ClaboOff Report
Corporate Services
Meeting: General Purpose and Administration Committee
Date: September 8, 2014 Resolution#: N/A
Report#: COD-016-14 File#:
Subject: Contract Awards During Council Recess
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
a) That Report COD-016-14 be received.
Submitted by: Reviewed by -
Marie Marano, H.B.Sc., C.M.O., Franklin Wu,
Director of Corporate Services Chief Administrative
Officer
MM\DF\cb
Municipality of Clarington
Report COD-016-14 Page 2
Report Overview
To report to Council the contracts awarded during Council recess.
Background
1. During periods when Council is in recess provision has been made for the
approval of contract awards in order to continue with business as usual. During
the summer recess of 2014 there were five contract awards that would normally
necessitate a report to Council.
Comments
2. In accordance with Purchasing By-law 2010-112, Part 2, Section 67, the
following contracts were awarded during the Council Recess.
CL2014-11, Construction of Scugog Street Neighbourhood Park
CL2014-12, Bowmanville Creek Erosion Remediation
CL2014-13, Orono Arena & Foster Creek Erosion Remediation
CL2014-15, 2014 Street Lighting, Various Locations
RFP2014- 9, Energy Efficiency and Water Conservation Performance
Assessment
A copy of the recommending Report Memos for the above noted projects are
attached as Attachments "1", "2", "Y, "4" and "Y respectively.
Concurrence
3. Not applicable.
Conclusion
4. The actions taken by Staff as documented in the attached Report Memos be
provided for Council's information.
Municipality of Clarington
Report COD-016-14 Page 3
Strategic Plan Application
Not applicable.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson @clarington.net
Attachments:
Attachment 1 PS-009-14 CL2014-11 Construction of Scugog Street Neighbourhood
Park
Attachment 2 PS-010-14 CL2014-12 Bowmanville Creek Erosion Remediation
Attachment 3 PS-012-14 CL2014-13 Orono Arena & Foster Creek Erosion
Remediation
Attachment 4 PS-011-14 CL2014-15 2014 Street Lighting, Various Locations
Attachment 5 PS-013-14 RFP2014-9 Energy Efficiency and Water Conservation
Performance Assessment
There are no interested parties to be advised of Council's decision.
Attachment 1 to Report
COD- 016- 14
ciffingo'n Report
Purchasing Services
Date: July 24, 2014
To: Frank Wu, Chief Administrative Officer
From: David Ferguson, Purchasing Services
Report#: PS-009-14 File#: CL2014-11
Subject: CL2014-11 — Construction of Scugog Street Neighbourhood Park
Summer Recess Procedure (Purchasing By-Law 2010-112, S. 67)
Recommendations:
It is respectfully recommended to the Chief Administrative Office the following:
a) That Report PS-009-14 be received;
b) That Royalcrest Paving and Contracting Limited, Toronto, Ontario with a total bid
in the amount of $316,551.24 (net of HST Rebate), being the lowest responsible
bidder meeting all terms, conditions and specifications of Tender CL2014-11 be
awarded the contract for the Construction of Scugog Street Neighbourhood Park
as required by the Municipality of Clarington, Engineering Department; and
c) That the funds required in the amount of$366,665.00 (which includes $316,551.24
net of HST Rebate for construction, tendering, design, other costs and
contingencies) be drawn from the following account:
Knox Park Construction
110-32-325-83302-7401 (2014) ............................................................$367,000.00
Municipality of Clarington
Report PS-009-14 Page 2
Recommended by:
David Ferguson, Vanag , Purchasing Date
Services
Concurrence:
Tony Cannella, Director of Engineering Date
NancyTaylor,'Director of Finance
l ,
Datd
Approved by:
Frank Wu, Chief Administrative Officer Date
DF\bh
c M. Marano, Director, Corporate Services
Municipality of Clarington
Report PS-009-14 Page 3
Report Overview
To request approval for the tender award for CL2014-11 Construction of Scugog Street
Neighbourhood Park.
Background
1. Tender specifications were provided by Henry Kortekaas & Associates
Incorporated for the Construction of Scugog Street Neighbourhood Park.
2. Tender CL2014-11 Construction of Scugog Street Neighbourhood Park was
advertised electronically on the Municipality's website and the Ontario Public
Buyer's Association website. Subsequently, tenders were received and tabulated
as per Attachment 1.
Analysis
3. A total of three (3) submissions were received in response to the tender call. Two
(2) submissions were deemed compliant.
4. The bid submission from TBG Landscape Incorporated, Whitevale, Ontario was
deemed non-compliant as unit prices were not provided.
5. After further review and analysis of the bids by the Engineering Department and
Purchasing, it was mutually agreed that the low bidder, Royalcrest Paving and
Construction Limited, Toronto, Ontario be recommended for the contract for the
construction of Scugog Street Neighbourhood Park. The recommendation memo
from the Engineering Department summarizing the project and costs is appended
as Attachment 2.
6. Royalcrest Paving and Construction Limited has provided similar services to the
Municipality of Clarington and the level of service and quality has been
satisfactory.
7. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Engineering.
8. The total project cost of$366,665.00 includes $316,551.24 (net of HST Rebate)
for construction, tendering, design, other costs and contingencies. The funding
and costs for this project are outlined in the memo from Engineering Services
(Attachment 2).
Municipality of Clarington
Report PS-009-14 Page 4
9. Funding for this project will be drawn from the following account:
Knox Park Construction
110-32-325-83302-7401 (2014) ............................................................$367,000.00
Concurrence
10. This report has been reviewed by Tony Cannella, Director of Engineering Services
who concurs with the recommendations.
Conclusion
11. To award the contract to Royalcrest Paving and Construction Limited, Toronto,
Ontario for the Scugog Street Neighbourhood Park construction project.
