CORPORATION OF THE TOWN OF NEWCASTLE ,
PLANNING AND DEVELOPMENT DEPARTMENT T.T.EDWARDS,M.C.I.P.,Director
HAMPTON,ONTARIO LOB 1,10 TEL.(416)263.2231
REPORT TO THE GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
MEETING OF MAY 7, 1984
REPORT NO. : PD-96-84
SUBJECT: PLAN OF SUBDIVISION - FILE: 18T-81034
GATEHOUSE HOLDINGS
PT.L. 35, CONC. 2, FORMER TWP. OF DARLINGTON
PROPOSED REVISIONS TO DRAFT PLAN
RECOMMENDATION:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the
following :
1 .
That Report PD-96-84 be received; and
2. That the Region of Durham be advised that the
Town of Newcastle has no objections to the
approval of revised Plan of Subdivision
18T-81034, dated February 10, 1984, subject to
the inclusion of a "daylight triangle" and 0.3
metre reserve (Blocks 207 and 208 respectively)
as noted on the previously draft approved plan.
. . .2
(t j
REPORT NO. : PD-96-84 Page 2
BACKGROUND:
Draft approval to Plan of Subdivision 18T-81034 was issued
by the Region of Durham June 3, 1983, subject to the
conditions set out in a letter dated May 10, 1983 addressed
* to the applicant. A portion of the draft plan as attached
hereto, illustrates the use of a cul -de-sac providing access
to eight (8) residential lots. A request submitted through
the Region has been received by Staff, thereby eliminating
the cul-de-sac. The redesign as shown, reduces the number
of potential lots by two (2) .
The Town of Newcastle Works Department, in reviewing the
application, indicated that they would have no objections to
the elimination of the cul -de-sac.
Staff would note for Committee's information , that in
reviewing the proposal , the provision of a "daylight
triangle and 0.3 metre reserve" shown as Blocks 207 and 208
respectfully on the previously issued draft plan , located at
the northeast corner of the proposed road allowance -
extension of Bloor Street, have been eliminated. This
requirement originally, was an additional provision
requested by the Region and noted on the draft plan as a
"redline revision". It would appear that the exclusion of
Blocks 207 and 208 on the revised plan, was merely an
oversight.
Within draft plan as approved, Blocks 191 and 192 were
contemplated for the providing of pedestrian access
throughout the subdivision. The location of Block 191 (see
* attached) has been altered slightly in the revised plan,
. . .3
i
REPORT NO. : PD-96-84 Page 3
locating it further to the west, than originally considered.
D.G. Biddle and Associates on behalf of the applicant,
indicated to Staff that in consideration of the proposed
location of the sanitary sewer line and necessary easement,
the walkway has been relocated to the west and would
coincide with the sewer line/easement. Staff has no
objections to this proposal , however would note that the
approval of the Region of Durham Works Department will be
required in consideration of the location of the sewer line
in relation to the walkway proposed.
In light of the above comments, Staff has no objection to
the approval of the revisions to draft plan of subdivision
18T-81034 as noted within the recommendations.
Respectfull mi ed,
,Director Edwards, M.C.I.P.
Director of Planning
LDT*TTE*jip
*Attach.
April 9, 1984
cc: D.G. Biddle & Associates
633 King Street East
OSHAWA, Ontario
L1 H 1 G3
ATTN: Mr. B. Creamer
Applicant: Gatehouse Holdings Limited
208 Park Road North
Suite 1
OSHAWA, Ontario
L1 J 4L8
ATTN: Mr. Cal Potter
REVISED PLAN
AS Di. ..r APPROVED
' BLOCK /�Fj N � • Y
Y ✓� i +! 3i �� �3 3a 96o
3EN 34 5_S .Xo f :-w .• _ .p. "d.s ie a a s �
�c ,
let
G 't rl Q "mss •e.s A" ne a /v
.ems /v ul N 49� 4$ 47
u1
45c:l n • 0
CU
0,0, n C N p Q
� 1
N
ol
—Ica 4S7 �se
I n A r
e - r07 F$8 Q Z' ,se_ !3 /S /t. eB ,Y
�': �� s /s .a /a. •,-o'.,`J• % ' :r+.xni -. �q /8 � /.Q /3 /Y? //''/o xP � ..
is /mac /a /a /� ion a _ 6� � p p �' „n•
3 .¢ j a/ 82 es as
Aa 8/ 82 69 1 W
K Q /7 17 /7
r
QM
REV ,D PLAZ AS DRAFT APPROVEL
N7241• O'•E /69.27 n N72°3030•E AGF-?.27
a/ 12- 84 85 - a7 8B 89 vo 9/
/s /s /s .S /s s m ,/s
/6 R, /S i9 z m ,�O �./6 �6 .'ro - .re /6 /9 2 C
7 N j /8n /B/ /e2 /8_3/84 /S5 /� C 7 N /8�D /6/ AS2 /84 /65/B
N-5 1p in
�p
AS
17 4r
2/
,nn 7
/moo r in
/6/ / s D o _J s (1�
� 'fl
Z
/a /B /B /S 27 \ �' /B
N71°47'30°E
Vt
q-_-e -S
62 63 6�1 65 67 EH
U
41
nl
r 76 17 17 7 17
9:3 44 95
C,
Rl
I-P
19 E-1 PAI