ELEVATION 67 C' Ell II RLI IIL IID IA - TA, ri F ff-ml . 1771T7"77 117, 171 EAST ELEVATION LrJ • _ .7 771 -_ - I ' irY NORTH ELEVATION SOUTH ELEVATION 3. Land Characteristics and Surrounding Uses 3.1 A single family dwelling is located on the subject lands. The dwelling is located on a plateau adjacent to Martin Road, also referred to as Regional Road 57. The site slopes significantly to the east approximately 15 metres. The slope is vegetated. 3.2 The surrounding uses are shown in Figure 3 and outlined below: North: Single detached residential units on existing semi-rural lots South: Semi-detached dwellings along Doreen Crescent East: Blaisdale Montessori School and Rhonda Park along Rhonda Boulevard West: Retail and service commercial uses; existing low density residential 12-70 Municipality of Clarington Report PSD-045-15 Page 5 Figure 3: Aerial Photograph illustrating surrounding uses Future O Future GO - tL bn S_ite. `} � 9 .TRE - � `� � _ � " ,. _ -�.. o:, _ r• .�IIs .- . � •x a ii 41L � •,Q��` � ' �: � -:w.� � 4• ' _ ,� g _ .fir PgP e o ►�� JWW�►^T r _ a .�. o, a Rhonda Parka ' L - — -- •=3 �_ ai z j t _ e tAWfENCE GATE :LAWR ~ Commercial. L As ¢ sC7 FRY CRES :Pg%@@g.aza OZ _ I SUb EES: 8farsdele� v t ti in :: ;j . Montessori Y - HARTVIIELLAVENUE, Prop School. r ► - J3. T Bundrn9 {mss r. - _ DOREEN CRESGdkNT _ O +v f �W Pfaza s CANDLER CT .mit . r i 7i .e♦ I NYCASTlE DR t PREST09NIN/�Y DR T „` _ T's y 4. Provincial Policy 4.1 Provincial Policy Statement The Provincial Policy Statement identifies settlement areas as the focus of growth. Land use patterns shall be based on densities and a mix of land uses that efficiently use land, resources and infrastructure. Opportunities for redevelopment and intensification are encouraged, and natural features shall be protected. Municipalities must provide a variety of housing types and densities, and a range of housing options that are affordable to the area residents. Healthy and active communities should be promoted by planning public streets to be safe, meet the needs of pedestrians, foster social interaction and facilitate active transportation and community connectivity. Compact and diverse developments promote active modes of transportation such as walking and cycling. The subject application is consistent with the Provincial Policy Statement. 12-71 Municipality of clarington Report PSD-045-15 Page 6 4.2 Provincial Growth Plan The subject lands are within the defined Built Boundary. Population and employment growth will be accommodated by directing a significant portion of new growth to the built up areas through intensification and efficient use of existing services and infrastructure. The development of complete communities is encouraged by promoting a diverse mix of land uses, a mix of employment and housing types, high quality public open space and easy access to local stores and services. New transit-supportive and pedestrian-friendly developments will be concentrated along existing and .future transit routes. A minimum of 40 percent of all residential development occurring annually within each upper tier municipality will be within the built up area. The proposed development will contribute to intensification within the built boundary. 5. Official Plans 5.1 Durham Regional Official Plan Within the Durham Regional Official Plan, the lands are part of part of the Urban System and designated Living Area. Part of the subject lands are identified as having a Key Natural Heritage Feature. The site has access to a Type A Arterial Road. Living Areas incorporate the widest possible variety of housing types, sizes and tenure to provide living accommodations that address various socio-economic factors. Living Areas shall be developed in a compact form through higher densities and by intensifying and redeveloping existing areas, particularly along arterial roads, and develop with particular consideration for supporting and providing access to public transit. By 2015, and each year thereafter, urban areas across the Region shall be planned to accommodate a minimum 40% of all residential development occurring annually through intensification within built-up areas. Development or site alteration is not permitted in key natural heritage and/or hydrologic features, including any associated vegetation protection zone, as determined by an Environmental Impact Study. Type 'A' Arterial Roads are designed to move large volumes of traffic and predominantly serve inter-regional and inter-municipal trips, with rigid and progressive access control. They have a right-of-way width between 36 and 45 metres. Private access points are generally located a minimum of 200 metres apart in Urban Areas. Mixed use and higher density developments are permitted with shared access points. On-street parking is not permitted and/or prohibited during peak periods. The flow, at speeds of up to 70 kilometres per hour, is uninterrupted with the exception of at signals. Type 'A' Arterial Roads connect with freeways and arterials and may serve as regional transit spines. The application conforms to the Durham Regional Official Plan. 12-72 Municipality of Clarington Report PSD-045-15 Page 7 I 5.2 Clarington Official Plan The lands are designated Urban Residential and are within the Waverley neighbourhood. i The housing target for the neighbourhood identifies approximately 75 intensification units ! by the year 2016. The proposed apartment building is an example of intensification. Intensification units encompass all density types. The development conforms to the housing and population targets of the Official Plan. A woodland feature is present on the sloped area of the site. An Environmental Impact Statement reviewing the sensitivity of the feature and anticipated impacts of development . was submitted in support of the application. Martin Road (Regional Road 57) is a designated Type A Arterial Road which provides a high level of services and operating speeds. One private access is allowed for every 200 metres. Urban Design policies encourage a high quality public realm, and give priority to sustainable design, including environment-first principles, walkability, land efficiency, compact and connected communities and resource and energy efficiency. Attractive and safe communities are encouraged to create a sense of place and a diversity of built form. The built form should facilitate active transportation and public transit. The application conforms to the Clarington Official Plan. 6. Zoning By-law The subject lands is currently zoned Urban Residential Type One (R1) under Zoning By- law 84-63. The submitted application to amend the Zoning By-law is necessary to implement the proposed apartment building use. 7. Summary of Background Studies 7.1 Planning Justification Report, D.G. Biddle &Associates Limited, July 2014 The report reviewed the proposed use of the subject site against Provincial, Regional and Municipal planning policy and concluded that the proposed apartment use is appropriate for the site and neighbourhood from a planning perspective. The report gives an overview of the submitted supporting studies and highlights that detailed design plans will be submitted with the site plan application. The report determines that site development will not have a significant negative impact on the surrounding natural environment or adjacent land uses and the existing arterial road C will adequately handle any increase in traffic. The apartment use will be a benefit to the Bowmanville Urban Area in providing a broader choice in housing for residents. r 12-73 I Municipality of Clarington Report PSD-045-15 Page 8 The report concludes that the proposed rezoning application and site development is consistent with current Provincial, Regional and local planning policy and represents good planning. 7.2 Traffic Impact Brief, Tranplan Associates, January 2014 The report found that the future site-generated traffic will have no appreciable impact on the surrounding road network. The entrance for the site is recommended at the north end of the property and constructed to current Region of Durham standards for a residential entrance to a multi-lane arterial road. The full movement site entrance will require only one inbound and one outbound lane. The new internal site roadway will be constructed to meet local and regional standards and will include a sidewalk to support pedestrian connectivity. All signage and pavement markings are to be constructed in accordance with standard design guidelines. 7.3 Environmental Impact Statement, Niblett Environmental Associates Inc., November 2013 The applicant's environmental consultant assessed the woodland and surveyed the property for species at risk. The woodland is an isolated feature and lacks connectivity to other features in the larger urban landscape. There are no other associated natural heritage features present, and the woodland is not a sufficient size to be determined significant. The consultant determined that there is no suitable habitat for any species at risk on the property. While the woodland feature is not deemed significant, the report highlights that the building envelope for the apartment building will be outside the woodland. The site plan to be submitted should retain as much tree cover as possible. 7.4 Phase One Environmental Site.Assessment, Geo-logic Inc., December 2013 The property was found to have a low risk of existing soil contamination and is suitable for future residential development. No further soil investigation is warranted. 7.5 Functional Servicing Report, D.G. Biddle & Associates Limited, July 2014, revised March 2015 The report confirms that there are existing water and sanitary services along Regional Road 57 that can accommodate the proposed development. Regional Road 57 does not currently have storm sewer services within the right-of-way. The report provides preliminary details for a storm sewer connection through Rhonda Park. Stormwater quality controls will be achieved by an oil/grit separator and Low Impact Development techniques. Stormwater quantity will be managed by detaining stormwater on site prior to discharging through Rhonda Park. The detailed design during the site plan process will also implement erosion and sediment controls. 12-74 i Municipality of Clarington Report PSD-045-15 Page 9 7.6 Geotechnical Investigation Report, Geo-logic Inc., January 2014 The report provides details of subsurface soil and groundwater conditions on the lands and provides geotechnical recommendations regarding earthwork construction, re-use of existing soils as backfill material, foundation and slab-on-grade design, service installation, pavement design and slope assessment. I i The consultant confirmed that the slope is considered stable at a maximum grade of approximate 5:1 (horizontal grade:vertical grade) and determined further slope stability study is not required. r i i 8. Public Submissions Prior to the Public Meeting under the Planning Act, the applicant held a Public Information Centre on Wednesday, December 3, 2014 at the Garnet B. Rickard Recreation Facility. Nine members of the public were in attendance, in addition to the applicant, the, applicant's Planning Consultant, Clarington Planning Staff, and the Ward 1 Local Councillor. The Public Meeting under the Planning Act was held on January 19, 2015. Public Notice of the complete application and the public meeting was given by mail to each landowner within 120 metres of the subject site and a public meeting sign was posted on the subject lands. Eight residents contacted staff regarding the application with concerns and or objections, however no members of the public spoke at the Public Meeting. The following comments were collected during the public consultation phase: • Traffic congestion, pedestrian safety-and lack of signals at Hartwell/Highway 57 • Density and built form is not in keeping with existing area • Property values may decrease f • Concern that the units would be subsidized/geared to income • Privacy concerns • Fencing would need to be installed • Impacts to environment and existing vegetation • Grading and drainage implications • Development would increase noise impacts to neighbourhood • Questions relating to eventual improvements to Highway 57 (Regional undertaking) • Too little parking provided • Driveway is too small • Building would impede views to the west • Owner to north requests privacy fence and minimal disruption during construction • Positive impact to area businesses and the downtown • Offers an affordable housing choice • Development would help to improve the lifestyle of residents in the community • Increases property values along Martin Road • Built form and architectural treatment should be compatible with existing character • Concerned about piece-meal approach to development on the east side of Martin Road 12-75 Municipality of Clarington Report PSD-045-15 Page 10 9. Agency Comments 9.1 Regional Planning and Economic Development Regional Planning finds the proposed use is consistent with Provincial planning policies and conforms to the Region of Durham Official Plan. The site is connected to municipal water and the sanitary sewer must be extended from Hartwell Avenue across Regional Road 57. A road widening must be provided. Regional Works has reviewed the Traffic Impact Study and the access to the site is to be located at the north limit of the site as shown on the site plan. Shared access points for lands along the east side of Regional Road 57 must be considered. The site design should consider pedestrian connectivity and relationship to Martin Road in more detail. The Region also notes that the grading of the site should be revised to avoid high retaining walls which would prevent any shared access arrangements with properties to the north. Regional Health Department has no objections provided the development is serviced by municipal sanitary sewer and municipal water. Durham Region Transit has no objection. 