Strategic Plan Application
The recommendations contained in this report supports investing in infrastructure as
outlined in the Strategic Plan.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson@clarington.net
Attachments:
Attachment 1 - Bid Tabulation
Attachment 2 — Recommendation Memo from Engineering Services
Municipality of Clarington
Report PS-009-14 Attachment 1
Municipality Of Clarington
Bid Summary
Tender CL2014-11
Scugog Street Neighbourhood Park
BIDDER TOTAL BID TOTAL BID
(HST Included) (Net of HST Rebate)
Royalcrest Paving and
Contracting Limited $351,516.22 $316,551.24
Toronto, ON
Hawkins Contracting Services
Limited $352,337.44 $317,290.77
Stouffville, ON
TBG Landscape Inc.
Pickering, ON non-compliant non-compliant
Municipality of Clarington
Report PS-009-14 Attachment 2
MEMOLeading the Way
TO: David Ferguson, Purchasing Manager
FROM: Peter Windolf, Park Development Manager
DATE: July 22, 2014
SUBJECT: Scugog Street neighbourhood Park Construction
Tender CL2014-11
I have reviewed the low bid by Royalcrest Paving and Contracting Ltd. and offer the
following comments:
In 2014 Council approved $367,000 for the construction of Knox Neighbourhood Park,
now known as Scugog Street Neighbourhood Park. Royalcrest Paving and Contracting
Ltd. has successfully completed many projects for the municipality in the past, including
Tooley's Mill Park in 2014 and Rosswell Park parking lot in 2012.
I recommend award of the contract in the amount of$311,076.30 plus HST ($316,
551.24 net of HST rebate) for the park development project.
A contingency allowance of 9% including net HST rebate is carried forward. Contract
administration and construction inspection will be done by municipal staff. The
Engineering Services Department advises the following breakdown for the above
referenced project:
Project Breakdown
Total Project Value $311,076 contract award
$ 21,250 design
$ 27,997 contingency allowance
$ 6,342 net HST
$366,665
2014 Approved Budget Amount
Knox Park Construction $367,000
110 32 325 83302 7401
Budget over (under) ($335)
Scugog Street Neighbourhood Park
Construction
CL2014-11 2
Should you have any questions, please feel free to contact me.
Regards,
Peter Windolf, OALA, CSL
Manager Park Development
m
Cc Nancy Taylor, Director of Finance
Tony Cannella, Director of Engineering
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379
Attachment 2 to Report
COD- 016- 14
ciffinooff Report
Purchasing Services
Date: August 6, 2014
To: Frank Wu, Chief Administrative Officer
From: David Ferguson, Purchasing Services
Report#: PS-010-14 File#: CL2014-12
Subject: CL2014-12 — Bowmanville Creek Erosion Remediation
Summer Recess Procedure (Purchasing By-Law 2010-112, S. 67)
Recommendations:
It is respectfully recommended to the Chief Administrative Office the following:
a) That Report PS-010-14 be received;
b) That TBG Landscape Incorporated, Whitevale, Ontario with a total bid in the
amount of$214,480.05 (net of HST Rebate), being the lowest responsible bidder
meeting all terms, conditions and specifications of Tender CL2014-12 be awarded
the contract for Bowmanville Creek Erosion Remediation as required by the
Municipality of Clarington, Engineering Department; and
c) That the funds required in the amount of$297,500.00 (which includes $214,480.05
net of HST Rebate for construction, tendering, design, contact administration,
other costs and contingencies) be drawn from the following account:
Bowmanville Creek Erosion Protection North of Longworth Ave
110-32-340-83418-7401 .......................................................................$222,500.00
Region of Durham
110-00-000-00000-1010 ........................................................................$ 42,000.00
Total Budget Amount $264,500.00
d) THAT the use of additional funds required for the work required for the
Bowmanville Creek Erosion Protection in the amount of$33,000.00 (net HST
Rebate) be provided from the following Accounts :
Bowmanville Creek Erosion Control (at Jackman Road)
110-32-340-83419-7401 (2013) .............................................................$ 33,000.00
Total Additional Funding $ 33,000.00
Municipality of Clarington
Report PS-010-14 Page 2
Recommended by:
David Ferguson, Manager, Purchasing Date
Services
Concurrence:
�Z Ton Cannella, Djr ctor of TPeering Date
.Nancy Taylor, Director of Finance r40�t�
Date
Approved by:
1
Frank Wu; Chief Administrative Officer Date r
D F\b6s7hi
cc: M. Marano, Director, Corporate Services
Municipality of Clarington
Report PS-010-14 Page 3
Report Overview
To request approval for the tender award for CL2014-12 Bowmanville Creek Erosion.
Background
1. Tender specifications were provided by CIMA for the Bowmanville Creek Erosion.
2. Tender CL2014-12 Bowmanville Creek Erosion was advertised electronically on
the Municipality's website and the Ontario Public Buyer's Association website.
Subsequently, tenders were received and tabulated as per Attachment 1.
Analysis
3. A total of five (5) submissions were received in response to the tender call. All
submissions were deemed compliant.
4. After further review and analysis of the bids by the Engineering Department and
Purchasing, it was mutually agreed that the low bidder, TBG Landscape
Incorporated, Whitevale, Ontario be recommended for the contract for the
Bowmanville Creek Erosion. The recommendation memo from the Engineering
Department summarizing the project and costs is appended as Attachment 2.
5. TBG Landscape Incorporated has provided similar services to the Municipality of
Clarington and the level of service and quality has been satisfactory.
6. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Engineering.
7. The total project cost of$297,500.00 includes $214,480:05 (net of HST Rebate)
for construction, tendering, design, contract administration, other costs and
contingencies. The funding and costs for this project are outlined in the memo
from Engineering Services (Attachment 2).
8. To release the funding for the Bowmanville Creek Erosion Control at Jackman
Road to fund the erosion remediation work upstream of Longworth Avenue. The
work at Jackman Road is complete and no additional costs are expected. The
$33,000.00 from account 110-32-340-83419-7401 would be directed to account
110-32-340-83418-7401.
