Loading...
HomeMy WebLinkAboutWD-88-90 Addendum ` UNFINISHED BUSINESS TOWN OF NEWCASTLE F r � REPORTTy File # � � * � �61, Res. # E: -�• By-Law # MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: NOVEMBER 5, 1990 REPORT #: WD-88-90ADDENDUMFILE #: S -CT. COST SHARING FOR.SERVICING OF TOWN OWNED LOTS ON HIGH STREET, BOWMANVILLE RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-88-90 Addendum be received; 2 . THAT recommendation No.2 of Report WD-88-90 be rescinded; 3. THAT Condition No.6 of draft plan approval for Subdivision 18T- 84035 located on High Street in Bowmanville be amended to read: 6 (a) "THAT the applicant will pay the full costs ( 100%) of all works (e.g. : intersection improvements, utility relocation, ditch grading, sodding, entrance construction, etc. ) on High Street and Meadowvale Boulevard which are required in connection with this development with the exception of topsoil and sodding of boulevards, street trees, driveways and hydro distribution and 50% of the sidewalk, all on the east side of High Street abutting the Town owned lots . " . . .2 REPORT NO. : WD-88-90 ADDENDUM PAGE 2 6(b) "THAT the Town will use its best effort to ensure in entering into agreements of sale of each of the four Town owned Lots which will front onto High Street that a portion of the sale price of each will be paid to the developer by the purchaser so that each purchaser will pay one quarter of the Town's share of the Town's allocated servicing costs. The Town's allocated servicing costs are the actual cost of the components of servicing High Street less the cost of topsoil and sodding of boulevards, street trees, driveways and hydro distribution and 50% of the sidewalk, all on the east side of High Street abutting the Town owned lots . The Town's allocated servicing costs are estimated to be $76,000; and 4 THAT Mr. Mario Veltri and Mr. George Karakokkinos, be advised of Council 's decision. -------------------------------------------------------------------- 1.0 ATTACHMENTS No. 1: Report WD-88-90 - Cost Sharing for Servicing of Town Owned Lots on High Street, Bowmanville No.2 : Memo to Mayor and Members of Council dated October 19, 1990, from A. S. Cannella. No. 3: Correspondence dated October 12, 1990, from Mr. G. Karakokkinos. No.4 : Engineer's Estimate No.5: Revised Estimate 2.0 BACKGROUND 2 . 1 At a regular meeting of Council held on October 15, 1990, the following resolution was passed: "THAT Report WD-88-90 be tabled to allow for staff to contact the Regional Municipality of Durham for clarification of the Regional Policy pertaining to cost sharing for servicing of Regionally-owned land. " . . .3 j 1 i 6 .a REPORT NO. : WD-88-90 ADDENDUM PAGE 3 2 .2 At a regular meeting of the General Purpose and Administration Committee held on October 22, 1990, the following resolution was passed: "THAT the memorandum from T. Cannella, Manager of Engineering, regarding cost sharing for servicing of Town owned lots be referred to the General Purpose and Administration Committee meeting -scheduled to be held on November 5, 1990, to allow sufficient time for a report to be prepared on this matter. " 3 . 0 REVIEW AND BACKGROUND 3. 1 Region's 'Cost Sharing Policy' and Relevance to the Servicing of the Town's Lots The mechanics of the Region's 'Cost Sharing Policy' is outlined on Attachment No. 1. It is clearly noted that this policy deals exclusively with Regional Services (watermains and sanitary sewers) only. This policy does not have a bearing on the servicing of the Town's lots on High Street, nor does it have a financial implication on Mr. Veltri. The purpose of the policy is to facilitate the installation of oversized Regional Services in a financially equitable manner with developers . 3 .2 Meeting Between Town Staff and Mr. Veltri Public Works Staff met with Mr. Veltri and his consultant, Mr. G. Karakokkinos of G. M. Sernas & Associates on October 12, 1990 to discuss the cost sharing of the Town's lots on High Street. Several scenarios were discussed with the objective of reducing Mr. Veltri's financial burden for the Town's share of the works on High Street. A cost sharing proposal in writing was later received from Mr. G. Karakokkinos of G. M. Sernas & Associates dated October 12, 1990 (see Attachment No.2) . l� ) L[ . . .4 i i REPORT NO. : WD-88-90 ADDENDUM PAGE 4 3 . 3 Mr. Veltri's Cost Sharing Proposal I i Town Staff reviewed Mr. Veltri's cost sharing proposal (See Attachment No.2) but could not justify the acceptance of the terms of this proposal as equitable to the Town from a financial viewpoint. 