Loading...
HomeMy WebLinkAboutPDS-067-26Staff Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: August 10, 2026 Report Number: PDS-067-26 Authored By: Shrija Vora, Planner II, Development Review Division Submitted By: Darryl Lyons, Deputy CAO, Planning and Infrastructure Reviewed By: Mary-Anne Dempster, CAO By-law Number: Resolution Number: File Number: ZBA-2026-0016 Report Subject: Zoning By-law Amendment application to implement zoning provisions appropriate to facilitate truck sales as an auxiliary use in Courtice Recommendations: 1.That Report PDS-067-26, and any related delegations or communication items, be received; 2.That the Zoning By-Law Amendment application submitted by Innovative Planning Solutions Inc. attached to Report PDS-067-26, as Attachment 1 be approved; 3.That the Region of Durham Community Growth and Economic Development Department and Municipal Property Assessment Corporation be forwarded a copy of Report PDS-067-26 and Council’s decision; and 4.That all interested parties listed in Report PDS-067-26 and any delegations be advised of Council’s decision. C-212-262026-079 Municipality of Clarington Page 2 Report PDS-067-26 Report Overview 1. Application Details Owner: PAG Commercial Vehicles Canada and PTG Mississauga Enterprises Limited Partnership Applicant: Katie Pandey c/o. Innovative Planning Solutions Inc. Proposal: Zoning By-law Amendment: To amend the zoning on the subject lands from General Industrial (M2) Zone to site specific General Industrial Exception Zone in order to implement zoning provisions appropriate to facilitate truck sales as an auxiliary use. Area: 2.74 hectares (6.79 acres) Location: 1631 Baseline Road, Courtice Roll Number: 181701007000200 Municipality of Clarington Page 3 Report PDS-067-26 Figure 1 – Property Location Map Municipality of Clarington Page 4 Report PDS-067-26 2. Background 2.1 A pre-consultation meeting with Municipality of Clarington Staff and agencies was held on July 10, 2025, with the owner, applicant, and their additional consultants to discuss the proposed development. 2.2 Following to which, on September 17, 2025 revised meeting minutes were sent to the applicant following a series of discussion between Municipal staff and th e applicant on whether a Zoning By-law amendment is required for the proposed use. 2.3 On March 30, 2026, the applicant submitted a Zoning By-law Amendment application to facilitate the proposed development. The Zoning By-law Amendment application proposes to facilitate the development of a single storey industrial building at 1631 Baseline Road in Courtice. The proposed zoning is to seek change to the existing use by adding permit truck sales as an auxiliary use with site specific performance standards . The application was deemed complete and circulated for review and comments on April 20, 2026. 2.4 A Statutory Public Meeting was held on June 15, 2026, to provide background information regarding the applications and to obtain public comments. No one spoke in opposition of the application at the Public Meeting. Two written comments were received by Planning Staff post the Public Meeting. 3. Land Use Characteristics and Surrounding Uses 3.1 The subject lands are located on the southwest corner of Baseline Road and Trulls Road in Courtice. 3.2 The subject property has an approximate area of 2.74 hectares (6.79 acres), with a frontage of 203 metres along Baseline Road and 127 metres along Trulls Road. The property is currently vacant 3.3 The surrounding uses are as follows: North: To the north of the subject site there is a detached residential dwelling and industrial uses. East: To the east there are two detached residential dwellings South: South of the subject site is Highway 401 West: To the west of the subject site is vacant industrial land. Municipality of Clarington Page 5 Report PDS-067-26 4. Provincial Policy Provincial Planning Statement (PPS 2024) 4.1 The PPS (2024) directs that Settlement Areas are the focus of growth and development and encourages planning authorities to support a strong and competitive economy by providing an appropriate range and mix of employment uses to meet long -term needs. The proposed development is located within the Urban Settlement Area and supports the efficient utilization of designated employment lands. 4.2 The PPS (2024) promotes economic development by encouraging a diversified economic base and maintaining a range and choice of suitable sites for employment uses that support industrial, manufacturing, warehousing, logistics, and other employment-generating activities. The proposed industrial development contributes to these objectives by facilitating investment and employment opportunities within the Municipality. 4.3 The PPS (2024) also encourages planning authorities to identify and maintain market - ready employment lands while addressing barriers to investment. The proposal represents the development of lands designated for employment purposes and supports the efficient use of existing municipal services and infrastructure, thereby contributing to the Municipality's long-term economic growth objectives. 4.4 Based on the foregoing, the proposed development is consistent with the PPS (2024) as it supports Provincial objectives related to economic development, employment growth, the protection of Employment Areas, and the efficient use of land and infrastructure. 5. Official Plan Durham Region Official Plan (Envision Durham) 5.1 The Durham Region Official Plan designates the subject lands as “Employment Areas.” 5.2 Employment Areas are intended to accommodate a broad range of employment uses, including industrial, manufacturing, warehousing, logistics, and other employment- generating uses that contribute to the Region's economic growth and competitiveness. 5.3 The Official Plan encourages the protection and efficient development of Employment Areas by ensuring an adequate supply of serviced employment lands to support current and future employment needs. The proposed development makes efficient use of designated employment lands and existing municipal infrastructure while supporting long-term employment growth within the Municipality. 