REPORT , 2
CI!l!inglOn
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
Date:
Report #:
DECEMBER 15, 2003
COD-048-03
File#:
By-law #:
Subject:
LONGWORTH AVENUE EXTENSION - SCUGOG STREET TO REGIONAL
ROAD NO. 57
CONTRACT CL2003-27
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee recommend to
Council the following:
1, THAT Report COD-048-03 be received;
2. THAT the remaining items in Contract CL2003-27 be awarded to Dagmar Construction Inc.,
Markham, Ontario for the amount of $860,032,11 (excluding G.S.T,);
3. THAT the total funds required in the amount of $985,000.00 representing Halloway Holdings
portion of the work be temporarily funded from the Roads Contributions Reserve Fund Account
#1110-00174-0000;
4. That the attached By-Law marked Schedule "A" be approved authorizing the Mayor and Clerk to
execute the agreement be approved.
5. THAT the Director of Engineering Services enter into negotiations with Halloway Holdings to
recover all costs incurred on their behalf,
Submitted by:
ReViewed/f
an lin Wu
Chief Administrative Officer
REPORT NO.:
Page - 2 -
ATTACHMENTS
No, 1: Report COD-043-03
NO.2: Cost Apportionment for Contract CL2003-27
Schedule "A" By-Law
1.0 BACKGROUND
On October 20, 2003 Council approved Report COD-043-03 (see attachment No, 1), awarding
part of Contract CL2003-07 to Dagmar Construction Inc. (Dagmar), The Contract was to be
funded by three parties; The Municipality of Clarington, The Region of Durham and Halloway
Holdings, Halloway Holdings had requested that their awarded portion of the works be delayed
while they discussed design changes with Dagmar in an attempt to reduce the cost of the
project A provision was included in the contract to allow the award in two phases,
Halloway Holdings Limited is obligated to complete the works as a result of a front-ending
agreement they entered into with the Municipality in May of 1997. The Director of Engineering
Services has had numerous discussions with representatives of Halloway Holdings Limited over
the past year regarding the need to complete the creek realignment and storm sewer outfall
works identified in the front-ending agreement in order to permit the extension of Longworth
Avenue in a timely fashion. Dagmar has now mobilized on site and has commenced work and it
is now critical to the project schedule that the remainder of the contract be awarded.
As negotiations have concluded between Halloway Holdings and Dagmar with no resolution on
cost savings the Director of Engineering Services recommends that the Municipality of
Ciarington award the remaining portion of Contract CL2003-27 in the amount of $860,032,11
(excluding G.S.T.), to Dagmar, A detailed cost breakdown of the Halloway Holdings portion of
the project is provided as Attachment No, 2. The total required funds in the amount of
$985,000,00 ($860,032.11 + Consulting + Contingencies + Net G.S.T,), required to complete
the work can be temporarily drawn from the Development Charge Reserve Fund while
negotiations continue with Halloway Holdings for full cost recovery.
REPORT NO.:
Page - 3 -
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation, Queries with respect to the department needs, specifications, etc., should be
referred to the Director of Engineering Services.
No.1
Clfll-!l]glon
REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
COUNCIL
Date:
October 20th, 2003
Resolution #:
Report #: COD-043-03
File#:
By-law #:
Subject:
TENDER CL2003-27, LONGWORTH AVENUE EXTENSION
Recommendations:
It is respectfully recommended to Council the following:
1. THAT Report COD-043-03 be received;
2. THAT Dagmar Construction Inc" Markham, Ontario with a total adjusted bid in
the amount of $3,456,743.04 (including GST), being the lowest responsible
bidder meeting all terms, conditions and specifications of Tender CL2003-27, be
awarded the contract for Longworth Avenue Extension, as required by the
Engineering Department;
3. THAT the total funds required in the amount of $4,100,000.00 (Total Bid
$4,316,775.15 less $860,032,11 Halloway Holdings less Region of Durham
portion $327,864.50, plus design, administration, utility relocations, contingency
and net GST) be drawn from the Engineering Capital Account # 8310-03105-
1401; and
4. THAT the attached By-law marked Schedule "A", authorizing the Mayor and
Clerk to execute the agreement be approved.
