HomeMy WebLinkAboutCSD-010-13 UNFINISHED BUSINESS 18 a Clff*Mjn m Rh EPUAO"M�--r COMMUNITY VI DEPARTMENT MENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: October 28, 2013 Resolution#: A -5 t" ',1 By-law#: N/A Report#: CSD-010-13 File#: Subject: CLARINGTON FITNESS CENTRE — PROPOSED RENOVATION RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report CSD-010-13 be received; 2. THAT Council approve the Basic Amenities Option at a preliminary construction budget of$2,850,000; 3. THAT the growth related portion be financed from the Municipal Capital Works Reserve Fund in the amount of $508,000; 4. THAT the balance of financing of$2,342,000 is recommended to be financed from the following sources: Community Services Capital Reserve Fund $48,000 (unspent 2013 design budget) Community Services Capital Reserve Fund $400,000 Community Services Building Refurbishment Reserve Fund $200,000 Impact/Escrow Reserve Fund $600,000 Municipal Government Enterprise Reserve Fund $500,000, and General Municipal Purposes Reserve Fund $594,000; 5. THAT to the extent possible in the future, the financing of $508,000 from the Municipal Capital Works Reserve Fund be repaid from future collections of the Indoor Recreation component of the Development Charges; and 6. THAT all interested parties listed in the report be advised of Council's decision. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 Clarjiwwn REPORT COMMUNITY SERVICES DEPARTMENT 9L_t'4�� Reviewed by. Submitted by: �/ose'ph P. Caruana Franklin Wu, Director, Community Chief Administrative Officer Services JPC/ga CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: CSD-010-13 PAGE 3 1.0 BACKGROUND 1.1 The Clarington Fitness Centre (CFC) was opened to the public in 1981 and has served the community very well since that time. During this current term of Council, staff has advised of various issues related to the aging of the facility, outdated amenities and implications resulting from recent accessibility legislation. 1.2 As part of the Community Services Department's ongoing preventative maintenance program, building profiles are conducted every five years on each of our recreation facilities. These profiles provide staff with the technical information required to develop our capital maintenance programs. In addition to the building profiles, the Department conducts accessibility audits on all recreation facilities, enabling staff to strategically address upgrades leading up to 2025 when the legislation requires that all our facilities must be fully accessible. 1.3 A Building Condition Assessment was completed by Algal Engineering in August of 2012 and the Barrier Removal Action Plan was completed by SPH Planning and Consulting in January of 2012. The recommendations provided in each of these studies form the basis of the schedule of improvements required to keep the facility performing at current standards while addressing legislated requirements for a fully accessible facility. 1.4 As the project evolved, staff also identified operational and programming constraints of the facility with the intention of providing a facility that meets the standards that our patrons have come to expect at our Municipal recreation facilities. 2.0 PUBLIC MEETING PROCESS 2.1 Whether we are contemplating construction of a new facility or renovating an existing facility, it is important that our community partners are involved with the planning process. For this project, meetings were held with our major facility users; the Clarington Swim Club, the Clarington Squash Club, and the aquafit and lane swim participants. In addition, two separate general public meetings were held where input for the project was received and considered by staff. 2.2 The Swim Club, lane swimmers and aquafit participants were quite clear in their desire to not alter the depth of the shallow end of the pool. The Swim Club and their members were very concerned that any change to the depth or structure of the pool would not allow the Club to sanction its swim meets and would hamper the growth of the Club. 2.3 The Squash Club expressed that their membership had experienced growth, particularly over the past two years, and that growth had warranted the addition of at least one and preferably two additional new squash courts to the facility. REPORT NO.: CSD-010-13 PAGE 4 2.4 With the information gained at the initial stakeholder meetings, staff and the architects developed three concept options for consideration. Each of the options showed no changes to the depth of the shallow end of the pool or the pool structure itself. 2.5 A final public meeting was held with all stakeholders and the general public on September 5, 2013. Each of the concept options were displayed and staff, along with the consultants, were available to answer questions and take comments regarding each of the options. 2.6 Although each option has merit, there was no really clear preference from those in attendance as to which option was preferable. Of the 29 comment forms received, 14 favoured the teaching pool and squash option, 12 preferred the squash only option, while two preferred to upgrade the existing facility and one preferred the teaching pool design. 3.0 DESIGN OPTIONS 3.1 Each of the preliminary design options include the same upgrades to the facility components and amenities. These are referred to as the Project Components (Attachment 1) and are required as a result of the previously mentioned studies to extend the operational life of the facility, to make the facility compliant with accessibility (barrier free) legislation and to modernize the facility to today's standards. 3.2 Teaching Pool Expansion 3.2.1 This option (Attachment 2) provides a new teaching pool to be added adjacent to the south wall of the existing facility, new public viewing areas, improved service and reception and brings natural light into the pool area. The preliminary project budget for this option is estimated at approximately $4,400,000. 3.3 Squash Court Expansion 3.3.1 This option (Attachment 3) provides one additional squash court to be added to the north side of the facility, squash spectator viewing, improved pool viewing at upper level, improved service and reception. The preliminary project budget for this option is estimated at approximately $4,200,000. 3.4 Teaching Pool and Squash Court Expansion 3.4.1 This option (Attachment 4) is a combination of previous options and provides for an additional squash court, new teaching pool, improved public viewing (pool and squash), improved services and reception and also brings natural light into the pool area. The preliminary budget for this option is estimated at approximately $5,400,000. REPORT NO.: CSD-010-13 PAGE 5 4.0 DESIGN CONSIDERATIONS 4.1 The Clarington Swim Club has experienced positive growth, particularly over the last two years. The Club's 2012-2013 membership is comprised of 54 competitive swimmers, 197 non-competitive swimmers and 71 masters for a total membership of 322 members. Staff is supportive of this organization and as such agree with the Club's position that altering the shallow end of the pool could be detrimental to the Club's future. 4.2 The Clarington Squash Club is a new Club with a history of a committed group of squash players. Working with Department staff this Club has recently adopted a constitution and is now operating as a not-for-profit organization with a membership base. Although the Club has experienced some growth, their membership numbers of 64 members do not support the addition of new facilities at this time. 4.3 In researching the standard ratio of members to court availability staff contacted Squash Ontario, who referred us to a squash consultant with Advantage Sport who advises that the industry benchmark suggests each court should accommodate 70 players. 4.4 As a result, it is staff's position that the existing two courts are adequate in terms of their current membership numbers while still providing for future growth of the sport and membership base. Staff does not support the Squash Club position that they require two new squash courts. There is room for the Club to operate with current membership numbers and also provide opportunity for growth with the existing two courts. 