Loading...
HomeMy WebLinkAboutEGD-014-13 Clarbgton REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: April 8, 2013 Resolution#: - -f3 By-law#: 13 " `- Report#: EGD-014-13 File#: D. 03.29.012 Subject: BIRCHDALE SUBDIVISION PHASE 2A, COURTICE, PLANS 40M-2317 (PART OF), 40R-24115, AND 40R-24135, `CERTIFICATE OF ACCEPTANCE' AND `ASSUMPTION BY-LAW' FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-014-13 be received; 2. THAT the Director of Engineering Services be authorized to issue a 'Certificate of Acceptance' for the Final Works, which includes final stage roads and other related Works, constructed within Plans 40M-2317, 40R-24115 and 40R-24135; and 3. THAT Council approve the by-law attached to Report EGD-014-13, assuming certain streets within Plans 40M-2317, 40M-2213, 40R-24115 and 40R-24135 as public highways. r Submitted by: eviewed by- A.S. Cannella, C.E.T. Franklin Wu, Director of Engineering Chief Administrative Officer Services ASC/RP/bc March 25, 2013 CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: EGD-014-13 PAGE 2 1. BACKGROUND 1.1 The Corporation of the Municipality of Clarington entered into a Subdivision Agreement, registered July 14, 2004, with Black Creek Developments Ltd. to develop lands by plan of subdivision, located in Courtice and described as Plans 40M-2317, 40R-24115 and 40R-24135 (Attachment 1). The agreement required the developer to construct all roadworks, including hot-mix paving, sidewalks, curb and gutter, street trees, a storm drainage system and streetlights, hereinafter referred to as the `Works'. 1.2 The Subdivision Agreement provides for the separation of the Works into four (4) stages: a) Initial Works; b) Final Works; c) Street Lighting System; and d) Stormwater Management S stem (not applicable) 1.3 The project was subsequently divided into Phases 2A and 2B. The Initial Works and Street Lighting System for Phase 2A were issued `Certificates of Completion" and subsequent `Certificates of Acceptance' by the Director of Engineering Services. 1.4 The Final Works for Phase 2A were issued a `Certificate of Completion' dated December 1, 2011. This initiated a one (1) year maintenance period, which expired on December 1, 2012. The Works were re-inspected at that time, and all deficiencies have now been rectified to the satisfaction of the Director of Engineering Services. 1.5 It is now appropriate to issue a 'Certificate of Acceptance' for the Final Works in Phase 2A. The Subdivision Agreement requires Council approval prior to the issuance of the `Certificate of Acceptance' for the Final Works in Phase 2A. 1.6 Further to the issuance of a 'Certificate of Acceptance', a by-law is required to permit the Municipality to assume certain streets within Plans 40M - 2317, 40M-2213, 40R-24115 and 40R-24135 as public highways (Attachment 2). 2. CONCURRENCE — Not Applicable CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Norman A. Clark, Manager of Construction Attachments: Attachment 1 — Key Map Attachment 2 — Proposed By-law List of interested parties to be advised by Council's decision - None Block Plan 1 Will 111/111/ --__ -_ Ell 111111111 .--,• �� •• � IIIIIillllllll ' � � ♦ �� -� IIIIIIIIII � - � • VIII . . • 111111 , - 1111111111111 .. � . WINZ •nn1 nm1 !_ �_ Illlj�i0�/4u InUllnlnullu mllln �� ���- I���Il�rii��,` .//rte ri i •=� r � j�``��,�,`�r��1,�11U llh• •: - • • � - . r��Vlillllllllllllilllllllllll � 1111111111111111//\11110% � _____0-III _ _-_22 Ii� i�=Ililllll��llll-_I -�- _=_ - cn nnnnnn0 ���t � Illlununnn mlll\\/amm►� .p_ �_ — ■_ nr r�.. .� nnn `` '�= � •••••� � 111111°I .1611111111 11111 x110►.'Q� '-pllllllllllll' C 111111\��..._ . �� "°—_ �1111■i:::�� _ IJIUIJ" � 1110111 ...� . - 1-11111■ �I�I�I• .- DATE: REPORT EGD-014-13 '' - • ■���11��1111111 C �� IIII_ Illn �■�mmmnnlllly � � ti 1 ATTACHMENT • �� • Ili►� ■ THE CORPORATION OF THE MUNICIPALITY OF CLARINGT( ACHE : BY-LAW NO.2013- REPORT F -OU- being a By-law to establish, lay out and dedicate certain lands as public highways in the Municipality of Clarington, to assume certain streets within the Municipality of Clarington as public highways in the Municipality of Clarington, and to name them The Council of the Corporation of the Municipality of Clarington hereby enacts as follows: 1. THAT the blocks shown on Plans 40M-2317 and 40M-2213, and listed below in this section, all being in the Municipality of Clarington, in the Regional Municipality of Durham, are hereby established, laid out, and dedicated by the Corporation of the Municipality of Clarington as public highways: Plan 40M-2317: Block 27 (0.3 metre reserve) Block 28 (0.3 metre reserve) Block 29 (0.3 metre reserve) Plan 40M-2213: Block 72 (0.3 metre reserve) 2. THAT the streets and blocks shown on Plans 40M-2317 and 40M-2213, and listed below in this section, being in the Municipality of Clarington, in the Regional Municipality of Durham, are hereby accepted by the Corporation of the Municipality of Clarington as public highways, and assumed by the said Corporation for public use: Plan 40M-2317: Jane Avenue Skinner Court Block 27(0.3 metre reserve) Block 28(0.3 metre reserve) Block 29 (0.3 metre reserve) Plan 40M-2213: Block 72(0.3 metre reserve) 3. THAT the following lands are hereby established as public highway, assumed by the Corporation for public use and assigned the names set out below: Land Established as Public Highway Name Part of Lot 29, Concession 3, George Reynolds Drive designated as Part 1, Part 2 and Part 3 on Plan 40R-24115 Part of Lot 29, Concession 3, Skinner Court designated as Part 1 and Part 2 on Plan 40R-24135 BY-LAW passed in open session this day of 2013. Adrian Foster, Mayor i Patti L. Barrie, Municipal Clerk