HomeMy WebLinkAboutPD-192-91 THE CORPORATION OF THE TOWN OF NEWCASTLE
REPORT
DN:WESTLAKE.GPA
PUBLIC MEETING Y 0,42
Meeting: General Purpose and Administration Committee File #
Date: Monday, September 9, 1991 Res. #
By-Law
Report#: PD-192-91 Fife #: DEV 89-55 #
Subject: OFFICIAL PLAN AMENDMENT APPLICATION - FILE: 89-042/D/N
SUBDIVISION APPLICATION - FILE: 18T-89038
REZONING APPLICATION - FILE: DEV 89-55
APPLICANT: WESTLAKE (821010 ONTARIO LIMITED)
PART LOT 25, CONCESSION 6, FORMER TOWNSHIP OF DARLINGTON
Recommendations:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report PD-192-91 be received.
2 . THAT official Plan Amendment Application 89-42/D/N,
Subdivision Application 18T-89038, and Rezoning
Application DEV 89-55 submitted by 821010 Ontario
Limited be referred back to Staff for further
consideration.
4 . THAT the applicant, delegations and persons listed in
this report, be notified of Council's decision.
1. APPLICATION DETAILS
1. 1 Applicant: 821010 Ontario Limited (agent: Bruce Rondeau)
1.2 Owner: Doreen Westlake
1. 3 O.P.A. : From: "Hamlet for Infilling" , "Permanent
Agricultural Reserve, " and Area
Subject to Development
Restrictions"
To: "Hamlet for Growth" and
"Residential Expansion"
1.4 Subdivision: Proposal is for a forty (40) lot residential
subdivision (See Attachment no. 1)
REPORT NO. : PD-192-91 PAGE 2
1 .5 Rezoning: Application is to rezone from "Agricultural
Exception (A-1) & "Environmental Protection
(EP) " to a zoning category appropriate to
permit the development
1. 6 Area: 34 .42 ha ( 85 . 05 acres)
2. LOCATION
2 . 1 The subject property is located on Lot 25, Concession #6, in
the former Township of Darlington (see Attachment no. 2) .
It is situated for the most part to the north of the present
Hamlet boundaries of Solina.
3. BACKGROUND
3 . 1 The following applications have been submitted by 821010
Ontario Limited:
i) Application to amend the Durham Regional Official Plan
and Newcastle Official Plan received May 1, 1989;
ii) Application for a Plan of Subdivision received April
18, 1989;
iii) Application to amend the Town's Comprehensive Zoning
By-law 84-63 received April 5, 1989 .
3.2 The above applications initially sought to develop a fifty-
one (51) lot residential subdivision on a 34 .42 ha parcel of
land located on the west side of Solina Road, north of
Concession Road 6 . Based on the advice of the applicant's
Hydrogeological Engineer (see Section 7 .4 for discussion of
report) , the applicant submitted a revised plan reducing the
proposed number of lots to be developed to 45 . Since then,
advice given by the Public Health Department has prompted
the applicant to reduce the proposed number of lots even
further to 40 . Public Health is concerned about the
capability of the stormwater retention pond and has
REPORT NO. : PD-192-91 PAGE 3
asked the applicant to withhold development of five lots
until the retention pond has proven adequate.
4. EXISTING AND SURROUNDING USES
4. 1 Existing Uses
4. 1. 1 The subject property has been used as a farm and slopes
towards the Hamlet of Solina. The southern portion of
the site is traversed by a tributary to Farewell Creek.
4.2 Surrounding Uses
4 .2 . 1 The surrounding uses to the subject property are as
follows :
North: Agricultural
South: A 22 lot subdivision within the Hamlet of
Solina
East: Agricultural and large lot residential (5-20
acres)
West: Agricultural
5. OFFICIAL PLAN POLICIES
5. 1 Existing ( 1976) Durham Region Official Plan
5. 1. 1 The majority of the lands in the vicinity of Solina are
designated as "Permanent Agricultural Reserve" by the
Durham Region Official Plan. Non-agricultural uses in
this designation are discouraged.