5.4 The Official Plan also promotes the preservation of Employment Areas for employment - generating uses and encourages development that supports economic investment, job creation, and the efficient utilization of land. Municipality of Clarington Page 6 Report PDS-067-26 5.5 The proposal conforms to the Envision Durham Regional Official Plan (2024). Municipality of Clarington Official Plan (COP) 5.6 The Municipality of Clarington Official Plan designates the subject lands "Light Industrial." 5.7 The Light Industrial designation is intended to accommodate a range of employment - generating uses, including manufacturing, assembly, processing, fabrication, research and development, warehousing, and other light industrial uses that contribute to the Municipality's economic growth. 5.8 The Official Plan recognizes Employment Areas as strategic economic assets and encourages their protection and development to support a diversified employment base, provide long-term employment opportunities, and ensure an adequate supply of serviced employment lands. The proposed development contributes to these objectives by facilitating industrial development on lands designated for employment purposes. 5.9 The Official Plan further encourages the efficient use of employment lands by promoting higher employment densities, supporting economic investment, and ensuring that Employment Areas continue to accommodate industrial and employment -generating uses. The proposed development supports these objectives by making efficient use of designated Light Industrial lands and existing municipal infrastructure. 5.10 The proposal conforms to the Clarington Official Plan. Courtice Transit-Oriented Community (CTOC) Secondary Plan 5.11 The subject lands are located within the Courtice Transit-Oriented Community (CTOC) Secondary Plan Area and are designated "Light Industrial." The Secondary Plan recognizes these lands as an important employment area intended to acc ommodate a range of light industrial and employment-generating uses in a high-quality business park setting that supports long-term economic growth. 5.12 The CTOC Secondary Plan promotes the development of employment lands adjacent to Highway 401 and Highway 418 to support business investment, employment opportunities, and a balanced mix of land uses within the future transit -oriented community. 5.13 The Secondary Plan also encourages high-quality site design, efficient land utilization, and employment development that complements the broader vision of creating a complete community centred around the future Courtice GO Station. The proposed development will be subject to Site Plan Approval, which will ensure that landscaping, building design, access, and site layout are developed in accordance with the urban design objectives of the Secondary Plan. Municipality of Clarington Page 7 Report PDS-067-26 5.14 The proposal conforms to the Courtice Transit-Oriented Community (CTOC) Secondary Plan Floodplain 5.15 The subject property is located within the study area of the Robinson Creek and Tooley Creek Sub watershed Study. This study has updated the existing hydrologic and hydraulic modeling for the Tooley Creek and as per the updated modeling, the Regulatory floodplain mapping has been refined. The south portions of the subject si te fall within the floodplain spill area, as per the Central Lake Ontario Conservation Authority’s (CLOCA) Floodplain maps. 5.16 The proposed Zoning By-law Amendment is limited to permitting truck sales within the existing building as an additional use within the General Industrial (M2) Zone and does not authorize the location or construction of any new buildings or structures. Detailed site design and any future development on the property will be subject to a subsequent Site Plan Approval application. 5.17 As part of the Site Plan Approval process, the applicant will be required to demonstrate that the proposed truck sales use, including its location and layout on the property, complies with the applicable provisions of the Zoning By-law, Official Plan policies, and other municipal requirements. The detailed submission will be reviewed to ensure conformity with all applicable regulations. Prior to the lifting of the Holding (H) symbol and the issuance of any permits, the applicant will be required to obtain Site Pla n Approval and satisfy all applicable municipal requirements. 5.18 As part of the Site Plan Approval process, the applicant will also be required to demonstrate that any proposed development complies with the applicable Official Plan policies and CLOCA requirements respecting the Regulatory Floodplain. Depending on the location and extent of the proposed development, additional technical studies, including a Flood Study, may be required to confirm that there will be no adverse flooding impacts on the subject property or adjacent lands. 6. Zoning By-law 84-63 6.1 Zoning By-law 84-63 zones the subject lands as “General Industrial (M2)”. A Zoning By- law Amendment is required to permit truck sales as an accessory use. The proposed amendment would maintain the existing industrial use of the lands while adding truck sales as a permitted use, subject to site -specific performance standards. 6.2 The proposed Zoning By-law Amendment is included as Attachment 1. Municipality of Clarington Page 8 Report PDS-067-26 7. Summary of Background Studies Below provides a summary of the findings from the background studies. Planning Rationale (Innovative Planning Solutions, March 2026) 7.1 The Planning Rationale submitted in support of the proposal concludes that the proposed Zoning By-law Amendment represents good planning and is in the public interest. The report concludes that the proposal is consistent with the Provincial Planning Statement (2024), conforms to the Envision Durham Regional Official Plan and the Municipality of Clarington Official Plan, and supports the vision of the ongoing Courtice Transit-Oriented Community Secondary Plan by facilitating employment growth within designated Employment Lands. Traffic Impact Study (LMM Engineering Inc., March 2026) 7.2 The Traffic Impact Study assessed the impacts of the proposed truck dealership on the surrounding road network, including Baseline Road, Trulls Road and Courtice Road. The study concluded that the proposed development is expected to generate a relatively low number of vehicle trips and that the surrounding road network has sufficient capacity to accommodate the additional traffic. 