Municipality of Clarington
Report PS-010-14 Page 4
9. Funding for this project will be drawn from the following account:
Bowmanville Creek Erosion Protection North of Longworth Ave
110-32-340-83418-7401 ....................................................................$222,500.00
Bowmanville Creek Erosion Control (at Jackman Road)
110-32-340-83419-7401 (2013) ...........................................................$ 33,000.00
Region of Durham
110-00-000-00000-1010 .....................................................................$ 42,000.00
Total Budget Amount $297,500.00
Concurrence
10. This report has been reviewed by Tony Cannella, Director of Engineering Services
who concurs with the recommendations.
Conclusion
11. To award the contract to TBG Landscape Incorporated, Whitevale, Ontario for the
Bowmanville Creek Erosion.
Strategic Plan Application
The recommendations contained in this report supports investing in infrastructure as
outlined in the Strategic Plan.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson@clarington.net
Attachments:
Attachment 1 - Bid Tabulation
Attachment 2 — Recommendation Memo from Engineering Services
Municipality of Clarington
Report PS-010-14 Page 5
Attachment 1
Municipality Of Clarington
Bid Summary
Tender CL2014-12
Bowmanville Creek Erosion
BIDDER TOTAL BID TOTAL BID
(HST Included) (Net of HST Rebate)
TBG Landscape Inc.
Whitevale, ON $238,170.65 $214,480.05
Cambridge Landscaping Inc.
Cambridge, ON $240,753.85 $216,806.29
The Ontario Construction Company
Limited $306,932.86 $276,402.55
Niagara-on-the-Lake, ON
560789 Ontario Limited
Acton, ON $332,835.85 $299,728.99
Tervita Corporation
Burlington, ON $339,088.19 $305,359.42
; Y I�71
Leading the Way
MEMO
TO: David Ferguson, Purchasing Manager
FROM: Ron Albright, Assistant Director, Engineering Services
DATE: August 5, 2014
RE: Bowmanville Creek Erosion Remediation
CL2014-12
The Engineering Services Department has reviewed the submissions for CL2014-12
and offers the following comments.
The project includes erosion remediation work on the upstream side of Longworth
Avenue on both sides of the creek, as shown on the attached site location plan.
There was an extension error in the low bid from TBG Landscape Inc., however this did
not affect the bid order. Based on past experience with this contractor, we recommend
award of the contract to TBG Landscape Inc. in the amount of $238,170.65, inclusive of
HST, or $214,480.05, net of HST rebate.
Due to past experiences on similar projects, a contingency amount of 10% is carried
forward. The attached cost apportionment shows the total project costs including
contingencies and material testing, and the budget for each site.
The project was initiated by Clarington because the erosion could threaten the road
embankment on the north side of Longworth Avenue. The project costs will be shared
with the Region of Durham because they have a watermain crossing the creek at this
location which could also be affected by the erosion. The project will benefit both levels
of government and costs are shared based on the scope of work required to protect the
respective infrastructure.
Funding for the project will come from the accounts noted in the table below.
Construction (net of HST) (Based on Low Bid) $214,480.05
Design, Tendering, Contract Administration (net of HST), Material $83,019.95
Testing, Permits, and Contingencies
Total Project Value (Clarington Share) $297,500.00
Budget Amount
Bowmanville Creek Erosion Protection North of Longworth Ave
110-32-340-83418-7401 (2013) $22,500.00
110-32-340-83418-7401 (2014) $200,000.00
Bowmanville Creek Erosion Control (At Jackman Road)
110-32-340-83419-7401 (2013) $33,000.00
Region of Durham
110-X-X-X-1010 $42,000.00
Total Budget Amount $297,500.00
Estimated Unexpended Budget $0.00
Additional Funding Required $0.00
The Bowmanville Creek Erosion Control (At Jackman Road) project was completed in
2013 with no additional costs expected and therefore it is recommended that the
necessary funding noted above be released to fund the erosion remediation work
upstream of Longworth Avenue. The additional funding will be directed to account 110-
32-340-83418-7401.
We recommend that Purchasing move forward with award of the contract based on the
above apportionments.
Should you have any further questions, please feel free to contact the undersigned.
Regards,
Z-'
�.. Ron Albright, P. Eng.
Assistant Director
RA/sb/nl
Pc: Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
`!'/ \�� I I�''Ot°```,,'✓ \`' ; !--I 111 �-J
1 � bA I_.. _.._ - � ��•r�� X11:�.��_. � �--�
�-
�, --
� --•j �__1 'c.: �. .%' jT lily ��� — i..
