REPORT
CORPORATE SERVICES DEPARTMENT
Meeting:
GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date:
May 9, 2005
COD-021-05
File#_
r:? es #: (,iJll ;;2/&'D5
By-law #.;Pcx:S - 693
Report #:
Subject:
CL2005-2 Valley's 2000 Pond Construction, Bowmanville Creek Valley opposite
Hetherington Drive
Recommendations:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-021-05 be received;
2. THAT Hard-Co Construction Ltd., Whitby, Ontario with a total bid in the amount of
$31,348.97 (Plus G.S.T.), being the lowest responsible bidder meeting all terms,
conditions, and specifications of Tender CL2005-2, be awarded the contract for the
Valley's 2000 Pond Construction, Bowmanville Creek Valley opposite Hetherington Drive
as required by the Engineering Department;
3. THAT the total funds required in the amount of $44,500.00 ($31,348.97 tender plus
contingencies, G.S.T., consulting and soils) be drawn from Engineering Account #110-
32-325-83262-7401 ;
4. THAT the attached By-iaw marked Schedule "A" authorizing the Mayor and the Clerk to
execute the necessary agreement be approved.
S"bm;"", by, ~u'~
- 'e, ...;;mo. HBSo.. C.M.O.
Director of Corporate Services
C;~t'hj
. trtc '(\ tfr....
\~ Na cy Taylor, B.BA, C.A.,
~ 7f!!l~
A.S. Cannella, C.E.T. '
Director of Engineering Services
Reviewed by~).LB~-S('--.J"Z\..
Franklin Wu,
Chief Administrative Officer
MM/LAB/ld
REPORT NO.: COD-021-05
PAGE 2
BACKGROUND AND COMMENT
Tenders were advertised in local papers, as well as electronically. Subsequently, tenders were
received and tabulated as per Schedule "B" attached.
The total project cost, including Project Administration, and costing allocation is as detailed in
the letter from Totten Sims Hubicki Associates, marked Schedule "C" and will be provided from
the Engineering Account #110-32-325-83262-7401.
Written confirmation has been received from the Ontario Trillium Foundation advising of
approved funding in the amount of $44,500.00.
The low bidder has previously performed satisfactory work for the Municipality of Clarington.
The Director of Finance has reviewed the funding requirements and concurs with the
recommendation. Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
After further review and analysis of the bids by the Engineering Department, Totten Sims
Hubicki Associates and Purchasing, it was mutually agreed that the low bidder, Hard-Co
Construction Ltd., Whitby, Ontario, be recommended for the Valley's 2000 Pond Construction,
Bowmanville Creek Valley opposite Hetherington Drive.
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L 1C 3A6 T(905)623-3379 F (905)623-4169
Schedule "An
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON
BY-LAW 2005-
Being a By-law to authorize a contract between the
Corporation of the Municipality of Clarington and Hard-Co
Construction Ltd., Whitby, Ontario, to enter into agreement for
the Valley's 2000 Pond Construction, Bowmanville Creek
Valley opposite Hetherington Drive.
THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON HEREBY ENACTS AS
FOLLOWS:
1. THAT the Mayor and Clerk are hereby authorized to execute, on behalf of the
Corporation of the Municipality of Clarington and seal with the Corporation Seal, a
contract between, Hard-Co Construction Ltd., Whitby, Ontario, and said
Corporation; and
2. THAT the contract attached hereto as Schedule "A" form part of this By-law.
By-law read a first and second time this day of
,2005.
By-law read a third time and finally passed this
day of
,2005.
John Mutton, Mayor
Patti L. Barrie, Municipal Clerk
ClfJlilJglOn
Municipality of Clarington
SCHEDULE "B"
BID SUMMARY
Tender CL2005.2,
Valley's 2000 Pond Construction, Bowmanville Creek Valley opposite Hetherington Drive
L [,I
Hard-Co Construction Ltd.
Whitb , ON
Ron Robinson Limited
Bowmanville, ON
Peninsula Constnuction Inc.
Fonthill, ON
Rutherford Contracting Limited
Gormle , ON
Hermanns Contracting Limited
Schomber ,ON
Lakeridge Contracting Ltd.
A'ax, On
Brinkman & Associates Reforestation Ltd.
New Westminster, BC
Miwel Construction Limited
Stouffville, ON
Elirpa Construction & Materials Ltd.
Pickerin ,ON
B.N, Fenton Constnuction Ltd.
Courtice, ON
$31,348.97
$38,572.20
$43,274.09
$46,333.73
$46,600.00
$63,876.00
$83,190.25
$83,643.80
$85,176.21
NOBID
II
TIll
Totten Sims Hubicki Associates
513 Division Street,
Cobourg, Ontario, Canada K9A 5G6
19051372-2121 Fax: 19051372-3621
E-mail: cobourg@tsh.ca www.tsh.ca
engineers
architects
planners
RECEIVED
April IS, 2005
Ms, Lou Ann Birkett, CPP, AMCT
Purchasing Manager
Corporation of the Municipality of Clarington
40 Temperance Street
BOWMANVlLLE, Ontario. LlC 3A6
APR 1 8 Z005
MUNICIPALITY OF CLARINGTON
PURCHASING DEPARTMENT
Schedule "C"
Dear Ms. Birkett:
Re: Valley's 2000 Pond Construction,
Bowmanville Creek Valley, Opposite Hetherington Drive, Bowmanville
Contract No, CL200S-2, Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Friday, February 25, 2005 at
2:00 p.m. A list of the bids received are provided in the table below. All numbers are exclusive ofGST.