7.3 The study also concluded that the proposed parking supply, loading facilities, site circulation and truck manoeuvring areas are appropriate for the intended use. No roadway improvements are required as a result of the proposed development beyond those identified through the detailed design process. Functional Servicing and Stormwater Management Report (Husson, March 2026) 7.4 The Functional Servicing and Stormwater Management Report evaluated the proposed municipal servicing, stormwater management strategy and grading design for the development. The report concludes that the site can be adequately serviced by existing municipal water and sanitary infrastructure. 7.5 Stormwater management measures, including an underground storage chamber, oil-grit separator and controlled outlet structure, are proposed to maintain post -development runoff rates at pre-development levels while meeting the Municipality's and CLOCA's requirements for water quality, quantity and erosion control. The detailed servicing and stormwater management design will be finalized through the Site Plan Approval process. Geotechnical Investigation (Green Geotechnical Ltd., March 2026) 7.6 The Geotechnical Investigation included seven boreholes to evaluate the site's subsurface conditions, groundwater levels and geotechnical characteristics. Municipality of Clarington Page 9 Report PDS-067-26 The investigation determined that the subject lands are suitable for the proposed industrial development, subject to the recommendations contained within the report. 7.7 The report provides recommendations respecting foundation design, slab -on-grade construction, pavement design, earthworks, groundwater control and underground servicing. These recommendations will be implemented through the detailed design, Site Plan Approval and Building Permit stages. Phase I Environmental Site Assessment (Pinchin Ltd., February 2022) 7.8 The Phase I Environmental Site Assessment was completed in accordance with the Canadian Standards Association Standard Z768-01. The assessment included a review of historical records, regulatory databases, aerial photography and a site reconnaissance to identify any potential environmental concerns. 7.9 The assessment concluded that no actual or potential environmental concerns were identified on the subject lands that would warrant a Phase II Environmental Site Assessment. The report concludes that the site is suitable for the proposed development from an environmental perspective. Stage 1 Archaeological Assessment (Archaeological Consultants & Contractors, March 2026) 7.10 The Stage 1 Archaeological Assessment evaluated the archaeological potential of the subject lands through a review of historical mapping, previous land uses and archaeological databases. The assessment determined that the subject lands possess archaeological potential due to their proximity to historic transportation routes and watercourses. 7.11 Accordingly, the report recommends that a Stage 2 Archaeological Assessment be completed prior to any site disturbance or development activities. This requirement will be addressed as a condition of future development approvals. 8. Public Notice and Submissions 8.1 Public Notice was mailed to 12 property owners within 120 metres of the subject lands, and 1 public meeting sign was installed on the subject lands along Baseline Road in Courtice. Details of the proposed application were also posted within the Clarington Connected e-newsletter. 8.2 At the time of writing this report, no public comments were received. Municipality of Clarington Page 10 Report PDS-067-26 8.3 At the time of writing this Staff Report, two written submissions had been received from members of the public. One resident expressed support for the proposed use but raised questions regarding the proposed setback from Highway 401 and the potential implications for any future highway widening. The second resident expresse d concerns regarding the existing floodplain and the measures that would be taken to protect and preserve 9. Department and Agency Comments 9.1 Various agencies and internal departments were circulated for comments on the applications. Attachment 3 to this report is a chart which provides the list of circulated parties. 10. Discussion 10.1 The subject lands are designated "Light Industrial" in the Municipality of Clarington Official Plan, designated "Employment Areas" under the Envision Durham Regional Official Plan, and are zoned General Industrial (M2) under Zoning By-law 84-63. The lands are also located within the ongoing Courtice Transit-Oriented Community (CTOC) Secondary Plan Area and are identified for future employment uses. The proposed Zoning By-law Amendment would not alter the existing industrial designation or zoning intent of the property but rather would introduce truck sales as a permitted accessory use to an industrial truck servicing facility, together with truck servicing, parts storage, ancillary retail sales and accessory office uses. 10.2 Planning Staff are satisfied that truck sales are functionally and operationally integrated with the principal industrial use of the site. The proposed development is intended to operate as a full-service commercial truck dealership where vehicle servicing, repairs, parts distribution and customer support remain the primary activities. Truck sales are complementary to these existing industrial functions and are characteristic of modern truck dealership operations. The proposed amendment recognizes this integrated business model while maintaining the employment function of the lands. 