Loading...
HomeMy WebLinkAboutWD-28-90 TOWN OF NEWCASTLE REPORT File #d'-2. /I Res. # By-Law # MEETING: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE DATE: APRIL 2, 1990 REPORT WD-28-90 FILE #: SUB,JECT: SIDEWALKS IN THE VILLAGE OF NEWCASTLE RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report WD-28-90 be received for information; and 2 . THAT a copy of Report WD-28-90 be forwarded to Mr. Robert Griffin. ---------------------------------------------------------------------- REPORT 1.0 ATTACHMENT No. 1: Correspondence from Mr. Robert Griffin, Chairperson of the Newcastle B. I.A. No.2 : Key Map and Detailed Map 2.0 BACKGROUND 2 . 1 At a meeting of Council held on February 26, 1990, the following resolution was passed: "THAT the correspondence dated February 15, 1990, from Robert Griffin, Chairperson of Newcastle B. I.A. , requesting sidewalk construction on King Street in the Village of Newcastle be received; 0 U r) ) REPORT NO. : WD-28-90 PAGE 2 "THAT the correspondence be referred to the Director of Public Works for review and subsequent report to be considered by the General Purpose and Administration Committee; and THAT Robert Griffin be advised of Council's decision. " 2 .2 Mr. Robert Griffin, Chairperson of the Newcastle B. I.A. , has requested that sidewalks be constructed on King Street (Highway #2) in conjunction with the Ministry's reconstruction of Highway #2 . The proposed sidewalks are located on the south side of King Street from the walkway at the Foster Creek Development easterly to Baldwin Street and on the north side from the existing sidewalk ending at the St. Francis of Assisi School easterly to Arthur Street (refer to Attachment No.2) . 2 .3 The Ministry of Transportation has tentatively scheduled the reconstruction of Highway #2 from Cemetery Road (Bowmanville) easterly to Graham Creek (Newcastle Village) for 1992 . 2 .4 The estimated costs of these sidewalks is $200,000 and provisions has been made in the 1990 Budget and Four Year Forecast for the construction of these sidewalk works to coincide with the Ministry of Transportation's schedule for the reconstruction of Highway #2 . 3.0 RECOMMENDATIONS 3. 1 It is, therefore, recommended that this report be received for information and that Mr. Robert Griffin receive a copy of this report. 1 n (l . . .3 REPORT NO. : WD-28-90 PAGE 3- Respectfully submitted, Recommended for presentation to the Committee, ------------------------ ---- ---- ------------------ Walter A. Evans, P.Eng. , Lawrenc . Kotseff, Director of Public Works . Chief nistrative Officer. ASC*WAE*llv March 19, 1990 Attachments 00 NEWCASTLE PUSINESS IMPROVEMENT 1,O. Bpi:" 5*H Newcastle . Ontario LOA 1H0 F�brt_iay'V 15 . 1990 Marie P . Knight Corporation of the Town of Newcastle 40 Temperance Street Bowmanvi 1 le . Ontar ic> L1C 3A6 Dear Ms . Knight. : Re : Report WD-2-90 At tile' Ir:eetln�_� held 0I-i Fe-�br�_:ary 13 . 1990 , the: B-oard _ Management of' the Newcastle B . I . A . na.ssed the f_ 1 ;`:? !t:i 'esolution : " That the Report WD-2-90 be accepted in principal for the Newcastle B. I . A . with the foll(dwinc_ additions to Table 1 of Report WD-2-90 : 1 Sweeping and Flushing of roads, minimum o or,c per weep: during appropriate seasons . �) Pick up of planter barrels in ti-:e rai 1 fc storacte and Cliaintenance . and that 7-e t.l_l r n r_cl - - t h e i 2: 1 i-; _ 1-t r. i T1te. r) Iant hanger brackets be prope!-1y fastened to he lailip s=tandards to prevent. sl : ppJaae Your- Tru l v_ . �1 liObeY' Gritrin :hai . ;erUon casI- ATTACHMENT NO . 1 WD-28-90 . 008 ti 04�40i4,y 0: 0 W A4 Cn MONROE Q �o = w GRADY DRIVE yL N YO EbH R S7. ST. S CT. Z cj C T. D WILMOT S w ST gSSISIISHAM g RESNIK DRIVE X40 z m SCHOO_`(� O LE �5. D�'HAL ENGE EXISTING yj_J� CT. =j SIDEWALK KING ST. �w HIGHWAY No.2 DR ILLIAN CR. ® ® =>N O CREEK a: w1 SUBJECT Z 2FORO o ` SITES u ° -i�pKA y ?o m T. W. ¢ Rp `4c STEQ Z ST. DW IEDWA ST.E. tt v4 N O w YF r- O yPt c) w to u A BLVD. _ � �F JAM a ST. HART HART CT. W m N SUNS _ AK D �—ROA GPP HIGHWAY N° 401 v TORONTO 37, 5 - D 5 y CANAO/qN NgrpA.g1. CLIFTON ST. N4/CWI Y 17 a III °Ili SUBJECT SITES OR O o 0 m N N J O K O pap O 1l N 6t c9 WD— 28 -90 KEY MAP ATTACHMENT N0.2 1009