3 .4 Town's Cost Sharing Proposal Upon further review and consideration of Mr. Veltri's concerns, staff prepared an alternative cost sharing proposal. Our proposal considered the staging of the works, whereby Mr. Veltri would construct all the 'Works ' specified in the engineer's estimate dated September 24, 1990 (see Attachment No.3) with the exception of topsoil and sodding of boulevards, street trees, driveways and hydro distribution and 50% of the sidewalk, all on the east side of High Street. The works excluded, would be constructed in the future by the Town or the purchaser of the lots on the east side of High Street when they are sold. Should the Town's proposal be implemented, the up-front costs to Mr. Veltri could be reduced by approximately $36,000 . Based on the engineer's estimates the staging of these works would reduce Mr. Veltri's up-front costs and reduce the future reimbursement from the Town, from approximately $112,000 to $76,000. However, the Town would be directly responsible for the deferred costs of approximately $36,000 in the future. The details of the estimate of cost is shown on Attachment No. 5 . 3 .5 Subsequent Meeting With Mr. Veltri Another meeting was held with Mr. Veltri on October 29 , 1990, to further discuss this matter. Mr. Veltri requested that the Town consider the use of monies received through the development of Plan 18T-84035 to offset the Town's share of the 'Works' on High Street such as: a) Public Works portion of the Lot Levies b) Parkland Contributions ' 6, . . .5 REPORT NO. : WD-88-90 ADDENDUM PAGE 5 This proposal was considered by staff and it was determined that the use of Lot Levies or Parkland Contributions for the purpose of development of Town owned lands would not be appropriate. 4.0 CONCLUSION AND RECOMMENDATIONS 4 . 1 In considering the various cost sharing proposals, it was concluded that the most reasonable and equitable option was the Town's Cost Sharing Proposal as outlined in Section 3 .4 . This proposal was selected, since it facilitated Mr. Veltri's development of Plan 18T-84035 and reduced his up-front costs . In addition, the proposal permits the Town to be selective in the timing for the sale of the Town lots . Respectfully submitted, Recommended for presentation to the Committee, -- -------------- V------------------ Walter A. Evans, P.Eng. , LawrencVi'istrative Kotseff, Director of Public Works Chief A Officer ASC*WAE*llv October 30, 1990 Attachments Mr. M. Veltri 68 King Street East Bowmanville, Ontario L1C 1R4 Mr. G. Karakokkinos c/o G M. Sernas & Associates Ltd. 110 Scotia Court, Unit 41 Whitby, Ontario L1N 8Y7 i i TOWN OF NEWCASTLE REPORT File # Res. # By-Law # MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE 'S DATE: OCTOBER 1, 1990 REPORT #: WD-88-90 FILE #: JB,ECT. COST SHARING FOR.SERVICING OF TOWN OWNED LOTS ON HIGH STREET, BOWMANVILLE trr RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-88-90 be received; 2 . THAT Condition No. 6 of draft plan approval for Subdivison 18T-84035 located on High Street in Bowmanville be amended FORTHWITH to read: 6 (a) "THAT the applicant will pay the full costs ( 100%) of any work (e.g. : intersection improvements, utility relocation, ditch grading, sodding, entrance construction, etc . ) on High Street and Meadowvale Boulevard which are required in connection with this development. " ATTACHMENT NO .1 WD-88-90 ADDENDUM 2 REPORT NO. : WD-88-90 PAGE 2 6 (b) "THAT the Town will use its best effort to ensure in entering into agreements of sale of each of the four Town owned lots which will front onto High Street that a portion of the sale price of each will be paid to the developer by the purchaser so that each purchaser will pay one quarter of the Town's share of the Town's allocated servicing costs. The Town's allocated servicing costs are the actual cost of the components of servicing High Street set out in Attachment No.3 to Report WD-88-90 which now are estimated to be $111,937 . " 3. THAT Mr. Mario Veltri and Mr. George Karakokkinos, G. M. Sernas & Associates Limited, be advised of Council's decision. -------------------------------------------------------------------- REPORT 1.0 ATTACHMENT No. l: Correspondence dated September 20, 1990, from G. M. Sernas & Associates Limited No.2: Key Map No. 3: Engineer's Estimate of Works 2.0 BACKGROUND 2 . 1 Plan of Subdivision 18T-84035 received draft plan approval on April 30, 1990 . Condition No. 6 of the draft plan approval states: "That the applicant will bear the full cost ( 100%) of any works (i.e. intersection improvements, utility relocation, ditch grading, sodding, entrance construction, etc . ) on High Street and Meadowvale Boulevard which are necessitated as a result of this development. " °f `✓ . . .3 68 i REPORT NO. : WD-88-90 PAGE 3 2 .2 Town Owned Lots on High Street The Town owns four lots on the north side of High Street. Since the Town will benefit from the construction of High Street and the related services, the owner of the development, Mario_ Veltri has asked the Town to agree to pay its fair share of the road and servicing costs . 3.0 REVIEW AND COMMENT 3. 1 Town's Share The lots owned by the Town and the Subdivision 18T-84035 are illustrated on Attachment No.2 . The details of the 66st estimates and cost sharing are illustrated on Attachment No.3. As noted, the estimated cost for the Town's share is $111,937 . The Town's share will be based on the items listed and will be based on actual costs which will be determined upon completion of construction. 3.2 When Town to Pay Its Share Mr. Veltri has asked that the Town pay its share within 30 days after certification by the consulting engineer that the works have been completed. His reasoning for this request is that once the servicing is complete, the Town will have four marketable serviced lots . However, from the Town's viewpoint, the best time for the Town to reimburse the developer for the Town's share of the servicing costs is when the Town sells the four lots on High Street. 3 . 3 Estimated Completion Date It is estimated that the servicing will be completed by November 30, 1990. 4.0 CONCLUSIONS AND RECOMMENDATIONS 4 . 1 Based on the above, it is recommended: 1. THAT Report WD-88-90 be received; REPORT NO. : WD-88-90 PAGE 4 2. THAT Condition No. 6 of draft paln approval for Subdivison 18T-84035 located on High Street in Bowmanville be amended FORTHWITH to read: 6 (a) "THAT the applicant will pay the full costs (100%) I of any work (e.g. : intersection improvements, utility relocation, ditch grading, sodding, entrance construction, etc. ) on High Street and Meadowvale Boulevard which are required in connection with this development. " 6(b) "THAT the Town will use its best effort to ensure in entering into agreements of sale of each of the four Town owned lots which will front onto High Street that a portion of the sale price of each will be paid to the developer by the purchaser so that each purchaser will pay one quarter of the Town's share of the Town's allocated servicing costs. The Town's allocated servicing costs are the actual cost of the components of servicing High Street set out in Attachment No. 3 to Report WD-88- 90 which now are estimated to be $111,937 . " I 3. THAT Mr. Mario Veltri and Mr. George Karakokkinos, G. M. Sernas & Associates Limited, be advised of Council's decision. Respectfully submitted, Recommended for presentation to the Committee, -d ---- --------- Walter A. Evans, P.Eng. , 4 Lawrence E. Kotseff, Director of Public Works V Chief Administrative Officer WAE*llv September 25, 1990 Attachments Mr. Mario Veltri Attention: Mr. George Karakokkinos 68 King Street East c/o G.M. Sernas & Associates Ltd. Bowmanville, Ontario 110 Scotia Court, Unit 41 L1C 1R4 Whitby, Ontario ( � / U ( / L1N 8Y7 i G.M. Sernas September 20, 1990 OAssociates Ltd. CConsuhing Engineers&Planners 110 Scotia Court Unit 41 Whitby,Ontario UN 8Y7 Telephone:(416)432-7878 Toronto line:(416)428-9049 Fax:(416)432-7877 Town of Newcastle 40 Temperance Street Bowmanville, Ontario .:;F.,! _�f LIC 3A6 A_ N. : ,+. '.' r Attention: Mr. Walter Evans, P;Eng.•—:.------- t Director of Public Works '_ � S_P �1 T�:?��{�'�� �tip},"rry�,� :± Dear Sir: Mr. Evans RE: HIGH STREET - DRAFT CONDITIONS PLAN OF SUBDIVISION 18T-84035 BOWMANVILLE, TOWN OF NEWCASTLE OUR PROJECT NO. 87155 With reference to the above-noted plan of subdivision and our meeting of September 17, 1990, we are writing to confirm that Condition No. 6 of the post circulation draft approval is onerous to this development as the construction of High Street will not only benefit the captioned subdivision but also the existing four lots owned by the Town as noted on the attached sketch. Therefore, we kindly request that this condition be amended to reflect the following: "That the applicant will bear the full cost (1000) of any works (i.e. intersection improvements, utility relocation, ditch grading, sodding, entrance construction etc. ) on High Street and Meadowvale Boulevard which are necessitated as a result of this development and that upon completion of same and within 30 days thereafter certification by the consulting engineer that the works have been completed, the Town will reimburse the developer for 500 of the works fronting the existing four lots. " It is my understanding that during the 1990 fiscal year, Mario Veltri, Larry Kotseff, Walter Evans, and Frank Wu had met and negotiated an arrangement whereby they all agreed that Mr. Veltri will purchase the four lots on the east side of High Street to be comprised of eight individual units (link homes) and that the estimated cost for construction for the frontage of these lots was to be borne by Mr. Veltri, however, reflected in the purchase price of the lots. Furthermore, correspondence from G.M. Sernas & Associates Ltd. dated February 2 , 1990 and February 7 , 1990 to Mr. Larry Taylor and Mr. Larry Kotseff of the Town of Newcastle j \2 -® ATTAC'i1 lt1N T N0 .1 G.M.Sernas p,kssociates Ltd. _ Town of Newcastle �X C `•*SiromEiB VGtrnFt Mr. Walter Evans September 20, 1990 Page 2 reflected the possibility of converting. the four Town lots from an R-1 zoning to an R-2 zoning allowing seven forty foot single to act , as a buffer to the existing residence bn the east of High Street. However, to date we have received no correspondence to this proposal and as such the developer is anxious to finalize the plan of subdivision 18T-84035 and deal with the four lots on a separate issue. It is therefore our position to proceed immediately With the construction of the said subdivision including High Street and that the four lots presently owned by the Town should not be conditional to this development. As such, we kindly request that the Town provide G.M. Sernas & Associates Ltd. the number of laterals required to service the four lots and the Town's position to their + share of construction of High Street. It is our intention to sign the draft conditions as soon as the Town is in agreement to amend Condition No. 6 as noted above and furthermore it is the developer's position to proceed with construction during the 1990 fiscal year. Therefore, we would appreciate your assistance in expediting both our concerns noted above and engineering drawings as soon as possible so we can finalize the the subdivision agreement. We are prepared to meet and discuss this matter so as to provide additional information or to clarify any questions that you may have. Yours very truly, G.M. SERNAS & ASSOCIATES LTD. rge Karakokinos, C.E.T. Associate, Branch Manager i GK: ss cc: Town of Newcastle, Attn: Mayor M. Hubbard Attn: Mr. Larry Kotseff Attn: Mr- Frank kau Region of Durham, Attn: Valerie Cranmer, Planning Dept. Veltri & Son Limited, Attn: Mr. Mario Veltri i HIGH STREET CONSTRUCTION I ' HIGH STRE T 50 % TOWNS SHARE , h � w O O � � m J HIGH STREET D V. 18 T— 84035 h MEADOWVIEW BLVD. c� c O } DRAWN = J .Mj DATE SEPT. 1990 ATTACHMENT NO . 2 KEY MAP G.N .Sernas 1ssociaws Ud. Cc-dh�rgEMwmlPiennm SUMMARY ENGINEERS' ESTIMATIE OF WORKS UNDERGROUND SERVICING AND ROADWORKS TOWNS SHARE OF HIGH STREET TOWN OF NEWCASTLE it SEPTEMBER 24, 1990 ESTIMATED AMOUNT CONTRACT DESCRIPTION _________w____ A, SANITARY . $4,400.00 B WATER DISTRIBUTION SYSTEM $5,x00. 0( C STORM SEWER $9 ,750. 00 D PROVISIONAL (STORM SEWER) $17 ,590. 0. E ROADWORKS $37 , 046.7t' F ROUGH GRADING _^$2 ,925_00 SUBTOTAL $76, 911' 71 ADD: STREET LIGHTING $2 , 025. 0 (50% OF $30 PER CENTERLINE) ADD: HYDRO DISTRIBUTION SYSTEM $16, 000 . 0^ ($2000 PER LOT) ADD: STREET TREE PLANTING $2 , 400. 00 ($300 PER TREE) ------ _- TOTAL $97 , 336. 76 ADD: ENGINEERING & CONTINGENCIES y$14 , 600_5 (+- 15%) GRAND TOTAL $111 , 937 . 2 ATTACi LENT 110 . 3 WD-33-90 i r' i TOWN OF NEWCASTLE MEMORANDUM a a Mayor and Members of Council TO: FROM: A. S. Cannella, Manager of Engineering ? DATE: October 19, 1990 SUBJECT; COST SHARING TOWN-OWNED LOTS COUNCIL MINUTES OF OCTOBER 15, 1990 REPORT wD-88-90 - RESOLUTION #C-669-90 --------------------------------------------------------- At a meeting of Council on October 15, 1990, the following Resolution #C-670-90 was passed: "THAT Report WD-88-90 be received; THAT Report WD-88-90 be tabled to allow for staff to contact the Regional Municipality of Durham for clarification of the Regional policy pertaining to cost sharing for servicing of Regionally-owned land; and THAT a subsequent report be presented to the General Purpose and Administration Committee Meeting scheduled for October 22, 1990" . AND Resolution #C-671-90 : "THAT the foregoing Resolution#C-670-90 be amended by adding the words "that appeared at both the General Purpose and Administration Committee Meeting held on October 1, 1990, and the Council meeting held on October 15, 1990" after the word "delegation" in the second paragraph. In accordance with the above-noted resolution, Public Works Staff have contacted the Region of Durham and have found that the Region does not have a policy pertaining to the cost sharing for the servicing of Regionally-owned lands . The Region does have a 'Cost Sharing Policy' that deals with development-`and the financing of the oversizing of Regional services . This policy is administered in conjunction with their standard subdivision agreement. Attached is a copy of the Region's 'Cost Sharing Policy' . ATTACHMENT NO .2• .2 '' WD-33-90 ADDE MUM i . . .2 II Due to time constraints, we have reviewed the Region's `Cost Sharing Policy' in a preliminary nature only. In addition, we have discussed this policy with Regional staff and have summarized our findings below: 1. The purpose, in principle, of the policy was to facilitate in a financially equitable manner with developers, for the oversizing and abutting costs of Regional services such as watermains and sanitary sewers . 