5 . 1.2 Section 10 .4 of the Regional Official Plan outlines
policies relating to hamlet development. In general,
residential development in hamlets shall be limited to
minor internal infilling and/or minor additions to
existing development. Additional indepth development
is permitted in those hamlets identified as 'Hamlets
for Growth' , generally to a maximum of 150 units.
Solina is currently designated as a 'Hamlet for
Infilling. '
REPORT NO. : PD-192-91 PAGE 4
5. 1.3 The Regional Official Plan also states that the
delineation of the limits and the detailing of land
uses in hamlets shall be provided in a development plan
adopted by local Council prior to major new development
taking place.
5.2 Town of Newcastle Official Plan
5 . 2 . 1 The southerly portion of the subject lands fall within
the Hamlet boundary and, as such, is predominantly
designated "Area Subject to Development Restriction"
by the Hamlet of Solina Secondary Plan. A small
portion is designated "Existing Residential" . The
majority of the property lies outside the present
Hamlet boundaries . The subject Official Plan Amendment
application would extend the Hamlet of Solina to
incorporate these lands, and redesignate the hamlet as
a "Hamlet for Growth" .
5. 3 New ( 1991) Durham Region Official Plan
5. 3. 1 The new Durham Region Official Plan retains the
designation for the subject lands as "Permanent
Agricultural Reserve" . Sections 13.2 .2 and 13 .2 . 3 of
the new Official Plan outline policies pertaining to
hamlets and they state that:
Hamlets shall be the predominant location for rural
settlement, with the other residential development and
Rural Employment Areas being limited in scale.
Growth will occur only in those hamlets that are
determined to be suitable for further development.
5. 3 .2 Furthermore, the new Durham Region Official Plan states
that the boundaries of a hamlet and the details of the
specific land uses to be permitted within the hamlet,
-1, 7 �y
REPORT NO. : PD-192-91 PAGE 5
are to be determined following a settlement capacity
study. This study must be completed to the
satisfaction of the Region and the Ministry of the
Environment.
The study requires, among other things, an analysis of
the hydrogeological regime and an assessment of the
long-term suitability of the soil to determine the
extent of development which can be supported on private
wells and septic systems within the hamlet.
6. ZONING DESIGNATION
6 . 1 Zoning By-law 84-63
6 . 1. 1 The Town of Newcastle Comprehensive Zoning By-law
places an "Agricultural Exception (A-1) " and
"Environmental Protection (EP) " zoning on the site.
The subject lands would require a 'Residential Hamlet
(RH) ' zone in order for the proposed residential
subdivisions to develop.
7. BACKGROUND STUDIES
7 . 1 Preliminary Storm Water Management Report
7 . 1. 1 This report was prepared by R.W. Bruynson Inc. , to
satisfy the requirements of the Newcastle Official
Plan, Central Lake Ontario Conservation Authority and
the Ministry of Natural Resources . The consultant
performed an analysis of the site to determine the
effects that the development would have on the quality
and quantity of water conveyed from and through the
site. It is the intention of the applicant to install
a retention pond at the south end of the site for
REPORT NO. : PD-192-91 PAGE 6
recreational purposes as well as to provide storm water
quality/ quantity control.
7 . 1 .2 The consultant noted that if the wet pond is properly
designed, constructed and sized, it would provide the
best method of controlling the quality/quantity of
storm water leaving and flowing through the site. It
was also noted that the proposed solution would
decrease the peak flood levels that the site presently
experiences and would release site flood waters at a
controlled rate. Consequently, this "would have a
significant effect on the downstream creek flows and
erosion of the creek banks . "
7 .2 Flood Plain Study
7 .2 . 1 R.W. Bruynson Inc . , prepared this study to determine
the extent of flooding over the existing property
resulting from a 1: 100 year storm. The analysis was
performed in accordance with the rules and regulations
of the Central Lake Ontario Conservation Authority.