9.2 Central Lake Ontario Conservation Authority The Conservation Authority does not object to the application and accepts the general assumptions of the stormwater management plan, and is satisfied that a suitable storm sewer connection is feasible for this development. Water quality and quantity, grading, overland flow and erosion control can be finalized at the detailed site plan stage. The Conservation Authority accepts the findings of the environmental consultant-but requests that standard mitigation measures be prepared to minimize impacts to the feature and its function and that the environmental consultant provide an evaluation of the area to be disturbed for the storm sewer connection and should consider, compensation planting. The additional work required by the environmental consultant can be finalized at the site plan stage. 9.3 Kawartha Pine Ridge District School Board The local Public School Board has no objections to the application. Students would attend Waverley Public School and Clarington Central Secondary School. Since the Public Meeting, the school board has confirmed that students along Martin Road are bussed to Waverley Public School. 12-76 Municipality of Clarington Report PSD-045-15 Page 11 I 9.4 Other Agencies Veridian, Canada Post, Enbridge and Rogers have provided no objections. Technical comments provided have been forwarded to the applicant. i 10. Departmental Comments 10.1 Engineering Services The Engineering Services Department highlights that Regional Road 57 is under the authority of the Region of Durham. Access and servicing must be approved by the Region. Engineering Services is generally satisfied with the principle of extending the storm sewer easterly down the slope and through the park to the stormwater management pond and is willing to consider granting an easement for construction and maintenance in favour of the applicant. Further discussion is required with respect to the detailed design which can be addressed at the site plan stage. A restoration planting plan will be required. Providing suitable pedestrian connections/sidewalks will be a condition of approval from the Municipality of Clarington in the event that the eventual reconstruction of Regional Road 57 has not occurred prior to development of the subject lands. Engineering requests that the developer construct a temporary municipal sidewalk northerly from the site to Aspen Springs Drive which will provide for a signalized pedestrian connection. The developer will be required to cover the costs of maintaining this sidewalk until Regional Road 57 is reconstructed to a full urban standard. i Other matters to be resolved prior to final approval include cash in lieu of parkland, entrance illumination and provision of dedicated snow storage. 10.2 Emergency and Fire Services Fire and Emergency Services has no objection to the rezoning and advised that the Fire Route must be shown on the site plan should approval be granted. They request clarification on whether the building will be sprinklered. This will be dealt with during site plan approval. ' F 10.3 Operations Department The Operations Department has no objection and provided comments that can be implemented at the site plan approval stage should the rezoning be approved. 10.4 Building Division The Building Division has no objections. 4: i 12-77 k Municipality of Clarington Report PSD-045-15 Page 12 11 . Discussion 11.1 The subject lands are within the urban area and the Official Plan policies support the requested use. Provincial and Regional intensification policies are also supportive of the development. 11.2 Built Form and Density The proposed apartment building is an example of intensification. The proposed development will be four storeys high facing Martin Road which is considered a medium density development built form. The site density complies being 58 units per hectare. This is appropriate given the site's location along a major arterial road and in an area where lands will be available for redevelopment over the longer term. The development conforms to the housing and population targets of the Official Plan. The proposed Clarington Official Plan 2015 identifies lands on the east side of Regional Road 57 as a Local Corridor and the apartment use will continue to conform to the policies that promote higher densities, transit oriented development, redevelopment and. intensification. While specific design guidelines and/or a secondary plan for this local corridor have not been considered, Staff are satisfied that this development is an appropriate form of intensification. Future development along the east side of Martin Road, between the subject lands and the railway, require parcel consolidation and will be more long term. The preparation of design guidelines and/or a secondary plan for local corridors will take place once the new Official Plan policies are in place. However, the development will allow for a shared access point on the east side of Martin Road. The maximum height for a local corridor is 4 storeys therefore the proposed building will be consistent with future intensification projects along Regional Road 57. The proposed zoning by-law would place the subject lands in a site specific Urban Residential Zone (Attachment 1) that will require both minimum and maximum yard setbacks for the building, and balconies, to maintain an appropriate distance between the building and the road. The maximum permitted height of the building will be 17.5 metres which is measured from the lowest point of grade to the top of the flat roof. 11.3 Piece-meal Development of Corridor Promoting a piece-meal approach to developing the corridor was raised as a concern, however, as mentioned in Section 11.2, the subject development will set the stage for future redevelopment opportunities to the north. The development is at the south end of the strip of lots that have redevelopment potential and is significantly larger. This development will serve as an anchor leading into the corridor, leading to the future GO Transit site and both the Bowmanville West and East Town Centres. This site is 1.29 hectares in size, while the parcels to the north, 15 in total, range in size from 0.1 to 0.4 hectares, with a depth of approximately 50.metres. The smaller parcels are expected to take longer to assemble and redevelop. The neighbouring parcels could accommodate multi-residential uses at a smaller scale. Redevelopment of the existing 12-78 Municipality of Clarington Report PSD-045-15 Page 13 lots with traditional and stacked townhouse units and smaller apartment buildings would complement the proposed apartment building. To address the concern of promoting a piece-meal approach to development, Staff have prepared a preliminary concept showing one possible layout that would meet the objectives of the new Local Corridor policies and provide limited and shared access points through a lane system. The concept demonstrates that the subject lands are of a sufficient size to accommodate the proposed use, does not rely on other parcels to fully develop, nor does the proposed development negatively impact the development potential of other lands in the area. That being said, establishing an opportunity for a shared access point with adjacent lands will be a requirement for the subject application and is further discussed in the following sections. FIGURE 4: Preliminary Concept showing Shared Access and Driveways I I MH { I = I pp ' 4 O � ! I i7RE\YIN LANE , 1 w 10111 ' L !I NAV�S Z t O K ! Proposed p Site o 'z I '-- m. oil i o a ayu ..ilc Jav u J woom�a tAVENUE Buil�ng µA{z7VJE1- il'il P'Jilc fthtdf y ZBA 2014.11011 12-79 Municipality of Clarington Report PSD-045-15 Page 14 11.4 Pedestrian and Vehicular Access to Regional Road 57 The findings of the traffic study have been accepted and the development will have no appreciable impact on the surrounding road network. The entrance at the north end of the property is supported by the Region of Durham and they identify that opportunities for shared access points should be encouraged. The Region of Durham is currently undertaking an Environmental Assessment for Regional Road 57. The study commenced in December 2014 and the first Public Information Centre was held in March 2015. Pedestrian safety and connectivity at Hartwell Avenue was raised by attendees as a concern. Next steps in the process include another Public Information Centre with the release of a document outlining the preferred options, and background on the alternatives, prior to final approval of the Environmental Assessment document. The Environmental Assessment is expected to be finalized in late 2015/early 2016. The Environmental Assessment will provide direction on long term pedestrian facilities along Regional Road 57. The applicant will be required to satisfy Engineering Services requirement to construct a temporary municipal sidewalk northerly from the site, on the east side of Regional Road 57, to Aspen Springs Drive which will provide for a signalized pedestrian connection. The developer will be required to cover the costs of maintaining this sidewalk until Regional Road 57 is reconstructed to a full urban standard. 11.5 Pedestrian Connection to Rhonda Park The subject lands are on the periphery of the neighbourhood but without ready access to the internal facilities such as Rhonda and Waverley Park, Waverley Public School and the Blaisdale Montessori School. It would also provide a more convenient walking route to the Downtown. It would be desirable to allow for public access from the internal neighbourhood as well to access transit and other amenities on Regional Road 57. The site grades make the construction of a public trail difficult, within the constraints of this property. This may be considered further and in particular, in consideration of future properties being redeveloped. However, at the very least a private pedestrian trail should be required to provide the residents of this building access to Rhonda Park. This matter will be examined in more detail as the site plan is prepared. 11.6 Servicing Water and sanitary services are available along Regional Road 57. Stormwater can be accommodated by extending a storm sewer easterly down the slope and through Rhonda Park and outlet to the existing stormwater management facility in the park. Although the principle of this option is not opposed, prior to determining the final details, an update to the Environmental Impact Study is required to assess impacts and propose suitable compensation. 12-80 i Municipality of Clarington Report PSD-045-15 Page 15 11.7 Conditions to be Satisfied Prior to Removing (H) Holdinq Symbol Planning Staff have considered withholding the recommendation on the Zoning By-law Amendment until the findings of the Environmental Assessment are released and approved. However, staff are satisfied that adding site specific conditions to be satisfied prior to removing the (H) Holding symbol is an appropriate planning tool to ensure the orderly development of the lands. This will allow the principle of the development to be approved. r The Official Plan has provisions for applying and removing the Holding Symbol pursuant to the Planning Act. Among other matters, the policies allow holding provisions to be used to ensure measures are in place to protect natural areas; measures are in place to mitigate the impact of development; and, the submission of any other requirements as may be deemed necessary by Council including the implementation of the policies of the j Official Plan. Staff recommend that in addition to the standard conditions for removing the (H) Holding symbol such as entering into a development agreement and satisfying all financial obligations, the following conditions must also be satisfied, through the site plan agreement: a) Construction of a temporary sidewalk along the east side of Regional Road 57 from the subject site to Aspens Springs Drive if the development proceeds in advance of the reconstruction of Regional Road 57; b) Construction of a trail, publicly accessible if feasible, to provide a pedestrian connection for this development to Rhonda Park, the interior of the neighbourhood and ultimately a connection to the downtown; c) An Environmental Impact Study addressing the proposed storm sewer connection to Rhonda Boulevard and the pedestrian trail; and d) An appropriate design and provision of easements to facilitate shared access connection between the approved entrance and a minimum of four parcels to the j north i the By-law authorizing the removal of the (H) Holding Symbol be approved; 11.8 Other Site Plan Related Matters The applicant and their consulting engineer have been notified that the preliminary grading plan and surface parking layout is unacceptable. The plan indicates the parking lot would be contained by retaining walls as high as 3 metres. This would severely limit any opportunities for a shared driveway connection with lands to the north. The grading plan needs to be revised to be sympathetic to existing grades both on and off site. The site plan process will allow the applicant to work towards satisfying the site-specific provisions for the removal of the Holding Symbol and to consider all other site plan review 12-81 Municipality of Clarington .. Report PSD-045-15 Page 16 items including final building design, landscaping, entrance and site lighting. The agreement will also contain provisions requiring a cash in lieu of parkland payment. 