10.3 As part of the Site Plan Approval process, the applicant will be required to demonstrate that any proposed development complies with the applicable Official Plan policies and CLOCA requirements respecting the Regulatory Floodplain. Depending on the location and extent of the proposed development, additional technical studies, including a Flood Study, may be required to confirm that there will be n o adverse flooding impacts on the subject property or adjacent lands. Compatibility with the Surrounding Employment Area 10.4 The subject lands are located within an established industrial area characterized by outdoor storage, automotive-related businesses and other employment uses. Highway 401 forms the southern boundary of the property, while surrounding lands are designated and zoned for industrial development. Municipality of Clarington Page 11 Report PDS-067-26 The proposed use is compatible with the surrounding land uses and will not introduce any sensitive land uses or create land use conflicts within the Employment Area. 10.5 The proposed site layout has been designed to accommodate truck servicing, display, parking and internal circulation while maintaining appropriate setbacks, landscaping and access. Staff are satisfied that the development represents an appropriate use of a vacant employment parcel and will contribute to the continued build -out of the Municipality's designated Employment Lands Employment Growth and Efficient Use of Employment Lands 10.6 The proposal supports the Municipality's economic development objectives by facilitating the development of a vacant parcel within a designated Employment Area. The proposed truck dealership will provide new employment opportunities while making efficient use of existing municipal infrastructure and transportation networks, including direct access to Baseline Road and close proximity to Highway 401 and Highway 418. 10.7 The proposal also supports the vision of the Courtice Transit-Oriented Community Secondary Plan by contributing to the planned employment base within the Courtice GO Station area. The development reinforces the role of the surrounding employment lands as a strategic business and industrial area while supporting long-term economic investment within the Municipality. 10.8 Planning Staff are satisfied that the proposed Zoning By-law Amendment represents good land use planning. The amendment maintains the industrial function of the lands while providing flexibility to accommodate an integrated truck dealership op eration that includes truck servicing, parts storage, ancillary retail uses, accessory office space and truck sales. The proposal is consistent with the Provincial Planning Statement (2024), conforms to the Envision Durham Regional Official Plan and the Municipality of Clarington Official Plan, supports the vision of the Courtice Transit -Oriented Community Secondary Plan, and represents the appropriate development of designated Employment Lands. Accordingly, Staff recommend approval of the proposed Zoning By- law Amendment (see Attachment 1). 11. Financial Considerations Not Applicable 12. Strategic Plan 12.1 The proposed development has been reviewed against the pillars of the Clarington Strategic Plan 2024-27. Clarington’s Strategic Plan prioritizes applications that support and implement the creation of growing, resilient, sustainable and complete communities and connecting residents through the design of safe, diverse, inclusive and vibrant communities. The proposal aligns with Clarington’s Strategic Plan. Municipality of Clarington Page 12 Report PDS-067-26 13. Climate Change 13.1 The proposed development incorporates sustainable design measures, including enhanced stormwater management, landscaped areas, and Low Impact Development (LID) practices, which assist in mitigating the impacts of climate change. The proposal also makes efficient use of designated Employment Lands and existing municipal infrastructure, consistent with the Municipality's sustainability objectives 14. Concurrence Not Applicable. 15. Conclusion 15.1 In consideration of the review of the detailed plans, all agency, staff and public comments, it is respectfully recommended that the Zoning By-law Amendment included in Attachment 1 be approved with a holding symbol. The (H) Holding provision will be removed once the applicant applies for a Site Plan Application and fulfills all the conditions of the Site Plan Approval. As this application has not yet been applied for, the conditions will be issued after Council makes a decision on the rezoning application. Staff Contact: Shrija Vora, Planner II, svora@clarington.net. Attachments: Attachment 1 - Zoning By-law Amendment Interested Parties: List of Interested Parties available from Department. Attachment 1 to Report PDS-067-26 Municipality of Clarington Corporation of the Municipality of Clarington By-law Number 2026-______ being a By-law to amend By-law 84-63, the Comprehensive Zoning By-law for the Corporation of the Municipality of Clarington Whereas the Council of the Corporation of the Municipality of Clarington deems it advisable to amend By-law 84-63, as amended, of the Corporation of the Municipality of Clarington for ZBA2026-0016; Now Therefore Be It Resolved That, the Council of the Corporation of the Municipality of Clarington enacts as follows: 1. Schedule ‘1’ to By-law 84-63, as amended, is hereby further amended by changing the zone designation from “General Industrial (M2) Zone” to “General Industrial Exception (M2-21) Zone” as illustrated on the attached Schedule ‘A’ hereto. 2. Notwithstanding Section 24.1, those lands zoned M2-21 on the Schedules to this By-law may, in addition to the other uses permitted in the M2 zone, may also be used for the sale of commercial motor vehicles in addition to other permitted uses. The above use shall be subject to the following regulations: i). Total Floor Area (maximum) 400 square metres Special Provisions for the Removal of the (H) Holding Symbol i). In addition to the general provisions of the Official Plan and Section 3.10 of this Zoning By-law, with respect to the removal of the (H) Holding symbol, Council shall only enact a by-law to remove the (H) Holding Symbol from the M2-21 zone once the following provisions have been satisfied: As part of the Site Plan Approval process, the applicant will be required to demonstrate that any proposed development complies with the applicable Official Plan policies and Conservation Authority requirements respecting the Floodplain. 