Loading...
HomeMy WebLinkAboutCOD-015-13 Clarington REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: May 6, 2013 Resolution#: By-law#: Report#: COD-015-13 File#: Subject: REQUEST FOR PROPOSAL RFP2013-4, ARCHITECTURAL SERVICES — CLARINGTON FITNESS CENTRE RENOVATION RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-015-13 be received; 2. THAT Barry*Bryan &Associates, Ontario, with a total bid in the amount of $201,942.72 (net of H.S.T. Rebate), being the highest ranked proposal meeting all terms, conditions and specifications of RFP2013-4 be awarded the contract for the provision of Architectural Services for the Renovation of Clarington Fitness Centre, as required by the Municipality of Clarington, Community Services Department; 3. THAT the funds required in the amount of $201,942.72 (which includes Architectural design, specifications for tender, contract administration and disbursements and net HST rebate) be drawn from the following Community Services Department Capital Account: Account: 110-42-421-84203-7401 .....................................................................$201,942.72 Submitted by. .� °-�, ' axe w Reviewed by: � Marie Marano, H.B.Sc., Franklin Wu, Director of Corpor to Services Chief Administrative Officer Nancy T ylorBA, CPA CA Director of Finance/Treasurer MM\JDB\sm CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: COD-015-13 PAGE 2 1. BACKGROUND 1.1 Request for Proposal specifications were provided by Community Services Department. Request for Proposal RFP2013-4 Architectural Services — Renovations at Clarington Fitness Centre was advertised electronically on the municipal website and the Ontario Public Buyers website. Forty-one (41) firms downloaded or picked up the specifications. 1.2 Subsequently, twelve (12) proposals were received and evaluated. Refer to Attachment#1 for the list of proponents who responded to the RFP. 2. ANALYSIS 2.1 Twelve submissions were received. All proposals met the bid submission requirements and were evaluated based on company background, references, pricing/cost, staff qualifications and experience, quality of submission, project deliverable and value added services. 2.2 The proposals were reviewed and ranked by staff members from Community Services and Corporate Services. The criteria was ranked accordingly on a scale from one (poor) to five (excellent) consistent with the RFP guidelines. 2.3 Four bidders with the highest ranked written proposals, AECOM Canada Architects Ltd., Whitby; +VG Architects, Toronto; Barry*Bryan Associates (1991) Ltd, Whitby; and Teeple Architects/Nick Swerdfeger Architects, Toronto were short listed and made a presentation to the Evaluation Team on their understanding and approach to the project. The presentations were evaluated based on ability to communicate, overall impression of the presentation, attention to concerns/questions, their understanding of the requirements and identification of practical solutions. 2.4 The highest ranked consultant is the Barry*Bryan Associates (1991) Ltd, Whitby, Ontario. They have completed numerous several similar renovation projects and provided satisfactory work to the Municipality in the past. 2.5 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Community Services. 3. FINANCIAL 3.1 The total cost of the services is $201,942.72 (net of H.S.T. Rebate) including disbursements. The total cost noted includes design, drawings, tender specifications, contract administration and disbursements. 3.2 The required funds are to be drawn from the Community Services' CFC Renovation Capital account #110-42-421-84203-7401 and are within the 2013 budget amount of$250,000.00 REPORT NO.: COD-015-13 PAGE 3 4. CONCURRENCE 4.1 This report has been reviewed by Joseph P. Caruana, Director of Community Services who concurs with the recommendations. 5. CONCLUSION 5.1 That the highest ranked proponent, Barry*Bryan Associates (1991) Ltd, be recommended as the successful proponent for the provision of Architectural Services for the Renovation of Clarington Fitness Centre. CONFORMITY WITH STRATEGIC PLAN — The recommendations contained in this report conform to the general intent of the following priorities of the Strategic Plan: Promoting economic development Maintaining financial stability Connecting Clarington Promoting green initiatives X Investing in infrastructure Showcasing our community Not in conformity with Strategic Plan Staff Contact: Jerry Barber, Manager of Purchasing Services Attachments: Attachment#1: Bid Tabulation List of interested parties to be advised of Council's decision: NONE Leading the Way Attachment 1 Municipality oI i BID TABULATION RFP2013-4 Architectural Services — Clarington Fitness Centre Renovation BIDDER Bid Amount (Net of HST Rebate) Barry*Bryan Associates (1991) Ltd $201,942.72 Whitby, ON AECOM Canada Architects Ltd. W $127,200.00 Whitby, ON +VG Architects $209,422.08 Toronto , ON Teeple Architects/Nick Swerdfeger Architects $183,473.28 Toronto, ON IBI Group Architects T $314,438.40 Toronto, ON J.R. Freethy Architect Bowmanville, ON $ 216,647.04 Lennis Trotter Architect Oshawa, ON $167,904.00 Raw Design $ 218,784.00 Toronto, ON Salter Pilon Architecture Inc. Barrie, ON $277,041.60 Stile Architect $99,561.98 Woodbridge, ON Susan Friedrich Architect Inc. Toronto, ON $293 068.80 Thomas Brown Architects Inc. Toronto, ON $ 161,289.6