Submitted by:
Reviewed by:
Marie Marano, H,B.Sc., C,M,O,
Director of Corporate Services
Franklin Wu,
Chief Administrative Officer
Nancy Taylor, B.BA, CA,
Director of Finance
A.S. Cannella, C.E.T.
Director of Engineering Services
MMlLABILNTlACllm
REPORT NO.: COD-043-03
PAGE 2
BACKGROUND AND COMMENT
Tender specifications were provided by Totten Sims Hubicki Associates
for Longworth Avenue Extension, as required by the Engineering
Department.
Tenders were advertised in local papers, as well as the Daily Commercial
News. Subsequently, tenders were received and tabulated as per
Schedule "B" attached.
For this project, Halloway Holdings is responsible for the construction of
the storm sewer, They have asked for additional time to discuss design
changes with the low bidder in an attempt to reduce the cost of the storm
sewer outfall. Therefore it is recommended that the low bid be accepted
for all the work except for the storm sewer outlet, Section A, Items A30 -
A44. Once negotiations have been completed between Halloway
Holdings and Dagmar Construction, a report will be brought forward to
Council with a recommendation for the award of Items A30 - A44.
Provisions were made in the tender specifications for a phased award,
The total price cost, including a final design and tendering, contract
administration, utility relocations, contingency and GST, less the Region of
Durham portion, less Halloway Holdings portion, is as detailed in the letter
from Totten Sims Hubicki, marked Schedule "B" estimated at
$4,100,000.00,
Included in the total tendered price is work to be completed on behalf of
the Region of Durham, for which they will be invoiced separately,
It is recommended that the required funds be drawn from the Engineering
Capital Account # 8310-03105-1401 and are within the 2002 carried over
Engineering Capital budget allocation of $4,100,000.00.
The low bidder has previously performed satisfactory work for the
Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and
concurs with the recommendation. Queries with respect to department
needs, specifications, etc., should be referred to the Director of
Engineering Services.
After further review and analysis of the bids by the Engineering
Department, Totten Sims Hubicki and Purchasing, it was mutually agreed
that the low bidder, Dagmar Construction Inc., Markham, Ontario, be
recommended for the contract for the Longworth Avenue Extension.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1 C 3A6 T (905)623-3379 F (905)623-4169
Municipality of Clarington/Region of Durham
Longworth Avenue Extension
Cost Apportionment For low Bid submitted By Dagmar Construction Inc.
Contract CL2003-27
October 10, 2003
T,S.H. Project: 12-29273
Description Total Clarington Region of Halloway
. Durham Holdings
Comments
Account Number 7205-ll2007 -ll261 696303OO3XX
Construction Costs Contract CL2003-21
Part A Road Works (ScuQog Street to 8t3. 9+835) $240.470.13 $240,470,13
Stann Sewer Outlet Works $852,335.41 $852.335.41
PartS Road Works (8t3. 9+835 to Regional Rd. 57) $1,218,246.90 $1,218,246.90
Parte Bridge Works $1,525,964.49 $1,525,964,49
Part 0 Watermain & Appurtenances 5324,930.34 $324,930,34
PartE Landscaping $116,195.70 $116,195,70
PartF General Items $38,632.18 ., $28,001.32 ..!2,934.16 $7.696.70 Prorated Based on Low Bid
Sub-Total ConstructIon "" 316 775,15 3 128878.54 7 864.50 <860 032.11
ESR, Preliminary Design, Archeological & Dump Site Investigations $280,000.00 $280,000.00
(TSH # 12-10932 Commencing February 1,2000)
Detailed Design & Tendering (TSH # 12-29273) $139,469.96 $128,702.18 $10,767.78 Region Costs Invoiced Directly TSH # 12-29256
(January 27. 2003 to October 3, 2003)
Construction Administration (TSH # 12M29273) $345,300.00 5250,300.00 $26.200.00 $68,800.00 Prorated Based on Low Bid
other Costs
Geotechnical Investigation $6,612.60 $6,612.60
Land Purchase $50,000.00 $50,000,00
Utility Relocation $20,000.00 $20,000.00
Placement of Steel Liner (by others) $15,000.00 $15,000.00
!sUb-Total Other Costs $91,612.60 $76,612.60 $15,000,00 $0.00
Sub-Total estImated Project Costs $5,173.157.71 $3,864,493.32 $379.832.28 $928,832.11
Net G.S.T. (3%) (excl. contingencies) $155,194.73 $115,934.80 $11,394.97 $27.864.96
Contingencies (lncl. G.S.T.) $158,647.56 $119,571.88 $10,772.75 $28,302.93
Total Estimated Project Costs $5.487,000.00 $4.100,000.00 $402,000.00 $985,000,00
G:\Projects\12.29177'Consr\12-29273 Low Bid CAI.x1s
z
!'>
'"
Printed on 121912003
...
