Loading...
HomeMy WebLinkAbout2013-070 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY-LAW 2013-070 Being a by-law to amend By-law 2006-105 to regulate the construction of driveway entrances upon the highways under the jurisdiction of the Municipality of Clarington WHEREAS the Council of the Municipality of Clarington has approved the recommendations contained in Report EGD-022-13; NOW THEREFORE THE COUNCIL OF THE COPROATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS: 1. THAT By-law 2006-105 be amended by deleting Schedule "A" and replacing it with Schedule "A" attached hereto. By-law passed in open session this 2nd day of July, 2013. Adrian Foster, Mayor a ti L arrie, Municipal Clerk Schedule "A" PAYABLE TO THE DRIVEWAY ENTRANCE TYPE MUNICIPALITY OF CLARINGTON Inspection Fee $75.00 1. 7 m —400 mm pipe $1800.00 (replacing 15" x 24' 2. 7 m —450 mm pipe $1900.00 (replacing 18" x 24' 3. 7 m — 600 mm pipe $2000.00 (replacing 24" x 24' 4. Entrance — No Culvert Time and materials + 35% minimum charge $200.00 5. Entrance — Extension Time and materials + 35% minimum charge $200.00 6. Entrance — Relocation Time and materials + 35% minimum charge $200.00) 7. Entrance —Temporary Time and materials + 35% minimum charge $200.00 8. Curb Cutting $30.00/m (minimum charge $125.00 per cut) Notes: All "Time and materials + 35%" works will be estimated by the Director of Operations or his designated representative. The estimated sum must be paid to the Municipality prior to the approval of the Application for Property Access and or the commencement of works.