4.5 Department staff has reviewed the recent growth patterns for primarily pre-school aged aquatic programs (six months to six years). Based on information gathered from previous registrations as well as Community Forecast Projections as prepared by Hemson Consulting Ltd., it is our position that at the current projected rate of growth, staff can continue to accommodate new participants in the pre-school aquatic programs at both the Courtice Community Complex and Newcastle & District Recreation Complex in the short to medium time frame (three to five years). 4.6 That being said, as programs and pool space approach capacity the choice of day or time for available lessons will decrease. Beyond the five year window capacity could likely still be made available but may impact time currently utilized by other pool users. For example, public swim time converted to an instructional time. REPORT NO.: CSD-010-13 PAGE 6 5.0 STAFF RECOMMENDATIONS 5.1 After careful consideration of the community consultation process, our staff project team is recommending a fourth option referred to as the Basic Amenities Option (Attachment 5) for the consideration of Council. This option encompasses the original intent of the project excluding any features that would alter the structure or depth of the existing pool. 5.2 The Basic Amenities Option accommodates a work program that accomplishes the majority of upgrades represented by the project components. Specifically it provides for replacement of the facility's major operating systems, improved public viewing, the addition of a family change room, lighting improvements, washroom, change room and overall facility upgrades, and would address barrier free accessibility. The preliminary project budget for this option is estimated at $3,052,000. 6.0 PROJECT BUDGET/SCHEDULE 6.1 The proposed project budget is as follows; Construction $2,500,000 Contingency $ 250,000 Equipment and Furnishings $ 100,000 Architectural Fees (Previously Approved) $ 202,000 Total Project Estimate $3,052,000 6.2 Staff has prepared a revised project schedule as follows; Project Report to GPA October 28, 2013 Ratification — Council November 4, 2013 Tender Award to GPA February 17, 2014 Ratification — Council February 24, 2014 Building Closes to Public March 11, 2014 Construction March —December, 2014 Building Re-opening December 2014/January 2015 7.0 PROJECT FINANCING 7.1 The upgrades and renovations to the Clarington Fitness Centre are primarily non- growth related due to the bulk of the work revolving around the existing facility. However, there are added features such as the addition of a family change room that would qualify as expansion to the facility. The expanded square footage totals 2,500 square feet or 16.7%. This equates to approximately $508,000 that would be eligible for funding from the Indoor Recreation Development Charges Reserve Fund. As Council is aware, this reserve fund is currently deficient due to REPORT NO.: CSD-010-13 PAGE 7 the slower than anticipated growth in units over the time frame of the current and previous by-law. As a result it is recommended that the growth component be financed from the Municipal Capital Works Reserve Fund with the proviso that should it be possible in the future, the $508,000 would be repaid from the Indoor Recreation component of the Development Charges collections. 7.2 The balance of financing of $2,342,000 is recommended to be financed from the following sources: Community Services Capital Reserve Fund $48,000 (unspent 2013 design budget) Community Services Capital Reserve Fund $400,000 Community Services Building Refurbishment Reserve Fund $200,000 Impact/Escrow Reserve Fund $600,000 Municipal Government Enterprise Reserve Fund $500,000 General Municipal Purposes Reserve Fund $594,000 7.3 A number of reserve funds have been recommended in order to spread the impact of the required funding across the reserve funds as long term asset management strategies will be considered in the future that will rely upon reserve funds for sources of funding, Should Council wish to proceed with other than the recommended option, consideration would have to be given to debenture financing rather than reserve fund financing due to the impact upon reserve fund balances that are needed for future long term asset management purposes. 