Municipality of Clarington/Region of Durham
Longworth Avenue Extension
Cost Apportionment For Low Bid submitted By Dagmar Construction Inc.
Contract CL2003-27
October 10. 2003
T.S.H. Project: 12-29273
Description Total Clarington Region of Halloway
Durham Holdings Comments
Account Number 720S..Q2007..Q261 696303003XX
Construction Costs Contract CL2003-27
Part A Road Works (Scug09 Street to Sta. 9+835) $240,470.13 $240,470.13
Storm Sewer Outlet Works $852,335.41 $852.335.41
PartB Road Works (Sta, 9+835 to Regional Rd. 57) $1.218,246.90 $1.218.246.90
PartC Bridge Works $1,525,964.49 $1.525.964.49
PartD Watermain & Appurtenances $3240930,34 $324,930.34
PartE Landscaping $116,195.70 $116,195.70
PartF General Items $38,632.18 $28.001.32 $2.934.16 $7,696.70 Prorated Based on Low Bid
Sub-Total Construction $4316775.15 !l;3 128878.54 !t327 864.50 $860 032.11
ESR, Preliminary Design, Archeological & Dump Stte Investi9ations $280,000.00 $280,000.00
(TSH # 12-10932 Commencing February 1,2000)
Detailed Design & Tendering (TSH # 12-29273) $139,469.96 $128,702.18 $10,767.78 Region Costs Invoiced Directly TSH # 12-29256
(January 27, 2003 to October 3, 2003)
Construction Administration (TSH # 12-29273) $345,300.00 $250,300.00 $26,200.00 $68.800.00 Prorated Based on Low Bid
Other Costs
Geotechnical Investigation $6,612.60 $6,612.60
Land Purchase $50,000.00 $50,000.00
Utility Relocation $20,000.00 $20,000.00
Placement of Steel Liner (by others) $15.000.00 $15,000,00
Sub-Total Other Costs $91,612.60 $76,612.60 $15,000.00 $0.00
Sub-Total Estimated Project Costs $5.173,157.71 $3,864,493.32 $379,832.28 $928,832.11
Net G.S.T. (3%) (excl. contingenCies) $155,194.73 $115,934.80 $11.394.97 $27.864.96
Contingencies (incl. G.S.T.) $158,647,56 $119.571.88 $10,772.75 $28,302.93
Total Estimated Project Costs $5,487,000.00 $4,100,000.00 $402.000.00 $985.000.00
z
!:l
'"
G:\Projects\12-29177\Const\12-29273 Low Bid CAt.xls
Printed on 121912003
tsh
.J .'
Schedule "A"
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2002-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Dagmar
Construction Inc., Markham, Ontario, to enter into an
agreement for the Longworth Avenue Extension.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1 . THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Dagmar Construction Inc. of Markham, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2003.
By-law read a third time and finally passed this day of
,2003.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk