SIB.JECT: UPDATE ON 1980 COURTICE STORMWATER MANAGEMENT STUDY
I
i
I
I
i
I
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT Report WD-80-90 be received;
2 . THAT Totten Sims Hubicki Associates be retained to carry out a
study to update their 1980 Courtice Stormwater Management Study and
that the estimated cost of $39,700 for this study be taken from the
I
Lot Levy Reserve Account No. 1110-00157-0000.
REPORT
1.0 ATTACHMENTS
No. l: Key Map showing Courtice Urban Area
No.2 : Courtice Stormwater Management Study Proposal from
Totten Sims Hubicki Associates
2 II
.0 BACKGROUND
2 . 1 Prior to the development of the Courtice Urban Area the Town
retained Totten Sims Hubicki Associates to prepare a report
entitled the 'Courtice Stormwater Management Study' .
. . .2
i
I
0 4 ,}
REPORT NO. : WD-80-90 PAGE 2
2 .2 The purpose of the study was to achieve a well planned and designed
Stormwater Management System that minimized the adverse affects of
urbanization on the receiving watercourses and provided a framework
for the development of the Courtice Urban Area (Attachment No.1) .
2 .3 The Courtice t
S ormwater Management Study was completed in 1980, and
has been used extensively by Town staff as a guide to the detailed
stormwater management engineering for each watershed. The
development of the Courtice Urban Area todate has occurred in
compliance with the general principles of this report.
2 .4 The development within Courtice is now concentrated in the
i
peripheral limits of the present urban area. The watershed
boundaries for storm drainage exceed the limits of the present
urban area and for this reason any future planning or engineering
is made quite difficult.
I
2 .5 We require a study to be undertaken at this time to:
a) Review the various stormwater management systems that are
currently built or are proposed to be built in the near future
in the Courtice Urban Area, in order to assess the
effectiveness of the stormwater management systems achieving
the objectives of the 1980 Study.
b) Evaluate the effects of expanding the Courtice Urban Area with
regard to stormwater management requirements.
c) Update the recommendations of the 1980 Study, in light of an
expanded Courtice Urban Area, state of the art stormwater
management practices, and of current regulatory requirements
for stormwater quantity and quality management.
. . .3
I
i
9 G Jr 4
i
REPORT NO. : WD-80-90 PAGE 3
2.6 This matter has been discussed with our consultants, Totten Sims
Hubicki Associates, who at our request submitted a proposal for a j
study to address our needs. (see Attachment 2) .
I
i
2 .7 The total estimated costs for this study is approximately $40,000
I
and has been calculated on the basis of an existing fee agreement
between the Town and Totten Sims Hubicki Associates ( 1981) .
3.0 CONCLUSION
3. 1 This study should be undertaken at this time, to assist Town staff
in the planning and engineering for the balance of the present
urban area and for the future planning for the expansion of the
urban area.
4.0 RECOrMENDATIONS
4. 1 It is recommended that Totten Sims Hubicki Associates be retained
to carry out a study to update their 1980 Courtice Stormwater
Management Study taking into account the existing stormwater
management facilities and the current regulatory requirements for
stormwater quantity and quality.
4 .2 It is further recommended that the costs for this study since it
is development oriented be taken from the Lot Levy Reserve Account
No. 1110-00157-0000 .
Respectfully submitted, Recommended for presentation
to the Committee,
I
------------------------ ------- -r ------------------
Walter A. Evans, P.Eng. , Lawrenc Kotseff,
Director of Public Works Chief A inistrative Officer
i
asc*WAE*llv
August 20, 1990
Attachments
UI
,F
35 35 34 3 132 S1 29
27 26
uunr 'uun�nnnr nnnnnnnnnr rrrnuuunnnn ■nrnnn
L-w ROAO '
OLIV
TS4Y C) E
9"E,'NF" JUge CT
R ct. 405
® CT' GIENVNN u
M. G
� � V
GATE W
f
�
6- i
K �< AN 0 µ
NASN R NASH ROAD WESTYORE STM1EET
mw
BlA NASN ROAD
IOIE 00. K 9QF
s <"-
141GN.NAY
CT Mt
RIO my
GATE < OSGOf1oEE pTPAT STIgVIt
R.e4. OM1 V TRATTML X11 Oq. ''
u � T
kT�f'E
M y R
t� O
Q
sew"
� A pNVE r
►►r►r►rr
- 3 � ° � �VAlE ►r►rr►r►r►
1 TNORNAUM1 I(E Q
PEBBIEO
•►
•••'• Q COURTICE g
ey 9�*`'�`• k URBAN
w.
g
BOUNDARYa
m-
eLOOn STREET -
.