7.4 Debenture financing was considered for this project due to currently favourable financing rates. However, as the project is primarily replacement, not growth, as referenced above, repayment would have to be financed from tax levy in future years. 8.0 COMMENTS 8.1 Staff is confident that the recommended option will allow the Clarington Fitness Centre to serve our community for years to come. When completed, the facility will have added a new elevator, new customer service/reception area and other upgrades, to make the facility fully accessible. 8.2 The addition of a family change room, second floor meeting space, new filtration and mechanical systems, and an overall facelift for the building components will improve our energy consumption and make the facility a more welcoming environment that supports our patron's expectations. 8.3 If approved, it is estimated that the upgrade will add a minimum of 15 years to the normal lifespan of the facility. REPORT NO.: CSD-010-13 PAGE 8 9.0 CONCURRENCE This report has been reviewed by Nancy Taylor, Director of Finance, who concurs with the recommendations. CONFORMITY WITH STRATEGIC PLAN — The recommendations contained in this report conform to the general intent of the following priorities of the Strategic Plan: _ Promoting economic development Maintaining financial stability Connecting Clarington _ Promoting green initiatives X Investing in infrastructure _ Showcasing our community Not in conformity with Strategic Plan Staff Contact: Joseph P. Caruana, Director of Community Services Attachments: Attachment 1 — Project Components Attachment 2 - Teaching Pool Expansion Option Attachment 3 - Squash Court Expansion Option Attachment 4 - Teaching Pool and Squash Court Expansion Option Attachment 5 - Basic Amenities Option List of interested parties to be advised of Council's decision: Clarington Squash Club Clarington Swim Club Attachment 1 to Report CSD-010-13 MUNICIPALITY OF CLARINGTON COMMUNITY SERVICES DEPARTMENT CLARINGTON FITNESS CENTRE RENOVATION Project Components • Barrier free accessibility • Elevator to second floor • Public washroom upgrades (2nd floor) • Family change room with private cubicles and accessible change areas • Pool deck the replacement • Main pool finishes upgrades Improved finishes throughout public areas • Upgrade pool filtration equipment • Upgrade HVAC systems and controls • Pool dehumidification/improved air quality • Lighting improvements • Improved security and communications systems • Designated substances removal • Separate building fire alarm system from high school • Improved viewing • Service access to squash courts • Replace existing roof • Plumbing fixture replacement • Locker improvements • Additional power outlets at pool deck level • Additional power outlets at change rooms Attachment 2 to Report CSD-01013 MUNICIPALITY OF CLARINGTON COMMUNITY SERVICES DEPARTMENT CLARINGTON FITNESS CENTRE RENOVATION Teaching Pool Expansion Option • Tot/Teaching Pool with ramped access and family viewing court • Improved pool viewing at lower and upper levels • Men's &Women's change room upgrades • Improved service and reception area • Improved entrance and way-finding • Improved lifeguard station and change facilities • Natural lighting to pool area • New hot tub • New sauna • Barrier free family washroom • Increased pool storage space TEACHING POOL EXPANSION Department Legend �O9�ti n Ex M uN— EXISTING 2 STOREY SCHOOL �7 �O w �y� PMpNG I i � BUEWAU< BAB�NOV00� C � r i �]_I i.w[PWO REMOVE PABt6 _ C7 { PAf1NW REBU:EO BF PAPKNG I_ 016T� OC B f Q I� BY6-'I SPACES GLARO I Clanngton Fitness Centre -- ___ � OG LIBERTY S7 NORTH C`UiuNEGC E%IB�NG aI;IIDING EDGE MUNI Y OF CLMINGTONGTO N OBSERVINGW�: ra�x 1 WINDOW. 