RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following
I
i
1. THAT Report WD-34-90 be received for information.
REPORT
1.0 ATTACHMENT
No. 1: Key Map
2 . 0 BACKGROUND
2 . 1 At a meeting of Council held on September 11, 1989 , the
following resolution was passed:
I
"THAT the Director of Public Works and
appropriate staff be directed to investigate
all possible avenues to improve safety of
pedestrians on Townline Road north where a
small child was recently fatally injured by a
vehicle. "
i
. . .2
OS _
I
i
i
REPORT NO. : WD-34-90 PAGE 2
i
3 .0 REVIEW AND COMMENT
3 . 1 Reconstruction of Regional Road 55
Townline Road from Olive Avenue/Kingswood Drive to
Taunton Road is a Regional Road (Regional nal Road 55) . The
Region's 1990 Capital Budget and Four Year Forecast
provides for the reconstruction of Townline Road as
follows:
1. From Olive Avenue/Kingswood Drive northerly to
Highway No. 2 (King Street) in 1990 .
2 . From Highway No. 2 (King Street) to
Adelaide Avenue in 1991.
3. From Adelaide Avenue to Taunton Road
in 1992 .
3 .2 Improvements for Safety to Pedestrians
3.2 . 1 Safety for pedestrians on a roadway can be improved by
the provision of sidewalks and street lighting. At the
present time there are thirty-two street lights on
Townline Road, at about seventy (70) metres (230 feet)
intervals from Olive Avenue to Adelaide Avenue. Also,
there are sidewalks on the west side of Townline Road
from Highway No. 2 northerly to Kilmaurs Avenue (see
Attachment No. l) .
3 .2 . 3 Provision has been made in the Town's 1990 Capital
Budget for $80,000 to provide for the construction of
sidewalks on the east side of Townline Road from Olive
Avenue to Highway No. 2 . The construction of the
sidewalks will be included in the Region's contract for
the reconstruction of Townline Road.
. . .3
13
i
i
REPORT NO. : WD-34-90 PAGE 3
3 .2 .4 The City of Oshawa has made similar arrangements for the
construction of sidewalks on the west side of Townline
Road from Adelaide Avenue to Highway No. 2 .
3.2 .5 Provision has also been made in the Town's 1991 Forecast
for the construction of sidewalks on the east side of
Townline Road from Highway No. 2 to Adelaide Avenue.
The Region has been asked to include the construction of
these sidewalks in their 1991 contract.
4 . 0 RECOMMENDATIONS
4. 1 It is recommended that this report be received for
information.
Respectfully submitted, Recommended for presentation
to the Committee,
Walter A. Evans, P.Eng. , Lawrence E. Kotseff,
Director of Public Works Chief Administrative Officer
WAE*llv V�
April 4, 1990
Attachment
I UJ �
35 35 34 3 132
0
KILMAURS AVE. K MCLEAN ROAD
w
O
U O
� a
ADELAIDE AVE. > O
Z LAWSON ROAD
a 'SCAY Cr DRIVE G�c
°� ° F�E� w LPG
w T RFIe� �,Pl o JURA Q cT. F RFr
z t C7 FO CT.
a � �
w N KINTYREW Q
F. m
3 V
o HAR IELD a LEITH 0 DUNKIN AV 00 BROADL
U OURT } O c
a \ELD �OPPYFI d CR.
N
o OAK fl DR. ALE
6 19 GATE
X SIDEWALK
w ; U
L) GELD m z
c (LAN olQ ALDEE
NASH ROAD s ED NASH ROAD C
DALEPARK 5 o aIRLACK� wZ
ul
EXISTING BRIDLE DR.
SIDEWALK r >
CT. a {GQ� TRAIL a0 0K
m VALUE' ��� �r'.0,
411GHWAY °
2
19 9 0 •FOXNUIVT
SIDEWALK cT
0
KINGSWAY J > �R
N J OSGOODE PNP STIRLING
of GATE it w Z GATE Ate.
0 F- 0 DR. ° TRATHALLA`J DR.
P DR
0 w z ° �k G�FF� 0�
z
z CI NGSv/EW o a °!� F & 2 N A/ n
i `�
O(/RT 3 TEAC
p
3 0 R04
0 00 LAN 3vU J� U h NOy a
N w F T 3 a
3
w ? o ?o� � <
3 x
OLIVE AVE. 3o��GFh Off`/ _ DR�\!'`
SA
CR.
4
S a � _
SUBJECT D-
SITE ! 1
14 23 22 21 20 19
NA
'r Q
_ f
a o
2 V , F KEY MAP WD— 34 —90
ATTACHMENT N0.1