HomeMy WebLinkAboutWD-14-89 10(n)
TOWN OF NEWCASTLE
REPORT
File #
Res.
By-Law #
MEETING: GENERAL PURPOSE AND ADMINISTRATION MEETING
DATE: JANUARY 9, 1989
REPORT #: WD-14-89 FILE #:
SUB.ECT: INFORMATION CENTRE: RECONSTRUCTION OF ONTARIO STREET FROM KING
STREET TO LIBERTY STREET, BOWMANVILLE
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1 . THAT WD-14-89 be received; and
2 < THAT provision be made in the 1989 Capital Budget and Four Year
Forecast , for Council ' s consideration, for the reconstruction of
Ontario Street from King Street to Liberty Street in 1989; and
3 < THAT a copy of this report be forwarded to all those who attended
the Information Centre held on October 27 , 1988.
1 . 0 ATTACHMENTS
No. 1 : Drawing showing the location of the project .
No. 2 : Copy of the Register from the Information Centre.
2 . 0 BACKGROUND
2 . 1 Provision was made in the 1988 Capital Budget and Four Year
Forecast for the design in 1988 and the construction in 1989 of
Ontario Street from King Street to Liberty Street .
2
i
Page 2
WD-14-89
3 . 0 INFORMATION CENTRE
3 . 1 Our consultants , Totten Sims Hubicki Limited prepared functional
plans for the reconstruction of Ontario Street . These plans were
reviewed with the public at an Information Centre held on October
27 , 1988 in Courtroom 2 .
3 . 2 The proposed reconstruction includes excavation, granular base,
storm sewers , hot-mix paving, curb and gutter and sidewalks . The
pavement width is 9. 50 m (31 feet) and since Ontario Street is a
collector road sidewalks will be constructed on both sides of the
street .
3 . 3 About 16 people attended the Information Centre. The general
response was that the project is long overdue. Some of the
residents had drainage concerns , and one resident had concerns
about parking. These concerns will be addressed during the
detailed design. One resident indicated that he would prefer
that there be no sidewalk on his side of the street . It was
explained that since Ontario Street is a busy street , it is felt
that there should be sidewalks on both sides of the street . A
copy of the register kept at the Information Centre is attached.
4. 0 COSTS
4. 1 The estimated cost for the reconstruction of Ontario Street from
King Street to Liberty Street is $850 , 000 . 00 .
5 . 0 RECOMMENDATION
561 It is recommended that provision be made in the 1989 Capital
Budget and Four Year Forecast , for Council ' s consideration, for
the reconstruction on Ontario Street in 19898
3
Page 8
WD--14--89
Respectfully submitted, Recommended for presentation
to the Committee,
s
Walter A. Evans , Pm Eng. , Lawrence a Kotseff,
Director of Public Works . Chief Ad in strative Officer.
/kms
December 29, 1988
i
'0(n)
\o:
0
sr �
N
P�
w
(
ATTACHMENT N-9 , 1
WD-14-33
i
WD-14-89 - INFORMATION CENTRE - RECONSTRUCTION OF ONTARIO STREET FROM
KING STREET TO LIBERTY STREET, BOWMANVILLE
Mr. & Mrs. Gibbs Mr. & Mrs. Bate
115 Ontario Street 89 Ontario Street
Bowmanville, Ontario Bowmanville, Ontario
L1C 2T3 L1C 2S6
Mr. Hooper Mr. H. Bromell
140 Ontario Street 131 Ontario Street
Bowmanville, Ontario Bowmanville, Ontario
L1C 2T6 L1C 2T5
Mr. J. Barnard Mr. & Mrs. Hitchens
152 Ontario Street 96 Ontario Street
Bowmanville, Ontario Bowmanville, Ontario
L1C 2T6 L1C 2T1
Mr. Buttonshaw Ms. A. Adair
154 Ontario Street c/o Canadian Statesman
Bowmanville, Ontario 68 King Street West
LlC 2T6 Bowmanville, Ontario
L1C 1R4
Mrs. Knapp Mr. Wood
148 Ontario Street 93 Ontario Street
Bowmanville, Ontario Bowmanville, Ontario
L1C 2T6 L1C 2T2
Mr. & Mrs. Blake Mrs. Quinney
34 Ontario Street 127 King Street East
Bowmanville, Ontario Bowmanville, Ontario
L1C 2S5 L1C 1N6
Mr. & Mrs. Tullock Mr. & Mrs. Lunn
143 Ontario Street 88 Ontario Street
Bowmanville, Ontario Bowmanville, Ontario
L1C 2T7 L1C 2T1
i
29-139 THU 14 :4� TbH. Qu"UKt: F Fix R S f'L bb".i 1 Y 106 Iol
INFORMATION CENTRE
THE CORPORATION OF THE
i
TOWN OF NEWCASTLE j
i
PROPOSED RECONSTRUCTION OF ONTARIO STREET , BOWMANVILLE.
( LIBERTY STREET TO KING STREET I
OQTOBER 27, 1968
Name Address Remarks
i
y s� C'.
l'S�1 �nrrq Nuoii 'f�tKY Ob 3+[w�S •l. STo M s�
Lg P. /5a �nframei a .�f
'oo'e
1
ATTACHMENT 0. 2
I�ID-1'�-33
i
I
7HU 1 4 : 45 -rSH . COBURG PAX = Z7—:, zr-- "� I P . 0:3
hoc r\ )
INFORMATION CENTRI
THE CORPORATION OF THE
TOWN OF NEWCASTLE
PROPOSED RECONSTRUCTION OF ONTARIO STREET , BOWMANVILLE.
( LIBERTY STREET To KING STREET I
OCTOBER 2T, 1968
Name
Address
Remarks
/lv�
f)el�a U-N ck kp C., %4-o -dew aak
v 00
lwx rswt 0o -541-14A$ "otiAl S"
le-m
I;y Ak� At
3'u 6 4�N eg
On hLA!b
xj
X,7
ATT.KH111ENT P , 9
09