2 . The policy deals exclusively with Regional watermains and sanitary sewers and not Regional roads or storm sewers. 3 . The ownership of the lands abutting or external to the proposed Regional services is not a consideration in the administration of this policy. 4. The policy defines the cost sharing apportionment between the Region and the developer, for the installation of Regional watermains and sanitary sewers in conjunction with the servicing of a development. The Region's costs for the oversizing of watermains and sanitary sewers, would be included in the Region's subdivision agreement with the developer. 5. In order to implement this the cost sharing policy, the Region established a reserve fund. The purpose of this reserve fund was to facilitate the payment to the developer, of the Region's share of any oversizing and/or abutting costs . 6 . In future, upon the development of the abutting lands for which the Region has paid for oversizing or abutting costs, the Region would recover their costs by imposing frontage charges . 7 . This policy dictates to Regional staff under what circumstances and to what limit, the Region will reimburse the developer for the oversizing of Regional watermains and sanitary sewers . . 3 i I . . .3 e this As mentioned above, summary is a brief overview of the methodology and mechanics of the Region's 'Cost Sharing Policy' . Should Council wish to pursue this matter further or require additional details, a detailed report may be prepared for the next General Purpose and Administration Committee meeting. Respectfully submitted, A.S. Cannella, C.E. T. Manager of Engineering ASC/llv pc: L. E. Kotseff, Chief Administrative Officer W. A. Evans, P. Eng. , Director of Public Works REG . OF DURHAM WKS . DEPT 1-416-668-2051 Oc 8 ,go 11 :06 No .003 P .04 APPENDIX 11 1. Pro osed Cost Sharing polio for Sanitar Sewe:rs. and Watermalns_ e ated to—Newes`fdentia Su�div lion eve o ent�� The eat levy Calculation for the development �ciudesocaststhe related to . Review of the Servicing and F,inaSgudy Study costs are developed external, internal and abutting services- on the principle that the lot levy covers the cost related to the external services and also includes the cost related to the Region's share of internal and abutting services. These C05t5 are covered On a Region-wide basis and thus are Incude in ihetlo next ten calculation for the protected subdivision developments A) DEFINITION OF TERMS Sanitary Sewers: shall re system and related pp with Regional standards. Watermains: shall refer to a watermain system and related appurtenances desigend in accordance with Regional standards. Abutting Services: shall include sanitary sewers and/or watermains, either existing or prop osed, that are either located on a road allowance outside the limit of a subdivision but abut the subdivision or located on a road allowance within the limit of a subdivision but abut other lands outside the subdivision. Internal Services: shall include sanitary sewers and/Or watermains, either existing or proposed, that are located within the limit of a subdivision but shall not include abutting services. External Services: watermains. eithertexistingrorawater proposed, that are located outside the limit of a subdivision but shall not include abutting services. Minimum Size: shall be the size of a sanitary sewer and/or a watermain of sufficient size, as determined by the Region, to service a subdivision provided that the minimum size shall not be less than 200 millimetres in diameter for sanitary sewers and 150 millimetres in diameter for watermains. i REG . OF DURHAM WITS . DEPT T 1-416-668-2051 Oct _ ,3 .90 11 :06 No .003 P .05 Cost: - the cost of existing sanitary sewers and/or watermains shall be the current cost as determined by the Region, of constructing a sanitary sewer and/or a watermain of sufficient size to service the subdivision. the cost of proposed sanitary sewers and/or watermains shall be the final cost of designing and constructing sanitary sewers and/or watermains,, as determined by the Region, after the construction of the sanitary sewers and/or watermains is complete. 