Loading...
HomeMy WebLinkAboutPD-76-95DN: SITEPLAN.GTAHE CORPORATION OF THE MUNICIPALITY OF CLARINGTON REPORT Meeting: General Purpose and Administration Committee File # Date: Monday, July 10, 1995 Res. #��� _q��� Report #: PD-76-95 File #: By -law # Subject: SEMI ANNUAL REPORT ON SITE PLAN ACTIVITIES Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PD -76 -95 be received for information. 1. BACKGROUND 1.1 The purpose of this report is to provide Committee a "status information" report with respect to site plan applications that have been submitted for approval. This is an information report which is provided on a semi - annual basis. 1.2 Pursuant to By -law 90 -130, plans and drawings are required to be approved for any building or structure prior to issuance of building permits except for those exceptions set out in the By -law. The same by -law delegates the approval authority to both the Director of Planning and Development and the Director of Public Works. 1.3 Except for additions or minor expansions, a site plan agreement is generally required for a proposed development to ensure the location of all buildings and structures, landscaping, access permits, parking areas, signage and grading etc., will be performed according to the approved plan. In addition, it is through the site plan approval process that the Municipality collects its cash -in -lieu of ....2 556 REPORT NO. PD -76 -95 PAGE 2 parkland dedication, road widening, performance guarantee etc. Each agreement is registered on title and is enforceable against present and future owners. 2. ACTIVITIES 2.1 Attachment #1 details site plan applications received and all site plan agreements approved between January 1, 1995 and June 30, 1995. 2.2 During this period seven (7) site plan applications have been approved for a variety of different uses as shown on Attachment #1, all of which are under construction or have completed construction. 2.3 Attachment #1 also shows Site Plans which completed the approval process in 1994, but are presently still under construction. 2.4 Staff are continuing to work on a number of outstanding files from previous years. The majority of these outstanding files are awaiting action by the applicant or are in circulation to various agencies and departments. Site plan files awaiting information are reviewed regularly by the assigned planner and a letter is sent informing the applicant of the status of the file. Respectfully submitted, Franklin Wu, M.C.I.P. Director of Planning and Development SL *FW *cc Attachment #1 - Site Plan Table June 30, 1995 Reviewed by, W. H. Stockwell Chief Administrative Officer c� r�; PLAN ACTIVITY FROM JANUARY 1, 1995 TO JUNE 30. 1995 ZWkti Dec. 19, 1994 1 In Apr. 7, 1995 Jun. 2, 1995 1 Bldg Permit June 16, 1995 I Blda Permit Dec. 5, 1994 1 No permit 1995 I CO MPLETE , 1994 JCOMPL ETE 1995 1COMPLETE 94 -005 Willsonia Lot 16, Con 1, Hwy # 2 both in circulation 94 -007 Tim Horton s/Wend s Y Lot 14, BFC, Baseline Rd both APPROVED 94 ;�35 Hallmarkhofiopas# ......: X85 eke St ,oWrnatiariile antendmert APPf1i71/EFJ 94 -039 Tzioumic & Papapetrou (commercial plaza) 20 King St. E, Bowmanville both appealed to OMB 94 040 Martin Road Holdings (Medical Centre) 1 Hartwell Blvd. both in circulation 9448 psvVenda llvesfi;neniscaTrtnercTa# plazaj....... 14317uke Street axnedrneht.waw#rhg ap#on by aj 94 -049 Willsam Holdings Inc. (storage building) 211 Baseline Rd E both APPROVED 94 063 Seniors Apts and Drop In Centre 63 Temperance St both awaiting drawings 95 0 E39 Cnadian.refrp ....seasonal garden cetflre ..... Ha:..: ....... entiin fi ., awa#€R acfon tay:aj 95 -027 Terry Klawitter — car wash 146 Liberty St. South plans only P in circulation 95 029 Canada Trust 184 Km Street East 9 both in circulation 95 ;q30 Nod P1arSchool board new elementary sehaal site. Wesiside bttve Mans only: �n circulation 95 -031 L & L Tool Inc. (industrial addition) 248 Simpson Avenue amendment APPROVED 95- 032 Busy Bee Car Wash 380 Baseline Rd amendment in circulation 95 :033 iavrmanvrlle i }gh. Sphaot;.,... ltbelty ^ a►ner�drnetlfi �rfi ciarttatron 95 -037 PVNC Sep. School Board — St. Stephen's Elementary ., 80 Rhonda Boulevard amendment in circulation 95 -038 PVNC Se . School Board — St. Joseph's School 90 Parkway Crescent amendment in circulation CO URTI CE 94 -054 Roth Construction (gas bar, kiosk, conv. com., restaur.) Courtice Rd, Lot 28, Con 2 both awaiting OPA & ZBA 94-056 WDM Consultants (medical centre) Trulls Rd both awaiting action by aK 94 D58 K. Kiddreotp tnvestmegts L#tl (t�iantucket 28t>4'Conce Rd. , both under revason,isyaljl Cry ; 94 -064 Consultants — retail plaza .... Lot 30, Con 3, Darling both in circulation C 95-011 Midwalsh Developments Ltd. plaza Lot 35, Con 2 Hwy # 2 amendment APPROVED CC, PVNC 5 School €Board : :.:Mother Teresa _ <€ 7g.ienabbe «lioad aendrrreit ... rn circulation VILLAGE 94 -044 PVNC Sep. School Board — St. Francis of Assissi 200 Highway No. 2 amendment await. info from Appl. 95 -022 1 Northumberland/Clarington Board of Education 385 Beaver Street Plans only in circulation RURAL — DARLINGTON 94 -055 P I Tool Limited (industrial building) 1 Progress Drive plans only APPROVED 94 -061 Crooked Creek Golf Club 3033 Townline Rd both awaiting OPA 95. :: 403 Pawa Wgoq .......:::.:.......:. .::..::..:..:.:..:.:.:........: m. APP1�t7V1~b....::... :; 95 -014 Oshawa Wood Products flea market 1696 Bloor St Darlin on ,nt.ofily.:.::.::.. plans only APPROVED RURAL — CLARKE 94 -013 Humphrey —drive thru donuts 3393 Hwy 115 both APPROVED 94 -014 Coffee Time Donuts 8848 H y115 !!!!1!........... both APPROVED f? f afarge Canada ..... :::Boun FarY'Rd......:: aofh. : < >:.. <:':;':;: awaittn a>✓lian:b ::a . 95 -006 1081799 Ont Inc —Esso gas bar, garage & coffee shop Lot 24, Con 8, Hwy 115 both in circulation 95-008 Tim Horton's Lot 28, Con 3 Hwy 115/35 amendment in circulation 95 034........ APPR 95 -035 RaNirn r:cn4rc — 1kAini­4r .... {T..�.........+.,a'..... oncn u:_�..._.. .n. .. ....... ....... .......: ....::.� ZWkti Dec. 19, 1994 1 In Apr. 7, 1995 Jun. 2, 1995 1 Bldg Permit June 16, 1995 I Blda Permit Dec. 5, 1994 1 No permit 1995 I CO MPLETE , 1994 JCOMPL ETE 1995 1COMPLETE