Loading...
HomeMy WebLinkAboutCOD-003-13 Clarington REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: February 25, 2013 Resolution#: 0 —17 -1 By-law#: N/A Report#: COD-003-13 File#: Subject: TENDER NO. C2013-1 — ELECTRICAL SERVICES PARK & STREET LIGHTING MAINTENANCE RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-003-13 be received; 2. THAT Langley Utilities Contracting Limited, Bowmanville, Ontario, with a total bid in the amount of $171,325.85 (net of H.S.T.), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2013-1, be awarded the contract for Electrical Services — Park and Street Lighting Maintenance, as required by the Municipality of Clarington, Operations Department; 3. THAT pending satisfactory pricing and service the contract be extended for a second, third and fourth year; and 4. THAT the funds expended be drawn from the Operations Department Annual Operating Budgets. Submitted by: Reviewed by: Marie Marano, H.B.Sc., C.M.O., Franklin Wu, r Director of Corporate Services Chief Administrative Officer MM\JDB\BH/km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 REPORT NO.: COD - 003 -13 �:cc]:Te l] 0I C PAGE 2 1.1 Tender CL2013 -1 Electrical Services Park & Street Lighting Maintenance was advertised and issued with bids being received as per Attachment 1. 1.2 Bid submissions are based on the estimated hours for labour and equipment and estimated quantities of material required for a one year term. The annual labour, equipment and material value will be determined by actual requirements. 1.3 The term of this contract is for a one year period with provision for up to three one year extensions, subject to acceptable pricing and the provision of satisfactory service. 2.0 ANALYSIS 2.1 After review and analysis of the bids by the Operations Department and Purchasing, it was mutually agreed that the low bidder, Langley Utilities Contracting Limited, Bowmanville, Ontario, be awarded the contract for the Electrical Services — Park & Street Lighting Maintenance. 2.2 Langley Utilities Contracting Limited, Bowmanville, Ontario has provided similar services to the Municipality of Clarington for a number of years and the level of service has been satisfactory. 3.0 COMMENTS 3.1 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Operations. 4.0 FINANCIAL 4.1 The total funds required for Tender CL2013 -1 Electrical Services Park & Street Lighting Maintenance are included in the Operations Department Annual Operating Budget(s). 4.2 For the information of Council, the labour cost to maintain the park and street lights has increased approximately by 5% from the previous year. 4.3 The contract will be monitored to ensure the service level is maintained and rates applied correctly. REPORT NO.: COD - 003 -13 5.1 This report has been reviewed by the Purchasing Manager, with the appropriate department and circulated as follows: Concurrence: Director of Operations 6.0 CONCLUSION 6.1 To award the contract to Langley Utilities Contracting Limited, Bowmanville, Ontario for the Electrical Services Park & Street Lighting Maintenance. CONFORMITY WITH STRATEGIC PLAN — Not Applicable Attachments: Attachment 1 — Bid Summary a Attachment 1 MUNICIPALITY OF CLARINGTON Bid Summary Tender CL2013 -1 BIDDER Estimated 1 Year Estimated 1 Year Estimated 4 Year Contract Expenditure Contract Expenditure Contract Expenditure HST included net of HST) net of HST Langley Utilities $190,249.82 $171,325.85 $706,138.01 Bowmanville, ON Aline Utility Limited $192,740.71 $173,568.98 $759,297.63 Dunsford, ON Dundas Power Line $381,110.13 $343,201.47 $1,435,826.96 Limited Chesterville, ON Stacey Electric $399,424.37 $359,694.01* $1,504,825.58* Toronto, ON Black & McDonald $661,912.77 $596,072.95 $2,501.198.84 Limited Scarborough, ON *adjusted for mathematical errors