8) POLICY i) Abuttinq Services The cost for abutting services shall be shared between the Region and the Subdivider on the following basis: a) for the abutting services which are not required to service the subdivision, the Region shall pay for 100 percent of the cost. b) For the abutting services which are required to service the subdivision as well as lands outside of the limits of the subdivision, the Subdivider shall pay for 50 percent of the cost for the minimum size and the Region shall pay for the balance of the cost. c) For the abutting services which are required to service only the subdivision and will not service any other lands outside j the limits of the subdivision, the Subdivider shall pay for 100 percent of the cost. 11) Internal Services The cost for internal services shall be shared between the Region and the Subdivider on the following basis: a) For internal services which are not required to service the subdivision, the Region shall pay for 100 percent of the cost, b) For internal services which are required to service the subdivision, the Subdivider Shall pay for 100 percent of the cost for the minimum size and the Region shall pay for the 1 balance of the cost. REG. OF DURHAM WKS . DEPT T : 1-416-668-2051 Oct '3 +90 11 :06 No .003 P .06 iii ) External Services The cost for external. services shall be 100 percent paid for by the Region and there shall be no direct charge to the Subdivider. C) EXAMPLES_ The following page (Table 19) illustrates the cost sharing policy in diagram form followed by two examples each for sanitary sewers (Tables 20 and 21) and watermains (Tables 22 and 23) to demonstrate the application of the policy. i 80 j Uw REG . OF DURHAM INKS . DEPT i 1-416-668-2051 Oct 5 ,90 11 :06 No . 003 P .07 TABLE 19 COST SHARING POLICY FOR SANITARY SEWER ANO WATERMAINS RELATED TO NEW SUBDIVISION DEVELOPMENT 0EV£I.OPEWS FiEG10t1 S ,,�t+APE NAR EXTERNAL 0 % 100% SERVICES =REQIU�IRED 0 % I00% ABUT T ING SERVICES REQUIRED FOR LANDS OUTSIDE 50%Off' BALANCE SUBDIVISION WGIZE . REQUIRED 5OR THE SUBDIVISION NOT REQUIRED FOR LANDS 100 % G bUTSIDE I VI I V NOT REQUIRED FOR THE 0 % SUBDIVISION INTERNAL SERVICES REQUIRECD) FOF2� !QO"o t% af�' BALANCE THE SUBD{V IS ION MIN. SIZE REG . OF DURHAM WKS . DEPT 1-416-665-2051 Oc 18 ,90 11 06 No .003 P .OS TABLE 20 SANITARY SEWER SERVICING COST SHARING 1 4 P O L 11 � I I 131 t E E I _ _- I mm E OK N t f i a 1 I f 1 1 i w COSH' SHARING OEVELOPERS REGI ON'S SECTION $IZE OEHARE R3 REGION'S S SECTION Sf2E SHARE SHARE SHARE SHARE A 200 m 50%d MIN.SIZE BALANCE K 250 mm 100% WIN112 E BALANCE 8 20C m 50%pf MIN.SIZE BALANC£ L 250 mm 100.% MIN.SIZE BALANCE C 200 m. 100 % M 200 mm 100 0 200 mrn 1001 N 300 mm $c% of MIN.SIZE BALANCE °o E 250 mm 10 %0%of M 0 200 mm 100 IN.SJZ BALANC£ --- f HOC mm 100%ofMIN,SIZE BALANCE P 200 mm _ 100% t00 % 0 200 mm �' 100 % G 3J' 0 T rr -- - - H _00 mrn 100% ,---- 1 200 mrr 100% i i I REG . OF DURHAM WKS . DEPT + 1-416-668-2051 Oci 8 .90 11 :06 No .003 P .09 i TABLE 21 SANITARY SEWER SERVICING COST SHARING GNASH ROAD 1 r � 1 , 1 1 1 f W -. -.. - H 325 D - ----------- E` ! + COMMERCIAL BLOCK Z. THE KING'S HIGyWAY 750 mm 5AN, � 1 1 COST SHARING SECTION SIZE DEVELOPERS ;iS' EGIONS SHARE SHARE A.8,9- C 200 mm SO % 50 % C•D 373 mm 50% of M1tl.Slz ALANC E D-G G K 5 mm 100%of MIN,SIZE ALANCE K-L OTHERS 200 m i REG . OF DURHAM WKS . DEPT 1-416-668-2051 Oc 8 ,90 11 06 No .003 F . 10 auwttiiw.t.�t�wtu•. .lau...nuraaA+..OKWruusJrli.rur►.1u-uu a�.wwu WAFER SUPPLY SERVICING AF— TABLE SHARING E` TABLE 22 •` .spara._..fir.._.r._._.. /l ---- ---- L 1 I • t I a f .ter._.�._I.Y .w—.w,..+.. �...Y....�,.,.. �'^ l��mm. E' mm. � G i 1 s M ° I I • I " ! i 1 1 I I t a COST SHARING N! i Q . SECTION SIZE DEVELOPERS REGION$ SHARE SHARE EXISTING A 2'04 mm .--� 100% EXIMNG ' + WATER '-``�,� 8 200 mm $O% of MiN,SIZE BALANCE C 200 mm 50%of MIN.StZE BALANCE D 200 mm too ° 00 mm 100%otMiNlIZE SALANCE f. 150 mm 100 % 4 200 mm 100%of MIN.SIZE BALANCE H 300 mm I00% 1 300 m m 100% 300 mm 50%of MIRSIZE SAL ANC£ ) �) `! K 200 m 100%of MIRSIZE BALANCE - _. REG . OF DURHRfi WI<0 . DEFT TEL : 1-416-668-2051 Oct �8 ,90 11 :06 Iqo .003 P . 11 • I TABLE 23 WATER SUPPLY SERVICING COST SHARING EXISTING 600 mM WATERMAIN NASHi ROAD I Y ul E� . �.---- — I i I BLOCK A E� r r i ---- I , I / COMMERCIAL BLOCK / THE KING'S r------- f I I I FUTURE 300 mm WATERMAlN i COST SHARING SECTION slXE DEVELOPERS REGION'S SNARE SNARE C o��cv0 mm 500/0 of MIN SIZE bAI,ANCE G - E ,20Gmrr X00 c- r;r;s Isc mm 1000/1 �— October 12 , 1990 Gm, Sernas QASSOCiate.S Ltd. ili;!neers a?fanner; n, Unit 41 Qr­vio LIN 8',", FiL E Cur y �4,i6'432,1a78. L,rq.