TM
}i0 n C�
T
MeadoNme-
BOWMANVILLIEI'� I stoill
Fou rth,. fJ---
BOWMANVILLE CREEK EROSION WORKS - - ---
1 f I I r min —I f rl I I
Municipality of Clarington
CB_2014-12, Bowmanville Creek Erosion Remediation
Municipality of Clarington and Region of Durham
Tender No.CL2014-12
CIMA Project No.C14-0014
Cost Apportionment Based on Low Bid
Owner Municipality of Clarington Region of Durham
2013 Budget Bowmanville 2014 Budget Bowmanville Comments
Description Total - Creek at Jackman Rd- Creek at Longworth Unknown
Carry" Over
Account No. 110-32-340-83419-7401 110-32-340-83418-7401 Unknown
Construction Costs(CL2014-12) $ 210,770.49 $ 26,000.00 $ 154,971.40 $ 29,799.09 Prorated items and quantities on east Embankment
Remediation to ROD(see itemized breakdown)
Engineering Design(CIMA) $ 22,800.00 $ - $ 19,800.00 $ 3,000.00 PO#08570 for$19,800
Additional$3,000 for watermain crossing design
Contract Administration&Inspection(12%+1-) $ 25,300.00 $ 3,120.00 $ 18,600.00 $ 3,580.00 Prorated and Estimated based on construction
Other Project Costs
Materials Testing and Fish Rescue During Construction S 3,500.00 $ - $ 2,500.00 $ 1,000.00 Estimate
Geotechnical Investigations $ 5,900.00 $ - $ 5,900.00 $ - Geologic Quote
Net HST(1.76%) $ 4,721.56 $ 512.51 $ 3,551.18 $ 657.87
Contingency(10%+1-) $ 23,607.96 $ 3,367.49 $ 16,277.43 $ 3,963.04 Includes Net HST
CLOCA Standard Permit'B'Fee $ 900.00 $ - $ 900.00 $ - Tax Exempt
Total Project Costs $ 297,500.00 $ 33,000.00 $ 222,500.00 $ 42,000.00 Includes Net HST
BudgetAmount $305,500.00 $ 33,000.00 $_ 222,500.00 $ 50,000.00
Under/(Over)Budget $ 8,000.00 -$ 0.00 -$ 0.00 $ 8,000.00
All values are exclusive of HST unless otherwise noted
Attachment 3 to Report
COD- 016- 14
ciffiflooft Report
Purchasing Services
Date: August 6, 2014
To: Frank Wu, Chief Administrative Officer
From: David Ferguson, Purchasing Services
Report#: PS-012-14 File#: CL2014-13
Subject: CL2014-13 — Orono Arena and Foster Creek Erosion Remediation
Summer Recess Procedure (Purchasing By-Law 2010-112, S. 67)
Recommendations:
It is respectfully recommended to the Chief Administrative Office the following:
a) That Report PS-012-14 be received;
b) That TBG Landscape Inc., Whitevale, Ontario with a total bid in the amount of
$117,331.85 (net of H.S.T. Rebate), being the lowest responsible bidder meeting
all terms, conditions and specifications of Tender CL2014-13 be awarded the
contract for Orono Arena & Foster Creek Erosion Remediation as required by the
Municipality of Clarington, Engineering Department; and
c) That the funds required in the amount of$144,000.00 (which includes $117,331,85
net of HST Rebate for erosion remediation work, contract administration, material
testing and contingencies) be drawn from the following accounts:
Orono Arena Storm Outfall Erosion Remediation
110-32-340-83668-7401 (2014) .............................................................$ 80,000.00
Foster Creek Remediation South of King Ave
110-32-340-83317-7401 (2014) .....:......................................................$ 51,000.00
Total Budget Amount $ 131,000.00
d) THAT the use of additional funds required for the work required for the Orono
Arena Storm Outfall Erosion Remediation in the amount of $13,000.00 (net HST
Rebate) be provided from the following Accounts
Mill Street Reconstruction
110-32-330-83362-7401 (2011) ..............................................................$13,000.00
Total Additional Funding $13,000.00
Municipality of Clarington
Report PS-012-14 Page 2
Recommended by:
x
bavid Ferguson, Manager, Purchasing Date
Services
Concurrence:
ony Canney, 15irWc-torfEngineering Date
Cy"t4,(' 4ad'f
(y( Nancy faylor, Director of Finance
ate
Approved by:
Frank Wu, Chief Administrative Officer Date
DF\bKS,.M
cc: M. Marano, Director, Corporate Services
Municipality of Clarington
Report PS-012-14 Page 3
Report Overview
To request approval for the tender award for CL2014-13 Orono Arena and Foster Creek
Erosion Remediation
Background
1. Tender specifications were provided by CIMA Canada Incorporated for the erosion
remediation work required for the Orono Arena Storm outfall and for Foster Creek
area south of King Ave.
2. Tender CL2014-13 Orono Arena and Foster Creek Erosion Remediation was
advertised electronically on the Municipality's website and the Ontario Public
Buyer's Association website. Subsequently, tenders were received and tabulated
as per Attachment 1.
Analysis
3. A total of five (5) submissions were received in response to the tender call. All
submissions were deemed compliant.
4. After further review and analysis of the bids by the Engineering Department and
Purchasing, it was mutually agreed that the low bidder, TBG Landscape Inc.,
Whitevale, Ontario be recommended for the contract for the Orono Arena and
Foster Creek Erosion Remediation. The recommendation memo from the
Engineering Department summarizing the project and costs is appended as
Attachment 2.
5. TBG Landscape Inc. has provided similar services to the Municipality of Clarington
and the level of service and quality has been satisfactory.
6. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Engineering.
7. The total project cost of$144,000.00 includes $117,331.85 (net of HST Rebate)
for erosion remediation, contract administration, material testing and
contingencies. The funding and costs for this project are outlined in the memo
from Engineering Services (Attachment 2). .
Municipality of Clarington
Report PS-012-14 Page 4
8. Funding for this project will be drawn from the following account:
Orono Arena Storm Outfall Erosion Remediation
110-32-340-83668-7401 (2014) ...........................................................$ 80,000.00
Foster Creek Remediation South of King Ave
110-32-340-83317-7401 (2014) ..........................................................$ 51,000.00
Mill Street Reconstruction
110-32-330-83362-7401 (2011) ............................................................$13,000.00
$144,000.00
Concurrence
9. This report has been reviewed by Tony Cannella, Director of Engineering Services
who concurs with the recommendations.
Conclusion
10. To award the contract to TBG Landscape Inc., Whitevale, Toronto, Ontario for the
Orono Arena and Foster Creek Erosion Remediation project.
Strategic Plan Application
The recommendations contained in this report supports investing in infrastructure as
outlined in the Strategic Plan.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson @clarington.net
Attachments:
Attachment 1 - Bid Tabulation
Attachment 2 — Recommendation Memo from Engineering Services
Municipality of Clarington
Report PS-012-14 Page 5
Attachment 1
Municipality Of Clarington
Bid Summary
Tender CL2014-13
Orono Arena & Foster Creek Remediation
Bidder Total Bid Total Bid
(Hst Included) (Net Of Hst Rebate)
TBG Landscape Inc.
Whitevale, ON $ 130,291.86 $ 117,331.86
Kawartha Capital Corp. $ 160,269.03 $ 144,327.23
Peterborough, ON
The Ontario Construction Company
Limited. $ 245,675.56 $ 221,238.45
Niagara-on-the-Lake, ON
Dynex Construction Inc. $ 321,001.93 $ 289,072.18
Concord, ON
CSL Group Ltd. $ 3,313,100.68 ** $2,983,549.78*
Ancaster, ON
*adjusted for arithmetic errors — used lump sum for unit pricing so when extended the pricing was
increased dramatically
Leading the Way
MEMO
TO: David Ferguson, Purchasing Manager
FROM: Ron Albright, Assistant Director, Engineering Services
DATE: August 5, 2014
RE: Orono Arena and Foster Creek Erosion Remediation
CL2014-13
The Engineering Services Department has reviewed the submissions for CL2014-13
and offers the following comments.