BIDDER TOTAL BID AMOUNT
(excl GST)
Hard-Co Construction Ltd. Whitby $ 31,348.97
Ron Robinson Ltd., BowmanvilIe $ 38,572.20
Peninsula Construction Inc., Fonthill $ 43,274.09
Rutherford Contracting Limited, Gormley $ 46,333.73
Hermanns Contracting Limited, Schomberg $ 46,600.00
Lakeridge Contracting Ltd., Ajax $ 63,876.00
Brinkman & Associates Reforestation Ltd., New $ 83,190.25
Westminister, R C.
Miwel Construction Limited, Stouffville $ 83,643.80
Elirpa Construction & Material Limited, Pickering $ 85,176.21
RN. Fenton Construction Ltd., Courtice NO BID
The low bidder's tender has been checked and is in order. Hard-Co Construction Ltd. has completed a
number ofprojects for the Municipality ofClarington, most recently Contract CL2004-3, Mearns Avenue
Reconstruction and CL98-3, Scugog Street/Middle Road Reconstruction. The Contractor has completed
private works in Clarington such as the realignment of West Side Creek for SI. Mary's Cement and
subdivision servicing for the extension of Tilley Court in BowmanvilIe for Baywood Homes. Based on
our office's experience with the Contractor on Municipal Contracts and the information from those
Ms. Lou Ann Birkett
April 15, 2005
2
contacted regarding the private work, the Contractor performed to an acceptable standard. Based on past
performance and ability we recommend that Hard-Co Construction Ltd. be awarded Contract CL2005-2.
Estimated total project costs based on the low bid are as follows:
Construction value of work (excl. GST)
Detailed Design and Tendering (to February 19,2005)
Contract Administration and Material Testing
Contingencies (excl. GST)
$31,348.97
$ 8,168.47
$ 3,200.00
$ 1,782.56
TOTAL PROJECT COST (excl. GST)
$44,500.00
Funding for this project is being provided for from the Ontario Trillium Foundation (Request LD.
9903206), but initially will be paid for by the Municipality ofClarington. The December 13, 2004
renewed Memorandum of Understanding between Valleys 2000 and the Municipality ofClarington states
that all construction projects be tendered and administered by the Municipality. This Memorandum of
Understanding expires December 31, 2009. Repayment to the Municipality will be provided upon
submission of invoicing to the Trillium Foundation. Based on total project costs and available budget,
there is a surplus of approximately $9,000.00 from the available Grant money.
A copy of the Grant confirmation for Valleys 2000 from the Ontario Trillium Foundation is attached for
your records.
Please proceed with the award of this Contract, upon receipt of the Grant confirmation letter from the
Ontario Trillium Foundation.
Should you have any questions regarding this matter, please contact the undersigned.
Best regards,
..------J7
..~
Ron Albright, P.Eng.
Project Engineer
RA/ym
P!29391/CnrR:spl20760.doc
Encl.
pc: Mr. A. S. Cannella, Director of Engineering Services, Municipality of Cia ring ton
Mr. Peter Windolf, Manager of Park Development, Municipality of Clarington
Mrs. Jennifer O'Donnell, Clerk, Municipality of CIa ring ton
TIH
""'" DJ; 'Nt: UNIAHlO TRILLIUM FOUNDATION; 70S 743 32M;
APR-21-0S 12:S9PMj
PAGE 1/1
"'"11 aNT"..u T.rL~ 111M ~C1U"I'ATION
L.A J'GNDATIOIll T.ILLIH. DC L'O"T^R.O
-~..__._..__..
April 21, 2005
Frank Lockhart,
Valleys 2000
By Fax: 905-62~ S- 5" 70
Dear Frank:
This memo is to confirm that the Onlarlo Trillium Foundatlor will be proviclng to
Valleys 2000 an additional $23,000 in funding for the pond construction. ThIs
amount will supplement the $21,500 which has alre3dy been provid.!d.
You may expect a letter and a cheql e in thE. near future.
c:p
OJacquenne Powell
l:Jrogram Manager
15 c"..r1...-s ~;I\:.l!:l E.&:.L F.. 'I =1,)\', ,t 'II~!. 1:"1,( 111'( ~..~ ." I I
"rliklrhone: <,'"'11',1 ~.'!', ",'n,. '"Utlmn". ;"1 "~J 'i6.~ i,l.'ljl I I y' ,.11,,) '.'".1 '.' 1011 tor...: >, ,11)1 J.~':; ,~, II ttrnltt. I; :~""'.'_ I ~ ,......I"~'linl .11"
..---.----..---- .--....----.
4'i "I"~ Cn""'I,'~ ,'~- ~,,,, r....I'I.~ 1...,- " '()nt., I . <4"' I!~~ '. ." I
1:lephDrtc: (411,1 ';("l.'::'-.;';! 'qlctopiOilr;!'41l>,l"u';;,:J.'il ....J"')::~ '1'9():....~. "l).~3f1,h. {,:;~."();, !:,I;lnr_r,)." .....,.~,... jl.m;;'."ll".o1,"h"~"