11.9 Staff have reviewed all public comments and all concerns have been addressed to the extent possible. The concerns of the public will continue to be taken into account during the site plan.review stage. Staff will consider additional elements such as screening through landscaping and fencing; window placement; and location of loading areas, etc. in response to concerns of neighbouring residents. 11.10 The applicant proposes to increase the height of the mutual property fence between the subject lands and the lots fronting onto Doreen Crescent, from the maximum permitted 2.1 metres to 2.4 metres. This solution is premature until a formal site plan application is received and there is a full understanding of all items such as grading, building design, and landscaping. 11.11 All taxes owing to the Municipality of Clarington have been paid in full. 12. Concurrence Not Applicable 13. Conclusion In consideration of all agency, staff and public comments, it is respectfully recommended that the application to rezone the subject lands to permit an apartment building be approved. 14. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan and will contribute to providing a variety of affordable housing types. 4-1 Submitted by: Reviewed by: u'� ;;L— D vid . Crome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer Staff Contact: Anne Taylor Scott, Planner II, 905-623-3379 ext. 2414 or ataylorscotKb-clarington.net 12-82 Municipality of Clarington Report PSD-045-15 Page 17 Attachments: Attachment 1 —Proposed Zoning By-law Amendment The following is a list of the interested parties to be notified of Council's decision: John Passalacqua Michael Fry Colleen Lush Rose and Norman Watkins Michelle Hardwick Jennifer Crespo Suzanne Barnes Jeff Guthrie Ruth Kolisnyk Dean Jacobs Catherine Dahlke, Drew Donmoyer, Cooper Donmoyer Henry Kortekaas Associates Inc. Gary Scott Ray Fadavi Rick Vanderkooi A Stones Throw Pub & Grill Physio Can c/o Brenda The Little Hair Shop c/o Joanne Bob Wine Jackie H. Snyder Joseph & Antoinette Passalacqua Christina Tourigny Ralph Tukker Rachel Smida E DJC/CP/ATS/SN/df r C i c 12-83 r Attachment 1 to Municipality of Clarington Report PSD-045-15 Corporation of the Municipality of Clarington By-law 2015- being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for the Corporation of the Municipality of Clarington Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for ZBA 2014-0013; Now Therefore-Be It Resolved That, the Council of the Corporation of the Municipality of Clarington enacts as follows: 1. Section 15.4 "SPECIAL EXCEPTIONS — URBAN RESIDENTIAL TYPE FOUR (R4) ZONE" is hereby amended by adding thereto, the following new Special Exception: 15.4.40 URBAN RESIDENTIAL EXCEPTION (R4-40) ZONE Notwithstanding 3.16 a., 3.16 c., 1.5.2 a., c., g., h., and i. on those lands zoned "R2- 82" on the Schedules to this By-law shall be subject to the following zone provisions: a. Regulations for Apartment Buildings i) Density (minimum) 50 units (maximum) 75 units ii) Yard Requirements (minimum) a) Front Yard 6 metres to building; 4 metres to balcony; b) Interior Side Yard 7.5 metres c) Rear Yard 7.5 metres iii) Yard Requirements (maximum) a) Front Yard 9 metres to building; 7 metres to balcony 12-84 iv) Yard Requirements Exception Notwithstanding 15.4.40 a. ii) and iii) where a building exceeds 10.0 metres in height, the minimum and maximum front yard requirements shall increase in direct proportion to the increase in building height above 10.0 metres. v) Building Height (maximum) 17.5 metres vi) Indoor Amenity Space (minimum) 2.0 square metres/unit vii) Outdoor Amenity Space (minimum) 4.0 square metres/unit i i viii) In addition to the requirements of 3.16 e., a minimum of 0.25 spaces per unit shall be provided for visitor parking. ix) Bicycle Parking Spaces (minimum) 25% of the required parking spaces x) Notwithstanding 15.4.40 a. viii) above, a maximum of 10% of the required parking spaces may be tandem parking spaces. Each tandem parking space shall be a minimum of 2.75 metres wide and 11.5 metres long and shall be equal to 2 parking spaces. All other spaces shall be a minimum of 2.75 metres wide and 5.7 metres wide, unless designated accessible parking spaces. f xi) The provisions of Section 3.1 j. (iv) continue to apply, except where they are in conflict with the yard requirements for a balcony as specified in Section 15.4,40 a. ii) and iii). 2. Schedule '3' to By-law 84-63, as amended, is hereby further amended by changing the zone designation from: "Residential.Type One (R1)Zone" to "Holding - Urban Residential Exception ((H)R4-40) Zone" as illustrated on the attached Schedule 'A' hereto. 3. Special Provisions for Removal of the (H) Holding Symbol In addition to the general provisions of the Official Plan with respect to the,removal of the (H) Holding symbol, Council shall only enact a by-law to remove the (H) E Holding Symbol from the R4-40 Zone once the following additional site specific conditions are fulfilled: L. a) Construction of a temporary sidewalk along the east side of Regional Road 57 from the subject site to Aspens Springs Drive if the development proceeds in advance of the reconstruction of Regional Road 57; b) Construction of a trail, publicly accessible if feasible, to provide a pedestrian connection for this development to Rhonda Park, the interior of the l neighbourhood and ultimately a connection to the downtown; c) An Environmental Impact Study addressing the proposed storm sewer connection to Rhonda Boulevard and the pedestrian trail; and 12=85 d) An appropriate design and provision of easements to facilitate shared access connection between the approved entrance and a minimum of four parcels to the north 4. Schedule `A' attached hereto shall form part of this By-law. 5. This By-law shall come into effect on the date of the passing hereof, subject to the provisions of Section 34 of the Planning Act. By-Law passed in open session this day of 12015 Adrian Foster, Mayor C. Anne Greentree, Municipal Clerk 1286 This is schedule "A" to By-law 2115- , passed this day of s 2015 A.D. G\ z to 47) J 0 ! F UJ O � � I HART WEA-LAVENUE i i E DOREEN CRESCENT rV CANDLER CT ®Zoning Ghange From"R-fi"To"(1-1)14440" i j I Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk a, ay 3 A - , 5 q (' 3 anVe g Ze20140013B7N7 12-87 EDULE3 I. Clarington Planning Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-046-15 Resolution Number: File Number: PLN 34.10.3 By-law Number: j Report Subject: Ontario Heritage Trust Recognition Program Recommendations: 1. That Report PSD-046-15 be received; 2. That the Ontario Heritage trust be advised that the Council of the Corporation of the Municipality of Clarington nominates: a. Brian and Audrey Jose for recognition under the Lieutenant Governor's Ontario Heritage Award for Excellence in Conservation for their significant contribution to the conservation of Clarington's built heritage with restoring The Walbridge House; and 3. That Brian and Audrey Jose, the Ontario Heritage Trust, and all interested parties listed in Report PSD-046-15 be advised of Council's decision. 1 i j; i' j 12-88 h Municipality of Clarington Report PSD-046-15 Page 2 Report Overview The Ontario Heritage Trust requests Council endorsement of local volunteers for recognition under the Trust's Heritage Community Recognition Program. Brian and Audrey Jose have been recommended for recognition by The Newcastle Village and District Historical Society, Clarington Heritage Committee and Staff for their refurbishment of the Walbridge House. 1 . Background The annual Lieutenant Governor's Ontario Heritage Awards, administered by Ontario Heritage Trust, enables Council to recognize individuals and small project groups who have made significant contributions to heritage preservation in Clarington. Eligibility for nomination applies to any resident over the age of 18, who has made outstanding volunteer contributions in their local community in the area of built, cultural, or natural heritage preservation. Small project groups may also be considered for nomination where the effort is shared, such as the co-authors of a local history publication. The types of activity that qualify are defined below: 1.1 Built Heritage • leadership in the restoration and preservation of heritage structures; • outstanding contributions as a volunteer member of a municipal heritage committee or other organization dedicated to preserving heritage structures; and • significant fund raising to support the restoration of a historic structure. 1.2 Cultural Heritage • outstanding contributions as a volunteer with a historical society, museum, or historic site; • research or writing related to local history; • voluntary teaching of local history or traditions; • personal collections of local artifacts, heritage photographs or memorabilia that are shared with the community; and • volunteer participation in activities or events that protect, preserve or promote First Nations, Metis, Franco-Ontarian heritage or others. 1.3 Natural Heritage • significant volunteer work at a conservation authority/area or parkland; • outstanding contributions as a volunteer with a local natural heritage organization; • demonstrated leadership in the protection of natural heritage; and • significant natural heritage conservation activities by private landowners. 12-89 Municipality of Clarington Report PSD-046-15 Page 3 1.4 Lieutenant Governor's Ontario Heritage Award for Lifetime Achievement • an individual who, for 25 years or more, has made exceptional contributions to built, cultural and/or natural heritage conservation. Staff consulted with the Clarington Heritage Committee, Newcastle Village and District Historical Society and the Clarington Museum about potential nominees. 2. Recommended Nomination Brian and Audrey Jose are nominated in the excellence in conservation category for their work in restoring The Walbridge House. The Clarington Heritage Committee during the spring of 2015 agreed that recognition of the Jose's for their purchase and refurbishment work on the Walbridge House was worthy of nomination. Since that time Staff have worked with Newcastle Village and District Historical Society to assemble the nomination materials. All nominations are to be endorsed by Council. Figure 1: The Walbridge House prior to refurbishment n - S► i 12-90 Municipality of Clarington Report PSD-046-15 Page 4 Figure 2: The Walbridge House nearing completion of the refurbishment _ - ' - _ add/ � ��' a- � .•- .. ti �n4 F " - - Vol Attachment 1 are the supporting reasons for Mr. and Mrs. Jose's nomination. The Newcastle Village and District Historical Society has provided additional supporting information, photographs of the various stages of construction are included on the blog the Jose's kept during the process and will be submitted as well. Attachment 2 is a listing of the previous nominations that have been submitted by Clarington for recognition of various individuals and groups. 3. Concurrence Not Applicable 4. Conclusion Staff have worked with the Newcastle Village and District Historical Society to document the reasons that Brian and Audrey Jose are being nominated as 2015 recipients of the Heritage Community Recognition Program awards in the built heritage category and recommend Council endorsement of the nomination. The Ontario Heritage Trust has confirmed that they are accepting nominations until September 30, 2015. 