HomeMy WebLinkAboutPD-160-89WOMEN �*$
TOWN OF NEWCASTLE
REPORT File # (,o
Res. #
By-Law #
MEETING: General Purpose and Administration Committee
DATE: Monday July 3, 1989
REPORT #: PD-160-89 FILE #: OP 3.4
SUBJECT: HAMPTON SECONDARY PLAN
FILE: OP 3.4
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
1. THAT Report PD-160-89 be received;
2. THAT the final report on the Hamlet of Hampton Secondary Plan prepared by
Proctor and Redfern be received;
3. THAT the Region of Durham be requested to amend the Town of Newcastle
Official Plan to incorporate the Hampton Secondary Plan and supporting
planning policies, as indicated by the proposed amendment attached hereto;
and
4. THAT Report PD-160-89 be forwarded to the Region of Durham.
1. BACKGROUND
1.1 The consulting firm, Proctor and Redfern was retained by the Town to
prepare Secondary Plans for the hamlets of Hampton and Orono. The
Consultant's Background Report on the Hampton Secondary Plan noted
REPORT NO.: PD- 160 -89
tl
existing problems with high water table and soil and well pollution in
Hampton and suggested a 'slow growth' approach for the Hamlet. To
accommodate growth pressures in the short term, the proposed Land Use
Plan allocated 64 lots over the next 5 to 10 years. A further 190 lots
were proposed in 'Long Term Residential Expansion Areas' to accommodate
growth to the year of 2011. However, the consultant suggested that,
prior to these areas being developed, Hampton would need to be upgraded
to a 'Hamlet for Growth', and detailed bydrogeological studies
undertaken to address existing servicing problems.
1.2 The Public had an opportunity to review and submit comments on the
Hampton Secondary Plan as prepared by Procter and Redfern at an Open
House held on January 25, 1989.
1.3 As part of the Hampton Secondary Plan Study, Procter and Redfern
contacted various agencies for comment on the proposed plan for the
Hamlet. The Region of Durham Works Department indicated that even minor
expansion of the hamlet should not proceed until a detailed study on
ground water and soil pollution has been completed. It was further
suggested that the Town should apply to the Ministry of the Environment
for funding through the Direct Grant Program to correct the existing
problems.
1.4 On April 24, 1989, Newcastle Council adopted the following resolution:
"THAT the Region of Durham be requested to initiate a Preliminary Well
Contamination Survey for Hampton pursuant to Section 10.4.2.7 of the
Durham Regional Official Plan with a view to participating in the
Ministry of the Environment's Direct Grant Program and designating
Hampton as a 'Hamlet for Growth'; and
THAT until the preliminary Well Contamination Survey for Hampton is
completed, Staff be authorized to proceed to finalize the Hampton
Secondary Plan for Hampton on the basis of minor infilling only"
1.5 Proctor and Redfern has now finalized the Hampton Secondary Plan on the
basis of minor infilling only. The Plan would therefore maintain
Hampton's current status pending completion of the necessary
hydrogeological studies and the development of a servicing strategy for
hamlets through the Region's Hamlet Servicing Study.
r' 7 /1
JJU
...3
REPORT NO.: PD-160-89 PAGE 3
Copies of Proctor & Redfern's final report on the Hampton Secondary Plan
have been circulated to each of the Committee members under separate
cover.
1.6 Given the constraints on development in Hampton, the revised Hampton
Secondary Plan as prepared by Proctor and Redfern is also being
recommended by Staff for adoption as the Land Use Schedule for Hampton in
the Town's Official Plan.
1.7 Notice of Public Meeting for the proposed Hampton Secondary Plan was
advertised in the Bowmanville Statesman/Newcastle Independent and Oshawa
Times and further circulated to residents who made submissions at the
Public Open House.
2. PROPOSED HAMPTON SECONDARY PLAN
2.1 The Land Use Schedule for Hampton as proposed by Proctor and Redfern (see
attached) differs from the previous plan presented at the Public Open
House in a number of respects. However, the most significant revision
involves the deletion of the 'Areas for Expansion' and the appropriate
adjustments to the hamlet boundaries.
2.2 Staff is also recommending that specific land use policies for Hampton
be incorporated into Section 9 (Hamlets) of the Town's Official Plan.
These policies, also attached hereto, together with the Land Use
Schedule, are intended to guide development and provide the Town with a
planning policy framework for Hampton pending the outcome of the various
studies being proposed.
2.3 The recommended Land Use Schedule and policies respect the existing
policy framework for Hampton. No amendment to the Regional Official Plan
would be required to implement the restricted growth scenario being
MEMO=
r 7 1
DD I
...4
REPORT 00^: pD-160-89 PAGE 4
_______________________________________________________________________________
2.4 There are two development applications currently being considered by the
Town which are directly affected by the Hampton Secondary Plan. These
are as follows:
- Official Plan Amendment Application 86-85/D/0 and Subdivision
Application I8T 86059 submitted by Waverly Belobto Subdivision
(Oshawa) Ltd. proposes to develop 37 single family lots on a 20.15
hectare parcel onthe north side of Ormieton8treet. The site lies
outside the Hamlet boundaries as indicated on the proposed Land Use
Schedule. This DcolxooaI is dealt with individually in m separate
Staff Report also being considered by Committee today.
