Loading...
HomeMy WebLinkAbout06/18/1964 . '. . . -. , Page 14 SPECIAL COUNCIL ]HNUTES A Special Meeting of Bowmanville Town Co~cil convened at 4:15 p.m. on Thursday June lS, .1964 at the Council Chambers, Town Hall, with His Worship Mayor Ivan M. Hobbs in the Chair. All members present. His Worship explained that the meeting had been called to con- sider the Storm Sewer Proje~~ to be effected under the Town's Supplementary Roar Expenditure By-Law, and the Report of the Roads and Streets Committee dated June 17th, 1964. "See Appendix A" Following consideration ari discussion of the Report the fol- lowing resolution was adolted. Moved by Con. Hooper and L8s1ie:- That the report of the Roads and Streets Committee dated June 17th, 1964 be received and adopted and that subject to Department of Highway, ApPI oval the liJorks Department be author- ized to proceed with $7,lCO.00 worth of work on the Simpson Avenue Storm Sewer Project. Carried. The meeting adjourned at 4:18 p.m. on motion of Councillors Hughes and Reeve Little. , .- . . . . t:) ~fe....J " v .. f.) ,. +0 Pa~ To... "f. er--- ''9~. l"i"'f~ Roads & Streets Committee Minutes The Roads & Streets Committee met June 17th, 1964 at 4:14 P.M. Present: Reeve Little, Chairman, Mayor Hobbs, Councillors Hooper and Rundle and T.K. Stewart, Works Superintendent. 1. - Moved by Con. Hooper, seconded by Mayor Hobbs. THAT we engage a gradall to ditch Hunt Street from Nelson to Albert Street. CARRIED 2. Moved by Con. Rundle, seconded by Con. Hooper. THAT we storm sewer road east of Lycett money permits. Simpson Avenue from Culvert crossing driveway north to Prince Street if CARRIED 3. Moved by Con. Hooper, seconded by Con. Rundle. THAT we engage Roberts truck from Peterborough to haul ~ravel from crusher to town yard at $1.05 of belt or iii\1.25 per yard from stock pile. . CARRIED 4. Proposed Simpson Ave. - Storm Sewer. Materials: Jane to Southway 780 I of 1811 pipe @ ~2. 45 ::~l.. 9111 00 3,080iOO 500.00 350.00 Southway to outflow llOO' of 2l~ pipe @ $2,80 5 Manholes @ $100.00 ea. 5 catchbasins @ 70.00 ea. 150' of catch basin connections @ 1.60 Tar AL MATERIAL . ~oo $~ Labour: 1880' of pipe line 5 manholes 5 catchbasins 150' of catch basin 1 outfall @ $1. 25 @ 30.00 @ 25.00 connections @ $2.00 TarAL 2,350.00 150.00 125.-0.0 300.00 50.00 2,975.00 9,0%.00 905.00 $ 9,961.00 Total Labour & Material Engineering and contingencies 10% TarAL COST Meeting Adjourned 5:00 P.M.