12-91 i Municipality of Clarington Report PSD-046-15 Page 5 5. Strategic Plan Application i Not applicable. j G i i Submitted by: Reviewed by:(:j D ' . Crome, MCIP, RPP Franklin Wu, Direc or of Planning Services Chief Administrative Officer Staff Contact: Brandon Weiler, Planner, 905-623-3379 ext. 2424 or bweiler@clarington.net � Attachments: Attachment 1 — Description of Activities/Achievements of Mr. and Mrs. Jose j Attachment 2 — List of Ontario Heritage Trust Nominees from Clarington The following is a list of the interested parties to be notified of Council's decision: Clarington Heritage Committee Newcastle Village District and Historical Society Ontario Heritage Trust Brian and Audrey Jose BW/FL/df 1 r I' r' i' i 12-92 Attachment 1 to Municipality of Clarington Report PSD-046-15 Description of Activities/Achievements of Mr. and Mrs. Jose The application form includes the following six description categories that have to be answered in 250 words or less. Supplementary information such as photos of the refurbishment, the reasons for heritage designation and letter of support from Newcastle Village and District Historical Society will also be attached to the nomination. Introduction: Brain and Audrey Jose purchased this property in May 2012. The home had been used as a sales and contractors office (1987-2006). The Municipality designated the house in 2007 after an appeal to the Conservation Review Board. When the Jose's purchased the home it had been vacant for some 6-7 years, lived in at time by vagrants' and a number of animals. The roof and basement had been leaking. The home suffered an interior fire in 1941 and there had been some alterations that affected the structure of the home. The Jose's are descendants of the original owner Asa E. Walbridge. The house is one of the oldest homes in Durham Region on its original foundation. Over the past 2-3 years the Jose's with their contractor Jim Sculthorpe and under the watchful eye of(Aunt) Erla Jose have brought the house back to its grandeur of earlier days. Leadership: The Jose's initiated a discussion with the developer/owner of the property. The developer had no interest in conserving the house and was allowing it to disintegrate. The Jose's purchased the property not having seen its condition but rather based on their memory from many years earlier. They Jose's retained a knowledgeable contractor willing to work with the structure, salvage materials and accentuate its historical attributes. A mason restored the stone foundation, a master carpenter exposed the wood post and beam along with its joinery to conserve the integrity with which the house had originally been constructed in 1819. It is the collaboration of the contractor, his craftsmen and the Jose's that has rejuvenated the house while conserving its most noteworthy aspects. This is not a restoration or a renovation the work has demonstrated and embodied the conservation ethic but also incorporated new materials to make the house livable and meet code. Commitment: Patience is required to conserve a loved family treasure. The Jose's took a risk when purchasing the house that its bones were solid and flexible. In many ways it was an act of faith. They then entrusted that faith to their contractor (along with a limited budget) and ample . time. The contractor worked with the Municipality's Heritage Committee, Staff and the process for the salvage of materials from buildings being demolished to make way for Highway 407. Taking materials and fitting them into the house. The true test is when family members come to see the home and marvel at how it has not changed. j i Creativity: Creativity is the combination of everyone working together to achieve that same goal. There are a number of ingenious ways the Jose's and their contractor have showcased the homes' heritage physically. However there have been many other creative ways this house continues to capture people's imaginations. Brian took up the challenge of communicating about the house while it was undergoing its transformation by blogging at becominghome.ca/ The approach the Jose's took with the developer was unconventional but proved successful. Local historical authorities spread the word about the house during the bleak years when it was vacant, through newspaper articles, having it listed on the most endangered sites and keeping j its plight in front of the local Council. I Impact: Many different groups and agencies have a vested interest in this property. The Newcastle Village and District Historical Society has championed the designation and refurbishment of the home. The Clarington Heritage Committee have worked with the owners and contractor to ensure that they have maintained the integrity of the reasons for designation. The Municipality has contributed by providing Community Improvement Plan grants for building fagade, code and permits. The Municipality also provides heritage incentive grants that can be applied for annually for ongoing enhancements and repair. i The Municipality attempted to work with the previous owner to redevelop the home, including offers for development credits and enhanced zoning. It was not until the Jose's became involved that the developer was willing to relinquish the property. Quality of Conservation: The Jose's have not yet moved in; however their belongings have been shipped from England and are stacked in the various rooms as the moulding and doors are being reinstalled. The house is becoming a home again, Brian and Audrey already have favourite spaces that they like to sit or look out from. The house will be showcased during Doors Open 2016 when the celebration of World Newcastle's will be in Newcastle, Ontario. r The 200th anniversary of the first service for Methodism will be November 5th, 2024 and the house is ready to host and carry on for another 200 years because of the high calibre and quality of its conservation. i r r 'r i' 12-94 Attachment 2 to Municipality of Clarington Report PSD-046-15 Ontario Heritage Trust Nominations Year Nominee Category Staff Report 1998 Sher Leetooze Volunteer Service, writing Volunteer Service, Preservation of Phyllis Dewell, Helen Schmid, Cultural Heritage and and Natural 2001 Frank Lockhart Herita a respectively PD-058-01 Dianna Grandfield (Mavis Preservation of Cultural Heritage Carlton, Nancy Miller, Garfield (Bowmanville Book), volunteer 2002 Shaw) ; Janie Dodds service, respectively 2004 Jack Gordon Preservation of Cultural Heritage 2005 Tenzin and Norman G altsan Built Heritage Preservation of Cultural Heritage, Built Heritage and Cultural Myno Van Dyk, Jim and Heritage (Tyrone Mill), Natural Margaret Coombs, Robert Heritage Hawk Ridge Farm, 2006 Shafer, Iry and Kae Harrell respective) PSD-117-06 2008 William Calver (Military Histo Preservation of Cultural Heritage PSD-079-08 Ed Vanhaverbeke, Gabbie 2011 Kirkwood Built Heritage, Youth Award PSD-055-11 Jenni Knox, Bill Patterson, Built Heritage, Lifetime Enfield United Church Achievement and Volunteer 2012 Volunteers Service PSD-038-12 Preservation of Cultural Heritage Garfield Shaw, Karin Murphy (writing), volunteer service (photo and David Reesor, Frank inventory) Lieutenant Governor 2013 Stapleton Award PSD-056-13 Preservation of Cultural Heritage, Lifetime Achievement and 2014 Ron Alldread, Susan Laing I Volunteer Service PSD-051-14 12-95 OffiRgloff Planning Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-047-15 Resolutions Number: File Number: PLN 34.6.13 Sy-law Number: Report Subject: Clarington Heritage Week 2015 i Recommendations: 1. That Report PSD-047-15 be received for information. ; C I j �I i I I� 12-96 Municipality of Clarington Report PSD-047-15 Page 2 Report overview The Clarington Heritage Week Committee has been hosting Heritage Week events since 2013. In previous years the events were held in February, coinciding with Ontario Heritage Week; however, this year the events were moved to August to explore more ways to engage. residents. Clarington Heritage Week has grown each year since 2013 and continued this year, including branding the event with a logo. Heritage Week 2015 focused on guided walking tours of Bowmanville, Newcastle, Orono, Tyrone and Newtonville. Self-guided walking tours were created in the five communities and brochures for the self-guided tours can be picked up at the Clarington Museum and Clarington Tourism. 1. Background In 1985, the Ontario government declared the third week in February Heritage Week province wide. Since that time many organizations within Clarington have used the week to stimulate awareness of heritage resources and heritage-related issues within the Municipality. While many different events were occurring during this week they were often independent of other organizations events and there was a lack of unity between the events throughout the week. In 2012, a number of organizations in Clarington came together to create the Clarington Heritage Week Committee. The Committee included representatives from the Clarington Heritage Committee, Clarington Museum and Archives, Visual Arts Centre of Clarington, Clarington branch of the Architectural Conservancy of Ontario, the Newcastle Village and District Historical Society, Clarington Older Adults Association, and the Bowmanville Business Improvement Area. The Clarington Heritage Committee put on Heritage Week events in 2013, 2014, and again in 2015. In 2013 and 2014 the Committee kept Heritage Week in February, coinciding with Heritage Week province wide. While the events in 2013 and 2014 were successful, there was a limit to the type of events that could occur due to the often harsh winter weather during February. In 2015, the committee decided to move Clarington Heritage Week to August 10 to 16. In addition to the change in the timing of the event a new organization, Clarington Tourism, joined the committee. 2. Heritage Week 2015 For the 2015 events a logo was created by the Heritage Week Committee in an attempt to brand the event, helping residents and businesses identify the event for years to come. Branding the event will hopefully encourage other organizations to join and contribute to Heritage Week in the future. 12-97 Municipality of Clarington Report PSD-047-15 Page 3 Figure 1: Heritage Week Logo j 0 96, HERITAGE WEEK AUGUST 10 - 16, 2015 The main events in Heritage Week 2015 were guided walking tours in five of the communities in Clarington; Bowmanville, Newcastle, Orono, Tyrone, and Newtonville. The guided tours were led by local experts Charles Taws, Kim Vaneyk, Myno Van Dyke, Erla Jose, Sher Leetooze, and Charles Crowther. The guided walking tours were offered on the same evenings as concert in the park events in the respective communities in an attempt to cross promote and engage residents in multiple events. The Clarington Museum presented a theatrical production to 175 attendees, running the entire week using the Bowmanville Museum, The Jury House, a designated heritage building as the setting. In addition, Eric Bowman's art work of historical buildings in Clarington is on display for the month of August in the mezzanine of the Clarington Library. To add to the momentum and support of Heritage Week 2015 the committee created self- guided historical tour brochures in four of the communities featured during Heritage Week. The Newcastle Village and District Historical Society had previously created a brochure for Newcastle. These brochures will allow residents and visitors to discover the history of these communities on their own time at later dates. The brochures will be available for residents and visitors to pick up at the Clarington Tourism office and at the Sarah Jane Williams Heritage Centre. The brochures have been provided to Council members (under separate cover). Heritage Week was promoted in Clarington and Oshawa This Week, The Orono Times, through rack cards, banners and posters and through social media (Twitter and Facebook). The event was sponsored by Ontario Power Generation. The Committee is exploring the next steps of putting the self-guided tours in an accessible format so they can be posted to the Clarington Tourism and Clarington Heritage websites, allowing users to access the self-guided tours on their mobile devices. 12-98 Municipality of Clarington Report PSD-047-15 Page 4 The guided walking tours saw approximately 120 participants, an average of 20 participants per tour, over the six tours (Newcastle held two tours). Bowmanville saw the largest tour with 30 participants. Some participants were non-residents however, the majority were local residents interested in learning more about the communities in Clarington. Many participants attended multiple tours and indicated they would like to see more opportunities to engage in these type of activities in the community. In addition to looking for more opportunities of this kind, participants commented on how much they learned and discovered about Clarington's many communities throughout the week of events. The committee looks forward to continuing to grow Clarington Heritage Week, engaging more organizations and residents, while providing tourism opportunities, as they promote and celebrate Clarington's rich built, cultural and natural heritage. 