3. Schedule ‘A’ attached hereto shall form a part of this By-law. 4. This By-law shall come into effect on the date of the passing hereof, subject to the provisions of Section 24(2) and 34 of the Planning Act. By-Law passed in open session this _____ day of ____________, 2026. __________________________ Adrian Foster, Mayor __________________________ June Gallagher, Municipal Clerk MEMO The Corporation of the Municipality of Clarington, 40 Temperance Street, Bowmanville, ON L1C 3A6 1-800-563-1195 | Local: 905-623-3379 | info@clarington.net | www.clarington.net Page | 1 If this information is required in an alternate format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. We have reviewed the above-noted application and have no objection to this proposal subject to the comments provided by the Development Engineering Division. The comments are attached to this letter in Excel Format. The file tiled as: DevEng 1st Sub CRM_05 May 2026_ZBA2026-0016. The applicant is required to complete and submit the provided file CRM (Comment Response Matrix) with the next submission, detailing how each comment has been addressed. If you have any questions regarding the above-noted comments, please contact Ajay Kumar Alagarsamy, Planning and Infrastructure Services Department. Karen Richardson, P.Eng. Manager of Development Engineering Planning and Infrastructure Services KR/AKA To: Shrija Vora, Planner II From: Karen Richardson, Manager of Development Engineering Date: May 05, 2026 Subject: Zoning By-Law Amendment Applicant: Innovative Planning Solutions c/o., Katie Pandey. Address: 1631 Baseline Road, Courtice File: ZBA2026-0016 MEMO The Corporation of the Municipality of Clarington, 40 Temperance Street, Bowmanville, ON L1C 3A6 1-800-563-1195 | Local: 905-623-3379 | info@clarington.net | www.clarington.net Page | 1 If this information is required in an alternate format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. To: Elissa Kelloway, Development Application Coordinator From: Jeff Norris, FPO Clarington Fire Date: April 17, 2026 Re: ZBA-2026-0016: 1631 Baseline Road - 1st Submission Type: Industrial File No: ZBA-2026-0016 ___________________________________________________________________ 1) Fire hydrants to be located no more than 45 meters from a fire department Siamese connection and no more than 90 meters from the principal entrance for buildings without a fire department Siamese connection. Any private fire hydrants are to be painted red and located no closer than 3 meters to any buildings. 2) Fire route will need to comply to OBC 3.2.5 and have required “No parking fire route” signs. Healthy watersheds for today and tomorrow. May 22, 2026 Municipality of Clarington Planning and Infrastructure Services Department 40 Temperance Street Bowmanville, Ontario L1C 3A6 Attention: Shirja Vora, Planner II Dear Ms. Vora: Subject: Zoning By-law Amendment File No.: ZBA2026-0016 Applicant: Innovative Planning Solutions c/o., Katie Pandey Location: 1631 Baseline Road, Courtice CLOCA IMS No.: PZOG1820 Cross Reference PC2025-0021 (RCON840) Purpose of Application: The applicant is proposing a Zoning By -law Amendment to permit development of a single industrial building with a gross floor area of approximately 4,296 m² and a building height of approximately 7.3 m (24 feet). Of the total floor area, approximately 3902 m² will be allocated to truck servicing operations, parts storage, and ancillary retail sales of parts, while approximately 394 m² will be dedicated to accessory office space. The Zoning By-law Amendment would be to permit the use of truck sales, which is currently not a permitted use within the existing zone. Thank you for circulating the above noted ZBA application to Central Lake Ontario Conservation Authority (CLOCA). Staff have had the opportunity to review the site location and existing conditions associated with the selected site for the above noted development proposal. The comments provided in this correspondence are based upon the review of the materials circulated to CLOCA from the Municipality on April 17, 2026. Technical Comments As discussed through the preconsultation phase, the south portions of the subject site are located within Tooley Creek’s flood spill area, based on CLOCA’s updated Regulatory Floodplain mapping. Please refer to the attached technical memo for a detailed commentary on the circulated materials and the information that is needed to be provided with the next submission. Please provide the requested information along with an itemized response matrix showing how each comment has been addressed. 100 WHITING AVENUE OSHAWA ON L1H 3T3 | P. 905 579 0411 | F. 905 579 0994 | CLOCA.COM Page | 2 Healthy watersheds for today and tomorrow. Regulation Number The updated regulation currently mandating CLOCA activities is ON Reg. 41/24. Please modify the referral to O.Reg. 42/06 within the Planning Rationale report. Thank you for the opportunity to provide comments on this ZBA application. If there are any questions related to this letter, please contact the undersigned. Sincerely Sarem Nejad, PhD RPP MCIP Development Planner Attachment: Technical Memo, CLOCA Environmental Engineering Department, D. Hipple 100 WHITING AVENUE OSHAWA ON L1H 3T3 | P. 905 579 0411 | F. 905 579 0994 | CLOCA.COM Healthy watersheds for today and tomorrow. Memo from Environmental Engineering Date: May 15, 2026 File: PZOG1820 To: Sarem Nejad Cc: From: Dan Hipple Subject: Materials Reviewed: 1631 Baseline Road Municipality of Clarington Functional Servicing and Stormwater Management Report, prepared by Husson, March 2026 Associated Engineering Drawings, prepared by Husson, March 2026 Geotechnical Investigation Report, prepared by Green Geotechnical February Site located