HomeMy WebLinkAbout2013-070 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2013-070
Being a by-law to amend By-law 2006-105 to regulate the construction of
driveway entrances upon the highways under the jurisdiction of the
Municipality of Clarington
WHEREAS the Council of the Municipality of Clarington has approved the
recommendations contained in Report EGD-022-13;
NOW THEREFORE THE COUNCIL OF THE COPROATION OF THE
MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS FOLLOWS:
1. THAT By-law 2006-105 be amended by deleting Schedule "A" and
replacing it with Schedule "A" attached hereto.
By-law passed in open session this 2nd day of July, 2013.
Adrian Foster, Mayor
a ti L arrie, Municipal Clerk
Schedule "A"
PAYABLE TO THE
DRIVEWAY ENTRANCE TYPE MUNICIPALITY OF CLARINGTON
Inspection Fee $75.00
1. 7 m —400 mm pipe $1800.00
(replacing 15" x 24'
2. 7 m —450 mm pipe $1900.00
(replacing 18" x 24'
3. 7 m — 600 mm pipe $2000.00
(replacing 24" x 24'
4. Entrance — No Culvert Time and materials + 35%
minimum charge $200.00
5. Entrance — Extension Time and materials + 35%
minimum charge $200.00
6. Entrance — Relocation Time and materials + 35%
minimum charge $200.00)
7. Entrance —Temporary Time and materials + 35%
minimum charge $200.00
8. Curb Cutting $30.00/m
(minimum charge $125.00 per cut)
Notes:
All "Time and materials + 35%" works will be estimated by the Director of
Operations or his designated representative. The estimated sum must be paid to
the Municipality prior to the approval of the Application for Property Access and
or the commencement of works.