3. Conclusion Clarington Heritage Week 2015 was the first time that Heritage Week was hosted outside of February. Moving the events into the summer months allowed for the walking tours to be the main focus. In addition, for 2015 the events were held in multiple communities within Clarington. This was a great success as it made Heritage Week 2015 truly Clarington Heritage Week and allowed people to discover areas of the Municipality that they may not often travel to. The self-guided brochures are a legacy of Clarington Heritage Week 2015 that the Heritage Week Committee hopes will lead to more of these initiatives and provides another way to engage residents in Clarington's heritage. The Committee is hoping that branding the event will provide for more support and recognition in future years and allow the event to continue to grow. 4. Strategic Plan Application Heritage Week helps to showcase our agriculture and "small town"feel. Submitted by: Reviewed by_ IbMJ. Crome, MCIP, RPP Franklin Wu, Director.of Planning Services Chief Administrative Officer Staff Contact: Brandon Weiler, Planner, 905-623-3379 ext. 2424 or bweiler@clarington.net There are no interested parties to be notified of Council's decision. BW/FL/df 12-99 i j Clarhgton Planning Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: Planning and Development Committee Date of Meeting: September 14, 2015 Report Number: PSD-048-15 Resolution Number: File Number: ZBA 2015-0005 By-law Number: Report Subject: An Application by 2346123 Ontario Inc. (Wally Gupta) � to permit a motor vehicle fuel bar j Recommendations: 1. That Report PSD-048-15 be received; f' 2. That the Zoning By-law Amendment application submitted by 2346123 Ontario Inc. (Wally Gupta) be approved and the by-law passed as contained in Attachment 1 to Report PSD- 048-15; 3. That once all conditions contained in the Official Plan with respect to the removal of the (H) Holding Symbol are satisfied including the matters identified in Section 11.13 of Report PSD-048-15, the By-law authorizing the removal of the (H) Holding Symbol be approved; 4. . That the Durham Regional Planning and Economic Development Department and Municipal Property Assessment Corporation be forwarded a copy of Report PSD-048-15 and Council's decision; and C 5. That all interested parties listed in Report PSD-048-15 and any delegations be advised of Council's decision. E 12-100 `' Municipality of Clarington Report PSD-048-15 Page 2 Report Overview This report recommends the approval of a proposed rezoning application at 3211 Highway 35/115 to permit a motor vehicle fuel bar in addition to the other commercial uses already permitted in the Special Purpose Commercial Exception (C4-12) Zone. The applicant is proposing.a convenience store, Tim Horton's restaurant with a drive through facility and a motor vehicle fuel bar. The approval of the proposed Zoning By-law Amendment will allow for a motor vehicle fuel bar use in the C4-12 exception zone, subject to a holding symbol which will be lifted when the owner enters into a site plan agreement with the Municipality. The subject site currently contains a commercial building and has access from the northbound traffic lane on Highway 35/115, just north of Newcastle Village. 1. Application Details 1.1 Owner: 2346123 Ontario Inc. (Wally Gupta) 1.2 Agent: Cantam Group Ltd. 1.3 Proposal: To permit a motor vehicle fuel bar 1.4 Area: 1.2 Hectares (3.0 acres) , 1.5 Location: 3211 Highway 35/115 1.6 Within Built Boundary: No 2. Background 2.1 The applicant is proposing to build a convenience store, a Tim Horton's restaurant with a drive through facility, and a motor vehicle fuel bar. The Special Purpose Commercial Exception (C4-12) zone allows for all proposed commercial uses on this site, with the exception of a new motor vehicle fuel bar. However, this zone does allow existing motor vehicle fuel bars. 12-101 Municipality of Clarington Report PS®-04815 Page 3 Figure 1: Proposed Site Plan and elevations submitted by applicant r------r—T � ! IF l Future Reta-Ti, !. C i ivenience ' :Store Gas Bar ' - Can py ' ® Coffee i Shop - a� h n° 1 — j 12-102 Municipality of Clarington Report PSD-048-15 Page 4 2.2 Highway 35/115 was reconstructed in the 1980's as a divided highway. Since that time, a number of the businesses along the Highway have struggled and disappeared as the result of no longer having access from both the northbound and southbound traffic. The former Ace Submarines restaurant on this subject site has been closed for approximately 10 years. Throughout this-period there has been a transition with new businesses, many are franchises that have been able to renew these commercial sites along the Highway. Figure a: Existing Site Photo 1 -- . 2.3 A public meeting for the subject application was held on June 22, 2015. At the meeting, two members of the public were in objection to the proposed application on the basis of competition. 3. Land Characteristics and Surrounding Uses 3.1 The surrounding uses are as follows: North: Commercial (gas stations, retail, restaurants) and institutional (high school) South and East: Former golf driving range and agricultural land West: Divided highway 115/35 12-103 Municipality of Clarington Report PS®-048-15 Page 5 Figure 3: Surrounding Land Uses � � - tlblic High School t � Resta rant • Agriculture ail F 1 �P- ,,C*n ercial z 5 ; An ` a } Former l #subject Range I I , Lands 441P +� tio 4. Provincial Policy Provincial Policy Statement 4.1 The Provincial Policy Statement (PPS) contains policies on the rural areas in municipalities. Rural Areas are important to the economic success of the Province and our quality of life. It is important to leverage rural assets and amenities as a foundation for a sustainable economy. 4.2 The rural areas often have unique characteristics and are interdependent with urban areas sharing markets, resources and amenities. Rural areas can be supported by promoting regeneration, including the redevelopment of brownfield sites. Brownfield sites are underdeveloped or previously developed properties that may be contaminated. They are usually, but not exclusively, former industrial or commercial properties that may be underutilized, derelict or vacant. Once cleaned up, they have the potential to be revitalized for other such uses. 4.3 The policies of the PPS also promote diversification of the economic base and employment opportunities through goods and services. It also states that new development proposed along transportation corridors should be compatible with and supportive of the long term purpose of the corridor. 12-104 Municipality of Clarington Report PSD-048-15 Page 6 4.4 Given that the site is located along a transportation corridor and the fact that it is a redevelopment of a brownfield site, this proposal should be supported as it is an asset to the long-term economic prosperity of this highway corridor. This site has existed as a commercial property for over 30 years. This proposal is consistent with the PPS, as it provides for redevelopment of a vacant commercial site which will create new employment opportunities and support local businesses and the larger community. 5. Official Plans Durham Regional Official Plan 5.1 The Durham Regional Official Plan designates the subject lands "Prime Agricultural Area". Prime Agricultural Areas permit a full range of agricultural, agricultural related and secondary uses. 5.2 Policy 14.5.4 of the Plan permits the continuation, expansion or enlargement of uses which do not conform to the policies of the Plan. Local councils may pass a zoning by-law to permit the continuation, expansion or enlargement of the legally existing uses, or the variation to similar uses. 5.3 The current proposal to permit a new motor vehicle fuel bar, is considered a variation to a similar use. The Region of Durham has provided their comments and advised that the proposal is considered to be in conformity with the Durham Regional Official Plan. Clarington Official Plan 5.4 The Clarington Official Plan designates the subject lands "Prime Agricultural Area". High quality agricultural lands are to be protected for farming. However, similar to the Region of Durham, the Clarington Official Plan has policies in Section 23.5.3 of the Plan which permits Council to pass a by-law recognizing the continuation, expansion or enlargement of non-conforming uses, or the variations to similar uses. 5.5 Allowing for a motor vehicle fuel bar is considered an additional and very similar commercial use in the Special Purpose Commercial Exception (C4-12) Zone. It is also similar to the commercial uses permitted along the highway corridor. It will not fragment agricultural lands and it allows the site to be revitalized. The proposal conforms to the Clarington Official Plan. 6. Zoning By-law 6.1 Zoning By-law 84-63 zones the subject lands "Special Purpose Commercial Exception (C4-12)". Although the zone permits existing motor vehicle fuel bars, along with a number of other commercial uses, it does not permit the establishment of a new motor vehicle fuel bar. The owner is seeking an amendment to the "Special Purpose Commercial Exception (C4-12) Zone" in order to facilitate the proposed development, to include a motor vehicle fuel bar. 12-105 Municipality of Clarington Report PSD-048-15 Page 7 I 6.2 When the current Zoning By-law was adopted, the subject lands were determined to be a Special Purpose Commercial use instead of a Service Station use. In 1985 (one year after the Zoning By-law was in effect), a subsequent amendment was made to this zone category to recognize only existing service stations in the Special Purpose Commercial Zone. The intent was to only allow new motor vehicle fuel bars in the "Service Station Commercial Zone" category instead of any other zone categories. 7. Summary of Background Studies i 7.1 The Owner's consultant submitted five studies in support of the application. A summary of j their conclusions is provided below: Planning Rationale Report 7.2 A Planning Rationale Report was submitted by Kirkness Consulting Inc. in support of the I additional motor vehicle fuel bar use. The report indicates-that the site is considered appropriate for a motor vehicle fuel bar given: • its high visibility along the highway; • the ease of access to the site; • the relatively large size of the site; and • the fact that Highway 35/115 has seen a substantial increase in daily traffic rates over the past 10 years. The use is compatible with surrounding land uses in this area. There are a number of similar developments with a gas bar in this area. Phase 1 and Phase 2 Environmental Site Assessment 7.3 A Phase 1 and 2 Environmental Site Assessment, prepared by WSP Canada Inc., was submitted in support of the application. The report indicated that no gas stations or automotive repair facilities have reportedly ever existed on site. The report concluded that soil and groundwater readings at this location detected elevated levels of petroleum hydrocarbons likely generated by historic gas stations on surrounding properties. The I report recommends-further soil and groundwater testing. Water Supply Assessment 7.4 A Water Supply Assessment was prepared by WSP Canada Inc. The site is to be serviced with a new well. A test well was installed to evaluate the site water supply. Based on the estimated water use for the proposed commercial development, the test well is considered to be a low yielding well. A water storage tank is recommended to j assist with peak pumping demand. Based on the test findings, the proposed ground water use should not interfere with other existing water systems in the local area. The existing well will need to be decommissioned. 12-106 r Municipality of clarington Report PSD-048-15 Page 8 Geotechnical Investigation 7.5 This report was prepared by Patriot Engineering Limited to determine the soil and groundwater conditions. The report indicates that conventional footings and slab-on- grade techniques shall be used. It is recommended that the foundation drawings be reviewed by Patriot Engineering Limited for general conformance with the geotechnical recommendations. Also, no major groundwater problems are anticipated with the excavation of the building foundation. The report concludes that the site can be developed for the proposed use, provided that the recommendations in the report are satisfied. Traffic Impact Study 7.6 A Traffic Impact Study was prepared by Mark Engineering. The Traffic Study was based on a week-long traffic count in July, which included Saturday peak hour volumes. There is a wider shoulder that is marked as a right turn lane in some locations along the Highway which operates as a right turn lane throughout its length. The forecasted traffic is higher than usual due to the Tim Hortons restaurant. The report indicates that there is sufficient capacity in the road system to serve the forecasted demand and that there will be sufficient gaps in the traffic to serve the existing demand. However, drivers will have to wait for adequate gaps to occur. The report concludes that no improvements to the highway are necessary to serve the proposed development. 8. Public Notice and Submissions 8.1 Public notice was given in accordance with the Planning Act prior to the Public Meeting on June 22, 2015. At the meeting, two property owners within the area spoke in opposition of the application. One additional written inquiry was received after the Public Meeting. The main concerns are outlined below: • Market competition (there are a number of gas stations already existing along this stretch of the highway and there is concern that an additional motor vehicle fuel bar will over saturate the market); • Increase in traffic congestion; • Loss of privacy. There is an existing single family dwelling to the south of the subject lands which also contains the golf driving range; and • Increase in litter. 