7 .2 .2 The consultant concluded that the storm waters are well
conveyed across the site and no significant adverse
effects on the flood levels within the site boundaries
are expected from downstream irregularities . It was
noted that "the proposed water course diversion and
retention pond are required during the construction of
the subdivision and at post development to ensure that
the quantity and quality of discharge is not
significantly altered. Furthermore, safeguards against
erosion must be taken around the site perimeter during
construction to prevent silting of the waste course.
Coarse rip-rap should be used at all abrupt changes in
4
REPORT NO. : PD-192-91 PAGE 7
channel direction as well as the ends of the culverts
to prevent scouring of the banks. "
7 . 3 Photo-Interpretative Soil and Terrain Analysis and
Agricultural Capability Assessment of Lands
7 . 3 . 1 The applicant asked Robinson, Merritt & deVries Ltd. to
review the physical conditions of the property and
assess the agricultural capability of the lands and
their potential to support agriculture.
7 . 3. 2 In this report the consultant notes that the Canada
Land Inventory Soil Capability for Agriculture Map
designates approximately 80% of the map area that
encloses the site as being Class 1 lands (no
significant limitations to crop use) and 20% as Class 4
lands (severe limitations restricting the range of
crops) . According to the Durham County Soil Survey
Report the property is composed of Bondhead Loam.
7 . 3 . 3 The consultant felt there were deficiencies with the
scales used to classify the soils as these scales were
deemed "very reconnaissance in nature and considered
inadequate for site specific evaluations . " To overcome
these deficiencies, the consultant has completed a more
detailed assessment of the soils using a photo-
interpretative soil and terrain analysis . The results
of the analysis indicated that "the major part of the
property is identified with Class 3 lands . " These
particular lands have moderately severe limitations
that restrict the range of crops or require special
conservation practices .
7 . 3.4 The report concluded that while the property does
contain some good lands, the predominant part of the
REPORT NO. : PD-192-91 PAGE 8
site is composed of lower quality land resources . The
site is also "fragmented by drainage ways, broken
lands, or their occurrence in small pockets which make
them difficult to utilize with modern day large farm
equipment. The drainage ways and broken lands also
offer some problems in the cultivation and management
of these lands . "
7 . 3. 5 The report suggests that while the property is
currently being used for agriculture, the continued
practice of row cropping and clear cultivation on the
long slopes on the northern flank of the property is
highly conducive to accelerated erosion. To prevent
further degradation of the soils it is necessary to
employ conservation measures such as strip cropping,
contour berming and grassed water. Generally, the site
has an arable base of approximately 50 acres which the
consultant considers inadequate for most general farm
operations .
7 .4 Preliminary Hydrogeologic Assessment
7 .4 . 1 The applicant hired Gibson & Associates Ltd. , to study
the surficial soils, shallow ground water movement,
recharge, baseline water quality, and availability to
satisfy the requirements of the Newcastle Official
Plan. The study revealed that there is a major aquifer
system at a depth of 27m. Recommendations were
presented in the report for private servicing for water
supply and waste disposal to lessen future possible
impacts on existing water quality functions or water
supplies .
7 .4.2 The consultant also noted that the "assessment of the
potential future impacts indicates that septic effluent
REPORT NO. : PD-192-91 PAGE 9
from the proposed 51-lot development will likely result
in long term nitrate levels that exceed the provincial
drinking water objective. " It was recommended by the
consultant that the development be limited to a maximum
of 45 residential units .
7 .4 . 3 In summary, the recommendations made in the report
were:
private wells should consist of drilled and
screened wells completed to a depth of at least
30m to reach the defined main water bearing
formation
grouting or other suitable sealing of the annular
space to a depth of at least 3m would assist in
protecting the wells from surficial sources of
contamination
long term effluent levels from private waste
disposal systems will likely exceed the provincial
drinking water standards for nitrates and
therefore, the proposed number of residential lots
should be reduced to 45 lots
7 .5 Supplementary Report Groundwater Availability Study
7 .5 . 1 This report supplements an earlier hydrogeologic study
conducted by Gibson & Associates Ltd. Based on their
findings the consultant recommended that each lot in
the development be serviced by a drilled well
penetrating into the deep aquifer. The best suited
aquifer is the "granular water bearing zone(s) in the
deep overburden at approximately 155 metres above mean
sea level ( 155 amsl) . " The report noted that the water
quality of the deeper aquifer meets the Provincial
Drinking Water Objectives .