within the Tooley Creek watershed at Baseline Road and Trulls Road in the Municipality of Clarington. Southern portion of the site is within the Tooley Creek floodplain, however flooding appears to be interacting with backwater generated from the Robinson Creek crossing to the west. Tooley Creek SWM requires standard post to pre-development quantity control, quality treatment, and erosion control. There does not appear to be any HVRA or ESGRA’s on site, and therefore water balance requirements are standard as well. CLOCA Water Resources Engineering provides the following: 1. The proposed works propose grading within a CLOCA regulated floodplain. CLOCA water resources staff request that consideration be made to pull the development outside of the existing floodplain plus a 6m setback. However, if this is not feasible, a Flood Study is required prior to any proposed works within a floodplain to confirm that adjacent properties will not be impacted by flooding associated with the proposed development. Please provide a Flood Study using CLOCA’s hydraulic modelling with the following: a. Confirmation of existing flood conditions and grades, and updates to the CLOCA model as necessary. b. Proposed conditions hydraulic modelling scenario based on the proposed grading. Please note that the proposed scenario must not result in increases to floodlines at the property line or on adjacent properties. c. A cut and fill balance demonstrating that the proposed fill will have an associated and equal volume compensating cut. This shall be conducted as outlined in Section 6.5 of the CLOCA Technical Guidelines for Stormwater Management, dated 2020. d. Drawings providing the existing floodline, proposed floodline, and the 6m setback from the proposed floodline to any proposed development. 2. Section 3.3 – The report and servicing drawings show that the underground chamber has capacity to retain the 5mm of runoff from the study area, however only the rooftop from the building is contributing to the chamber. In an effort to reduce the overall runoff from the study area, please re- Page | 2 Healthy watersheds for today and tomorrow. evaluate if any portion of the parking area can be sent to the chamber to provide on-site retention and quantity treatment, with pre- treatment options such as CB Shields to minimize debris and clogging. a. Further to this, the storage volume required on the Servicing Plan states 108 m3, which is the equivalent of 4mm of runoff across the site. Please provide a supporting calculation for the target volume, noting that it should be based on 5mm of runoff over the impervious area on the development site. 3. Section 4.2 – The report states that 1,160 m3 of storage is required but is not specific on how that storage is being provided. Further, the Servicing Plan shows that storage is within the subsurface chamber and surface level ponding is provided above the catchbasins. Please confirm if the subsurface level storage is sufficient for the entire site, or if storage above the catchbasins is necessary. Further, if storage above the catchbasins is necessary, please note that flow restrictors will be required in catchbasins with an elevation higher than 94.80, as the backwater condition will not go above the 94.97m spillway elevation and the east and north catchbasins will not provide active storage. 4. Appendix B – Please address the following from the appendices a. The existing conditions Rational Method uses a runoff coefficient ‘C’ value of 0.55 for landscaped area, then 0.25 for the post-development condition. CLOCA staff believe the existing condition value is too high to represent flat, cultivated lands described in the geotechnical report as sandy silt and clayey silt and should be closer to 0.25 as shown in post- development. Please adjust the existing conditions runoff coefficient. b. With subsequent submissions, please include digital copies of all modelling for staff to review. c. Please provide a detail of the dual pipe orifice outlet, including plan and profile views, to confirm feasibility. 5. Please note that CLOCA staff will defer commenting on the ESC strategies to the permit stage. If this information is required in an accessible format, please contact Reception at 1-800-372-1102, extension 2548. May 31, 2026 Shrija Vora Planning and Infrastructure Services Department Municipality of Clarington 40 Temperance Street Bowmanville, ON, L1C 3A6 Re: Region of Durham Comments Zoning By-law Amendment Application ZBA 2026-16 Applicant: PAG Commercial Vehicles Canada (GP) Ltd. & PTG Mississauga Enterprises Limited Partnership Location: 1631 Baseline Rd. Municipality: Municipality of Clarington The Region of Durham has completed its review of the above-noted applications and offers the following servicing and transit comments. The subject site is located on the corner of Baseline Road West and Trulls Road and are 2.75 ha in size. The site is currently vacant, consisting primarily of agricultural fields in a predominantly industrial area. The proposed zoning by-law amendment is to permit development of a single industrial building. The Zoning By-law Amendment would be to permit the use of truck sales, which is currently not a permitted use within the existing zone Regional Servicing The Regional Works Department has reviewed the above noted application and have no objection to the Zoning By-law Amendment application. Any requirements of the Regional Municipality of Durham concerning the provision of regional services, financial and otherwise, shall be made through a future site plan application. Zoning By-Law Amendment Application Regional Works has no objection to the further processing of the Zoning By-Law Amendment application. Site Servicing Plan The following changes are recommended for the site servicing plan: The Regional Municipality of Durham Community Growth and Economic Development Department Community Growth Division 605 ROSSLAND ROAD EAST LEVEL 4 PO BOX 623 WHITBY, ON L1N 6A3 CANADA 905-668-7711 1-800-372-1102 Email: CommunityGrowth@durham.ca durham.ca Sandra Austin Commissioner of Community Growth and Economic Development -2- • Water meter/ backflow prevention room to be provided in the mechanical room of the building. A stand-alone water meter building is not required. • Add note “Water Meter and Backflow Prevention Room as per S- 240.041” • A private fireline is required to service the proposed private hydrant. • Revise the configuration of the proposed dead-end flushing hydrant on Trulls Rd. • Hydrants required every 75.0m along the 300mm watermain. • Ensure to add note on drawing to remove and re-instate existing 150mm hydrant via 300x300x150 anchor tee. Next Submission The following items are required to be submitted with the Site Plan Application submission: • Revised Site Servicing Plan • Cost estimate for proposed Regional Servicing works within the municipal ROW • 40R-Plan • Completed Regional Servicing Agreement Checklist Durham Region Transit The above noted file was reviewed from a transit perspective, and Durham Region Transit has the following comments: • Please ensure the protected stop space adheres to the attached stop guidelines. • Please protect space for a bus stop to be constructed by the Region, at the following location: -3- o Baseline Road eastbound at Trulls road, nearside to the intersection. Conclusion The proposed zoning by-law amendment is to permit development of a single industrial building. The Zoning By-law Amendment would be to permit the use of truck sales, which is currently not a permitted use within the existing zone The Region has no objection to the further processing of the zoning by- law amendment application. Regional comments can be addressed through the future submissions. Please contact me at michael.scott@durham.ca or at (905) 668-4113, ext. 2571 should you have any questions regarding our comments. Yours truly, Michael Scott Michael Scott Principal Planner Attachments: 1. S-500.011 2. S-500.012 3. Region of Durham Works – Redline Comments cc: Kurt Niles - Regional Works Department Francisco Castillo – Durham Region Transit I 2.0m I 3.0m I {NOTE a, *=PREFERRED SHELTER DOOR LOCATION CONCRETE SIDEWALK/~MULTI-USE PAll-1 -:--,~.--~~--::....,.~·.-..~-:-'·:-.-~"""'·~"":_:=-:-.-_·-.-~~-::_-,•..,..;_-.__·-~:.~.~--~.....~!....,·:.~,-::--.-~--:_....,.::_-.i-._:·....,_:;""_1-;--. :---,,>---~,-,. ~~--.-.•~-----~-~.-.;-~--~--: --~.~-~·:-.:-=~,-<,-·.·.,.,...:-~---.--~ NOTES: MIN. 6.0m MAX 60m (NOTE 5) 2.0m MIN . 6.0m MAX. 60m (NOTE 5) ··.... ·4 .... -~· .. .... ·. 4...... .. ·.,,. . : MIN. 10.0m (FOR A 12.2m BUS) PREFERRED VARIES MIN . 10.0m (FOR A 12.2m BUS) ALTERNATIVE 1. ALL CONCRETE WORK TO BE IN ACCORDANCE WITH OPSD 310.010, 310.020. CONCRETE SHELTER PAD AS PER S-500.040 CONCRETE PASSENGER STANDING AREA MIN . 1.5m MAX. 3.0m (lYP.) 2. ALL CONCRETE WORK TO BE CONSTRUCTED WITH 2!11: CROSSFALL lYPICALLY, MAX. 4!1l 3. IN 11-IE AREA OF CONCRETE PASSENGER STANDING AREA, SAWED CONTRACTION JOINTS SHALL BE USED. 4. A HARD SURFACE CONNECTION FROM PASSENGER STANDING AREA TO NEAREST SIDEWALK OR INTERSECTION WILL BE REQUIRED WHERE A MUNICIPAL SIDEWALK IS NOT AVAILABLE. (SEE S-500.010) 5. STOPS TO BE LOCATED MIN. 6m MAX 60m FROM INTERSECTION/HIGH VOLUME DRIVEWAY (MEASURED FROM THE START OF THE CONCRETE STANDING AREA TO THE INTERSECTION CURB RADIUS), UNLESS 011-IERWISE REQUESTED. STOPS TO BE LOCATED SO THAT BUS SHELTER DOES NOT OBSTRUCT INTERSECTION SIGHT LINES. 6. IN LOCATIONS WHERE A MULTI-USE PATH IS PROVIDED INSTEAD OF A CONCRETE SIDEWALK, THE MINIMUM SETBACK BETWEEN SHELTER AND MULTI-USE PAll-1 IS 1.0m . 7. DESIGNER TO CONSIDER TAC CLEAR ZONE WHEN SITTING SHELTER. 8. SHELTER FOOTPRINT DIMENSIONS OF 1.5m X 3.0m, TO BE INCREASED TO 1.8m x 4.8m FOR HIGH VOLUME BUS STOP. MIN . 3.5m (NOTE 7) *=PREFERRED SHELTER DOOR LOCATION ALL DIMENSIONS IN METRES UNLESS OTHERWISE NOTED. WORKS DEPARTMENT PASSENGER STANDING AREA WITH SHELTER PAD (WIDE BOULEVARD >3.5m) DWG. DATE: 2009 04 REVISION NO.: 6 REV. DATE: 2017 04 SCALE: N.T.S. S-500.011 11 11 11 11 11 CONCRElE SHELTER PAD AS PER S-500.040 11I \ CONCRElE SIDEWALK/ 11 MULTI-USE PA'Jli \ \,,,,,,,, PREFERRED *=PREFERRED SHELTER DOOR LOCATION *=PREFERRED SHELlER DOOR LOCATION 1.5m_/'~::-------~~~~-----------------------I MIN . 6.0m NOTES: i-----MAX--6-0-m--i (NOlE 5)E/P ALTERNATIVE SHARED SIDEWALK / PASSENGER STANDING AREA 1. ALL CONCRElE WORK TO BE IN ACCORDANCE WITH OPSD 310.010, 310.020. 2. ALL CONCRElE WORK TO BE CONSTRUClED WITH 2" CROSSFALL TYPICALLY, MAX. 4%. 3. IN THE AREA OF CONCRElE PASSENGER STANDING AREA, SAWED CONTRACTION JOINTS SHALL BE USED. 4. A HARD SURFACE CONNECTION FROM PASSENGER STANDING AREA TO NEAREST SIDEWALK OR INTERSECTION WILL BE REQUIRED WHERE A MUNICIPAL SIDEWALK IS NOT AVAILABLE. (SEE S-500.010) 5. STOPS TO BE LOCAlED MIN. 6m MAX 60m FROM INlERSECTION/HIGH VOLUME DRIVEWAY (MEASURED FROM 11-IE START OF 11-IE CONCRElE STANDING AREA TO THE INlERSECTION CURB RADIUS), UNLESS 011-IERWISE REQUESlED. STOPS TO BE LOCAlED SO 11-IAT BUS SHELlER DOES NOT OBSTRUCT INTERSECTION SIGHT LINES. 6. IN LOCATIONS WHERE A MULTI-USE PATH IS PROVIDED INSlEAD OF A CONCRElE SIDEWALK, 11-IE MINIMUM SETBACK BETWEEN SHELTER AND MULTI-USE PA'Jli IS 1.0m. 7. DESIGNER TO CONSIDER TAC CLEAR ZONE WHEN SITTING SHELlER. 8. SHELlER FOOTPRINT DIMENSIONS OF 1.5m X 3.0m, TO BE INCREASED TO 1.8m x 4.8m FOR HIGH VOLUME BUS STOP. 9. ALTERNATIVE TO BE USED ONLY WITH PERMISSION FROM THE REGION . ALL DIMENSIONS IN METRES UNLESS OTHERWISE NOlED. WORKS DEPARTMENT PASSENGER STANDING AREA WITH SHELTER PAD {NARROW BOULEVARD <3.5m) DWG. DAlE: 2009 04 REVISION NO.: 7 REV. DAlE: 2017 04 SCALE: N.T.S. S-500.012 WATER METER & BACKFLOW PREVENTION ROOM AS PER S-240.041 TEMP. 200mm & 150mm PLUGS C/W 50mm BLOW-OFF AS PER S-210.060PRIVATE FIRELINE WORKS DEPARTMENT REGIONAL MUNICIAPALITY OF DURHAM DEVELOPMENT APPROVALS DIVISION TO BE REVISED AS NOTED DATE:_________________________________________ SUBMISSION No.:_______________________________ 27-MAY-26 ZBA - 1st SUBMISSION 300mm PLUG From:Augurusa, Romeo (MTO) To:Development Applications Coordinators Subject:RE: ZBA-2026-0016: 1631 Baseline Road - 1st Submission Attachments:image001.png Good afternoon, Re: ZBA-2026-0016: 