(416 422-9049 432-7877 Town of Newcastle 40 Temperance Street BowmaDville, Ontario LIC -3A6 Attention: Mr. Lawrence E. kotseff Chief Administrative officer Dear Sir: RE: TOWNS ' SHARE OF HIGH STREET PLAN OF SUBDIVISION 18T-84035 TOWN OF NEWCASTLE (BOWMANViLLE) OUR PROJECT NO. 87155 It i$ unfortunate that we were. unable to meet and discuss the matter concerning the construction of High Street within plan of subdivision 18T-84035 since the General Purposes and Administration Committee meeting of October 1, '1990, Our concern related to the above relates to the developer ):)eiirjg responsible for 100; of any works. I it is our belief and understandihfq that the percentage of 10o' as a result of Mr. Veltri purchas'ing the 4 lots owned by the Town. T believe Mr. Veltri had documeilted certain costs to be deducted from the price of the 4 lots, attributed to 50% construction of High Street. Therefore, the 1,00% cost was attributed to the developer on the premises that Mr. Veltri would have purchased the 4 lots from the Town . As you are aware this scenario has not and may not occur. As such the Town� should treat this development of High Street in accordance with p�' st situations which are sinilar. it is our experience that in similar situations, the developer has negotiated with the Public Works�, Departmoent that an abutting road such as the one in question be constructed to a certain type of cross-section reflecting 50% of the works. This is very difficult to achieve if one wishes to be practical, therefore, in most situations the developer ends up 6onstructing the road and services in such a manner acceptable to the Town Public Works Department, resulting to approximately 60 70 per cent of the total works . ATTACHMENT NO ,3 ­ \2 WD-88-90 ADDENDUM 1 30 MISSISSAUGA WHITBY i i I G.M. Sernas Town of Newcastle ����1 .5�x;iarc s l.rci. Mr. L. Katseff C� October 12 , 1990 Page 2 As you can see from the above., the Town is being inconsistent with the Town in this instance requesting 1004 of costs to be borne by the developer. and a best effort to collect when and if the 4 are ever sold. i In order to expedite this situation, we wish to request that the Town apply the same guidelines ::as used in the past, We recommend the following for your consideration. 1. The developers (Veltri & San Limited) construct High Street in the following manner: a) all underground services as required b) all ! of first year roadworks up to base asphalt C) no top curb on east side d) no sidewalk on east side which is required by the Town e) no top course asphalt throughout �iigh Street f) no boulevard treatment on east side i. e, trees, sod, driveways, etc. g) all items included in; year 2 works as attached herein. 2 . The Town 'to be responsible for the aforementioned as needed or when the lots are sold. 3 . The Town to be responsible for the required storm sewer connections needed for the '4- lots 30 days after certification of the work by G.M. Sernas & Associates. 4 . The Town; to reimburse Veitri & son Limited the cost of subdra,ins under the east curb line fronting the 4 lots and that portion south of the 4 lots to Meadowview Boulevard when the 4 lots are sold. 5 . The Town reimburse Velt,i & Son Limited 50% of the cost of all granular material and base asphalt when the 4 lots are sold. Conditions 4 and 5 are not to be on the best efforts basis but must be enforced when lots are sold. We trust the proposal provided is amiable to all parties, however, we realize th4 Town staff will not be able to reach a decision prior to the Council meeting being held Monday, October 15, 1990 . G.M. Berms Town of Newcastle IQIIV`—ISIS—Ociales Ltd. Mr. L. Kotseff October 12 , 1990 Page 3 Therefore, we are requesting that the matter be tabled allowing both parties to reach a mutually agreed solution. We are requesting that the matter be fabled for a period of 2 weeks and that a meeting be held by the appropriate parties in the meantime to resolve this issue. Should you have any questions in regards to the above, please do not hesitate to contact the undersigned. Yours very truly, G.M. SERNAS & ASSOCIATES LTO. George Karakokkinos, C.E.T. Associate, Branch Manager cc: Town of Newcastle, Attn: Mr. Walter Evans, P.Eng. Attn; Mayor M. Hubbard Attn-, 6ouncillor Larry Hanna Attn: Mr. Tony Canella, C. F.T. Attn: Dianne Hamre G.M. Se nas oP�,y]N� ssociates 1,ld- • ��w. ENGINEEP,S ' ESTI2 ATE HIGH STREET DE�iELOPM- T CONTRACT 111 SECTION 1 - HIGH STREET ROADWORKS (YEAR 2) ------ -------�_-___�__----__ UNIT ESTIMATED ITEM DESCRIPTION QUANTITY UNIT RATE AlKOUNT 312 . 1 SUPPLY AND PLACE HL3 ASPHALT 180 MG 52 . 00 9, 360 . 00 3 . 2 . 2 ADJUST MA BOLES AND CATCHBASINS 12 NO 200. 