7 .6 Justification Report Pursuant to the Foodland
Guidelines
_ F �1
REPORT NO. : PD-192-91 PAGE 10
7 . 6 . 1 The applicant submitted a study conducted by Conroy
Dowson Planning Consultants Inc . , to justify the use of
agricultural land for purposes other than agriculture
as required by Section 3. 14 of the Food Land
Guidelines .
7 . 6 . 2 The consultant makes reference to Official Plan
policies regarding hamlets for infilling and hamlets
for growth. The consultant states that "it is implied
that when options for infilling are either not
available or limited, consideration will be given to
proposals for a Hamlet for Growth. " The Westlake
development would result in a total of approximately
150 residential units for the hamlet, which is the
maximum number of lots generally permitted by the
Official Plan for 'Hamlets for Growth. "
7 .6 . 3 The consultant notes that the Town of Newcastle and the
Region of Durham envision major increases in the
planned population. The Town's population is projected
to increase to 110,000 persons by the year 2005 and the
Westlake proposal provides for additional yet limited
housing opportunities in a hamlet setting. It is
stated that "forty-five -lots (approximately 171
population) as a percentage of planned growth of 110,000
is negligible (approximately 1/10 of 1 percent) " . It
is further noted that the consultant projects
population for Solina as a Hamlet for Growth at 570 .
7 .6 .4 The report states that there are 105 existing and
potential residential lots within the existing
boundaries of the Hamlet of Solina, including 8 vacant
lots and 12 possible new lots on 25 acres presently
designated for infill. The addition of the Westlake
_. t {
REPORT NO. : PD-192-91 PAGE 11
lands would result in a total of 150 homes . It is
indicated that the development of the Westlake lands
would provide a competitive option to the 8 existing
undeveloped lots. The argument is also presented that
the proposed subdivision would "not unduly or adversely
affect the character of the Hamlet of Solina. "
7 . 6 .5 The consultant also states that there are no
alternative locations of lower agricultural capability
lands on the boundaries of Solina. He considers the
location of the proposed development to be the least
detrimental to continuing agricultural activity in the
area.
8. PUBLIC MEETING AND RESPONSE
8 . 1 Public Notice
8 . 1 . 1 In accordance with the Town's procedures and the
requirements of the Planning Act, it is necessary for
the Town to hold a public meeting concerning the
application. A public meeting was held on September 5,
1989, at 6:00 p.m. The appropriate signage
acknowledging the application was installed on the
subject lands, and written notice was circulated to
property owners within 120 metres of the subject site.
8. 1.2 Due to a technical error in the first public meeting
notice, which listed the correct date, but the
incorrect day of the week, it is necessary to hold a
second public meeting. Thus, in order to have a second
public meeting, appropriate signage has been installed
and a written notice has once again been circulated to
property owners within 120 metres of the subject site.
REPORT NO. : PD-192-91 PAGE 12
8 .2 Public Meeting Comments
8 .2 . 1 Two citizens, (one appearing on behalf of his family
and neighbours) appeared at the public meeting on
September 5, 1989 and raised objections over the
proposed application. The concerns of the citizens
were that the application would: set a negative
precedent, create water problems and hazardous traffic
conditions . In addition, the citizens felt that the
Town would be better advised to encourage industrial
development in the Town rather than residential
development, since industrial development would
generate more revenue for the Town.
8.2 .2 One citizen appeared on behalf of five residents and
stated that they were in support of the application.
This citizen stated that they lived directly across the
street from the proposed site and that residents had
never encountered problems with water. The person
noted that surrounding agricultural lands had not been
used for farming and therefore should be used for
residential purposes. The final comment was that
additional homes in the Hamlet would create a greater
tax revenue base for the municipality.
8 . 3 Written Submissions
8.3 . 1 Approximately twenty-two (22) citizens raised concerns
in four letters and one petition. Their concerns were
as follows:
the proposed development is not warranted, in that
many acres of residentially designated lands have
not been developed;
new residents do not participate in the already
established community;
- 15 46
.J t
REPORT NO. : PD-192-91 PAGE 13
- an increase in the population would result in the
loss of "community spirit" or "togetherness" ;
- increased vehicular traffic could pose safety
problems for people using the park and playground;
- the proposed development will eliminate prime
agricultural lands;
- a burden will be placed on the existing schools;
- development of industrial areas should be promoted
rather than residential areas;
- the proposed development will place a burden on
local water supplies
- the proposed development will cause a potentially
negative impact on the low-lying areas
9. AGENCY COMMENTS
9 . 1 The subject applications were circulated by the Region and
the Town Planning Departments to various agencies for
comment. The following agencies/departments offered no
objection to the principle of this development, but have
offered conditions for draft approval:
Town of Newcastle Community Services Department
Town of Newcastle Public Works Department
Ontario Hydro
Separate School Board
9 .2 The Public School Board stated that they had some concerns.
The Board "requires that the development agreement include a
clause that the developer is to be responsible for advising
parents of school-age children of
the Board's busing policy" . It was noted that the students
generated by this development could be accommodated.
9 . 3 The Town of Newcastle Fire Department stated that the site
falls within the recognized response area of Station No. 5
F l�
REPORT NO. : PD-192-91 PAGE 14
on Concession Road # 8 . The site is not serviced by
municipal water and therefore, water for firefighting
purposes must be supplied by Fire Department tanker trucks.
9 .4 The Central Lake Ontario Conservation Authority reviewed the
revised submission and noted the following concerns:
i) The floodplain study of the tributary indicates that
portions of lots 1, 2, and 43 as well as Block 52 and
the southern access road to Solina Road are flood
prone.
ii) The proposed relocation of the watercourse into Block
52 is generally acceptable to staff, however, it has
yet to be determined if the floodplain of the diverted
stream will be fully contained with the 'open space' block.
iii) The Authority asks that until the floodplain area of
the proposed diversion channel is combined to block 52,
and the channelization is carried out satisfactorily,
the lot boundaries and road alignment in the southern-
most portion of the plan must be considered flexible.
iv) The Authority does not foresee any benefits of routing
the natural baseflow of a perennial headwater stream
through the proposed on-stream pond in block 52 .
9 .5 Regional Planning has advised the applicant that "all
applications must have regard for the Provincial Policy
Statement on Land Use Planning for Housing, which came into
effect on August 1, 1989 . " The Region has requested the
applicant to provide supportive documentation demonstrating
how this application would meet the Provincial Policy
Statement with respect to the Region of Durham.
9. 6 Regional Works Department has no objection to the
application, but has noted that municipal water supply and
sanitary sewer services are not available to the subject
land and consequently, the proposed residential development
has to proceed with private services .
REPORT NO. : PD-192-91 PAGE 15
9 . 7 The Public Health Department had originally withheld
approval of the application because:
i) Subdivision proposal is unsuitable due to a high
nitrate concentration (over provincial standard) from
private sewage disposal .
ii) The area 200m from the south lot line is unsuitable due
to a high water table and poor drainage.
iii) The remaining part of the subdivision is sloped to the
south and the individual sewage flows will inevitably
contaminate ground water and possible water supplies
down-gradient of the sewage systems .
The applicant subsequently hired a consultant to do
supplementary soil explorations . The Regional Health
Services Department advised the applicant that a number of
conditions must be met prior to the release of the plan for
registration. The conditions include:
i) That the owner satisfy the requirements of the Regional
Health Services Department, financial and otherwise,
regarding the provision of subsurface sewage disposal
systems and drilled wells . The implementation of this
condition may involve the inclusion of appropriate
provisions in the Regional Subdivision Agreement.
ii) Compliance with all recommendations established by
Gibson & Associates Ltd. report, Project No. F-591,
April 1989 . (Refer to Section 7 .4 . 3 for a summary. )
9 . 8 The Ministry of the Environment (MOE) has stated that an
adequate supply of potable water is obtainable from the
wells drilled in the deeper aquifer. However, one of the
test wells has minor bacteriological levels which will need
to be treated by chlorination. In addition, the MOE has
noted that the wells should be grouted to a level below the
shallow aquifer as the aquifer is a possible source of
contamination. In summary, the MOE stated that "provided
the wells are drilled and not bored or dug, [and] the wells
9
REPORT NO. : PD-192-91 PAGE 16
are constructed as per the recommendations of the
hydrogeological report and our office, we have no objection
to draft approval of the above application subject" to a
number of conditions .
9 . 9 Originally the Ministry of Agriculture and Food would not
support the application until they had received sufficient
justification for using the land for other than agricultural
purposes as required by Section 3. 14 of the Food Land
Guidelines . The applicant submitted a study by Conroy
Dowson Planning Consultants Inc . , to justify the proposed
expansion of Solina.
In its response to the report, the Ministry of Agriculture
and Food noted the central issue of this application is the
amount or size of expansion to be permitted within Solina.
The Ministry notes that most of the soils in this area of
Newcastle are prime agricultural land (Class 1,2, 3, & 4) and
consequently, any expansion of the Hamlet would reduce the
agricultural land base and may impact on adjacent
agricultural uses . Furthermore, the Ministry stated that
the Hamlet should be developed in a compact manner to reduce
the length of the agriculture Hamlet boundary.
9. 10 The Ministry of Natural Resources noted that:
i) Despite the special precautions proposed such as major
evacuation and grading works, there is still a high
potential for downstream environmental damage due to
sedimentation. It is recommended that the online pond
be discouraged.
ii) Combined water quality/quantity facilities should be
discouraged since they are considered relatively
ineffective in controlling water quality.
_f
REPORT NO. : PD-192-91 PAGE 17
iii) Alternative techniques for water quality control should
be investigated. Infiltration techniques are preferred
over other best management practices. If best
management practices are used, it is necessary that the
feasibility of implementing infiltration measures be
fully assessed and documented.
iv) If soil conditions are suitable for infiltration, it is
necessary to do an assessment of potential groundwater
impacts . If the soil is not suitable then extended
detention ponds will need to be used to treat
stormwater runoff quality and alternative strategies
that address the thermal impacts of development should
be studied. It is also suggested that a tree planting
program be considered to minimize light penetration and
heating of base flows and groundwater.
v) It is recommended that extended detention ponds with an
artificial marsh component be used.
9 . 11 The Ministry of Transportation has indicated that they would
have no objection to the proposal provided it is carried out
in phases . The second phase of the proposal, which occupies
the northern one-third of the site, would be subject to a
formal review once the final alignment for Highway 407 is
known. Staff note that the preferred alignment subsequently
identified by the Ministry of Transportation runs to the
south of the hamlet.
10. COMMENTS
10. 1 A review of the comments received indicates that the
concerns of most of the technical agencies have been
resolved, although there is still some concern with the
proposed stormwater detention pond at the south end of
the site. However, these specific details regarding
site development are appropriately dealt with through
the rezoning and subdivision review process .
10. 2 A number of issues need to be considered in the review
of the subject official plan amendment application.
REPORT NO. : PD-192-91 PAGE 18
These issues are discussed in detail below, with
specific reference to the conclusions of the
justification report submitted by the applicant
pursuant to the Food Land Guidelines.
10. 3 Need for additional residential land
10 . 3 . 1 In the justification report, the consultant states that
the proposed development of 45 residential lots on the
Westlake lands is negligible in terms of the projected
future population for the entire Town of Newcastle.
The consultant also implied that the policies of the
Durham Regional Official Plan promote the consideration
of proposals for redesignating a hamlet to a 'Hamlet
for Growth' when options for infilling are either not
available or are limited.
