HomeMy WebLinkAboutEGD-04-03
....... ..
CI[!#!gron
REPORT
ENGINEERING SERVICES
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Report #:
JANUARY 20, 2003
EGO-04-03
vII-- {;/I1-(J;J6-o 3
0.06,09.001 By-law #:.J2v3 -/3
Date:
File#:
Subject:
SUMMITCREST COURT SUBDIVISION, TYRONE, PLAN 40M-1882,
'CERTIFICATE OF ACCEPTANCE' AND 'ASSUMPTION BY-LAW',
FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1, THAT Report EGD-04-03 be received;
2. THAT the Director of Engineering Services be authorized to issue a 'Certificate of
Acceptance' for the Final Works, which include final stage roads and other related
Works, constructed within Plan 40M-1882; and
3. THAT Council approve the by-law attached to Report EGO-04-03, assuming a certain
street within Plan 40M-1882 as public highway.
~ C/ ()~~
Submitted by: Anthony Cannella, CET. Reviewed by: Franklin Wu,
Director of Engineering Services Chief Administrative Officer
AHC*ASC*ce
January 6, 2003
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T 905-623-3379 F 905-623-9282
.712
"-
REPORT NO.: EGD-04-03
PAGE 2
1.0 BACKGROUND
1.1 The Corporation of the Municipality of Clarington entered into a Subdivision Agreement,
registered November 12,1996, with Elfriede and Otto Jost to develop lands by plan of
subdivision, located in Tyrone and described as Plan 40M-1882 (Attachment 1). The
agreement required the developer to construct all roadworks, including hot-mix paving,
sodded drainage ditches and streetlights, hereinafter referred to as the 'Works'.
1.2 The Subdivision Agreement provides for the separation of the Works into four (4)
stages:
a) Initial Works;
b) Street Liqhtinq System;
c) Final Works; and
d) Stormwater Manaqement System
1.3 The Initial Works and Street Liqhtinq System were issued 'Certificates of Completion'
and subsequent 'Certificates of Acceptance' by the Director of Engineering Services, as
per the maintenance requirements set out in the Subdivision Agreement.
1.4 There are no Stormwater Manaqement System works associated with this project.
1.5 The Final Works were issued a 'Certificate of Completion' dated October 22, 2001. This
initiated a one (1) year maintenance period, which expired on October 22, 2002. The
Works have been re-inspected and all deficiencies have now been rectified to the
satisfaction of the Director of Engineering Services.
1.6 It is now appropriate to issue a 'Certificate of Acceptance' for the Final Works. The
Subdivision Agreement requires Council approval prior to the issuance of the 'Certificate
of Acceptance' for the final Works.
713
,~- .-
REPORT NO.: EGD-04-03
PAGE 3
1.7 Further to the issuance of a 'Certificate of Acceptance', a by-law is required to permit
the Municipality to assume a certain street within Plan 40M-1882 as public highway
(Attachment 2).
Attachments:
Attachment 1 - Key Map
Attachment 2 - Proposed By-Law
714
.;/~
r
j -1_ \ I \~~1 conlDo~L~-
. I~~ll- ~ TfHj f - ~-- I
L Il__~j tL_L!L I ~- 1----
--I . I 1____
I 'I" I I
-- _ ___ L-lsummilcrest C-"urt-.!
.~
--.J-=
I 1---
i-~
_I
1-
,
,
I
I
I
I
I
I
I
SUMMITCREST COURT
SUBDIVISION
PLAN 40M-1882
.-- ~'---I
'"
l1l
o
et::
UJ
c:
Q)
E
Q)
(3
L... .. _
I Tl1r-:UB ECT
1 I! . 51 E: I,
IL--J~-~f./ ( ~~1t.\vRl :l~~'1
_I "0 <P I
~
IT
I
J
,
- ~ \
ll{
W,+-li:
s
715
'"
ATTACHMENT NO.: 2
REPORT NO.: EGD-04-03
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY.LAW2003-
Being a By-law to assume a certain street within the
Municipality of Clarington as public highway in the Municipality
of Clarington.
NOW THEREFORE the Council of the Corporation of the Municipality of Clarington hereby
enacts as follows:
1, THAT the street shown on Plan 40M-1882, and listed beiow in this section. being
in the Municipality of Clarington. in the Regionai Municipality of Durham. is
hereby accepted by the Corporation of the Municipality of Clarington as a public
highway, and assumed by the said Corporation for public use:
Summitcrest Court
BY-LAW read a first and second time this 27th day of January 2003.
BY-LAW read a third time and finally passed this 27th day of January 2003.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk