Loading...
HomeMy WebLinkAboutWD-72-90 TOWN OF NEWCASTLE REPORT File # elf: Res. # By-Law # MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: JULY 23, 19 9 0 REPORT #: WD-72-90 FILE #: SJB.,ECT: CONSTRUCTION OF A SIDEWALK ON LAMBERT STREET, BOWMANVILLE RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-72-90 be received; 2 . THAT a sidewalk be constructed in 1990, on the east side of Lambert Street, from King Street to Church Street; and 3. THAT the estimated cost of $18,000 be funded by using $8,000 from the contribution received from W.E. Roth Construction Limited and the balance of $10,000 be obtained from the Roads Contribution Reserve Fund ( 1110-174-X) . --------------------------------------------------------------------- REPORT 1.0 ATTACHMENTS No. 1: Key Map . . .2 Uri REPORT NO. : WD-72-90 PAGE 2 2.0 BACKGROUND 2.1 At a regular meeting held on May 14, 1990, Council passed Resolution #C-353-90: "THAT the Director of Public Works investigate the feasibility of constructing sidewalks on Lambert Street and repairing the sidewalks on Prospect Street; and THAT a report be forwarded to the General Purpose and Administration Committee on his findings . " 3.0 REVIEW AND COMMENT 3.1 Attachment No. 1 illustrates the existing sidewalks in the area of Lambert Street and the location of the Vincent Massey School. 3.2 Route to the Vincent Massey School The school children from east of Lambert Street who walk to school have been using Lambert Street to get to the Vincent Massey School. At the present time an office building is under construction on the north-east corner of Lambert Street and King Street. The additional traffic that this will generate has raised concerns about the safety for the children since there are no sidewalks on Lambert Street. 3.3 Feasibility of Constructing a Sidewalk on the East Side of Lambert Street One item which must be considered when constructing a sidewalk on a street such as Lambert Street, is will the sidewalk have to be . . .3 REPORT NO. : WD-72-90 PAGE 3 replaced when the street is reconstructed. This has been reviewed and it has been determined that the sidewalk can fit existing conditions and future conditions when Lambert Street is reconstructed. 3.4 Cost The estimated cost for the construction of the sidewalk from King Street to Church Street is $18,000 . 3.5 Funding The owner, W.E. Roth Construction Limited, of the office building which is now under construction on the north-east corner of Lambert Street and King Street was required to make a contribution of $16,092 .00 to the future reconstruction/upgrading of Lambert Street. 3.6 Sidewalk on Prospect Street The concerns about sidewalk on Prospect Street will be dealt with in a future report. 4.0 RECOrMENDATIONS 4.1 It is recommended that a sidewalk be constructed in 1990, on the east side of Lambert Street from King Street to Church Street; and THAT the estimated cost of $18,000 be funded by using $8,000 from the contribution received from W.E. Roth Construction Limited and the balance of $10,000 be obtained from the Roads Contribution Reserve Fund ( 1110-174-X) . REPORT NO. : WD-72-90 PAGE 4 Respectfully submitted, Recommended for presentation to the Committee, fV ------------------------ - ---In / ----------------- Walter A. Evans, P.Eng. , LawrenKotseff, Director of Public Works Chief istrative Officer WAE*kmd July 23, 1990 Attachment w w VINCENT.MASSEY PUBLIC SCHOOL EXISTING SIDEWALK CHURCH STREET .n%EXISTING CROSSWALK w - w r � PROPOSED m SIDEWALK cr- w m Q i EXISTING SIDEWALK KING STREET r I SL Kj I CONCESSION I ST. ST.W. T M'FEETI 4 (FT 00 ? Py w wP� LOWE T LOVERS CL&yr Ay ALE%ANUER ,t J 3 BLVD. S. G sTti 9 ISLE AVE R Jl SUBJECT = a CfiES. sT O - SITE TREE c�R 0 RUYAL a D ]J z ! < PINE n E CT. A Q W a� 1 O a HIGHWAY He 2 £N ' a 'A sT G DATE JULY 1990 DRAWN BY: D.G. MWE ST ASHDN-E Q ANE ST. `RES T �TTA5,H,-'IEINT NO, 1 KEY MAP D-7 � — I 1024