8.2 At the meeting the consultant acting on behalf of the Owner of the subject lands indicated that market competition is not a planning consideration unless it impacts the planned function of the area. 8.3 The increase in traffic congestion was not raised as a concern in the Traffic Impact Study that was prepared. No further studies have been brought forward to indicate otherwise. 12-107 Municipality of Clarington Report PSD-048-15 Page 9 8.4 The applicant has indicated that they will be working with adjacent property owners to address issues such as privacy and litter as part of the site plan. The applicants have shown on the proposed landscape plan, a 4 meter landscape buffer on the north and south side of the property to address issues such as privacy. The landscape buffer shows a mix of coniferous and deciduous trees and shrubs. The applicant is also proposing a fully enclosed garbage building to reduce odors and the amount of litter on site. 9. Agency Comments Regional Municipality of Durham 9.1 The Region of Durham considers a motor vehicle fuel bar to be an expansion and a variation to a similar use, which once contained an eating establishment. The Region considers the application to conform to the Regional Official Plan. 9.2 The Region requires that a Record of Site Condition be filed with the Ministry of � Environment and Climate Change. An "Acknowledgement Letter" from the Ministry of Environment and Climate Change, which acknowledges the Record of Site Condition and indicates the site has not been selected for audit, shall then be provided to the Region. 9.3 The Regional Health Department has indicated that the daily design sewage flow is greater than 10,000 litres/day therefore, the Ministry of Environment and Climate Change should be contacted in order to determine servicing capacity for this site. Ministry of Transportation 9.4 The Ministry of Transportation has no objection to the proposed gas bar use in principle but there are a number of comments that will need to be addressed at the site plan stage of this development. 10. Departmental Comments Engineering Services f 10.1 The Engineering Services Department has reviewed the application and has no objection to the,proposed use in principle. The applicant will be required to satisfy the Engineering Services Department prior to final approval of the site plan for the subject property. Emergency and Fire Services 10.2 The Emergency and Fire Services Department has no objection to the gas bar use. However, on-site water supply for firefighting may be required. 11. Discussion 11.1 The applicant is proposing a motor vehicle fuel bar with a convenience store and a Tim Norton's restaurant with a drive through facility. The rezoning application is only required to permit the motor vehicle fuel bar. The convenience store and restaurant uses are 12-108 Municipality of Clarington Report PSD-048-15 Page 10 already permitted on this site. The proposed development will replace an existing vacant restaurant building (Ace Submarines). 11.2 The subject property was previously rezoned in 1994 from "Special Purpose Commercial (C4)" to a site specific exception zone to allow for a convenience store in addition to the other permitted uses in the C4 Zone. The proposed development at that time was also subject to a site plan agreement. Site plan approval was granted however the site-was never developed. The site plan approval expired on July 22, 1996 due to the project being abandoned by the property owner. The zoning permissions for the convenience store remained in place but a new site plan application is required. 11.3 In the past there have been similar instances where the "Special Purpose Commercial (C4) Zone" has been amended for other properties along Highway 35/115. They allowed for similar type of uses to be permitted as an extension to the existing commercial permissions granted on these properties in order to allow businesses to adapt to evolving market trends. 11.4 It is clear from the preceding paragraphs and the public input received that there are a number of issues with the site design. Many can be addressed by appropriate traffic management and through the implementation of the site plan. The following sections detail how the issues identified can be addressed. Site Contamination 11.5 A Phase 1 and Phase 2 Environmental Site Assessment was submitted by the applicant. The Assessment indicated elevated levels of petroleum hydrocarbons on the site, but that the source of the contamination may have been caused by other surrounding fuel bars. The applicant must fulfil the Regions comments prior to site plan approval, including providing satisfactory information to the Region of Durham that any on-site contamination is within the acceptable limits of the Ministry of the Environment and Climate Change by filing a Record of Site Condition with the Ministry and providing the "Acknowledgement Letter." Site Servicinq 11.6 The proposal will be on private'services as municipal water and sanitary sewers are not available. The Durham Region Health Department does not have approval jurisdiction over the septic design. In this case, private services must be provided to the satisfaction of the Ministry of Environment and Climate Change as a condition of approval. As a result of this, a holding provision has been incorporated into the proposed zoning by-law amendment requiring that services be provided or provisions be made with the Ministry of Environment prior to lifting the holding. 12-109 Municipality of Clarington Report PSD-048-15 Page 11 Transportation 11.7 The Region of Durham Division indicates that the proposed amendment does not present any significant Regional transportation impacts. The subject property fronts Highway 35/115, which is the jurisdiction of the Ministry of Transportation. 11.8 The Ministry of Transportation has indicated that a Building & Land Use permit is required for the proposed development, along with an entrance permit for any changes to the entrance on Highway 35/115. The Traffic Impact Study will need to be revised to demonstrate that all vehicular movements can be safely accommodated to, from and within the site. Concerns were raised by the Ministry regarding separation between existing entrances on neighbouring properties, in order to mitigate weaving issues and unnecessary conflict points, they recommend amalgamating with either the neighbouring properties to the north and south or obtaining an entrance permit that is mutually agreed to with adjacent property owners. 11.9 Since both the applicant and the adjacent property owners to the north and south need to be in agreement with the design of the entrance, it is recommended that this be a condition of the holding on the property. Market Competition with other Gas Stations 11.10 Concern was raised at the public meeting that the combination of Tim Hortons, a convenience store and the gas station provided a significant market advantage that would negatively impact other service stations. While this may be the case, it is not the Municipality's role to regulate market competition except to the extent that it may negatively impact the planned function of an area, such as a downtown. This is not the case here. The Municipality's Official Plan does not identify this area as a commercial precinct; it is designated for agricultural purposes. However, the existing commercial uses that preceded the Official Plan were recognized in the Zoning By-law. We anticipate that all businesses along the 35/115 will evolve to meet market changes. While these lands are permitted to continue with evolve and hopefully be occupied by successful businesses, there is no planned function identified in the Official Plan that is threatened by this application. Stormwater 11.11 The Ministry of Transportation and the Clarington Engineering Services Department are responsible for commenting on the stormwater management of the property. They have indicated that the Stormwater Management for the site will be reviewed at the site plan application stage when a grading and drainage plan is prepared in detail, as well as a stormwater management brief. Holding Symbol r 11.12 In consideration of the Ministry of Transportation comments and other concerns raised by the public, to remove the holding symbol on the property will only be lifted at such time as the applicant has entered into a site plan agreement with the Municipality and satisfied the requirements of all agencies and departments. 12-110 I' Municipality of Clarington Report PSD-048-15 Page 12 11.13 Prior to the lifting of the holding symbol the applicant is required to enter into a site plan agreement with the Municipality of Clarington that addresses: landscaping buffers.to address the issue of privacy on adjacent properties; highway entrance approvals to the satisfaction of the Ministry of Transportation; • stormwater management to the satisfaction of the Ministry of.Transportation and the Municipality of Clarington Engineering Department; • site contamination to the satisfaction of the Ministry of Environment and Climate Change and the Region of Durham; and site servicing to the satisfaction of the Ministry of Environment and Climate Change. 11.14 The application has been reviewed within the context of the Regional and Clarington Official Plans, and the nature of the development along Highway 351115. Staff are of the opinion that the addition of a new motor vehicle fuel bar as a permitted use is compatible with the surrounding properties and supports the objectives for economic development and the rejuvenation of the existing commercial properties along Highway 35/115. In addition, staff note that other properties in the surrounding area have similar zone provisions to those sought by the applicant. 11.15 The Finance Department advises that taxes have been paid in full as of August 28, 2015. 12. Conclusion 12.1 In consideration of the comments received from the circulated agencies and staff comments, the approval of the attached zoning by-law amendment is recommended to permit a motor vehicle fuel bar and further that a by-law will be brought forward to Council to remove the holding symbol at such time as a site plan agreement has been executed and all agency and department comments have been addressed. 13. Strategic Plan Application 13.1 This conforms to the Strategic Plan as it facilitates the expansion of jobs and the attraction of new businesses. Submitted b . y Reviewed by: r Da J. Crome, MCIP, RPP Franklin Wu, Director of Planning Services Chief Administrative Officer .Staff Contact: Nicole Zambri, Planner, 905-623-3379 ext. 2422 or nzambri(aD-clarington.net 12-111 Municipality of Clarington Report PSD-048-15 Page 13 Attachment: Attachment 1 - Zoning By-law The following is a list of the interested parties to be notified of Council's decision: Diane Werry Betty Petropoulos Jaswinder Bawa Tejinder Singh Nipu Patel Kenneth Rowlands NZ/COS/df I i f • C kI I I 6 I; I; P i' k, 12-112 Attachment 1 to Municipality of Clarington Report PSD-048-15 Corporation of the Municipality of Clarington By-law 2015- being a By-law to amend Zoning By-law 84-63 Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for ZBA 2015-0005; Now Therefore Be It Resolved That, the Council of the Corporation of the Municipality of Clarington enacts as follows: 1. Zoning By-law 84-63 is amended as set out in Section 2 through 4 of this by-law. 2. Section 19.4.12 is replaced as follows: "19.4.12 SPECIAL PURPOSE COMMERCIAL EXCEPTION (C4-12) ZONE Notwithstanding Section 19.1, the lands zoned C4-12 on the Schedules to this By- law, in addition to the uses permitted in the C4 Zone, may also be used for a motor vehicle fuel bar and a convenience store." 3. Schedule '2' to By-law 84-63, as amended, is hereby further amended by changing the zone designation from "Special Purpose Commercial Exception (C4-12)" to "Holding (H) — Special Purpose Commercial Exception (C4-12)" as illustrated on Schedule 'A' attached hereto and shall form part of this By-law. 4. This By-law shall come into effect on the date of its passage, subject to the provisions of Sections 34 and 36 of the Planning.Act. By-law passed in .open session this day of , 2015 Adrian Foster, Mayor C. Anne Greentree, Municipal Clerk 12-113 This is Schedule "A" to Bylaw 2015- passed this day of 12015 A.D. 0 Zoning Change From"C4-12"To"(H)C-4-12" Adrian Foster,Mayor C.Anne Greentree,Municipal Clerk 6 . O ❑ CL'` —1 O O O jq At k0c R D 3 — 111 CLARKE p 28A 2015-D6A t- SCH EDl]CE 2 12-114 Clarington Memo Clerk's Department If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. To: Mayor Foster and Members of Council From: June Gallagher, Deputy Clerk Date: September 11, 2015 Subject: Planning & Development Committee Meeting Agenda — September 14, 2015 — Update File: C05.Planning & Development Committee Meeting Please be advised of the following amendments to the Planning & Development Committee agenda for the meeting to be held on Monday, September 14, 2015: 8 Delegations See attached Final Agenda - Attachment#1 10 Communications — Direction D-2 Cliff Curtis, Correspondence Regarding a Proposed General Amendment to Zoning By-law 84-63, Report PSD-042-15, Public Meeting Report for a General Amendment to Zoning By-law 84-63 - Attachment#2 une Gallagher, Deputy terk J EG/mc c: F. Wu, Chief Administrative Officer Department Heads ATTACHMENT # TO UPDATE MEMO ciffingoll Planning and Development Committee Agenda Date: September 14, 2015 Time: 7:00 PM Place: Council Chambers, 2nd Floor Municipal Administrative Centre 40 Temperance Street Bowmanville, Ontario MOM IMA Inquiries & Accommodations: For inquiries about this agenda, or to make arrangements for accessibility accommodations for persons attending, please contact: Michelle Chambers, Committee Coordinator, at 905-623-3379, ext. 2106 or by email at mchambers(c clarin toq n net. Alternate Format: If this information is required in an alternate format, please contact the Accessibility Coordinator, at 905-623-3379 ext. 2131. Audio Record: The Municipality of Clarington makes an audio record of Planning and Development Committee meetings. If you make a delegation or presentation at a Planning and Development Committee meeting, the Municipality will be audio recording you and will make the recording public by publishing the recording on the Municipality's website. Copies of Reports are available at www.clarington.net i 8EM00,U Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 1 Call to Order 2 New Business — Introduction 3 Adopt the Agenda 4 Disclosures of Pecuniary Interest 5 Announcements 6 Adoption of Minutes of Previous Meeting 6.1 There are no previous minutes to be considered under this Section of the Agenda. 