The project includes erosion remediation work at the storm sewer outlet on the west
side of the Orono Arena parking lot, and at Foster Creek adjacent to the Lion's Trail
approximately 60 m south of King Avenue in Newcastle, as shown on the attached site
location plans.
Based on past experience with this contractor, we recommend award of the contract to
TBG Landscape Inc. in the amount of $130,291.86, inclusive of HST, or $117,331.85,
net of HST rebate.
Due to past experiences on similar projects, a contingency amount of 10% is carried
forward. The attached cost apportionment shows the total project costs including
contingencies and material testing, and the budget for each site.
. ;I .; ,. „tl � _;!:': '.. I'll; IC, I i'.:f, iif •I'ilt ,l
Funding for the project will come from the accounts noted in the table below.
Construction (net of HST) (Based on Low Bid) $117,331.85
Contract Administration (net of HST), Material Testing, and $ 26,668.15
Contingencies
Total Project Value $144,000.00
Budget Amount
Orono Arena Storm Outfall Erosion Remediation
110-32-340-83668-7401 (2014) $80,000.00
Foster Ck Remediation South of King Ave,
110-32-340-83317-7401 (2014) $95,000.00
Total Budget Amount $175,000.00
Estimated Unexpended Budget (Foster Ck) $44,000.00
Additional Funding Required (Orono Arena) $13,000.00
Due to the different funding sources (i.e. Foster Creek is funded from Development
Charges, and Orono Arena is funded from tax levies) the surplus from Foster Creek
cannot be used to fund the shortfall for Orono Arena.
In reviewing our accounts we have identified the Mill Street Reconstruction project (110-
32-330-83362-7401) as one in which we are comfortable releasing the unexpended tax
levy portion of the funding, closing the account and transferring $13,000 or the
remaining $13,773.45 to the Orono Arena project (account 110-32-340-83668-7401).
Both of these projects are funded through tax levy so the funding types are compatible.
The Mill Street project was completed in 2011 with no additional costs expected.
We recommend that Purchasing move forward with award of the contract based on the
above apportionments.
Should you have any further questions, please feel free to contact the undersigned.
Regards,
Ron Albright, P. Eng.
Assistant Director
RA/s b/n I
Pc: Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
� � _ _ I
Evu llff.EU
EFT
Al
ORONO
rIB—k�-TE T
a OTC
ct
ONCESSION ROADS ORONO ARENA STORM 0 UTF L
--//,-7.`EROSION REMEDIATION J� / > �� If
;A
----------------
-F-11
GRAOY DR
RNE ANDREW STREET
0
GOYD
F
0
THO"i'S *)LE
GEORGE$To GEORGE ST E GEORGE ST E
GRAHAM IT
0
11 ri A
.1 MOT STREET
MACASTLIE
OATLEYGT
KING AVENUE EAST
'M
LILLIAN
HARMER DRIVE LJ L -ST
FOSTENCREERDRV
u
BLGO
10
STANFORD 0
.1 c"'.I ST LARK UNESTE
I I I f—,I " TAKIN—IME
_T
CRESCENT RAVE'
ID-IIAIDITW EMMARO STREET EAST
IC OFU_]
1111ET1 o EDWARD TERCRES N
IIIAS T �-TFT
FULFT
FOSTER REEK REMEDIATION
Municipality of Ciarington
Orono Arena and Foster Creak Erosion Rernediation
Cost Apportionment Based on Low Bid July-23-14
Contract CL2014-13
Vlllunicpality of Clarigton
Description Total Comments
Orono Arena Foster Creek
110-32-340- 110-32-340-
Account Number/PO 83668-7401 83317-7401
Construction Costs Contract CL2014-13
PART W: ORONO ARENA STORM SEWER OUTFALL EROSION
REMEDIATION $ 74,447.13 $ 74,447.13 $ -
PART'B': FOSTER CREEK EROSION REMEDIATION, 60 m SOUTH $ 40,855.40 $ - $ 40,855.40
OF KING AVE, NEWCASTLE
Sub-Total Construction $ 115,302.53 $ 74,447.13 $. 40,855.40
1.76% Unrecoverable HST $ 2,029.32 $ 1,310.26 $ 719.06
Total Construction Cost Net of FIST Rebate $ 117,331.85 $ 75,757.39 $ 41,574.46
Other Costs
Survey and Baseplan Update $ 1,000.00 $ 1,000.00 Cima proposal
Construction Admin., Inspection and Materials Testing $ 13,800.00 $ 8,910.22 $ 4,889.78 Cima proposal
Sub-Total Other Costs $ 14,800.00 $ 9,910.22 $ 4,889.78
1.76% Unrecoverable HST $ 260.48 $ 174.42 $ 86.06
10% Contingencies (Including 1.76% Net HST). $ 11,607.67 $ 7,157.97 $ 4,449.70 for Rounding
Total Other Costs Net of FIST Rebate $ 26,668.15 $ 17,242461 $ 9,425.54
Total Estimated Project Costs $ 144,000.00 $ 93,000.00 $ 51,000.00
Budget Amount $ 80,000.00 $ 95,000.00
Under/(Over) Budget Amount $ (13,000.00)1 $ 44,000.00
All Costs Exclude HST Unless Indicated Otherwise
Attachment 4 to Report
COD- 016- 14
ciffbooft Report
Purchasing Services
Date: August 19, 2014
To: Frank Wu, Chief Administrative Officer
From: David Ferguson, Purchasing Services
Report#: PS-011-14 File#: CL2014-15
Subject: CL2014-15 — 2014 Street Lighting, Various Locations
Summer Recess Procedure (Purchasing By-Law 2010-112, S. 67)
Recommendations:
It is respectfully recommended to the Chief Administrative Office the following:
a) That Report PS-011-14 be received;
b) That Langley Utilities Contracting Limited, Bowmanville, Ontario with a total bid in
the amount of$257,693.97 (net of HST Rebate), being the lowest responsible
bidder meeting all terms, conditions and specifications of Tender CL2014-15 be
awarded the contract for the 2014 Street Lighting, Various Locations as required
by the Municipality of Clarington, Engineering Department; and
c) That the funds required in the amount of$307,356.00 (which includes $257,693.97
net of HST Rebate for construction plus tendering, design, other costs and
contingencies) be drawn from the following account:
Street Lighting Installation, Various
110-32-324-83221-7401 (2014).................................................... $59,230.27
110-32-324-83221-7401 (2013) ................................................... $49,769.73
Liberty Street Lighting (Con Rd 3 to Sydel Ct) 4
110-32-324-83360-7401 (2014) ...................................................$106,000.00
Build Canada Fund
110-32-330-83347-7401 ............................................................. $ 23,356.00
Developer Contribution
110-32-324-83221-7401 ........................................................... $ 46,000.00
City of Oshawa
110-32-324-83221-7401.............................................................$ 23,000.00
Total Budget .......................................................................... $307,356.00
Municipality of Clarington
Report PS-011-14 Page 2
Recommended by:
David Ferguson, Mai ager, Purchasing Date
Services.