IIEtaNaL o zz eLOOn STREET
RIOOR STREET
11
tl
I 4 55 �G o
O
3S 1/ 3 31 31. 30 ?4;: pg 37; 26 ?S 1 13 22 21
H R
NA
D a
& o
2, eLO a DRAWN J .M. DE AUGUST 1990
I
3
J ATTACHMENT N0, 1
O J �
= KEY MAP WD-80-90
U'11 6
Em G.L.TOTTEN B.Sc., P.Eng.
R.E. SIMS B.A.Sc., P.Eng.
11—MIN J.M. HUBICKI B.A.Sc., OAA, P.Eng.
R.L. WINDOVER M.Sc.,P.Eng.
P.C. EBERLEE B.A.Sc., P.Eng.
CONSULTANTS TOTTEN SIMS HUBICKI ASSOCIATES(1981)LIMITED
1A KING STREET EAST P.O. BOX 398,COBOURG
ONTARIO,CANADA K9A 4L1
t®tten SlmS hublcid associates (416)372-2121 FAX(416)3723621
Mr,A.S.Cannella
Manager of Engineering
Town of Newcastle
40 Temperance Street
Bowmanville,Ontario
L1C 3A6
June 20,1990
Dear Mr.Cannella:
Re: Courtice Storm Water Management Study Update
TSH Project No.24-0860
We are pleased to submit our proposal for consulting services to update the 1980 Courtice Storm Water
Management Study.
THE STUDY
The 1980 Courtice Storm Water Management Study,completed by Totten Sims Hubicki Associates,has been
used by the Town to guide the storm water management design of urban development within the Courtice
Urban Area.The urban development that has taken place in the Courtice Urban Area,plus proposed extension
of the Area,necessitated a review of the 1980 Study.
The objectives of the 1990 Update are:
1. Review the various storm water management systems that are currently built or are proposed to be
built in the near future within the Courtice Urban Area,in order to assess the overall effectiveness of
the storm water management systems in achieving the objectives of the 1980 Study.
2. Evaluate the effects of extending the Courtice Urban Area as planned by the Town's Planning
Department.
3. Update the recommendations of the 1980 Study,in light of the planned Courtice Urban Area Exten-
sion,and state-of-the-art storm water management practices,and of current regulatory requirements
for storm water quantity and quality management.
'ATTACHMENT NO , 2
WD-80-90
ENGINEERS ARCHITECTS AND PLANNERS 0 4
Courtice Storm Water Management Study Update 2
Proposal for Consulting Services
SCOPE OF CONSULTING SERVICES
The scope of work which we will undertake to meet the Study Objectives is described in the following paragraphs:
Obtain and review all available existing information on the Study Area:existing land uses,engineering
reports and drawings for storm water management systems constructed since 1980 or that are currently
under design;hydrologic data;hydraulic data;proposed development within the Courtice Urban Area.
Determine the extent of the planned Courtice Urban Area Extension from the Town's Planning
Department.
Establish a hydrologic model of the Farewell Creek/Black Creek watershed incorporating the various
new developments.The firm of Marshall Macklin Monaghan Ltd.has already done a portion of this
work for the Central Lake Ontario Conservation Authority,so we will confirm and update their model.
Update the hydraulic model of the watercourses to determine the floodlines for existing and proposed
conditions.
Carry out an inspection of the watercourses downstream of the Courtice Urban Area,to confirm en-
vironmentally significant areas and erosion sites.The field data will be used to supplement data avail-
able from the Central Lake Ontario Conservation Authority and the Ministry of Natural Resources.
Determine the effects of proposed development and of expansion of the Courtice Urban Area on
flowrates,runoff volumes,water levels,flow velocities,and frequency of floods in the watercourses.
Determine the existing constraints on development posed by the hydraulic capacity of the watercourse,
environmentally sensitive and significant areas,water quality,and erosion prone areas.
Develop and evaluate alternative storm water management plans to mitigate the potential impacts of
proposed development and an expanded Courtice Urban Area.
Recommend a preferred storm water management scheme,including preliminary conceptual design
and criteria for the detailed design of the various components of the storm water management scheme.
Prepare a report to summarize and present the findings,conclusions,and recommendations of the
Study.
Arrange and attend meetings to review the study progress with the Town of Newcastle,the Central
Lake Ontario Conservation Authority,and the Ministry of Natural Resources,
ESTIMATED COST OF STUDY
We will calculate our fee based on the agreement between the Town and Totten Sims Hubicki Associates
(1981)Limited.Disbursements will be billed at cost.
We estimate that the cost of the study will be as follows:
Engineering $38,000
Disbursements 1,700
TOTAL ESTIMATED STUDY COST $39,700
totten sims hubicki associates
1048
Courtice Storm Water Management Study Update 3
Proposal for Consulting Services
CLOSURE
We would be pleased to meet with you at your convenience to discuss our proposal.
Yours very truly,
TOTTEN SIMS HUBICKI ASSOCIATES
�g
Leo Sanchez,P.Eng.
Manager,Water Resource ngineering
LS/seg
cc: D.R.Bourne
totten sims hubicki associates