7i -_ _ RVIN J GROUND El.00R _________ __ ___________ WINDOW - — (p ADDITION ADDITION I,p ,® (DD `— t Levell — 1300D �A101 i❑m 0 — O O W I � o �,_ HOOF BEIDW i MVO:E%ISTNG WNDOWS I W WEN TO ROOH FOGEOF EIGSTN6 GUIDING fialNOfon C� NEW WNDOIVS * I w Clara T; C on Fitness n Centre D re HOOF BELOW\ w --_-_ — --- COLIRERTYST NORTH \\\\ �---� ' MUNICIPPLT'OF CLARINGTON O AWNS' F 0 � SECOND FLOOR ROOF BELOW L : O o Level 2 tl�— - .Ba o o 130 A102 Cn O_ O W Attachment 3 to Report CSD-010-13 MUNICIPALITY OF CLARINGTON COMMUNITY SERVICES DEPARTMENT CLARINGTON FITNESS CENTRE RENOVATION Squash Court Expansion Option • Additional squash court • Squash court spectator viewing area • Improved pool viewing at upper level • Men's & Women's change room upgrades • Improved service and reception area • Improved entrance and way-finding • Improved lifeguard station and change facilities • New hot tub • New sauna • Barrier free family washroom SQUASH COURT EXPANSION Department Legend E-9 ti EXISTING 2 STOREY SCHOOL r tLF f!Ni1GN0 LIFE O -- 6F-G Clarington Fitness ti Centre D 49 LIBERTY ST NORTH j GURINE GF E%ISI FG MUNICIGTON OF 0 _ eUILGU:G EGGS- "44 .. ��, s., CLMINGTON 0 �� OfNWf:G. GROLR40 FLOOR n i ® ° ADDITION / - /� / _e O /1 Level I °° ro 13OW ;101 L O O W I 'ROOF BFIOW nO I AMMO=WS�NG WNOOWS IDWER TO aooa �JAiOP EDGE OF E%ISTNf+ / PROJECT: I� Clarington Fitness D Y� (i 9eLI�BERWSTNORTH HOOFBLLOW\ -_ - r-F O MUNICIPALITY OF c CLARINGTON n A ` O V - SECOND FLOOR O 0 L ell 13OlU Al 02 (n O O W Attachment 4 to Report CSD-010-13 MUNICIPALITY OF CLARINGTON COMMUNITY SERVICES DEPARTMENT CLARINGTON FITNESS CENTRE RENOVATION Teaching Pool and Tot Pool Expansion Option • Tot/Teaching pool with ramped access and family viewing court • Additional squash court • Squash court spectator viewing area • Improved pool viewing at lower and upper levels • Men's & Women's change room upgrades • Improved service and reception area • Improved entrance and way-finding • Improved lifeguard station and change facilities • Natural lighting to pool area • New hot tub • New sauna • Barrier free family washroom • Increased pool storage space TEACHING POOL + SQUASH COURT EXPANSION ry Department Legend U EXISTING 2 STOREY SCHOOL [wa�wosouAw E FT,-Ducx.xD i. 0 f°OLF-2-�"•m I PARKNG 7- -R. - � - iV ZI �L ..I o .D REMOVE PArRS O d " PNINNC REDUCE) IMF PARKNG LIFE DFEf05lWG CONC Bi BV&TIBPAGES PANELSANDADD _ Q lEW WNpO.NS ¢ . 1 q al WFPA we Clarington Fitness p� 1 Centre — � - I dB LIBERTY ST NORTH - m i I OUTWEOF WSfNG asxa�e I SUN EDGE ._ MUNICIPALITY OF .-__.:. -_ _ CURINGTON OBSERVING D— (D WINDOW _ _ OBSERVING_ GROUND FLOOR Z3 i �� WINDOW n -_ 0 —TU 70 (D ADDITION ADDITION - O its n Co Im I 13080 I ^1 O1 O O W B'.WIvANYIII.I:SF�DNDARY S.HDDL • II I �+++�++�+�W C�, / \ 1RGGF BELOW ]I I I I I I I I I rcav t_aa; — I I I I I I I I A FR OTNELG�WNOON'B I I I I I I I I 7171 EDGE Of ING EXISTING I o e BUILD I I I rav wvrooWS I I I � I RiaECr: NwAPC CIBYington Fitness D --- Centre -�RJ BELOW 49 LIBERTY ST NORTH MUNICIPAUTY OF CLARINGTON SECOND FLOOR CD ROOF � oz &Bvets rap 13= ;102 W Attachment 5 to Report CSD-010-13 MUNICIPALITY OF CLARINGTON COMMUNITY SERVICES DEPARTMENT CLARINGTON FITNESS CENTRE RENOVATION Basic Amenities Option • Barrier free accessibility • Elevator to second floor • Public washroom upgrades (2nd floor) • Family change room with private cubicles and accessible change areas • Staff change rooms • Pool deck tile replacement • Main pool finishes upgrades • Improved finishes throughout public areas • Upgrade pool filtration equipment • Upgrade HVAC systems and controls • Pool dehumidification/improved air quality • Lighting improvements • Improved security and communications systems • Renovation of existing men's and women's change rooms • Designated substances removal • Improved viewing • Plumbing fixture replacement • Additional power outlets at pool deck level • Additional power outlets at change rooms Basic Amenities Option F TT Department LegendTti t, Ue,suFv ❑N�+ EXISTING 2 STOREY SCHOOL ' Fnsrwo manooR� �•� ew � auFTS I x.— :717� PNiWNG I•� MPNiWNG lMa GurJ [SY' w�W Olarin®ton FRness D Newopse-, Centre ..— I : - aO LIBERTY ST NORTH r-r- //��+iB'0� OUR.I.YF CF F.%IBTNO (y __L._-i BUIU]IVG E➢Oe MUNIOI OF i CURINGTON GTON C7 GROUND FLOOR m aeccP?an -_ mac 3 gg Basic funantias Option. L�� 4 Newwiivbwb r-°- rep°x°°ISfq C°crcpenrzp ADDITION SAE° M Level 1 13080 1101 O O Cl) Basic Amenities Option CJ Em uxn.nmiie.m I', i ROGF BELOW EIYaE Df EbSTNG BUSGNG '^ enaccr: \ Clarington Fitness f� Centre RGOF BELGW 40 LIBERTY ST NORTH CLRRINGTON OF - auWNC. SECOND FLOOR ' j Basic NReNfei Optlan 0 Level 2 .� »oeD N A102 C) O O W