10 . 3 .2 Staff note that it is misleading to evaluate additional
residential growth in a hamlet in the context of growth
for the entire Town. Hamlets such as Solina are much
more sensitive to the effects of additional development
due to their small size and possible limitations on
water supply and sewage disposal. Therefore, the
justification for the additional residential lands must
be provided in the context of the hamlet itself.
10. 3 . 3 The modifications to the Hamlet policies in the Town's
Official Plan as approved by Council in November 1990,
indicated a maximum of 110 residential units for the
Hamlet of Solina. The justification report indicates
that there are only 81 existing homes in the Hamlet,
which represents only 74% of the planned capacity of
the Hamlet. In particular, there is currently no active
development application for the 'Residential Expansion'
area in the southwest quadrant of the hamlet. In this
REPORT NO. : PD-192-91 PAGE 19
regard, there would appear to be no justification for
designating additional residential lands in Solina.
10. 3.4 Staff also disagree with the consultants interpretation
that the policies of the Regional Plan encourage
redesignating hamlets as 'Hamlets for Growth' . Rather,
the Plan specifically states that any application to
permit additional expansion in hamlets shall be
considered on its own merits and subject to a number of
considerations . No broad based rationale has been
provided by the applicant which would appear to justify
the redesignation of Solina as a 'Hamlet for Growth' .
10.4 Character of Solina
10 .4 . 1 Staff disagrees with the consultant's conclusion that
the approval of this application would not unduly or
adversely affect the character of the Hamlet. The
creation of the 40 new residential lots would represent
a 50% increase in the existing number of homes in the
hamlet, and a 35% increase over the planned population
of the hamlet. As well, it is anticipated that
approval of this application would set a precedent and
inevitably lead to more development on the east side of
the road outside of the Hamlet boundary. These lands
consist of are smaller lots varying between 5 and 20
acres and could successfully be considered to round-
out or balance the hamlet boundries . This in turn
would result in an almost doubling of the current
population of Solina.
10. 5 Impact of Agricultural Land
10 .5 . 1 The detailed survey conducted by the consultant
indicates that most of the site is Class 3 lands which
have moderately severe limitations that restrict the
REPORT NO. : PD-192-91 PAGE 20
range of crops or require special conservation
practices . However, the Canada Land Inventory Soil
Capability for Agriculture Map designates 80% of the
map area that encloses the site as being Class 1 lands
(no significant limitation to crop use) and 20% as
Class 4 lands (severe limitations restricting the range
of crops) .
10 .5 .2 Despite the disagreement over the classification of the
soils, Planning Staff are convinced that the
maintenance of agriculture lands within agriculture
areas, whether it be on intermediate or good soils, is
very important to the maintenance of the 'integrity' of
the agricultural land base.
10. 5 . 3 In addition, although the Ministry of Agriculture and
Food has not formally objected to this application,
they expressed a concern that any expansion of the
Hamlet would reduce the agriculture land base and
potentially impact on adjacent agricultural uses . They
have indicated that the hamlet should be developed in a
compact manner to reduce the length of the
agricultural/hamlet boundary.
10.5.4 As such, Planning Staff is particularly concerned that
the proposed development will not be done in a compact
manner and in fact represents a greater impact on
agricultural land than is represented by this
application. As noted, approval of this application
will likely set a precedent and lead to development on
the east side of the boundary. Consequently, a total
of approximately 100 acres, most of which is currently
used for agricultural purposes, would be added to the
Hamlet. Moreover, the various impacts of residential
i
REPORT NO. : PD-192-91 PAGE 21
development would be increased by the extended
perimeter of the hamlet on surrounding agricultural
land.
11. CONCLUSIONS
11. 1 The issues related to this application are significant and
cannot be viewed as a small incremental change to the Hamlet
of Solina. The consideration of this site requires
fundamental decisions about the scale and direction of
growth for the Hamlet of Solina. It is staff's opinion that
a substantive rationale for Solina as a 'Hamlet for Growth'
has not been provided by the applicant.