Concurrence:
9
Tony Cannella, Director of Engineering Date
Nancy.Taylor, Director of Finance
Date
Approved by:
fZ
Frank Wu, Chief Administrative Officer Date
DF\sm
cc: M. Marano, Director, Corporate Services
Municipality of Clarington
Report PS-011-14 Page 3
Report Overview
To request approval for the tender award for CL2014-15 Street Lighting Various
Locations.
Background
1. Tender specifications were provided by AECOM for the 2014 Street Lighting,
Various Locations.
2. Tender CL2014-15 2014 Street Lighting, Various Locations was advertised in the
Daily Commercial News and electronically on the Municipality's website and the
Ontario Public Buyer's Association website. Subsequently, tenders were received
and tabulated as per Attachment 1.
Analysis
3. A total of four (4) submissions were received in response to the tender call. All
submissions were deemed compliant.
4. After further review and analysis of the bids by the Engineering Department and
Purchasing, it was mutually agreed that the low bidder, Langley Utilities
Contracting Limited, Bowmanville, Ontario be recommended for the contract for
the 2014 Street Lighting, Various Locations. The recommendation memo from the
Engineering Department summarizing the project and costs is appended as
Attachment 2.
5. Langley Utilities Contracting Limited has provided similar services to the
Municipality of Clarington and the level of service and quality has been
satisfactory.
6. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Engineering.
7. The total project cost of$307,356.00 includes $257,693.97 (net of HST Rebate)
for construction, plus tendering design, other costs and contingencies. The
funding and costs for this project are outlined in the memo from Engineering
Services (Attachment 2).
Municipality of Clarington
Report PS-011-14 Page 4
8. Funding for this project will be drawn from the following account:
Street Lighting Installation, Various
110-32-324-83221-7401 (2014)................................................. $ 59,230.27
110-32-324-83221-7401 (2013) ................................................ $ 49,769.73
Liberty Street Lighting (Con Rd 3 to Sydel Ct)
110-32-324-83360-7401(2014).................................................. $106,000.00
Build Canada Fund
110-32-330-83347-7401 .......................................................... $ 23,356.00
Developer Contribution
110-32-324-83221-7401 .......................................................... $ 46,000.00
City of Oshawa
110-32-324-83221-7401 .................. ............ $ 23,000.00
Total Budget ........................................................................ $307,356.00
Concurrence
9. This report has been reviewed by Tony Cannella, Director of Engineering Services
who concurs with the recommendations.
Conclusion
10. To award the contract to Langley Utilities Contracting Limited, Bowmanville,
Ontario for the 2014 Street Lighting Various Locations.
Strategic Plan Application
The recommendations contained in this report supports investing in infrastructure as
outlined in the Strategic Plan.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson@clarington.net
Attachments:
Attachment 1 - Bid Tabulation
Attachment 2 - Recommendation Memo from Engineering Services
Municipality of Clarington
Report PS-011-14 Page 5
Attachment 1
Municipality Of Clarington
Bid Summary
Tender CL2014-15
2014 Street Lighting Various Locations
BIDDER TOTAL BID TOTAL BID
(HST Included) (Net of HST Rebate)
Langley Utilities Contracting Limited
Bowmanville, ON $286,157.81 $257,693.97
Guild Electric Limited
Toronto, ON $290,968.39 $262,026.05
Aline Utility Limited
Lindsay, ON $383,177.35 $345,063.07
Black & McDonald Limited
Scarborough, ON $393,383.42 $354,253.95
Attachment 2
M ME M 0
Leadi:g the Way
TO: David Ferguson, Purchasing Manager
FROM: Ron Albright, Assistant Director, Engineering Services
DATE: August 15, 2014
RE: 2014 Street Lighting, Various Locations
CL2014-15
The Engineering Services Department has reviewed the submissions for CL2014-15
and offers the following comments.
The project includes installation of street lights at various locations throughout the
Municipality, as shown in the table below.
Location Limits
Liberty St Concession Rd 3 to Sydel Ct
Concession Rd 7 At Solina Rd — Intersection Lighting
Concession Rd 7 At Middle Rd — Intersection Lighting
Concession Rd 7 At Old Scugog Rd — Intersection Lighting
Concession Rd 7 At Townline Rd — Intersection Lighting
Gord Vinson Ave Fenning Dr to Rosswell Dr
Concession Rd 4 At RR 57 — Intersection Lighting
Old Kingston Rd Highway 2 to Osgoode Gt
Glenabbey Dr At Townline Rd South— Intersection Lighting
Highway 2 Newcastle Fire Hall to Rudell Rd
Based on past experience with this contractor, we recommend award of the contract to
Langley Utilities Contracting Ltd. in the amount of $286,157.81, inclusive of HST, or
$257,693.97, net of HST rebate.
