Loading...
HomeMy WebLinkAboutPD-228-88 DN: 228-88 REPORT #2 TOWN OF NEWCASTLE REPORT File # Res. # By-Law # MEETING: COUNCIL DATE: Monday, October 24, 1988 i REPORT #: PD-228-88 FILE #: PLN 7.2.1 SUBJECT: REQUEST FOR ISSUANCE OF FOUNDATION PERMIT CROTHERS LIMITED FILE: PLN 7.2.1 RECOMMENDATIONS: It is respectfully recommended to Council the following: 1. THAT Report PD-228-88 be received; and 2. THAT Mr. Rick Gay be advised that the Town is prepared to issue a Foundation Permit for the proposed building of equipment sales and service shop by Crothers Limited on Courtice Court provided he deposits with the Town: a) a Letter of Credit of $50,000. ; and b) a Letter of Undertaking that, prior to the issuance of a full building permit by the Town, the Owner warrants to: i) submit an Engineering Report based on test drilling to certify that there is sufficient potable water to service the proposed industrial operation as well as for fire protection purposes and further, that the soil condition is suitable for sub-surface sewage disposal acceptable by the Durham Region Health Department; ii) enter into a Site Plan Agreement with the Town to include, among other matters, a Letter of Credit as Performance Guarantee to cover all landscaping works and other works as required by the Public Works Department. It is understood that the $50,000. j Letter of Credit will be adjusted based on estimated cost of these works. . . .2 REPORT NO. : PD-228-88 PAGE 3 _______________________________________________________________________________ l. BACKGROUND By letter dated October 14, 1988" Mr. Diob Gay, on behalf of Ccotbero Limited, requested the Town to issue him a Foundation Permit for an industrial building for equipment sales and services on Coortioe Court, within the Couctine Road Industrial Park. 2. EXISTING POLICIES 2.1 Pocaoaut to 8y-law 79-151 (Site Plan approval) , no person shall , construct or place any structure or building on land without first aeoociug site plan approval from the Town. 3.3 In view of the foregoing, the Director of Planning and Development is not in a position to issue any Foundation Permit unless so directed by Council. � � 3. COMMENTS 3.1 Application for site plan approval was made by Mr. Gay on September 13, 1988. The application was subsequently circulated to various ogauoiea for onomneuta and, as of writing of this report, comments from ( Public Works Department and Regional Health Department are still outstanding. It is also noted that the applicant has yet to submit an Engineering Report to demonstrate that the soil is suitable for septic purposes and that there is sufficient water supply for the industrial operation and fire pocLectiou purpose. 3.2 Notwithstanding the outstanding items yet to be dealt with prior to entering into o Site Plan Agreement, Staff reviewed the request from Mc. Gay and fully appreciate his position and, are of the opinion that his request for a Foundation Permit merits consideration. . . .3 REPORT 0O. : PD-228-88 PAGE 3 _ 3.3 It has been the policy of Council that priority be given to industrial and commercial development applications and Staff feel that this is n case where Council could exercise some flexibility and direct Staff to issue him the Foundation Permit. 3.4 However, in no doing, the Town moot ensure its interests and requirements, financial and otherwise, are protected. As a result, the recommendations contained herein are provided to Council for its consideration. / Respectfully submitted, Recommended for presentation to the Committee _ ------------------- Franklin Wu, M.C.I.P. Lawrence/E. 8otseff Director of Planning 6 Development Cbief (Ad iuiotcative Officer *FW* 'ig *Attach. October 18" 1988 CC; Mr. Rick {aQ' Ashley 333 Company Limited P.O. Boo 2065 ( O88AWA, Ontario LI8 7V4 A HLY 333 COMPANY UM1TE® (416) 579-5561 P.O. BOX 2065 OSHAWA, ONTARIO 1-11H 7'V4 October 14, 1988 Town of Newcastle, Hampton, -Onta-rio. LOB UO Attention: Frank Wu Director of Planning & Development Re: Crothers Equipment Limited Project Dear Sir: As per our conversation, we are requesting a foundation permit for Crothers Equipment Project before the Site Plan Agreement is signed. We fully agree not to proceed beyond the foundation portion of the project until the site plan agreement is signed and full permit is issued. Please advise us of any conditions you may require. Thank you. We hope this meets with your approval and if there are any questions, please call Rick Gay at 579-5561 . Yo rs ul RG/j w Gay