00 2 , 400 . 00 3 . 2 . 3 ADJUST VALVES PRIOR TO SODDING 3 NO 110. 00 330 . 00 3 . 2 . 4 SWEEP AND CLEAN BASE ASPHALT 1, 500 Sm 0. 30 d50. 00 3 . 2 . 5 APPLY TACK COAT PRIOR TO HL3 11300 SM 0 . 30 450 . 00 3 . 2 . 6 SUPPLY AND PLACE CONCRETE CURB AND GUTTER a) TOP 175 LM 30. 00 5, 250 . 00 i 3 . 2 . 7 CONSTRUCT 1. 5m WIDE SIDEWALK 165 . LM 57. 00 9 , 405 . 00 (130mm DEPTH) i 3 . 2 . 8 CONSTRUCT DRIVEWAY APPROACHES a) GRANULAR 'A' (15 01Rm DEPTH) 130 MG 18 . 00 21340 . 00 b) HL3 (50mm DEPTH) 50 MC 80 . 00 4 , 000 . 00 3 . 2 . 9 TOPSOIL AND SOD BOtiLEVARDS 1, 500 SM 4 . 50 6 , 750 . 00 3 . 2-. 10 CONSTRUCT LAP JOINT } 2 0 L4 20. 00 4 0 0 . 0 0 ---------------- - -- ------------------ SUBTOTAL - INTERNAL ROADh70RKS (YEAR 2) $41, 135 . 00 189 G.M.Sernas QL SSOCiatcS Ltd. ENGINEERS' ESTIMATE HIGH STREET DEVELOPMENT - ------------------- -------------- -------- ----------------------- --------- SECTION A SANITARY. SEWER SYSTEM UNIT ESTIMATED ITEM DESCRIPTION QTY UNIT RATE AMOUNT - ------------------------------------------------------------------------------ 1. SUPPLY AND INSTALL 3-00mm DIA 8 Lm $550.00 $4,400.00 PVC SERVICE CONNECTIONS ------------------------------------------ SUBTOTAL - SANITARY SEWER :$4,400.00 --------------------------------------------- L-=ION B WATER DISTRIBUTION SYSTEM 1. SUPPLY AND INS-TALL 19= WATER: a Lm $650 . 00 $5,200. 00 CONNECTION --------------------------------------------- SUBTOTAL - WATER DTST. SYSTEM .$5,200. 00 ------------- ---------------------------- : ACTION C - STROM SEWER SYSTEM ---------- 1, SUPPLY AND INSTALL 150mm DIA PVC SERVICE CONNECTION 8 11114 $600. 00 $4, 800. 00 2. MANHOLE 35 (50% SHARE) LS $950. 00 ' 3. CATCHBASINS (50% SHARE) 4 NO $850 . 00 $3,400- 00 4 . REMOVE PLUG FOR EX. MANHOLE LS $600. 00 ----------- -------------------------- SUBTOTAL - STORM SEWER . $9, 750. 00 --------------------------------------------- ATTACHMENT NO .4 WD-88-90 ADDENDUM } G.M.SE'rnas �,�ss�ciates �,td. �„�.. Cat,cldikj 6x!nre!3 Piahnen ENGINEERS' ESTIMATE HIGH STREET.' DEVELOPMENT ---------------------------------------------- --------------------------------------------�-------- UNIT ESTIMATED ITEM DESCRIPTION QTY UNIT RATE AMOUNT ----------------------------------- --------------------------------- --------------- --------------------------- SECTION D - PROVISIONAL (TO BE INCLUDED IF EX. SYSTEM IS NOT ADEQUATE) 1. MANHOLES (50% .SHARE) 2 NO $1,900.00 $31800. 00 2 . 450mm DIA CONC. SEWER 132 LM $70. 00 $9, 240. 00 (50% SHARE) 3 . REMOVE EX. STORM MANHOLES 2 NO $600. 00 $1,200.00 4. REMOVE STORM SEWERS a) 375mm DIA 55 LM $20. 00 . $1-1100.00 b) 450mm DIA 90 LM $25. 00 $2 ,250. 00 - SUBTOTAL - PROVISIONAL $17 , 590. 00 SECTION D ROADWORKS TOTAL COST (180. 0 OF ROAD) YEAR 1 $57 , 655. 00 YEAR 2 `$41, 135_00 $98 ,790 . 00 COST / M = $548 . 83 TOWN SHARE / M (50%) = $274.42 TOWN SHARE = 1352 X $274 .42 /M $37 , 046. 70 SECTION E - ROUGH GRADING $2 , 925 . 00 r G.M.Serna.s LJ�. Cr-.t��gEn�vrmh4iDnrun i i i i SUMMARY ENGINEERS' ESTIMATE OF WORKS UNDERGROUND SERVICING AND ROADWORKS TOWNS SHARE OF HIGH STREET TOWN OF NEWCASTLE sx. SEPTEMBER 24, 1990 ESTIMATED CONTRACT DESCRIPTION AMOUNT A SANITARY . $4 ,400. 00 ' B WATER DISTRIBUTION SYSTEM : $5, 200. 0( C STORM SEWER $9 ,750. 00 D PROVISIONAL (STORM SEWER) $17 ,590 E ROADWORKS $37 , 046.70 F ROUGH GRADING '$2 ,925. 00 SUBTOTAL $76,911. 71 ADD: STREET LIGHTING $2 , 025. 01 (50% OF $30 PER CENTERLINE) ADD: HYDRO DISTRIBUTION SYSTEM $16, 000. 0^ ($2000 PER LOT) ADD: STREET TREE PLANTING $2 , 400. 00 ($300 PER TREE) TOTAL $97 , 336. 70 ADD: ENGINEERING & CONTINGENCIES $14 , 600. 5 ----------- GRAND TOTAL $111, 937 . 2 ATTACH,!IENT NO .3 L' °2� WD-33-90 i REVISED WORKS COSTS ESTIMATE FOR TOWN LOTS ON HIGH STREET October 30, 1990 i i Works deferred from original estimate ************************************* 1. Roadworks 50% of sidewalk on east side $3,892.50 Driveways $6,430.00 Topsoil and Sodding of Boulevards $2,475.00 --------------- roadworks deferred $12,797.50 2. Street Trees $2,400.00 3. Hydro Distribution $16,000.00 --------------- Total Works deferred $31,197.50 Revised Summary of Works Cost Estimate ************************************** Sanitary $4,400.00 Water Distribution $5,200.00 Storm Sewer $9,750.00 Provisional (Storm Sewer) $17,590.00 Roadworks $37,046.70 less roadworks deferred ($12,797.50) Rough Grading $2,925.00 --------------- sub-total $64,114.20 50% of Street Lighting $2,025.00 Hydro Distribution (deferred) $0.00 Street Trees (deferred) $0.00 --------------- total $66,139.20 15% Eng and Cont. $9,920.88 --------------- Grand Total $76,060.08 Rounded to $76,000.00 ATTACHIIENT NO.5 1 9 ..' WD-88-00 ADDENDUM