- Rezoning Application DEV89-2lsubmitted by Sam Mastrangelo proposes
to develop a nine (9) store commercial plaza on a 0.93 hectare site at
the northeast oncoer of Taunton Road and Kim] Street. The site is
designated 'Residential IufiIliug' by the proposed Land Use Schedule.
Staff have not yet finalized the processing of this application.
3. PUBLIC SUBMISSIONS
3.1 & total of 36 residents and landowners submitted comments on the Hampton
Secondary Plan at the Public Open House and in letters submitted
directly to the Planning Department. The possible contamination of well
water and oogpIv disruptions as the result of new development was the
concern most frequently cited by residents. A number of residents also
suggested that mooioigmI water be provided to deal with existing well _
contamination problems. Concerns that existing storm drainage problems
in the hamlet would be aggravated by new development were also noted.
The 'no-growth' option for Hampton being proposed through the Secondary
Plan and the supporting policies recognizes the residents, concerns with
respect to the impact of new development on existing wells and storm
drainage. Development will be restricted to minor iofilIiog only
pending the completion of the various studies intended to identify
solutions to the existing servicing problems in Hampton.
3.2 Many residents also expressed concerns with the impact of large scale
new development on the Hamlet of Hampton itself. Loss of the peaceful
community '��c��i��t������io��l'
�
JJL
increased traffic and further deterioration of roads were noted.
fDE90BT N3.: PD-160-89 PAGE 5
------------------------------------------------------------------------------
Inasmuch asa'no growth' scenario isbeing proposed for Hampton pending
completion of the various studies, the impacts of new development on the
hamlet will not be an immediate concern for existing residents. If at
such time as Hampton is upgraded to a 'Hamlet for Growth`, many of these
impacts can be minimized through the staging of development and
contributions from developers for road improvements. With respect to
over-crowding at the existing Hampton School, the Public GcbnoI Board has
acknowledged that the present facilities are presently at capacity. The
Board further notes that expansion of hamlets provides the Board with a
more stable student population in Hamlet areas.
3.3 A number of submissions made by landowners within and adjacent to the
proposed hamlet boundaries requested that additional lands be
incorporated into hamlet boundary. They stated that there was a need to
more evenly balance residential development on either side of BovmaoviIIe
Creek' and increased exposure for the hamlet along Taunton Road. As
well, it was suggested that the development of these lands would have
little impact on the existing wells in the hamlet. Owners of the lands
to the east of the proposed Hamlet tmoudoriea associated with the creek
valley expressed the desire to reduce the area indicated as being subject
to development restrictions to allow residential development.
Given the undetermined extent of the existing problems with well
contamination, the high water table and surface drainage problems in
Hampton, it was deemed appropriate to proceed with a 'no growth'
scenario for the hamlet pending completion of the various studies to
resolve these problems. The requests for expansion of the hamlet
boundaries will be dealt with in the context of a subsequent amendment
based on the results of the environmental health and servicing studies.
JJJ
IDC9O8T NO.; PD-160-89
4. CONCLUSIONS AND RECOMMENDATIONS
4.1 The Hampton Secondary Plan has been finalized on the basis of minor
iofilIiug. Policies are proposed which indicate CoouoiI"a desire to
undertake studies to identify solutions to the servicing problems in the
hamlet and designate Hampton as a 'Hamlet for Growth'.
4.2 It is therefore recommended that the Region of Durham be requested to
amend the Town of Newcastle Official Plan to iocozlx)cote the Hampton
Secondary Plan and the supporting policies, as indicated by the proposed
amendment attached hereto.
Respectfully submitted,
Franklin Wu, M.C.I.P.
Director of 9Iaouiog & Development
JAS*[xC*FW*cc
*Attach.
June 23, 1989
Recommended for presentation
to the Committee
!Lawrenc- -----------------
0otseff
Chief AdmInistrative Officer
INTERESTED PARTIES TO BE NOTIFIED OF COUNCIL AND COMMITTEE'S DECISION:
(See attached List)
_ r7x
HAMPTON DEVELOPMENT PLAN REPORT
INTERESTED PARTIES TO BE NOTIFIED OF COUNCIL AND COMMITTEE'S DECISION:
Wayne and Barbara Wells Mr. Joseph Riddle
McCallum Drive General Delivery
Hampton, Ontario Hampton, Ontario
Mr. Raymond Farrow Mr. Hans Haagmans
Box 44 Box 67
Hampton, Ontario Hampton, Ontario
Beth & Jeff Beckell Mr. Chester Borek
R.R. # 5 Box 15,
Oshawa, Ontario Hampton, Ontario
Mrs. Wilma Kanton William & Jennie Marsh
10 Division Street Box 118
Hampton, Ontario Hampton, Ontario
Will & Jill Hambly Mr. Georg Krohn
Temperance Street 50 Temperance St.
