Loading...
HomeMy WebLinkAboutEGD-002-14 Clarbgton REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: January 20, 2014 Resolution #: Report#: EGD-002-14 File M D.03.29.014 By-law #: )l -- f6 Subject: BIRCHDALE SUBDIVISION PHASE 3, COURTICE, PLAN 40M-2384 `CERTIFICATE OF ACCEPTANCE' AND `ASSUMPTION BY-LAW', FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-002-14 be received; 2. THAT the Director of Engineering Services be authorized to issue a `Certificate of Acceptance' for the Final Works, which include final stage roads and other related Works, constructed within Plan 40M-2384; and 3. THAT Council approve the by-law attached to Report EGD-002-14, assuming a certain street within Plans 40M-2384 as public highway. Submitted by: Reviewed by T C C�uT ,tc A.S. Cannella, C.E.T. Franklin Wu Director of Engineering Services Chief Administrative Officer ASC/nac/jb December 13, 2013 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: EGD-002-14 PAGE 2 1.0 BACKGROUND 1.1 The Corporation of the Municipality of Clarington entered into a Subdivision Agreement, registered August 1, 2008, with Black Creek Developments Ltd. to develop lands by plan of subdivision, located in Courtice and described as Plan 2384 (Attachment 1). The agreement required the developer to construct all roadworks, including hot-mix paving, sidewalks, curb and gutter, street trees, a storm drainage system and streetlights, hereinafter referred to as the `Works'. 1.2 The Subdivision Agreement provides for the separation of the Works into four (4) stages: a) Initial Works; b) Final Works; c) Street Lighting System; and d) Stormwater Management System (not applicable) 1.3 The Initial Works and Street Lighting System were issued `Certificates of Completion' and subsequent `Certificates of Acceptance' by the Director of Engineering Services. 1.4 The Final Works were issued a `Certificate of Completion' dated November 1, 2012. This initiated a one (1) year maintenance period, which expired on November 1, 2013. The Works were re-inspected at that time, and all deficiencies have now been rectified to the satisfaction of the Director of Engineering Services. 1.5 It is now appropriate to issue a `Certificate of Acceptance' for the Final Works. The Subdivision Agreement requires Council approval prior to the issuance of the `Certificate of Acceptance' for the Final Works. REPORT NO.: EGD-002-14 PAGE 3 1.6 Further to the issuance of a `Certificate of Acceptance', a by-law is required to permit the Municipality to assume a certain street within Plan 40M-2384 as public highway (Attachment 2). CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Norman A. Clark, Manager of Construction Attachments: Attachment 1 - Key Map Attachment 2 - Proposed By-law GFORG�REYNOCO S ORIV� SKINNER COURT a 4 w O� w U Q a w z 10 Birchdale Phase 3 Plan 40M-2384 FOURTH AVENUE FTF �j WESTMORE STREET N George Reynolds-Dr.. ' N O R Im tU C7 L m Nash DRAWN BY: E.L. DATE: December 11,2013 Rd. _ REPORT EGD-002-14 COURTICE KEY MAP ATTACHMENT NO. 1 G:\Attachments\40 M-2384.mxd Attachment 2 To Report EGD-002-14 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2014- XX Being a By-law to assume a certain street within the Municipality of Clarington as public highway in the Municipality of Clarington. The Council of the Corporation of the Municipality of Clarington hereby enacts as follows: 1. THAT the street shown on Plan 40M-2384, and listed below in this section, being in the Municipality of Clarington, in the Regional Municipality of Durham, is hereby accepted by the Corporation of the Municipality of Clarington as public highway, and assumed by the said Corporation for public use: Skinner Court BY-LAW passed this xxth day of xxxxx 2014. Adrian Foster, Mayor Patti L. Barrie, Municipal Clerk