St1BJECT: INFORMATION CENTRE: RECONSTRUCTION OF CONCESSION STREET
FROM LIBERTY STREET TO MANN STREET, BMA MLLE
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration
Committee recommend to Council the following:
1. THAT Report WD-66-89 be received for information;
2. THAT a copy of this report be sent to all residents who attended the
information centre.
REPORT
1. ATTACHMENTS
No.l: Drawing showing the location of the project
No.2: Copy of letter to local residents
No.3: Copy of advertised Public Notice
No.4: Copy of the Register kept at the information centre.
2. BACKGROUND
2.1 As outlined in the 1989 Capital Budget, Concession Street is to be
reconstructed from Liberty Street to Mann Street to an urban road standard
including grading, granular base, sub-base, curb and gutter, hot mix asphalt,
sidewalks (both sides) and storm sewers.
. . .2
,
REPORT N3. : V0D-66-89 Iy\G8 2
________________________________________________________________________________
2.2 Snbinkedaoz Bros. Ltd. is developing lands north of Concession Street
(see Attachment 0o.1) and through negotiations with the Town will be
reconstructing Concession Street simultaneously to facilitate their
developing lands.
23, Construction and road closure of O000eooiom Street is teoativeIy scheduled
to commence July 12, 1989 and shall be on going for approximately six weeks.
3. INFORMATION C8BORO
3^I An information Centre was held at the Newcastle Gardens Trailer, located
on the north aide of Concession Street, east of Liberty Street on
Wednesday, May 31, 1989 between the hours of 4:00 and 7:00 p.m.
3^2 Local residents were previously informed of the Public meeting by bam]
delivered letters and by Public Notice in the Canadian Statesman
(Gee Attachment 0o. 2 and 3) .
3.3 & significant number of residents showed interest and attended the
Information Centre. A typed copy of the register kept at the Information
Centre is attached (refer to Attachment No.4) .
3.4 The residents were generally in favour of the proposed works. However,
a number of oouoezua seemed to be unanimous among the residents.
They are as bzllcvvo:
CONCERN SOLUTION
l~ Location of future sidewalk The standard sidewalk location
relative to existing trees will be adjusted to accommodate
and to save many if not all
existing trees.
. . ..
10AO
| UUO
,.
REPORT 0D. : WD-66-89 PAGE 3
________________________________________________________________________________
CONCERN SOLUTION
2° The effect of development on The developers shall be tolIv
existing septic systems responsible for ensuring that
development related works will
not adversely affect existing
septic systems.
3. Regional service connection Regional charges were quoted as
charges and whether per information obtained from the
connection was mandatory Region of Durham. Residents were
assured that connection was not,
mandatory, but that a service
connection is taken to the property
line to accommodate any future
servicing requests.
4. Road closure and bmv it would Residents were promised that the
affect property access. contractor would be required to
maintain an acceptable access to
all homes at all times. However,
it would be reasonable to expect
that there may be some
inconvenience from time to time.
The affected homeowners would be
contacted prior to any driveway
access being temporarily cut off~
4. COSTS
4.1 The estimated cost for the reconstruction of Oouoeoaiom Street is $320,000
and these costs shall be borne by Sobiohedauo Bros. Ltd. at no cost to the
Town of Newcastle.
^ ^ ~4
: W �Y /
~
REPORT 0O^ : WD-66-89 PAGE 4
________________________________________________________________________________
5~ RECOMMENDATION
5°I It is, therefore, recommended that this report be received for information;
and
5.2 That a onIy of this report be sent to all residents who attended the
Information Centre.
. . .4
Respectfully submitted, Recommended for presentation
to the Committee,
Walter A. Evans, P. Eng., Lawreo 4 Qotoe±t,
Director of Public Works. Chief Admilbiatcative officer.
MEB*WAE*Ilv
June 12, 1989
Attachments
no: Mr. 6 Mrs. P. 0owal Mr. D. Baao
21 Onuoeosiom Street 40 O000esaimo Street
BommauvilIe, Ontario BovmauviIIe' Ontario
LIC lYJ LIC IY3
Mr. R. Mutton Mr. G. Couch
45 Concession Street 42 Cmooeaaiom Street
BowmaoviIle, Ontario BowmauvilIe, Ontario
LlC IY2 LIC IY3
Mr. & Mrs. N. Dickinson Mrs. Higgs
45 Concession Street 34 Ozooeaeiou Street
Bommauville, Ontario DovmauvilIe' Ontario
LIC lY3 LIC 1Y3
Mr. K. Mpuut'oy Mrs. Tcewiu
4 Concession Street 8 O000eaaioo Street
BommaovilIe, Ontario BovmnanviIIer Ontario
LIC 1Y3 LIC 2[]
Mr. Johnston
15 Concession Street
BowmauviIIe, 0tuazio
LIC II2
� .
' 010
i
LIMIT OF
SUBDIVISION
CGI
1
_j L
i � II
SCHIf EDANZ NORTH 7 Q
I ( � yJBDIVISION
I I ,-- - -� r I W
L- J L - - � L -J
zi
.I
II
y ^fw
t+iht..
C
ONCESS O
�. I N ST
W5
LW
r
TRUDEAU DR.
w
MARCHWOOD CRIES. Q
0
z
TRUDEAU
SECTION OF ROAD Q
H �
H
m ATTACHMENT N0 ,1
-' TO 13 E WD-66-39
RECONSTRUCTED
- 1011
i
CORPORATION OF THE TOWN OF NEWCASTLE
40 TEMPERANCE STREET
BOWMANVILLE, ONTARIO
Ll C 3A6 TELEPHONE 623-3379
May 26, 1989
i
Dear Resident:
RE: RECONSTRUCTION OF CONCESSION STREET
FROM LIBERTY STREET TO MANN STREET
The Corporation of the Thwn of Newcastle proposes the reconstruction
of Concession Street from Liberty Street to Mann Street, in the 1989
construction program.
The reconstruction work will include road excavation, placing of granular
road base, curb and gutter, storm sewers, upgrading of services and
placing of hot mix pavement. The new roadway will consist of a total
pavement width of 10 metres (32.8 feet) with 1.5 metre (4.9 feet) sidewalks
on both sides, for the full length of the reconstruction.
You are invited to attend an Information Centre to be held between
the hours of 4:00 p.m. and 7:00 p.m. , on Wednesday, May 31, 1989,
at the Newcastle Gardens Sales Trailer located on the north side
of Concession Street, east of Liberty Street. Plans for the
reconstruction will be available for inspection, and staff will be
on hand to answer questions.
Yours truly
,,4,e- .,,/,-
A.S. Cannella, C.E.T.
Manager of Engineering
ASC/kms
ATTACHMENT NO ,2
WD-66-89
1012
CORPORATION OF THE TOWN OF NEWCASTLE
40 TEMPERANCE STREET
BOWMANVILLE, ONTARIO
Ll C 3A6 TELEPHONE 623-3379
PUBLIC NOTICE
RECONSTRUCTION OF CONCESSION STREET
FROM LIBERTY STREET TO MANN STREET
INFORMATION CENTRE
The Corporation of the Town of Newcastle will be reconstructing the above
street to an urban standard during the construction year of 1989.
The reconstruction work will include road excavation, placing granular
road base, curb and gutter, storm sewers, upgrading of services and placing
of hot mix pavement. The new roadway will consist of a total pavement
width of 10 metres with 1.5 metre sidewalks on both sides, for the full
length of the reconstruction.
You are invited to attend an Information Centre to be held between the
hours of 4:00 p.m. and 7:00 p.m. , on Wednesday, May 31, 1989, at the Newcastle
Gardens Sales. Trailer located on the north side of Concession Street, east
of Liberty Street. Plans for the reconstruction will be available for
inspection, and staff will be on hand to answer questions.
W.A. Evans, P. Eng.
Director of Public Works
40 Temperance Street
Bowmanville, Ontario
L1C 3A6
ATTACHMENT NO,3
WD-66-89
1013
INFORMATION CENTRE
RECONSTRUCTION OF CONCESSION STREET
FROM LIBERTY TO MANN STREET
NAME ADDRESS PHONE CONCERNS
1. Paul Magowan Marshall, Macklin 449-2500 Respresentative from
Monaghan consulting Engineers
office.
2. W.A. Evans, P. Eng. Representatives from the Public Works Department
A.S.Cannella, C.E.T.
M.E. Hendry, C.E.T.
3. Peter and Elaine 21 Concession St. 623-5868 Do not want to loose
Kowal East any trees. Concerned
about Regional
connection charges
and would like to see
copy of Region/
Schickedanz agreement.
Concerned that sweeper
has not cleaned
Concession Street.
4. Robert Mutton 45 Concession St. 623-2437 General concerns
East
5. Rose and Norm 46 Concession St. 623-5166 Would like walkway from
Dickinson east Highway #2 to
Concession Street.
(note: other concerns
the Dickinsons have
were addressed at a
previous meeting) .
6. Ron Hass 40 Concession St 623-1037 Effect development
East on septic system
7. Greg Couch 42 Concession St. 623-2104 Water being pumped
East along Mann Street is
causing ditch to plug
up. Does not want
to loose cedar hedge
at rear of lot and
would agree not to
have a wooden privacy
fence.
ATTACHMENT NO ,4
WD-66-39 ° •°2
1014
. .2
INFORMATION CENTRE
RECONSTRUCTION OF CONCESSION STREET
FROM LIBERTY TO MANN STREET
NAME ADDRESS PHONE CONCERNS
8. Mrs. Higgs 34 Concession St. 623-7420 Is not in favour of
East having sidewalks.
9. Ken Mountjoy 4 Concession St. 623-7127 General concerns
East
10. Mrs. Trewin 8 Concession Street 623-5870 General concerns
East
11. Mr. Johnston 15 Concession St. 623-3670 Effect of development
on septic systems.
Concerned there will be
a loss of trees due
to sidewalk. Is storm
sewer connection
manditory?