HomeMy WebLinkAboutPD-128-88 DN: 128-88
TOWN OF NEWCASTLE /F
REPORT File #
Res.
By-Law #
MEETING: General Purpose and Administration Committee
DATE: Monday, June 6, 1988
REPORT #: PD-128-88 FILE #: DEV 88-28
SU.JECT: REZONING APPLICATION - E. VANDEWALKER
PART LOT 25, CONCESSION 1, CLARKE
OUR FILE: DEV 88-28
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
1. THAT Report PD-128-88 be received; and
2. THAT the application submitted by Mr. E.E. VanDeWalker to rezone a parcel
of land within Part of Lot 25, Concession 1, former Township of Clarke to
permit year-round accommodation within the Trailer Park be referred back to
Staff to permit the applicant the opportunity to provide further
information pertaining to the conversion of the existing and proposed
trailers and to address the comments of the Durham Regional Health Unit.
1. BACKGROUND
1.1 On March 14, 1988 an application was received by the Town of Newcastle
Planning Department for rezoning and site plan of a site in Part Lot 25,
Concession 1, former_ Township of Clakre (623 King Street East, Newcastle)
to bring into compliance the existing Trailer Park operation. The subject
property is presently zoned "Special Purpose Commercial Exception (C4-8)"
which allows a Trailer Park or Trailer Camp including a propane dispensing
tank as an accessory use for the use of park patrons only in accordance
with the provisions of Section 9.3 of By-law 84-63.
. . .2
REPORT 0O. : ID-138-88 PAGE 2
_______________________________________________________________________________
1.3 & 8ite Plan Agreement for the establishment was originally produced in
I981. This Agreement allowed eighteen (18) trailer sites on the
subject property. The zaouou a rezoning and amendment to the Site Plan
Agreement are required at this time is as follows. The definition of
Trailer Camp or Park under both the current and previous Zoning By-law
indicate the establishment is to be used on a Seasonal basis. The
applicant has used and proposes to continue using the pack for YEAR
ROUND LIVING &CC0M(8}&TIONS. Furthermore, as previously mentioned the
Site Plan Agreement recognized eighteen (IH) camp sites, there are now
twenty-nine (29) trailer sites being used, and the applicant would like
to amend said Agreement to enable him to continue using twenty-nine
(
(29) sites.
2. CIRCULATION COMMENTS:
2.1 In a000cdeuca with Town procedures, the application has been circulated
to various departments and agencies as was considered appropriate. The
following is u summary of the comments received through the circulation
process.
2"3 Newcastle Public Works tme t
'
Works Department Staff noted they had no objection to the applications
provided, that all works be completed in a000cdaooa with Town of
Newcastle's Design Criteria and Standard Drawings and that the
applicant's Engineer provide a Site Grading Plan.
2^3 Newcastle Fire Department
Fire Department Staff noted some oouomruo with the proposals in terms
of compliance with the Ontario Building Code and Ontario Fire Code.
Areas of deficiency include minimum road width; and turn-around
�
REPORT 0D.; ID-128-88 PAGE 3
_______________________________________________________________________________
3.3 Newcastle Fire Department 'd
facility. Suggestions noted in the comments included; connecting to
municipal water once services are extended to KkewtoovilIe. In the
meantime access should be made to Graham Creek. 7\ recommended
separation distance of 5 to 6metreo between trailers as opposed to the
present 2.5m in some instances.
2.4 Newcastle Building Department
The Building Department noted that, in order for mobile buom*a to be
�
considered as dvnsIIiug units, they must be placed on foundations
capable of supporting all intended loads. As well, decks and other
attached buildings would be required to meet similar standard.
Any new mobile homes placed within the pork would require building
permits and proof that the structure complies with C.S.A. 2240.2.1 or
the Ontario Building Code.
2.5 Durham Regional Planning
Regional Planning Staff noted that Section 8.I.2.1I of the Durham
'
Regional official Plan provides that mobile bmne park development may
be permitted if in the opinion of the respective municipality, such
development is considered to be desirable and compatible with
surrounding uses. However, Section 8.1.2.I2 of the Durham Regional
Official Plan specifies mobile Home Parke abolI be folll, serviced with
water and sewer services. Regional Services are not presently
available at this site.
\
REPORT 0O. : PD-I28-88 PAGE 4
_______________________________________________________________________________
2.5 Durham Regional Planning
Regional Staff further noted that, since this is an existing
uVo-cnufozmlug use, the municipality may vvieb to consider this
development within context of Section 16.6.5 of the Durham Regional
Official Plan which allows the expansion of non-conforming uses.
2.6 Regional Health Department
The BeoItb Staff noted there is insufficient area for the installation
of on-site sewage disposal system with 100% replacement area to service
the proposed year round mobile home development.
2^7 The following agencies noted no objection to the subject proposal:
- Newcastle Hydro Electric Commission
- Gaoazaokm Region Conservation Authority
- Ministry of Transportation
3. STAFF COMMENTS:
3.1 As noted previously, the application is for the expansion and
'
modification to an existing use to year round operation. The above
comments have provided an indication of the difficulty the applicant
may have in alleviating the various deficiencies. Staff note that the
applicant has attempted to meet with the various concerned agencies in
an attempt to satisfy the noted deficiencies.
...5 |
\
.��
REPORT 0O.; PD-I28-88 PAGE 5
_______________________________________________________________________________
3.2 In consideration of the requested conversion to full-time residency and
the requirements of the Ontario Building Code and the comments of the
Durham Regional Health Department, Staff would reoire further
clarification from the applicant that the necessary conversions would
appropriately address the stipulations within the Ontario Building Code
for full-time accommodation.
It is Staff's opinion that the integrity and intent for full-time
residency has to be addressed to justify any conversion request.
3^3 At this time' Staff cannot support the proposed rezoning. Pending
clarification from the applicant as to the methods proposed to
alleviate the couoezoa of various agencies, Staff will bring forth a
report to the Committee at m later date.
Respectfully submitted, Recommended for presentation
to the Committee
\ /
------------------------ ° ---------------
Franklin Wu wrence otseff
Director of Planning 6 Development Chief o tzative Officer
CP*FW* 'ip
*Attach.
May 35' 1988
�
CC: Mr. Eugene \aunDeWaIker
152 Conlin Road East
0S8AWA' Ontario |
[lB 7K5 /
SUBJECT- SITE
LOT 27 LOT 26 LOT 25
1
Z
cn
I R •h••.... N w co
RI-1 ••hhh""'••. pqC/FCC U
R2 �..h. �q w ( ( o
••. ., q y U
R I GRAHAM CT. �hh
Rl
OA
—� M2-3
N
C1 KING STREET ( HWY.N°2) EP
( HIGHWAY Ntl 2
C1 a Cl R1 Ct R1 C5-I
C4-2 (H)RI
I -
1 �
EP o
Al
w
MR ]
,-N, I _
0 50 loo WO -mofn III[KEY A P Som
woom.
L)ev. 88 28-
C 7J00- Z_
N 1753 X20"
ZIL
4LL
ET
a-1/9, 1117 L,5
—— —
—— —
j
1,, -IT
ScuE 2C'