2014 Street Lighting, Various Locations,
CL2014-15 2 August 15, 2014
Due to past experiences on similar projects, a contingency amount of 5% is carried
forward. The attached cost apportionment shows the total project costs including
design, connection fees and contingencies and the budget for each site.
The City of Oshawa has agreed to pay a 50% share of the cost for installation of street
lights at Concession Road 7 and Townline Road, in accordance with the Boundary
Road Agreement. The Municipality of Clarington is also pursuing cost sharing from
Hyrdo One at 50% of the cost of this location due to their use of this intersection to
access the Enniskillen Transformer Station. The collection of this amount will be
contingent on Hydro One entering into the lease agreement with Clarington for the use
of Townline Road. If the agreement is executed the costs from Hydro One will be split
evenly between the Various Street Lighting account and the City of Oshawa based on
the 50% cost sharing agreement.
Construction of street lights on Gord Vinson Dr was included in the developer's
responsibilities under the subdivision agreement. Funding for the proposed street lights
will be provided by the developer which staff are currently working with the developers
consultant to finalize details.
Funding for the project will come from the accounts noted in the table below.
Construction (net of HST) (Based on Low Bid) $257,693.97
Design, Tendering, Material Testing, Other Costs and Contingencies $49,662.03
(net of HST)
Total Project Value $307,356.00
Budget Amount
Street Light Installation - Various
110-32-324-83221-7401 (2013) $49,769.73
110-32-324-83221-7401 (2014) $60,000.00
Liberty Street Lighting (Con Rd 3 to Sydel Ct)
110-32-324-83360-7401 (2014) $110,000.00
Build Canada Fund
110-32-330-83347-7401 $23,356.00
Developer Contribution
110-32-324-83221-7401 $46,000.00
City of Oshawa
110-32-324-83221-7401 $23,000.00
Total Budget Amount $312,125.73
Estimated Unexpended Budget $4,769.73
Additional Funding Required $0.00
2014 Street Lighting, Various Locations,
CL2014-15 3 August 15, 2014
We recommend that Purchasing move forward with award of the contract based on the
above apportionments.
Should you have any further questions, please feel free to contact the undersigned.
Regards,
Ron Albright, P. Eng.
Assistant Director
RA/sb/na
Attachment
Pc: Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
I:1"Dept,lrne.ifi`,t's�iii-.1 Vdoilc.l/Ol^1CSl '_)014'1\v,lviiu lv F'urcii_'r_i,iy re.. Tewler ,d,t-a,d (-:11')00-"i5 201z! V�aJnua
�.AC811 Ci iS.f�OC.
Municipality of Clarington
2014 Street lighting,Various Locations
Low Bid Cost Apportionment 15-Aug-2014
Contract CL2014-15
Engineering Comments
Description Total Street Ligthing Liberty Street Build Canada Developer
Various Lighting Fund City of Oshawa Contribution
Account Number/PO 110-32-324- 110-32-324- 110-32-330- 110-32-324- 110-32-324-
83221-7401 83360-7401 83347-7401 83221-7401 83221-7401
Construction Costs Contract CL2014-15
PART A: CONC 7 AND SOLINA RD.,SOLINA $ 10,920.00 $ 10,920.00
PART B: CONC 7 AND MIDDLE RD.,TYRONE $ 10,382.00 $ 3,184.46 $ 7,197.54
PART C: CONC 7&OLD SCUGOG RD.,ENNISKILLEN $ 12,066.00 $ 12,066.00
PART D: GORD VINSON AVE.FROM FENNING DR.TO This site was to be completed by
ROSSWELL DR.,COURTICE $ 38,896.00 $ 38,896.00 developer.Staff working with developer for
cost recovery.
PART E: WALKWAY FROM HART BLVD.TO SUNSET BLVD., $ 14,466.00 $ 14,466.00
PART F: REG.RD.57 AND CONC.4,BOWMANVILLE $ 8,485.00 $ 8,485.00
PART G: OLD KINGSTON RD.,COURTICE $ 30,515.00 $ 26,500.00 $ 4,015.00 Partial funding from DC(St.Lighting
Related to Park Opening-Toole Mills
PART H: TOWNLINE ROAD NORTH,OSHAWA-CLARINGTON $ 35,905.00 $ 17,952.50 $ 17,952.50
PART 1: TOWNLINE ROAD SOUTH AT GLENNABBY DR, $ 6,580.00 $ 6,580.00
PART J: REGINAL HIGHWAY 2,NEWCASTLE $ 12,032.00 $ 12,032.00 DC Project#123
PART K: LIBERTY STREET,BOWMANVILLE $ 72,990.00 $ - $ 72,990.00 $ - $ - $ -
Sub-Total Construction Cost $ 253,237.00 $ 89,233.96 $ 89,037.00 $ 18,117.54 $ 17,952.50 $ 38,896.00
Net HST @ 1.76%of this Certificate $ 4,456.97 $ 1,570.52 $ 1,567.05 $ 318.87 $ 315.96 $ 684.57
Total Construction Cost Net of HST Rebate $ 257 693.97 $ 90 804.48 $ 90 604.05 $-18,436.41 $ 18 268.46 $ 39 580.57
Other Costs
0.0% Contract Administration and Materials Testing $ - $ - $ - $ - $ -
Hydro One Connection Fees $ 9,650.30 $ 3,673.55 $ 1,067.65 $ 2,837.02 $ 1,538.18 $ 533.90 Quote
Design and Tendering(Aug 1,2013-June 27,2014 $ 26,742.78 $ 9,386.71 $ 9,413.46 $ 1,925.48 $ 1,898.74 $ 4,118.39 From AECOM Invoices
Design and Tendering(June 28,2014 to completion) $ 1,000.00 $ 351.00 $ 352.00 $ 72.00 $ 71.00 $ 154.00 AECOM Estimate to Completion
Sub-Total Other Costs $ 37,393.08 $ 13,411.26 $ 10,833.11 $ 4,834.50 $ 3,507.92 $ 4,806.29
1.76% Unrecoverable HST $ 658.12 1 $ 236.04 $ 190.66 $ 85.09 1 $ 61.74 1 $ 84.59
5.0% Contingencies(Including 1.76%Net HST) $ 11,610.83 1 $ 4,548.221 $ 4,372.18 1 $ - 1 $ 1,161.88 1 $ 1,528.55 1 +/-For Rounding
Total Other Costs Net of HST Rebate $ 49 662.03 $ 18 195.52 1 $ 15,395.951 $ 4,919.59 1 $ 4,731.541 $ 6,419.43
Total Estimated Project Cost $ 307 356.00 $ 109 000.00 $ 106 000.00 $ 23,356.00 1 $ 23,000.00 $ 46,000.00
Budget Amount $ 312,125.73 $ 109,769.73 $ 110,000.00 $ 23,356.00 IS 23,000.00 $ 46,000.00
