Loading...
HomeMy WebLinkAboutCOD-017-14 If this information is required in an alternate accessible format, please contact the Municipal Clerk at 905-623-3379 ext. 2102 City-MOOR Report Corporate Services Meeting: General Purpose and Administration Committee Date: September 22, 2014 Resolution#: t - ffi By-law#: N/A Report#: COD-017-14 File#: CL2014-18 Subject: Darlington Sports Centre Renovation of the Ice Resurfacer Room Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: a) That Report COD-017-14 be received; b) That Gallant Construction Limited with a revised bid amount of$242,350.00 (net HST rebate) being the lowest compliant bidder meeting all terms, conditions and specifications for tender CL2014-18 be awarded the contract for the Darlington Sports Centre Renovation of the Ice Resurfacer Room as required by Community Services Department; c) That the funds required in the amount of$267,250.00 (net HST Rebate) which includes construction costs, contract administration and contingencies be drawn from the following Community Services Department Accounts; and Description G/L Account Amount DSC — Mechanical Room 110-42-421-84267-7401 $ 250,000.00 Expansion d) That additional funds in the amount of $ 17,250.00 (net HST Rebate) be provided from the following Account: Description G/L Account Amount Municipal Capital Works Reserve 110-42-421-84267-7401 $ 17,250.00 Fund Municipality of Clarington Report COD-017-14 Page 2 Submitted by: Reviewed by. Ma a Marano, H.B.Sc., C.M.O.,4Franklin Wu, Director of Corporate Services Chief Administrative Officer I. Nanc Taylor, B.B.A., C.P.A., C.A., Director of Finance/Treasurer MM\DF\sm Municipality of Clarington Report COD-017-14 Page 3 Report Overview To request authorization from Council to award the contract for the Renovation of the Ice Resurfacer at Darlington Sports Centre. Background 1. Tender CL2014-18 was issued for the renovation of the ice resurfacer room at Darlington Sports Center as per the specifications provided by Community Services Department and Barry Bryan and Associates. 2. The tender was advertised electronically on the Municipality's website and the Ontario Public Buyers Association's website. 3. Thirty-two (32) companies obtained/downloaded the bid document. Eight (8) submissions were received in response to the Tender. All bids were deemed compliant. Darlington-Sports- entre-Renovation-Detail 4. All submissions received were reviewed by the Community Services Department and Barry Bryan Associates. A tabulation of the total bid amounts is attached as Attachment 1. 5. After reviewing the Tender submissions, the Community Services Department, Barry Bryan Associates and Purchasing Services, it was mutually agreed that the low bidder Gallant Construction Ltd, Bethany, Ontario be recommended for the award of contract CL2014-18 for the renovation of the Ice Resurfacer Room at Darlington Sports Centre as required by the Community Services Department. 6. Gallant Construction Limited has worked with the Municipality of Clarington in the past and have proven to meet the requirements and expectations of the Municipality of Clarington. 7. Queries in regards to the department requirements, specifications, etc. should be referred to the Director of Community Services. 8. The total bid amount received from Gallant Construction Limited was $293,517.50 (including HST). 9. As the bid submission from Gallant Construction Limited, Bethany, Ontario exceeded the allotted-budget, two (2)itemized sections where removed to reduce- the overall cost of the project. This deletion is within the Municipality's right to reduce the scope of work up to 25%. Municipality of Clarington Report COD-017-14 Page 4 10. The total project cost $267,250.00 (net HST Rebate) which includes construction costs, contract administration be drawn from the Community Services' account as follows: Description G/L Account Amount DSC — Mechanical Room 110-42-421-84267-7401 $ 250,000.00 Expansion Municipal Capital Works 110-42-421-84267-7401 $ 17,250.00 Reserve Fund Total Amount $ 267,250.00 Concurrence 19. This report has been reviewed by Joseph Caruana, Director of Community Services Department. Conclusion 20 he contraGt-for the-additio"f-thp—lce Resu-rfaceuRoom-at-Darlipgton-Sports - - - Centre,, as-required-by-the-Community Services-Department, be-awarded to Gallant Construction Limited, Bethany, Ontario with a total revised bid in the amount of$242,350.00 (net of HST Rebate). Strategic Plan Application Not applicable. Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or dferguson@clarington.net Attachments: Attachment 1 - Bid Tabulation There are no interested parties to be advised of Council's decision. Municipality of Clarington Report COD-017-14 Page 5 Attachment 1 Municipality of Clarington SUMMARY OF BID RESULTS Tender CL2014-18 DARLINGTON SPORTS CENTRE - RENOVATION BIDDER TOTAL BID (including HST) Gallant Construction Ltd. $293,517.50 Gerr Construction Limited $324,310.00 Rankine Construction Ltd. $368,487.35 Newcastle Construction Services Ltd. $370,244.22 Kawartha Capital Corp. $409,692.69 M.J. Dixon Construction Ltd. $422,620.00 Boss Clair Contractors 507_,a70_00 -- -Index-Construction-Inc. - - --- - -----$635,750.43— - - - Tender award pending