Respectfully Submitted, Recommended for presentation
to the Committee
Franklin Wu, M.C. I .P. Lawrence( Kotseff
Director of Planning Chief A istrative Officer
and Development
TH*DC*FW*df
27 August 1991
Attach No. l - Plan of Subdivision
Attach No.2 - Key Map
INTERESTED PARTIES TO BE NOTIFIED OF COMMITTEE AND COUNCIL'S
DECISION:
821010 Ontario Limited Janet Bennett-Cox
Attention: Bruce Rondeau 106 Fallingbrook St.
278 Union Avenue Whitby, Ontario
PRINCE ALBERT, Ontario L1R 1X1
LOB 1PO
Vella and Dalrymple Tim Sawyer
Barristers & Solicitors Group 2, Box 9
P.O. Box 2247 Hampton, Ontario
187 King Street East LOB 1JO
OSHAWA, Ontario
L1H 7V5
REPORT NO. : PD-192-91 PAGE 22
George Vetzal Mr. Wm. G. Grant
6489 Solina Road North R.R. # 1
R.R. # 1 Hampton, Ontario
Hampton, Ontario LOB 1J0
LOB 1JO
Viola Ashton Bruce Taylor
6092 Solina Road R.R. # 1
R.R. # 1 Enniskillen, Ontario
Hampton, Ontario LOB 1HO
LOB 1J0
Paul Smith F. Westlake
Group 2, Box 36 R.R. #1
R.R. # 1 Hampton, Ontario
Hampton, Ontario LOB 1JO
LOB 1JO
'Lisa and Milt Robinson
Robinbrae Farms
R.R. #1
Hampton, Ontario
LOB 1JO
T DATE No ISSUE In:
IsiDUn t FOR Mue APPaovAt �
OMAT 7'fl 2 "At"URIT R�
Z
r>�
n�
W
s
c�
_ - zz, I
`---- WA AL
\ \
ar
LOCK 42 ilI I -
I(OTURC DEW t c O :�� .
r•
- -\
HIT \ \ LT
J M+r r>T t
1 c
WE Na. ecwslON R
_ a /
w
MA ♦•♦♦ ;I I'i ALL KfASURCNCNTSMVST K CMCCxCt
AND VONS ICD AND ALL ERRTED OR
•_-x� �� wl> ' _ _ • •_- OMISSIONS DIY.LL/C REPORTED
TO THE ARCNIT[CT PRIOR TO PRO-
(�[\�>�' 1 [1—TI OT"BLAHS—IPCCICIC
�
T10MS MC TK MIYCMTr TV'tN
\v♦ S - 1 — ARCM rCCTS MD MKT IC Kti RM
AT COPPLETIO"Of THE vORM
\ IIINNN • : W ,IMI D—M S 1.NOT PC USED I
♦1-1i C '"�; 1 II — W _1 CONSTRUCTION PURPOSES UNTIL
U VT C D VJ < IT IS SIGHED IT THE APCNIT[CT
I txiisr, or RECORD
♦
LEGEND J.R. R. BRUYNSON INC.
ARCII[[ICT-CON/ULTIN O IN OINII
DRILLED WELL pRP->a mcot MRlr 1.
/ DIRECTION OF DRAINAGE >�Mmti>=%T�%w����aa-a•
Op LOT GRADING PATTERN TYPE WFSTLAKEASUDDIVISIO'
216M RESERVE BED MIN. SITE PLAID
216M TILE BED MIN.
15M MANTLE $i EL['�'AR yi yin R>DTt
tr I[YI n0.
CHECK PRry
NCCM[p DY RVl
Attachment No. 2
® SUBJECT SITE
A- 1
A- 1 0 A- i
co
Z � Z
J O
LOT 26 LOT 2 ° LOT 24
/� --- - to
Al
w
0
EP v
HAMLET
BOUNDARY
EP
RH
RH
R
CONCESSION ROAD 6
0 so m moo 300r,
KEG( MAP
Dev. 89-55 18T-89038
�� C)
U.P.A.- 89-042/D/N ._.