Under/Over Budget Amount $ 4,769.73 $ 769.73 $ 4,000.00 $ - 1 $ - $ -
Attachment 5 to Report
COD- 016- 14
ciffft"n Report
Purchasing Services
Date: August 12, 2014
To: Frank Wu, Chief Administrative Officer
From: David Ferguson, Purchasing Services
Report#: PS-013-14 File#: RFP2014-9
Subject: Priority Green Clarington
RFP2014-9 — Energy Efficiency and Water Conservation Performance
Assessment
Summer Recess Procedure (Purchasing By-Law 2010-112, S. 67)
Recommendations:
It is respectfully recommended to the Chief Administrative Office the following:
a) That Report PS-013-14 be received;
b) That Sustainable Edge Limited, Toronto, Ontario being the highest ranked
proponent meeting all terms, conditions and specifications of Request for Proposal
RFP2014-9 be awarded the contract for Energy Efficiency and Water Conservation
Performance Assessment as required by the Municipality of Clarington, Planning
Department with a total bid in the amount of $30,019.20 (net of HST Rebate); and
c) That the funds required in the amount of$ 30,019.20 (net HST rebate) be drawn
from the following account:
100-50-000-10542-7520 ........................................................................$ 30,019.20
Municipality of Clarington
Report PS-013-14 Page 2
Recommended by:
David Ferguson, Manager, Purchasing Date
Services
Concurrence:
A eC--rd/me�jIirZector of Planning Date
Approved bar:
6. .
Frank Wu, Chief Administrative Officer Date
DF\bh
cc: M. Marano, Director, Corporate Services
Municipality of Clarington
Report PS-013-14 Page 3
Report Overview
To request approval for the tender award for RFP2014-9 Energy Efficiency and Water
Conservation Performance Assessment as part of the Priority Green Clarington Project
Background
1. Request for Proposal (RFP) was issued by the Municipality for Energy Efficiency
and Water Conservation Performance Assessment as required by the Planning
Department.
2. RFP2014-9 Energy Efficiency and Water Conservation Performance Assessment
was advertised electronically on the Municipality's website and the Ontario Public
Buyer's Association website. Subsequently, proposals were received from the
following companies: Clearsphere, Toronto, ON; IndEco Strategic Solutions,
Toronto, ON; Sustainable Edge Ltd., Toronto, ON; and Cambium Inc.,
Peterborough, ON.
3. A total of four (4) proposals were received in response to the request for proposal
call. All submissions were deemed compliant.
4. As stipulated within the request for proposal document, proposals/submissions
were evaluated based on the following criteria:
i) Experience of the Firm
ii) Experience of Key Personnel
iii) Proposed Methodology and Workplan
iv) Deliverables
v) Pricing, etc
5. As stated within the request for proposal documents, the vendor selection would
be made on the written proposal, reference checks and an interview if required.
6. All proposals received were reviewed by the evaluation committee which consisted
of representatives from Planning, Durham Region and Purchasing Services.
Analysis
7. The evaluation committee reviewed and scored the proposals in accordance with
the established evaluation criteria. Based on the evaluation rankings only one firm
met the established threshold to move forward in the process, Sustainable Edge
Ltd., Toronto, ON.
8. References were completed on Sustainable Edge Ltd. of Toronto and were found
to be satisfactory.
Municipality of Clarington
Report PS-013-14 Page 4
9. To ensure a firm understanding of the project and scope of work for this project, to
obtain clarification in regards to their proposal and to meet the proposed
representative a meeting was held.
10. Queries with respect to the department needs, specifications, etc. should be
referred to the Director of Planning.
11. The evaluation committee's recommendation is to award the contract to
Sustainable Edge Limited, Toronto, Ontario.
12. Priority Green Project is being funded by the Ontario Ministry of the Environment
through the Showcasing Water Innovation program and the Federation of
Canadian Municipalities Green Municipal Fund.
13. The proposal submitted by Sustainable Edge Limited was in the amount of
$30,019.20 (net HST Rebate). Funding for this project will be drawn from the
following account:
Account Name
100-50-000-10542-7520 ..................................... ..$ 30,019.20
..............................
Concurrence
14. This report has been reviewed by David Crome, Director of Planning Services who
concurs with the recommendations.
Conclusion
15. To award the contract to Sustainable Edge Limited, Toronto, for the Energy
Efficiency and Water Conservation Performance Assessment.
Strategic Plan Application
The recommendations contained in this report supports promoting green initiatives as
outlined in the Strategic Plan.
Staff Contact: David Ferguson, Purchasing Manager, 905-623-3379 ext. 2209 or
dferguson@clarington.net
Attachments:
Attachment 1 - Submission Summary
Municipality of Clarington
Report PS-013-14 Page 5
Attachment 1
Municipality Of Clarington
Bid Summary
Request for Proposal RFP2014-9
Energy Efficiency and Water Conservation Performance Assessment
BIDDER PROPOSAL COST PROPOSAL COST
(HST Included) (Net of HST Rebate)
Sustainable Edge Ltd. $33,335.00 $30,019.20