Loading...
HomeMy WebLinkAboutCOD-011-15 Clariiwn Corporate Services Report If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102. Report To: General Purpose and Administration Committee Date of Meeting: May 25, 2015 Report Number: COD-011-15 Resolution: File Number: CL2015-5 By-law Number: .•JJ Report Subject: Quarry Bridge Rehabilitation Recommendations: 1. That Report COD-011-15 be received; 2. That All Services Inc. with a total bid amount of $851,278.37 (net H.S.T. Rebate) being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2015-5 be awarded the contract for Quarry Bridge Rehabilitation as required by the Municipality of Clarington, Engineering Services Department; 3. That the total funds required in the amount of$919,000.00 (net HST Rebate) including construction cost of$851,278.37 (net HST Rebate) and $67,721.63 (net HST Rebate) contingency be drawn from the following accounts: Structures Rehabilitation 110-32-330-83275-7401 $ 875,000.00 Roadside Protection 110-32-330-83338-7401 $ 44,000.00 4. That all interested parties listed in Report COD-012-15 and any delegations be advised of Council's decision. Municipality of Clarington Report COD-011-15 Page 2 Report Overview To request authorization from Council to award the contract for the Quarry Bridge Rehabilitation as required by the Municipality of Clarington's Engineering Services Department. 1 . Background Tender specifications were provided by Engineering Services Department for Quarry Bridge Rehabilitation. Tender#CL2015-5 was prepared and posted on the Municipality of Clarington's website. Notification of the availability of the document was posted on the Ontario Public Buyer's Association website. Seventeen (17) companies registered as downloading the document. The Tender closed Wednesday, May 13, 2015. 2. Quarry Bridge Rehabilitation Four (4) submissions were received in response to the tender call. Bids were reviewed and tabulated (see Attachment 1). All submissions were deemed to be compliant. After review and analysis of the bid by both the Engineering Services Department and the Purchasing Services Division, it was mutually agreed that the low bidder, All Services Inc. be recommended for the award of contract CL2015-5 for the Quarry Bridge Rehabilitation. (See Attachment 2). All Services Inc. has completed several projects for the Municipality of Clarington in the past. 3. Financial and Budget Considerations The total project cost is $919,000.00 (net HST Rebate). The amount includes the construction cost of$851,278.37 (net HST Rebate) as well as $67,721.63 (net HST Rebate) contingency. Funding required for this project will be drawn from the following Engineering accounts: Structures Rehabilitation 110-32-330-83275-7401 $ 875,000.00 Roadside Protection 110-32-330-83338-7401 $ 44,000.00 4. Concurrence This report has been reviewed by Tony Canella, Director of Engineering Services, and concurs with the recommendations. Municipality of Clarington Report COD-011-15 Page 3 5. Conclusion It is respectfully recommended that All Services Inc. with the lowest compliant bid of $851,278.37 (net HST Rebate) be awarded the contract for the Quarry Bridge Rehabilitation requirements as per Tender CL2015-5. 6. Strategic Plan Application The recommendations contained in this report conform to the Strategic Plan. I � Submitted by: Reviewed by-6 Y ie Marano, H.B. Sc., C.M.O. Franklin Wu, F Director of Corporate Services Chief Administrative Officer - Nancy Taylor, BBA, CPA, CA., Director of Finance/Treasurer Staff Contact: David Ferguson, Purchasing Manager, 905.623.3379 Ext 2209 or dferguson @clarington.net Attachments: Attachment 1 —Tabulation of Bid Summary Attachment 2 — Memo from Engineering Services Department List of interested parties to be notified of Council's decision is on file in the Corporate Services Department. MM/DF/sm f Attachment 1 to Municipality of Clarington Report COD-011-15 Clarboon Municipality Of Clarington SUMMARY OF BID RESULTS a � Tender CL2015-5 QUARRY BRIDGE REHABILITATION F Bidder Total Bid Total Bid (including HST) (net HST Rebate) All Services Inc. $945,307.15 $851,278.37 GMP Contracting $999,542.07 $900,118.59 Clearwater Structures Inc. $1,045,482.21 $941,489.12 Anscon Contracting Inc. $1,086,947.90 $978,830.25 Attachment 2 to Report COD-011-15 Ciff-M-910—fl' N In MEMU TO: David Ferguson, Purchasing Manager FROM: Ron Albright, Assistant Director, Engineering Services DATE: May 14, 2015 ! RE: Quarry Bridge Rehabilitation CL2015-5 The Engineering Services Department has reviewed the submissions for CL2015-5 and offers the following comments. The project includes the rehabilitation of Quarry Bridge on Baseline Rd, east of Simpson Ave, Bowmanville. The work includes widening of the sidewalk, replacement of the guide rails, repairs to the bridge deck, and re-surfacing. The low bidder on this contract was All Services Inc. Based on past experience with this contractor, we recommend award of the contract to All Services Inc. in the amount of $945,307.15, inclusive of HST, or $851,278.37 net of HST rebate. A total contingency amount of approximately 8% of construction costs is being carried. Therefore, including contingencies and net HST costs, the Engineering Department advises of the following project cost breakdown. Quarry Bridge Rehabilitation, CL2015-5 2 May 14, 2015 Construction Cost, Based on Low Bid (net of $851,278.37 HST) Contingencies (net of HST) $ 67,721.63 Total Cost $ 919,000.00 Budget Amount Structures Rehabilitation, 110-32-330-83275-7401 $875,000.00 Roadside Protection 110-32-330-83338-7401 $44,000.00 Estimated Unexpended Budget $0.00 Additional Funding Required $0.00 * A more detailed breakdown to be provided to Finance to provide necessary information for tracking of Tangible Capital Assets (TCA). Considering all costs, the project is within budget and the Engineering Dept recommends that the Purchasing Dept. move forward with award of the contract based on the above apportionments. Should you have any further questions, please feel free to contact the undersigned. Regards, ✓_� _-- Ron Albrig t, P. Eng. Assistant Director, Engineering Services RA/sb/dv Pc: Nancy Taylor, Director of Finance A.S. Cannella, Director of Engineering Services Quarry Bridge Rehabilitation, CL2015-5 3 May 14, 2015 klge S�ee1 Hat urt at m e 0 u IUU i Pa v ue Bowma vill a U Ramp �— H(gh--Y 401 H(yhWaY 401 m 0 o 'c J C)r�wee 1:10,000 N lui1[[ � CL2015-5 Quarry Bridge Rehabilitation I