Hampton, Ontario Hampton, Ontario
Mr. David Taylor Marie & Michael McCormack
26 Ormiston Street R.R. #1
Hampton, Ontario Hampton, Ontario
Leslie & Michael Karas Rick & Sandra Purrott
Box 187 Group 4, Box 21, R.R. #1
Hampton, Ontario Hampton, Ontario
William & Marilyn James Mr. Robert Simon
6 Haymur Street P.O. Box 201
Cobourg, Ontario Hampton, Ontario
Mr. & Mrs. John Thomas
Mr. Michael Zygocki
P.O. Box 126
Waverly Heights Subdivision
Hampton, Ontario
(Oshawa) Ltd.
378 King Street West
Mr. & Mrs. Gerald Balson
Oshawa, Ontario
Hampton Post Office
Hampton, Ontario
Ms. Sandra Kiy
R.R. #1
Mr. & Mrs. B. Crann
Hampton, Ontario
c/o Mr. T. E. Cieciura
Design Plan Services Inc.
Sam Mastrangelo
385 The West Mall
1920 Stephenson Road N.,
Suite 303
Oshawa, Ontario
Etobicoke, Ontario
Glen & Stuart Glaspell
Mr. Peter Gerrits
1260 Townline Rd. N.,
Gerrits Construction Co. Ltd.
R.R. #5
R.R. #3
Oshawa, Ontario
Bowmanville, Ontario
Mr. Arthur N. Morton
Mrs. Berta Turkocio
Box 52
c/o Mr. Joseph J. Neal
Hampton, Ontario
Barrister & Solicitor
142 Simcoe Street N.,
Ms. Sharon Yarrow
Oshawa, Ontario LlG 4S7
Box 54
Hampton, Ontario
Mrs. John C. Cook
General Delivery
3
Hampton, Ontario
PROPOSED AMENDMENT TO THE TOWN OF NEWCASTLE OFFICIAL PLAN
PURPOSE: The Purpose of the Amendment is to incorporate the Hampton
Secondary 9Iao and supporting planning policies into the Town
of Newcastle Official Plan.
BASIS: The amendment isbased upon adetailed Secondary Plan Study for
the Hamlet of Hampton as permitted by Section 9.1(ii) of the
Town of Newcastle Official Plan.
ACTUAL AMENDMENT: The Town of Newcastle 0f±ioimI Plan is hereby amended
as follows:
I) Section 9.1 (iii) is amended by deleting /9-6' from the
first line and replacing same with 19-71, and by adding the
phrase 19-7 Hampton' to the end of the section;
2) Section 9.2 is amended by adding the following new sub-section:
iii) The Hamlet of Hampton will beconsidered for designation
as a "Hamlet for Growth" only after an investigation of
the existing water and soil pollution problems, the
identification of the solutions to the problems, and a
comprehensive bmdrngeoIogio examination of hamlet area
confirming that additional development will have no
adverse impact on the supply of water or the soil and
groundwater conditions of the Hamlet and ouzcoom]iug
areas.
3) The Hampton Secondary Plan, attached to the Doxeodoxsut as
Schedule "&', is incorporated as Schedule 9-7.
IMPLEMENTATION: The provisions set forth in the Town of Newcastle Official
Plan with respect to implementation, shall apply to this
INTERPRETATION: The provisions set forth in the Town of 0cnvnaatle Official
Plan, as amended regarding the interpretation mf the Plan shall
apply in regard to this Amendment
�JV
Existing Residential
Residential Infilling
LOT 20
LOT 19 LOT 18 LOT 17 LOT 16
I
I
II
®
Community Facility
Community Park
II
II
II
Elementary School
®
Senior Elementary School
Commercial
\ \ \ \\
Utility
Area Subject to
Development Restrictions
®
Possible Access Points
._. I LO
Z
cn
W
0
Z
•::i'k • I o
I
I Ii
� �I •• : ,. • <:�`.• ill
Ill
� `!`i •�`� 1 ' _i, -
� ;.
/`
TAUNTON ROA
REGI
Existing Residential
Residential Infilling
—.—Limit of
Hamlet Secondary Plan
HAMPTON SECONDARY PLAN
SCHEDULE 9 -7
TOWN OF NEWCASTLE OFFICIAL PLAN
0 100 200 300 400m
loom
N
n
m
n
C
r
m
D
Residential Expansion
Conservation Area
®
Community Facility
Community Park
Elementary School
®
Senior Elementary School
Commercial
\ \ \ \\
Utility
Area Subject to
Development Restrictions
®
Possible Access Points
—.—Limit of
Hamlet Secondary Plan
HAMPTON SECONDARY PLAN
SCHEDULE 9 -7
TOWN OF NEWCASTLE OFFICIAL PLAN
0 100 200 300 400m
loom
N
n
m
n
C
r
m
D