Loading...
HomeMy WebLinkAboutEGD-007-13 Leadi�:g the Way REPORT ENGINEERING SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: February 25, 2013 Resolution #: 4 00A / Report#: EGD-007-13 File #: D.01.35.001 By-law #: Subject: ROBINSON RIDGE SUBDIVISION PHASE 3, COURTICE, PLAN 40M-2201, `CERTIFICATE OF ACCEPTANCE' AND `ASSUMPTION BY-LAW', FINAL WORKS INCLUDING ROADS AND OTHER RELATED WORKS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report EGD-007-13 be received; 2. THAT the Director of Engineering Services be authorized to issue a `Certificate of Acceptance' for the Final Works, which include final stage roads and other related Works, constructed within Plan 40M-2201; and 3. THAT Council approve the by-law attached to Report EGD-007-13, assuming certain streets within Plan 40M-2201 as public highways. Submitted by: Reviewed b _ A.S. Cannella, C.E.T. Franklin Wu Director of Engineering Services Chief Administrative Officer NAC/ASC/dv February 6, 2012 REPORT • 1 1 1 A - • 6111 1.1 The Corporation of the Municipality of Clarington entered into a Subdivision Agreement, registered August 5, 1998, with Robinson Ridge Developments Inc., to develop lands by plan of subdivision, located in Courtice, and included lands described as Plan 40M -2201 (Attachment 1). The agreement required the developer to construct all roadworks, including hot -mix paving, sidewalks, curb and gutter, street trees, a storm drainage system and streetlights, hereinafter referred to as the `Works'. 1.2 The Subdivision Agreement provides for the separation of the Works into four (4) stages: a) Initial Works; b) Final Works; c) Street Lighting System; and d) Permanent Stormwater Quantity and Quality Pond Works (not applicable) 1.3 The Initial Works and Street Lighting System were issued `Certificates of Completion' and subsequent `Certificates of Acceptance' by the Director of Engineering Services, as per the maintenance requirements set out in the Subdivision Agreement. 1.4 The Final Works were issued a 'Certificate of Completion' dated November 1, 2010. This initiated a one (1) year maintenance period, which expired on November 1, 2011. The Works were re- inspected at that time, and, although the developer experienced__ delays in completing the required repairs, all deficiencies have now been rectified to the satisfaction of the Director of Engineering Services. REPORT NO: EGD- 007 -13 PAGE 3 1.5 It is now appropriate to issue a 'Certificate of Acceptance' for the Final Works. The Subdivision Agreement requires Council approval prior to the issuance of the 'Certificate of Acceptance' for the Final Works. 1.6 Further to the issuance of a 'Certificate of Acceptance', a by -law is required to permit the Municipality to assume certain streets within Plan 40M -2201 as public highways (Attachment 2). 2.0 CONCURRENCE — Not Applicable CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Norman A. Clark, Manager of Construction Attachments: Attachment 1 - Key Map Attachment 2 - Proposed By -law List of interested parties to be advised by Council's decision — Not applicable KI T ACHMENT NO: 2 REPORT NO.- EGDr 007 -13 THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON BY -LAW 2013 - XX Being a By -law to assume certain streets within the Municipality of Clarington as public highways in the Municipality of Clarington. The Council of the Corporation of the Municipality of Clarington hereby enacts as follows: 1. THAT the streets and blocks shown on Plan 40M -2201, and listed below in this. section, being in the Municipality of Clarington, in the Regional Municipality of Durham, are hereby accepted by the Corporation of the Municipality of Clarington as public highways, and assumed by the said Corporation for public use: Bingham Gate. Cousins Street Dudley Court Fenning Drive Block 92 (street widening) Block 93 (street widening) BY -LAW passed this xxt" day of xxxxx 2013. Adrian Foster, Mayor Patti L. Barrie, Municipal Clerk City o_ Oshawa 2 F O O Q O Ix w z _i z O F _ =11fl1' X11 ILI 11111111111111111111111111 . �uA N ' Robinson Ridge Subdivision Phase 3 Plan 40M -2201 DRAWN BY: E.L. I DATE: January 21, 2013 a REPORT EGD- 007 -13 KEY MAP ATTACHMENT NO. 1 G:\Attach ments \40M -2201. mxd