HomeMy WebLinkAboutCOD-041-03 REPORT #4 Cl~ilJglon REPORT CORPORATE SERVICES DEPARTMENT Meeting: COUNCIL Date: September 29, 2003 Report #: COD-041-03 File#_ By-law # Subject: CO.QPERATlVE TENDER D2003-014, HOT MIX PAVING AND GRANULAR SHOULDERING Recommendations: It is respectfully recommended to Council the following: 1. THAT Report COD-041-03 be received; 2. THAT a purchase order in the amount of $1,470,749,05 (less G,S.T. Rebate) be issued to the Regional Municipality of Durham for the Clarington portion of Co-operative Tender D2003-014 Hot Mix Paving and Granular Shouldering; 3, THAT the required funds be drawn from the 2003 and 2002 Capital Budget Accounts as identified in the body of this report; and 4, THAT the additional funds in the amount of $29,186,54 be drawn from the General Capital Reserve Account #2900-00017-0000. SUbmitter:y: U~ - '~ . Marie Marano, H.B.Sc., C.M,O. ~;;J:- AS, Cannella, CET. Dir or of En . eer' g Services Reviewed by: 0 ~--.Q- L~ Franklin Wu Chief Administrative Officer MM\LB\NT\TC'eo REPORT NO.: COD-041-G3 PAGE 2 BACKGROUND AND COMMENT The Operations Department participated in a co-operative tendering arrangement with the Region of Durham for the Hot Mix Paving and Granular Shouldering. Although the contract conditions include both the Region of Durham's requirements and the Municipality of Clarington's requirements, they are not independent of each other but rather are considered as one complete contract. However, the contract award is subject to the approval of the Region of Durham, and the Municipality of Clarington. In this instance, the Municipality of Clarington actually issues the purchase order to the Region, not the contractor, The Region is recommending that Contract No. 02003-014 be awarded to Harnden and King Construction, Ajax, Ontario, Part of Contract No, 02003-014 includes work to be done on behalf of the Municipality of Clarington, The estimated cost of this work is $1,470,749,05 (Includes G,S.T. and Engineering). The required funds, including G,S.T. and a 10% Engineering Contingency will be provided as follows: Accounts Total $27,710.70 56,790.84 24,090,83 52,048,82 10,000.00 1,100,000,00 170,921,32 (2002 Budget) 7208-00401-0261 8310-03401-1401 8310-03402-1401 8310-03403-1401 8310-03501-1401 8310-03601-1401 2900-00017-0000 Note, as Church Street is approximately $29,186.54 over budget, it is recommended that additional funds be drawn from the General Capital Reserve Account #2900-00017-0000, REPORT NO.: COD-041-o3 PAGE 3 The Director of Finance has reviewed the funding requirements and concurs with the recommendation, Queries with respect to department needs, specifications, etc. should be referred to the Director of Engineering, CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-3330