S(JCT• INFORMATION CENTRE RECONSTRUCTION OF BEAVER STREET AND ROBERT
STEET, VILLAGE OF NEWCASTLE
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT Report WD-18-89 be received; and
2 . THAT the option of narrowing the pavement on Beaver Street and
Robert Street be examined; and
I
8 . THAT a copy of this report be sent to all residents who attended
the Information Centre; and
i
4. THAT another Information Centre be held in 1989 to report our
findings on narrowing the pavement .
REPORT
1 . 0 ATTACHMENTS
No. 1: Drawing showing the location of the project .
No. 2: Copy of the Register kept at the Information Cente.
2 . 0 BACKGROUND
2 . 1 Provision was made in the 1988 Capital Budget and Four Year
Forecast for the design in 1988 and the construction in 1990 of
Beaver Street and Robert Street in the Village of Newcastle.
< , . 2
Page 2
WD-18-89
3 . 0 INFORMATION CENTRE
3 . 1 An Information Centre was held at the Newcastle Town Hall between
the hours of 4: 00 p.m. and 7: 00 p.m. on November 2 , 1988.
3 . 2 About 22 area residents attended the Information Centre. A copy
of the Register kept at the Centre is attached.
3 . 3 Drawings were available to show the residents the details of the
project . The proposed project includes the reconstruction of
Beaver Street from Highway No. 2 to the school at Robert Street
and the reconstruction of Robert Street from Mill Street to
Beaver Street .
3 . 4 The comments from the property owners concerning the proposed
reconstruction was varied, but in general , the response was
considered to be Eery_pe g�!Iive to the proposed reconstruction.
The main reason for the negative response is that , because the
right-of-way width of Beaver Street is only 50 feet , the
reconstruction would require the removal of about twenty--five
mature trees .
Other comments included the need for providing a
loading/unloading area for parents picking up and dropping off
their children at the school .
4. 0 COSTS
4. 1 The estimated cost for the reconstruction of Beaver Street and
Robert Street is $983, 000 . 00 .
5 . 0 REVIEW AND COMMENT
5 . 1 Beaver Street is in very poor condition and the open ditch
drainage system does not provide good drainage.
". . . 3
1c)( C
Page 3
WD-18-89
5 . 2 One option is to pulverize the pavement and repave Robert Street
and Beaver Street . However, this is only a "make do" alternative
and does not solve the drainage problems on Beaver Street . This
project was reviewed in the field with a representive of the
Ministry of Transportation who advised that the Ministry strongly
favours reconstruction with curb and gutter and storm sewers .
5 . 3 Our consultants , Totten Sims Hubicki Associates Limited are
reviewing the design to determine if narrowing of the pavement
and making Beaver Street and/or Robert Street one-way streets
would make it possible to reconstruct Beaver Street and Robert
Street with curb and gutter, storm sewers and sidewalks without
destroying the trees .
6. 0 RECOMMENDATION
6. 1 In view of the above, it is recommended that the alternative of
narrowing the pavement on Beaver Street and Robert Street be
examined to determine if this would make it possible to
reconstruct Beaver Street and Robert Street without destroying
the trees, that a copy of this report be sent to all persons who
attended the Information Centre and that another Information
Centre be held in 1989 to review our findings with the area
residents .
Respectfully submitted, Recommended for presentation
to the Committee,
-- -- ------------------
Walter A. Evans , P. Eng. , Lawrenc Kotseff,
Director of Public Works . Chief Admi istrative Officer.
/kms
December 29, 1988
i
KING ST. ( HWY, NO. 2) j
EMILY ST .
ti
cn
o N
CAROLINE ST.
w �-
..
EDWARD ST.
v w
y JAMES ST.
J
f
SUNSET ROBERT ST.
_E< <
I `>"
BLVD. o
z
i ATTACHMENT N0 , 1
IUD-1.8-39
i
i
WD-18-89 - INFORMATION CENTRE - RECONSTRUCTION OF BEAVER STREET AND ROBERT
STREET, VILLAGE OF NEWCASTLE
,I
i
Mr. Ibbotson Mr. & Mrs. D. Kearney
141 Mill Street 49 Beaver Street South
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
St. George's Parish Hall Mr. & Mrs. F. Castellano
3 Edward Street 49 Robert Street
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mr. & Mrs. Goheen Ms. Schmiegelow
127 Beaver Street South P.O. Box 148
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mrs. Chard Mr. & Mrs. Cadorin
450 Beaver Street 412 Beaver Street South
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mrs. J. Watson Mr. & Mrs. M. Robinson
438 Beaver Street South 47 Robert Street
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mr. & Mrs. R. Burley Mrs. H. Crago
48 Robert Street 188 Beaver Street South
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mr. T. Philip Mr. & Mrs. Scott
354 Beaver Street South 338 Beaver Street
Newcastle, Ontario Newcastle, Ontario
LOA 1HO LOA 1H0
Mr. A. Barbacsy Mr. R. Wagar
58 Simpson Avenue 50 Caroline Street East
Bowmanville, Ontario Newcastle, Ontario
L1C 2H8 LOA 1H0
Mr. R. Langstaff
53 James Street
P.O. Box 367
Newcastle, Ontario
LOA 1H0
i
10(r)
ATTACHMENT NO , 2
INFORMATION CENTRE WD-18-89
THE CORPORATION OF THE
TOWN OF NEWCASTLE
PROPOSED RECONSTRUCTION OF BEAVER STREET AND
ROBERT STREET, VILLAGE OF . NEWCASTLE .
NOVEMBER 2, 1988
Name Address Remarks
v r .cir// E JC 5 1 l v� o�v�c t`� ✓o!�1 e►-i
dT
or) S V e i e j
tic
oa4 .
{_T F �lcic. C o1,ee 1 Z-7
Y�t. U
t
c ,
4-9
Q.-S�� /�Q � o
-- � -<_4L
>
--._..
1
jco-L v-, L. 0 t i
�-z `n kek--_0 4� r -- ,
0
L OSS 6.1 ouch
A�TE•f' c.<//�iP �if,F of 7r4'4.1-
11v /
L f�SS OF i%cw t„va�c�
S�i✓d c�
i.���C'�.v� CANE is �flNGt f'c� s Tu
-S - /} sP�f�wA
0
INFORMATION CENTRE
THE CORPORATION OF THE
TOWN OF NEWCASTLE
PROPOSED RECONSTRUCTION OF BEAVER STREET AND
ROBERT STREET, VILLAGE OF . NEWCASTLE .
NOVEMBER 2, 1988
Name Address Remarks
--
4 xx-
Yk + DAB
�� ►� s s .
e.e
/4 e s
�C) r
n.21
S S I
4
INFORMATION CENTRE
THE CORPORATION OF THE
TOWN OF NEWCASTLE
PROPOSED RECONSTRUCTION OF BEAVER STREET AND
ROBERT STREET, VILLAGE OF . NEWCASTLE .
NOVEMBER 2. 198a
Name
Address
Remarks
tE' gGSy
��— BE�v sT.
roT.�.�.y vis,ac, c- w . 7 '
t7
SavE •4s f1�•,v 7- s ,ca s
-
w LEa4-(J E � ,cam
5-A V<= LL
/T
cp
i
sT
V
IF
/
Iu( r)
INFORMATION CENTRE
THE CORPORATION OF THE
TOWN OF NEWCASTLE
PROPOSED RECONSTRUCTION OF BEAVER STREET AND
ROBERT STREET, VILLAGE OF . NEWCASTLE .
NOVEMBER 2, 1988
Name Address Remarks