HomeMy WebLinkAboutPSD-018-13 Clarftwn
REPORT
PLANNING SERVICES DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: March 18, 2013 Resolution#: - ) By-law#:
Report#: PSD-018-13 File#: S-0-2012-02 AND Z-2012-10
Subject: APPLICATIONS TO AMEND OSHAWA ZONING BY-LAW 60-94 AND
APPROVE PROPOSED DRAFT PLAN OF SUBDIVISION
APPLICANT: 1494339 ONTARIO LIMITED
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1 . THAT Report PSD-018-13 be received;
2. THAT the City of Oshawa be advised that the Municipality of Clarington has no objection
to the proposed Zoning By-law Amendment and proposed Plan of Subdivision for 33
single detached dwellings subject to the Conditions of Draft Approval contained in
Attachment 3;
3. THAT a copy of Report PSD-018-13 be forwarded to the City of Oshawa, Development
Services Department and the Region of Durham Planning Department; and
4. THAT all interested parties listed in Report PSD-018-13 be advised of Council's decision.
Submitted by: Reviewed by:
Da id J. rome, MCIP, RPP Franklin Wu,
Director of Planning Services Chief Administrative Officer
BR/CP/nl/df
7 March 2013
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379
REPORT NO.: PSD-018-13 PAGE 2
1. BACKGROUND
1.1 The City of Oshawa circulated the Municipality of Clarington on January 9, 2013 the
referenced applications for Zoning By-law Amendment and Proposed Plan of Subdivision.
The applications have been reviewed by the Clarington Engineering Services Department
and the Clarington Planning Services Department.
2. APPLICATION DETAILS
2.1 Owner/Applicant: 1494339 Ontario Limited (Foley)
2.2 Agent: D.G. Biddle & Associates
2.3 Proposed Plan of Subdivision: To permit the development of 33 single detached
dwellings, a landscape strip block, future development
blocks and local roads.
2.4 Zoning By-law Amendment: To rezone the majority of the subject site from R1-D
(4)"h-14" (Residential) to an appropriate R1-E
(Residential) Zone to implement the proposed draft
plan of subdivision and special zoning regulations.
2.5 Area: 1.74 hectares (4.30 acres)
2.6 Location: South of Conlin Road East, north of Coldstream Drive
and immediately west of Townline Road North,
Oshawa
3. STAFF COMMENTS
3.1 The subject applications abut a section of Townline Road, the boundary road located
between the Municipality of Clarington and the City of Oshawa. The adjacent lands in the
Municipality of Clarington are located in the Provincial Greenbelt whereas the adjacent
lands in the City of Oshawa are located within the urban area. No future urban
development is possible or anticipated on the Clarington side of Townline Road.
3.2 Clarington Engineering Services Department advises that the Municipality of Clarington
and the City of Oshawa entered into a Boundary Road Agreement in 2006 regarding
Townline Road. Under the terms and conditions of the Agreement the Municipality of
Clarington shall bear none of the construction costs on Townline Road (if applicable) that
are related to development on the Oshawa side of the road. This portion of Townline
Road is maintained by the City of Oshawa under the terms of the Boundary Road
Agreement. The developer will be responsible for maintaining Townline Road free of
mud, dust and debris as directed by the City of Oshawa during construction.
REPORT NO.: PSD-018-13 PAGE 3
3.3 Where development is adjacent to rural land uses that rely on private wells and septic
systems, a hydrogeological study is typically undertaken prior to development occurring
to consider potential impacts on nearby wells and identify measures to mitigate any
potential negative impacts. The current application by Foley is in essence an infill
development as it is surrounded on the Oshawa three sides by a draft approved and
partially constructed plan of subdivision by Silwell Developments and the Metrontario
Group (S-0-2001-003). This earlier development application was supported by a
hydrogeological report prepared by Soil Engineers Limited (see Attachment 2).
3.4 The Soil Engineers Report reviewed well water data for the broader area affected by
Subdivision S-0-2001-003 including the properties of Clarington residents, and
concluded it would be an "unlikely event that any of the private well systems within 500
metres of the site would deteriorate due to the site servicing of the residential
development". There have been no issues related to existing wells and the development
of the larger subdivision to date. However, through the review of the engineering
drawings for the phase of the Silwell/Metrontario subdivision currently being considered,
the Durham Regional Works Department has requested a consultant to address how
water could be extended across Townline Road to the existing developed properties
fronting on the Clarington side of the road, should their wells be impacted as a result of
subdivision development in Oshawa.