7 Public Meetings 7.1 Application to Permit an Outdoor Wedding and Event Venue 7-1 Applicant: Lesle Gibson Report: PSD-041-15 7.2 Application for a General Amendment to Zoning By-Law 84-63 7-3 Applicant: Municipality of Clarington Report PSD-042-15 8 Delegations 8.1 Delegation of Michael Fry, DG Biddle &Associates, Regarding Report PSD-043-15, A Rezoning Application by 1351739 Ontario Limited to Amend Zoning By-Law 84-63 to Permit the Severance of a Residential Lot Fronting on Townline Road, Courtice 8.2 Delegation of Michael Fry, DG Biddle & Associates, Regarding Report PSD-045-15, Application by Zemer Holdings Ltd. to Rezone Lands to Permit an Apartment Building at 50 Martin Road in Bowmanville 8.3 Delegation of Laverne Kirkness, Kirkness Consulting, Regarding Report PSD-048-15, An Application By 2346123 Ontario Inc. (Wally Gupta) To Permit a Motor Vehicle Fuel Bar i i Page 1 Oar�WR Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 9 Communications - Receive for Information 1 - 1 D. Bowen, AMCT, Regional Clerk/Director of Legislative Services, 9-1 Regional Municipality of Durham — 2015 Corporate Climate Change Update i 1 - 2 Melodee Smart, Works Department, Regional Municipality of Durham — 9-48 Durham/York Energy from Waste Project —Ambient Air Monitoring 1 - 3 Melodee Smart, Works Department, Regional Municipality of Durham — 9-135 Durham/York Energy from Waste Project —2014 Durham Region and York Region Waste Diversion Program Monitoring Reports and Waste Management Annual Reports (Due to volume, these reports have not been reproduced but are available at http://www.durhamyorkwaste.ca/) 1 - 4 Melodee Smart, Works Department, Regional Municipality of Durham — 9-138 Durham/York Energy from Waste Project—April, May and June 2015 Complaint and Inquiry Logs and Project Team Direct Contact Log 1 - 5 Minutes of the Ganaraska Region Conservation Authority dated May21, 9-151 and June 18, 2015 10 Communications — Direction D - 1 Lesle Gibson, Letter Addressing Concerns of Neighbours Regarding 10-1 Proposed Amendment to the Official Plan, Report PSD-041-015, Applications by Lesle Gibson to Permit an Outdoor Wedding and Event Venue (Motion to refer the correspondence from Lesle Gibson, regarding Report PSD-041-15, Applications by Lesle Gibson to Permit an Outdoor Wedding and Event Venue, to the Director of Planning Services to be considered as part of the application review process) Page 2 i ClarjDOOII Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers D - 2 Cliff Curtis, Correspondence Regarding a Proposed General Amendment to Zoning By-law 84-63, Report PSD-042-15, Public Meeting Report for a General Amendment to Zoning By-law 84-63 (Motion to refer the correspondence from Cliff Curtis, regarding Report PSD-042-15, Public Meeting Report for a General Amendment to Zoning By-law 84-63.) 11 Presentations No Presentations 12 Planning Services Department Reports 12.1 PSD-041-15 Applications by Lesle Gibson to Permit an Outdoor 12-1 Wedding and Event Venue 12.2 PSD-042-15 Public Meeting Report for a General Amendment to Zoning 12-13 By-law 84-63 12.3 PSD-043-15 A Rezoning Application by 1351739 Ontario Limited to 12-48 Amend Zoning By-Law 84-63 to Permit the Severance of a Residential Lot Fronting on Townline Road, Courtice 12.4 PSD-044-15 Courtice Main Street Community Improvement Plan — 12-61 Terms of Reference 12.5 PSD-045-15 Application by Zemer Holdings Ltd. to Rezone Lands to 12-67 Permit an Apartment Building at 50 Martin Road in Bowmanville 12.6 PSD-046-15 Ontario Heritage Trust Recognition Program 12-88 12.7 PSD-047-15 Clarington Heritage Week 2015 12-96 12.8 PSD-048-15 An Application by 2346123 Ontario Inc. (Wally Gupta) to 12-100 Permit a Motor Vehicle Fuel Bar Page 3 I Planning and Development Committee Agenda Date: September 14, 2015 Time: 9:30 AM Place: Council Chambers 13 New Business - Consideration 14 Unfinished Business. None 15 Confidential Reports 15.1 Confidential Verbal Report from the Director of Planning Services Regarding a Property Matter 16 Adjournment i Page 4 ATTACHMENT # TO UPDATE MEMO Chambers, Michelle From: Fleming, Cindy Sent: September-11-15 2:11 PM To: Chambers, Michelle Subject: FW: Presentation for the September 14th Planning Public Meeting Attachments: Sept14 Planning Delegation.docx Cindy Fleming, AMCT REVIEWED BY, Administrative Assistant to the Municipal Clerk ORIGINA1 1-o; Municipality of Clarington V'SH ❑ moi- ❑ FILE 40 Temperance Street DIRECTION INFORMATION Bowmanville, ON L1C 3A6 COPY TU: 905-623-3379, extension 2101 ❑ MAYOR ❑ MEISPERS C1 CAO OF COUNCIL ❑ CONVOUNITY ❑ CORPORATE ❑ EMERGENCY SERVICES SERVICES SERVICES ❑ ENGINEERIPlG U VUiVICIPAL CJ OPERATIONS From: Cliff Curtis SERVICES CLERK'S Sent: September-11-15 2:06 PM ❑ PLANNING ❑ SOLICITOR C1 TREASURY To: Clerks Department Outside <ClerksDepartment@clarington.net> SERVICES ❑ OTHER Subject: Presentation for the September 14th Planning Public Meeting MUNICIPAL CLERK'S FILE DVA:2-6)0 �S— Municipal Clerk �'� As discussed, please find an advance copy of the text my delegation for the Sept 14th Planning Committee/Public Meeting. I understand that a copy will be provided to all Councillor prior to the meeting. As well, I understand that there is no formal advance registration process to speak as a delegate but that there is a sign up sheet at the meeting and delegations will heard on a first come first served basis. Thanks Cliff Curtis THIS MESSAGE IS FOR THE USE OF THE INTENDED RECIPIENTS) ONLY AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED, PROPRIETARY, CONFIDENTIAL, AND/OR EXEMPT FROM DISCLOSURE UNDER ANY RELEVANT PRIVACY LEGISLATION.No rights to any privilege have been waived. If you are not the intended recipient,you are hereby notified that any review, retransmission, dissemination, distribution, copying, conversion to hard copy, taking of action in reliance on or other use of this communication is strictly prohibited. If you are not the intended recipient and have received this message in error, please notify me by return e-mail and delete or destroy all copies of this message. 1 September 14, 2015 Members of Clarington Planning Committee and Councillors My name is Clifford Curtis and I reside at 3280 Tooley Road, Courtice. I own property at the rear of 3280 Tooley Road legally known as Part 2 of Plan 1011-4051, comprising of 7048 square meters, currently zoned (H)R1. I have owned this property since 1981. The Part 2 parcel was created by severance from the 3280 Tooley Road property in 1991. 1 respectfully request that Committee not endorse the recommendations of PSD-042-15 with respect to deletion of major portions of the Holding Zone provisions contained within section 3.11 of Zoning By-law 84-63 as they will further restrict the uses permitted on my property will further complicate the process involved in the removal of the Holding designation to allow future development. I have had extensive history with the Municipality of Clarington with respect to this property. When I purchased the property I did my due diligence and determined that the property was located within the Courtice Urban Area, was designated for full municipal services, and was zoned R1 residential. Prior to the passage of Zoning By-Law 84-63 1 was assured by Clarington planning staff that the impact of the addition of a Holding symbol to the zoning would only have the effect of forcing me to construct any dwelling close to Tooley Road, where the zoning remained R1, rather than the rear of the property. A revised Official Plan was put forward in or around 1996 and, in its original form, targeted my property for a woodlot/parkland designation. I expressed my concerns with this proposal and eventually reached a two part agreement with Clarington. Part 1 involved the removal of the wood lot/pa rkland designation prior to the Official Plan going forward. This removal was specifically endorsed by Council of the day. Part 2, which occurred subsequent to my appeal of the Official Plan to the Ontario Municipal Board, involved the creation and approval of a Neighbourhood Plan that specifically addressed the form of development on the land. That agreement to create that neighbourhood plan led to my appeal (Referral, No.4) being dealt with in a mutually agreed upon manner at an Ontario Municipal Board Hearing on September 30, 1997. While not the direct topic of tonight's discussion, I continue to have concerns with respect to both the upcoming revised Official Plan and the upcoming revised Neighbourhood Plan as I believe both documents, if approved, will limit my land to Environmental Protection uses. As far as I am concerned, I had, and continue to have, an agreement with Clarington that will permit development of the property based on an R1 Zoning designation at the conclusion of the normal approval process. i i i I I am therefore actively pursuing preparation of a Plan for residential development of the property, I have retained a consultant to prepare a concept plan for preconsultation purposes and have had a Biologist walk the site to give an opinion on environmental constraints. He did not find anything particularly noteworthy on the property. I have also had a Forester visit the site and prepare a tree removal plan (in accordance with good forestry practice). The current By-Law, as drafted, provides clear direction on issues and requirements that must be addressed and resolved prior to lifting of the H designation. The proposed change in language will adversely affect the future uses of my property. The settlement previously reached was based, in part, or the current language in section 3.11 of Zoning By-Law 84-63,which I intend to comply with as I move my applications forward. The specific wording is "The (H) Holding Symbol may be removed upon Council being satisfied that the uses to be permitted will be adequately serviced, the lands to be used have adequate access, prior uses of the land will not prevent the use of the land for the purposes intended by the By-law, that the lands and proposed uses will be adequately protected from any physical or man made hazard or conditions associated with the lands, that the agreements in respect of such matters and the associated financial requirements where required, have been executed with the Municipality of Clarington and the Owner has satisfied all of the requirements of the Regional Municipality of Durham with respect to the provision of sewer and water services and Regional roads and entered into any necessary agreements in this regard," I respectfully request that the proposed amendments to Zoning By-Law 84-63 with respect to removal or lifting of the H designation not be changed, or that they be deferred until such time as they can be matched up with the new Official Plan and the resultant new Zoning By-Law. Thank you for your time. I I Handouts/Circulations Planning & Development Committee Meeting Application By. Lesle Gibson AMIAL ma Proposed Amendments to the Official Plan and Zoning By- law to permit an outdoor wedding and event venue II II J I 1 I I I Storage I I I I Barn 2 I I Ex. Orchard I I I I To Remain I Ex.Orchard 1 � To Remain 1 )— I Implement r Shed / —_------- Storage I I Barn 1 Ex.Gravelled Area I'— i � 1 Ex.Orchard To Remain I — r �, 1 tPortable Washroom `t 1 I 1 Trailers 1 Proposed Ii Reception Tent Proposed Catering Tent � i I I 11 Proposed ISI Area for Orchard Themied ----4 to I Events/Ceremonies pf; �� --I Ex.Orchard I,I �. I To Remain ILI Ex, Orchard Iml To Remain I �' Irol ISI t I I I Lu I I ii I le I I j co I� I X I �p 1w I L -'! LU Concession Road 3 k si I.L.! F7 A . i�.