3.5 It is recommended that as a condition of draft approval the Owner/Applicant be required,
prior to any servicing of the plan of subdivision, to retain a qualified Professional Engineer
to prepare and submit a Hydrogeological Report to the satisfaction of the Municipality of
Clarington and that the recommendations of the report be included in an agreement with
the City of Oshawa. The report would be a follow-up to the Hydrogeological Report
prepared by Soil Engineers Limited, titled "Baseline Hydrogeological Report, Proposed
Residential Development, Parkridge Developments", reference number 0510-W104.3 and
dated November 15, 2005, done for Silwell Developments and the Metrontario Group for
the surrounding subdivision S-0-2001-003. The recommendations of the study shall be
incorporated into the subdivision agreement between the proponent and the City of
Oshawa, to the satisfaction of the Clarington Planning Services Department,
3.6 In addition to the recommendations of the hydrogeological study referenced in 3.5,
Durham Region has their "Drilled Well and Lot Sizing Policy" which contains provisions
for well interference related to the installation of water and sanitary sewer servicing. The
Region's policy would ensure anyone who has a private well, which is impacted as a
result of development, will have municipal water extended to the property or provided a
new well. The combination of existing policy and proposed study and recommendations
should help ensure nearby Clarington residents have an alternative water supply in the
event of well interference problems.
4. CONCURRENCE
4.1 The Director of Engineering Services concurs with the recommendations of Report PSD-
018-13.
REPORT NO.: PSD-018-13 PAGE 4
5. CONCLUSION
5.1 In consideration of the comments provided within this report, it is recommended that the
Municipality support the approval of the proposed draft plan of subdivision, subject to the
comments herein and the recommended condition of draft approval.
CONFORMITY WITH STRATEGIC PLAN — Not Applicable
Staff Contact: Bob Russell, Planner II
Attachments:
Attachment 1 - Survey of Proposed Plan of Subdivision
Attachment 2 - Limits of S-O 2001-003 and S-O 2012-02
Attachment 3 - Conditions of Approval of Final Plan Registration
List of interested parties to be advised of Council's decision:
David Sappleton, City of Oshawa
Lino Trombino, Durham Region
Bob Annaert, D.G. Biddle & Associates
Attachment '1 to
Report PSD-018-13
z i
a o c E
CL .c' ° N z ® � e
z F r N O
0
o N O M
H1aO I WMA 3NnNMOi 0
07
J FL d
ro HM i
O VO ku 3
a.
9H 9w
99 0
® mm
Z�
H18ON GV08 3N17NM01
- - dWIS 3dVOSGNVI g£N0018
H 133Z11S M
00
M
W
LO CO I- 00 O 0 0 C\l = CO
O
W N M
W
N N
d' Ce)
N 00
N
M e-
N
�
N LO N
c' d'
N
(fl N
N
b£>10018
L£>10018 9£>10019-3 5£ A0018 i- I
E-
- - — — — — — � -- - - - - - ; I - - i - - - - - -- - - i
i i I --- -
ii - - - --- - --
! - - a- - - - - - - - - - a L — -- - - a
Attachment 2 to
Report PSD-018-13
FF
M
O
0
4)
< 9 0
0
C'4
Z 0 1 11 0
U) 6 C04
0 0
Y 6
Cl) O 0 0
w
z E E E
Hl l]ON G VOil NIIN AO-L
1E13211S M31ANV'
0
CK <
0
< w
z III z
0
U)
0
ill
F
GV08 ANOMM
—--------------- —------
Attachment 3
To Report PSD-013-13
CONDITIONS OF APPROVAL OF FINAL PLAN REGISTRATION
MUNICIPALITY OF CLARINGTON
MARCH 4, 2013
1494339 ONTARIO LIMITED
FILE NOS.: S-0-2012-02 AND Z-2012-10
1. The Owner/Applicant agrees, prior to any servicing of the plan of subdivision, to
retain a qualified Professional Engineer to prepare and submit, to the satisfaction
of the Director of Planning Services, a follow-up Hydrogeological Report to the
Hydrogeological Report prepared by Soil Engineers Limited, titled "Baseline
Hydrogeological Report, Proposed Residential Development, Parkridge
Developments", reference number 0510-W104.3 and dated November 15, 2005.
The 2005 Report was done for Silwell Developments and the Metrontario Group
for the surrounding Subdivision S-0-2001-003, that is to the south, west and north
of Subdivision S-0-2012-02, and
2. That the recommendations of the approved follow-up Hydrogeological Report be
included in the agreement between 1494339 Ontario Limited and the City of
Oshawa to the satisfaction of the Municipality of Clarington Director of Planning
Services.