�''r' � ; _\`� � � .. / � y r��' - �� J .v � '\rthh�`+4��d"Y�y��t 1 S`�• Ito. Ir JR Ilk lk t "s JIlk IVA s :. tip• _ �r `� ,',. -! - t cy tit. Q 0 z 3141 cc o Proposed Event Area 3060 COco N A4 EY? co CONCESSION ROAD 3 co r LN LO O 0-)© N L N N co CN C7 ro co Tributary of Wilmot Creek CP Railway 1Public Fn r 1 cComments r AM ti. .. } I E S � )i X provincial Z Policy7, _ V Statement Under the Planning Act Jnta^o carPPS — MAZE ENTRANCE Mario 2.3.3 Permitted Uses 2.3.3.1 In prime agricultural areas, permitted uses and activities are: agricultural uses, agriculture-related uses and on farm diversified uses. Proposed agriculture-related uses and on-farm diversified uses shall be compatible with, and shall not hinder, surrounding agricultural operations. Criteria for these uses may be based on guidelines developed by the Province or municipal approaches, as set out in municipal planning documents, which achieve the same objectives. • No objections from staff/agencies • Engineering/Operations identify items to be resolved at site plan — stage • Regional/Clarington Planning identify new policies in support of on -farm diversified uses and agri - tourism II II J I 1 I I I Storage I I I I Barn 2 I I Ex. Orchard I I I I To Remain I Ex.Orchard 1 � To Remain 1 )— I Implement r Shed / —_------- Storage I I Barn 1 Ex.Gravelled Area I'— i � 1 Ex.Orchard To Remain I — r �, 1 tPortable Washroom `t 1 I 1 Trailers 1 Proposed Ii Reception Tent Proposed Catering Tent � i I I 11 Proposed ISI Area for Orchard Themied ----4 to I Events/Ceremonies pf; �� --I Ex.Orchard I,I �. I To Remain ILI Ex, Orchard Iml To Remain I �' Irol ISI t I I I Lu I I ii I le I I j co I� I X I �p 1w I L -'! LU Concession Road 3 k si I.L.! F7 A Proposed General Amendment to Zoning By- law 84 - 63 lickaringmn Planning Services Department Proposed Amendments JuneF141,1111111 , _AP1ff4i'% t_z_q in -. L, — Clarify a number of Definitions and General Provisions. — Provide revisions for consistency with the Kennel Licensing By-law 2013-025. — Introduce General Provisions for Special Events, Refreshment Vehicles, Visitor Parking for multiple residential unit developments, 0.3 metre reserves, Temporary Sales Offices and Model Homes. • Current Public Meeting — Restrict the establishment of residential units within storefronts in the "General Commercial (Cl) Zone" — Permit pet care as a home occupation. — Delete some of the provisions regarding the removal of the (H) Holding symbol. Residential Units In Storefronts 14 Pet Care as a Home Occupation �' Holding Symbol • Dog Daycares • Holding Symbol i • Review of the proposed Amendments • Recommendation for Adoption � II F w ! I I 2346123 ONTARIO INC. L y 1 I PROPOSED HIGHWAY COMME AL g, L---------- GAS BAR DEVELOPMENT 3211 HWY 115 MUNICIPALITY OF CLARINGTOKUL- Kirkness Consulting — ® I I Urban and — Rural Planning CANTAM I � f I KEY PLANNING CONSIDERATIONS • NEW GAS BAR NOT PERMITTED CURRENTLY • ALL OTHER REQUESTED USES PERMITTED • ZONING BY- LAW AMENDMENT REQUIRED --- i • EXISTING C4- 12 ZONING TO BE AMENDED • ALL STANDARD C4 --- PROVISIONS CAN BE MET unving.mange An RESIDENTIAL PROPERTY too# ChM 40 1 '7" RESIDENTIAL #0%%,PROPERTY I It style oo'�o I RESIDENTIAL, PROPERTY r.., R RESIDENTIAL �� j ' .4 PROPERTY Aerial looking north - showing Hwy 115 /35 and right lane access lane and site plan n� n rm p.c NTtmm mewnpc„mc PRptGp ri-LAW RE0.WiN1 ENL I,xYY.J5 sYY1 x.wE PARI or I➢T .1—= I cEwwmc lo.miP or GNUS YWILIPLtt7NI wmY NP PtONAL uNIOP410T D uw NNN£0 NY: rv,Y 8 NvuNR Ec�uoaTarlw wuu�wsroTEt�t at rw wr ams w p189N5 R Na If9Et1. ss nNna c-EaaNc N18E � — IN¢Ru vuo sareux u A,1 Y da) SSaY - NYna �N W>sl 1m,Pa K mASSNHtx 65 P0.RYIW 9,Pk8 ,< NN gPaa mNTv. . TjJa 93 n/m _ Na EuYm �R� (SINYMYM In ~�N ,os.oia = ms<IauuNm Tnc 1� E�•a n m Sf s'Nns Nua� - �,us au.Yxo Pi N, SIN 13,8iN J9M5 apPpm mPrss a ge¢s Famx: mNu aYYxwxs >e N N re N tNTEW[f WtloT5 Y6T16 B.oN - Site Plan I SSN sp o {r �Y a r w1 �Il 9 m la[gnm PANRO 5 p 1 ' El tc , CPNNMH�r j 75 ac our: o wY �• 60ffp „ i5 g i,al4 � Jm. » R"I N1tlaY ePeNEPTIIiPtlAT ENL PARI or I➢T .1—= I cEwwmc lo.miP or GNUS YWILIPLtt7NI E PtONAL uNIOP410T D uw NNN£0 NY: rv,Y 8 NvuNR Ec�uoaTarlw wuu�wsroTEt�t at rw wr ams w p189N5 R Na If9Et1. - w ntnilra�i��oin � — I SIiE PLW mra"na,Ew rim : � �iNNa usi NL ,�'ss SP1 nsm �I r�raw�° : � NRllwnmc rxaa mR m ICIPAUTY OF CLARINCTON. NE GASSLTE 11 Nai mn�vnNru uw cSsic,NS wRe mvrRmNrRe wNo vEavERvv cv 91�WMR4Cru&EG( RND ���LL gMFN&cats T ROCEEo fitl NllH mlbile �CIa.� alooRm�RFEgRA,vNq� -CANTAM Gia..P r&: PLANNING 8 B1HLG NG N5 LT NPS —A. SITS pw PAPSCOYP lib F Y41. POROWYG, ,Nu.. 3211 HIGHWAY 351t15, NEWCASTLE, MUNICIPALITY OF CLARINGTON PROPOSED GAS STATION, CONVENIENCE STORE, EATING ESTABLISHMENT WFTH DRIVE-THRU, AND FUTURE DEVELOPMENT SITE PIAN �NGNo Sf'1 -CE P '(AII 7 A A } f SPECAL PURPOSE COMMEAaAL (0) NNE PROPOSED BY-LAW REpuIREMENT M Ncw LANOSCFae S i t e P a n HGILT POLE 4 1 _. TQ^f➢NC ---- PROPERTY LINE GAS STATION. C -STORE EATING ESTABLISHMENT W/ ORIAE-111X1, ANLL NTURE RETAIL SALES PERMIIED !EA NEW WILDING NTVh£ ftEIaIL STDR WC 402 MAC GARBAGE ENCLOSURE 4140 SO.M (0.352) GAS CANOPY 367.92 SOIA [2.892) 7 SETBACK - .. AREA'. 27875 SDI AREA 15 M GARBAGE ENCLOSURE 1994 M GAS CANOPY 22.25 M GO SETBACK NEW WADING 1010 son) 5 OP 1` GAFBAF ENCLOSURE 17.95 W CAS CANOPY 39.90 W 1 . ................ .. .......... .: ... .' .. .... ...... , .. ......... ...:::... .............: ......F, TRENCH Ok AIN -CE P '(AII 7 A A } f SPECAL PURPOSE COMMEAaAL (0) NNE PROPOSED BY-LAW REpuIREMENT <} (AI) CNE WAY TRAFFIC SEM MIN. 112302 No (EMSTNG) (12.70225 SpA) 15M ICS HGILT POLE M20 M 30 W ---- PROPERTY LINE GAS STATION. C -STORE EATING ESTABLISHMENT W/ ORIAE-111X1, ANLL NTURE RETAIL SALES PERMIIED !EA NEW WILDING 327,94 SOA (2662) 402 MAC GARBAGE ENCLOSURE 4140 SO.M (0.352) GAS CANOPY 367.92 SOIA [2.892) 7 SETBACK NEW BUILDING 2153M 15 M GARBAGE ENCLOSURE 1994 M GAS CANOPY 22.25 M GO SETBACK NEW WADING 229 M 5 M GAFBAF ENCLOSURE 17.95 W CAS CANOPY 39.90 W NO SMV0 NEW BUILDING 53.3:1 M 5 M GARBAGE ENCLOSURE 54.05 M GAS CANOPY 2041 M SETBW( NEW BUKDING 55.11 N 5 M GARBAGE ENCLOSURE 41.21 N GAS CANOPY 56.10 M ]INT . _... .. ... 6 M (I STaEY) 14 N WAY, IN AREA .. 327.99 93.M - IG AREA 6,617.50 SO.V (53.792) IDS NTN. TRIP MI VOTE STARTING FROM 3 M 3 M 'ACES 65 PARKING YAM 3 BARBER -FRFs SPACES TOTAL BB SPACES G-=111 1/)D SAN 17E77J3A ' 4.6 REWIRED EATNG£STAWSHMENT 1/7 Sam 1550/7 =26.54 REQUIRED GAS STATION: 1/FUMP 6/1 = 6 R EWIRED 25 TO 5O SPACES REWIRE 2 BARRIER FREE STALLS NFa61ATON ON THIS 91 PLAY IS TAKEN FROM. SCREWS REAL PROPERTY REPORT PANT OF LOT 28 CONCESSION 3 GEOGRAPHIC TOWNSHIP OF CLARKE MONIGPALITY OF CLARINGTON RELBONAL MUNICIPALITY OF DURHAM PREPARED RY: IVAN B. WALLACE ONTARIO LAND SLMIVEYWR LTD. DATED: APRIL 17. 2013 THE AT TOOT OR PLAINER IS NOT RESPONSIEE FOR ANY ERRORS OR OMSSIONS N THIS RESPECT. m 4.0 R 5.7V P.06olcnP SPACE 15 , PAINTED LINES NEWl IT °'.lM. EHi .di LEGEND D HULLOING ENTRANCES <} (AI) CNE WAY TRAFFIC SEM MIN. (A2) Q TWO WAY TRAFFIC 60 MIN. — HGILT POLE F—, L EXISTING BUIEIRNG TO BE DOWN -SLED ---- PROPERTY LINE ai"n:. NEW 151,1 CLARET CURB Cw1RY SILK LAXNSCA'E - SW AREA NFa61ATON ON THIS 91 PLAY IS TAKEN FROM. SCREWS REAL PROPERTY REPORT PANT OF LOT 28 CONCESSION 3 GEOGRAPHIC TOWNSHIP OF CLARKE MONIGPALITY OF CLARINGTON RELBONAL MUNICIPALITY OF DURHAM PREPARED RY: IVAN B. WALLACE ONTARIO LAND SLMIVEYWR LTD. DATED: APRIL 17. 2013 THE AT TOOT OR PLAINER IS NOT RESPONSIEE FOR ANY ERRORS OR OMSSIONS N THIS RESPECT. m 4.0 R 5.7V P.06olcnP SPACE 15 , PAINTED LINES NEWl IT °'.lM. EHi .di 'fav ®Ni a�■ski um�mn Ell . . V O (3.2) 4 4 ° — ENNRE YLCN ENCLOSURE AREA 21:1 SC. 2 -NEW DRIVE -MAD ai"n:. (233 SG.FT) Cw1RY SILK NEW SIGHT NEW It IN NEW Ise,. CONE. NEW im— RAISED NEW GARBANE i B DDILI ISLAND AREa aa4 I To 1 POPE fT'�b , .,P°,, a\cNT Poi 1 ,\ RACKS— ,o Si Ai FORG MS P D 1-(75,'71-: 111,-") M - .. ..'. -� . _... .. ... -(7 WR: SPLIT 5I. REGULAR PP.OPCIN LINE .. CIL TANK EL 2- NG A A k 001 PREVIDN) UJC D.W. P ELF 6 POSITION 'fav ®Ni a�■ski um�mn Ell . . YLCN REIAtl4FD h R ai"n:. NEW SIGHT NEW It IN NEW Ise,. CONE. i B fl6rvlAxpSGAPE 1 POPE fT'�b , .,P°,, »° ey 1 Si Ai .-.A RB ESTOP A - .. ..'. Qn . _... .. ... PP.OPCIN LINE .. .......... P RTY LIN ..-. v. - ..,,a r . N a/ p7'1+2+o-t:.:.:F �NF.W CCNC, WRB ANB ExrasrEo Ours ry . vxns7 PV. OEHC CURB C 1 NEW TUNE. LJ D GU17E7 OPS' 6W 010 - TO BE RENOVED INW0.01 ETD - I ------------------- ...... ........ ......................................................TRENCH DRAA-NEW PANCRAS4.0 9 570SPACLNLW 150- RAISED'2 . III PANTED CONA= PQPSLCPCSPACES'm UNCL M RE2- EW ERNE- LAUEN MY SEN81 AR[k2l 7 50NCR 15D- RAISEDNnP GARBAGEARLA,414 SONCR VERB RACKS— So20NEN C -S ORETUI EL IDING (AD) 6COUC PADIF 5 IN HWICAPNEW can C' SHOPARI M SC mBO, LARD (TYNFLI.S NrDEN MISSNEW C1111- ISLAND11Landscape4�Ull IT AlIan mRWY JIN NEENC ml�CUTTER DPqD 60000 , P".7 - o9j to BE KMI CI CPO 509,010 • GAS BAR WITH SIX PUMP ISLANDS • TIM HORTONS RESTAURANT (20-27 SEATS) • DRIVE THROUGH FACILITY • CONVENIENCE STORE (142.15 sq. m.) • FUTURE RETAIL USE ECONOMIC CONS • NO GAS BAR DEVELOPMENT SINCE "94 • 46% INCREASE IN WADT BETWEEN '94 - '10 • AA DT INCREASE O F 10,000 CARS • EXISTING SITE CURRENTLY BLIGHTED • POTENTIAL TO CREATE 30-40 JOBS • LARGE POPULATION INCREASE PREDICTED IDERATIONS AADT = Average Annual Daily Traffic SADT = Summer Avenue Dally Traffic SAWDT = Summer Average Weekday Traffic WART = Winter Avenue Daily Traffic r,„1111111111111111l1111 r r r IIIIIIIIIIIIIIII�Ii►11� r r r r �:•:!'��'� �lil��l�l 'rim1!lIIIIIIIi1111 ,,,,��i�lllllllllllllllll r r r lllllllllllllllllllll r lllllllllllllllllllll SITE OVERVIEW • EXISTING COMMERCIAL SITE • SITE AREA 1.23ha • LOT FRONTAGE 76.2m • SPECIAL PURPOSE COMMERCIAL ZONE C4-12 • DESIGNATED "PRIME AGRICULTURAL" • REMNANT RESTAURANT BUILDING ON SITE A-1 A-1 J EP 1. ��•, I -ii �4n11..Iii.Ifil�rYa - 1-- RC•6 A-1 C6.4 SUBJECT i CB•11 Cd LANDS -C6.1Q i C4.1 I EP 1 6�9 A-1 � ' M EP . R , A-1 t CONCLUSIONS • Consistent with PPS • In conformity with Regional Official Plan • In conformity with Clarington Official Plan • Existing zoning permits all but one permitted use • Respects service stations design guidelines • Provides for sustainable design features • Logical development of derelict commercial site • Positive economic impact • Responds to publics' comments Handout Additional changes to the proposed General Amendment to Zoning By-law PSD -042-15 Revised Recommendation 2 to read as follows: 2. That the Zoning By-law Amendment contained in Attachment 3 of Report PSD -042- 15 , with additional changes in the Handout from the Director of Planning, be approved; 9. By replacing Section 3.12 HOME OCCUPATION as follows: "3.12 HOME OCCUPATION a. Permitted Uses i) adult home care; business, professional or administrative office, iii) caterer; iv) children's home care, v) home craft business, vi) instructional services for an; vii) light service shop; viii) personal service; ix) pet home care; and x) repair and retail sales of antiques. b. Excluded Uses i) furniture refinishing, ii) light equipment service; iii) motor vehicle body shop; iv) motor vehicle repair garage; and v) retail sales, with the exception of antiques and home craft products. C. Regulations The following regulations apply to dwelling units wherein a home occupation is permitted: i) The home occupation is limited to the members of the household residing in the dwelling unit, plus one additional person. ii) There shall be no display, other than a sign erected in conformity with the By-laws of the Municipality, to indicate to persons outside that any part of the dwelling unit or lot is being used for a purpose other than residential. iii) Such home occupation shall be clearly secondary to the main residential use and shall not change the residential character of the dwelling unit nor create or become a public nuisance due to the levels traffic, parking, noise, glare, dust, odours, or vibration and hours of operation. iv) Such home occupation shall not interfere with communication signals. v) Not more than twenty-five (25) percent of the total floor area of the dwelling unit shall be used for the purposes of the home occupation use except in the case of a Bed and Breakfast or Vacation Farm Establishment and such home occupation shall be conducted within the principal residence. vi) Parking shall be provided in accordance with Section 3.16. vii) There shall be no outside storage of goods or materials associated with a home occupational use. viii) An adult home care may accommodate a maximum of five adults that do not reside in the dwelling at one time. The rear yard of the dwelling may be used IS aGGessery +^ "^ for adult home care establishment. ix) A children's home care may accommodate a maximum of five children, not including the owner's children. The rear yard of the dwelling may be used as aGGeSS^^� +^ the for children's home care. x) A pet home care may accommodate a maximum of three dogs, including the owner's dogs. The rear yard of the dwelling may be used as an aGGess^^y I^ for the pet home care. xi) Instructional services are limited to one student at a bri The rear yard of the dwelling may be used as an aGGeSS^^Y t^ the -for instructional services of an individual." 22. Section 3.21 d. is replaced as follows: No ouilding containing a residential or institutional use shall be located closer than 30.0 metres from any railway property line.