1631 Baseline Road - 1st Submission After review, the Ministry offers the following comments regarding the above address: The MTO is supportive of the Zoning By-Law Amendment in principle. Detailed review of the site will take place at the Site Plan Application stage. At this moment, please see below observations that should be addressed prior to the SPA stage. Please accept these comments as “preliminary”, as the Ministry reserves the right to provide formal comments, once the full-size plans and required reports are submitted for our review. General Site Plan comments: The subject site is within MTO’s Permit Control Area and as such, MTO Site Plan Approval and MTO Permits will be required prior to any construction activities. A 14m minimum setback is required from the Provincial Highway lands & associated service roads property line. The current ROW as well as a 14m MTO setback should be clearly labeled on all drawings that will be provided for the Ministry’s review and comments. A 30m minimum setback is required for wells from the Provincial Highway lands & associated service roads property line. The required setback of a well may be reduced to 14m, provided that the property owner acknowledges in writing and signs our well acknowledgement form that the Ministry will not be responsible for any reduction in the quality or quantity of the water supply. Please be aware that no feature, amenity or operational arrangement (such as, but not limited to, fire-routes, emergency access/exits, parking, loading docks, access to loading docks, storm-water management ponds, snow storage) that is required by by-law or is essential to the viability of this site, should be located within the 14m setback. Furthermore, only the surplus parking (excess of the Municipal’s minimum parking requirement under the Zoning Bylaw) can be located within the 14m MTO setback, but must be setback a minimum of 3m from the Provincial Highway lands property line. All required and surplus parking must be clearly indicated on the SP. Requirements for fencing include (but are not limited to) erecting fencing along the MTO right-of-way at 0.3m into the MTO ROW. A MTO Encroachment permit is required for this work and it should follow OPSD 972.130 (Chain Link Fence with Top-Wire). As part of the review and approval process the applicant will be required to submit copies of a detailed Site Plan, Stormwater Management Report, Site Servicing, and Grading Plans prepared by a Professional Engineer of Ontario. Any noise mitigation is the responsibility of the landowner which includes the design and implementation. The Ministry will not be held liable for noise attenuation next to the highway which also includes its maintenance and upkeep. The proponent is required to submit a copy of a Photometric Lighting Plan (in metric LUX units) for MTO review and approval. The plan must illustrate proposed lighting and any light spillage on the Provincial Highway lands & associated service roads ROW. It is Ministry practice to have zero light trespass onto MTO right-of-way. All plans and reports must be stamped and signed and circulated to the MTO through municipal site plan application process for a formal review and comments. MTO Sign Permits will be required for any new signage visible from Provincial Highway lands & associated service roads. The Applicant should be advised that they cannot apply for MTO Permits until the Site Plan has been approved by MTO and the Municipality. All site access to/from the subject site shall be from the Municipal Road network. The Applicant must apply online through the link below once clearance letter is issued: https://www.hcms.mto.gov.on.ca/ Let me know if you have any questions or concerns. Thanks, Romeo Augurusa | Corridor Management Planner (Toronto/Durham) Highway Corridor Management Section | Central Operations | Ministry of Transportation 159 Sir William Hearst Avenue, 7th Floor, Toronto, ON. M3M 0B7 Cell: 416-617-1915 | Email: romeo.augurusa@ontario.ca Web: www.ontario.ca/page/highway-corridor-management From:WILSON, Chris To:Development Applications Coordinators Subject:RE: ZBA-2026-0016: 1631 Baseline Road - 1st Submission Date:May 6, 2026 12:17:35 PM EXTERNAL Hi, No Comments for mail delivery. Thank you, Chris Wilson Officer, Delivery Services, Delivery Planning | Canada Post | GTA Region | chris.wilson@canadapost.ca | 416-262-7408 From:Municipal Planning To:Development Applications Coordinators Subject:RE: ZBA-2026-0016: 1631 Baseline Road - 1st Submission Date:April 24, 2026 11:47:41 AM EXTERNAL Thank you for your circulation. Enbridge Gas does not object to the proposed application(s) however, we reserve the right to amend or remove development conditions. This response does not signify an approval for the site/development. Please continue to forward all municipal circulations and clearance letter requests electronically to MunicipalPlanning@Enbridge.com. Regards, Willie Cornelio CET (he/him) Sr Analyst, Municipal Planning Engineering — ENBRIDGE TEL: 416-495-6411 500 Consumers Rd, North York, ON M2J1P8 enbridge.com Safety. Integrity. Respect. Inclusion. Date May 19, 2026 Municipality of Clarington Attention: Elissa Kelloway Re: File No.: ZBA-2026-0016 Owner: PAG Commercial Vehicles Canada and PTG Mississauga Enterprise Limited Partnership Location: 1631 Baseline Rd Dear Ms. Kelloway Thank you for your letter. Rogers Communications appreciates the opportunity to review and comment on future development within the Municipality of Bowmanville. We have reviewed the proposed area and do not have any comments or concerns at this time. Rogers currently has existing communications within this area. Please contact Colin Germaine at colin.germaine@rci.rogers.com prior to the commencement of construction. Should you have any questions or require further information, please do not hesitate to contact Colin Germaine Sincerely, GloriaQ Gloria Quimado For : Colin Germaine System Planner – York/Durham Rogers Communications 301 Marwood Dr Oshawa, ON L1H 1J4 colin.germaine@rci.rogers.com o 647-926-7636 CG/gq Encls. From:Anthony, Laura on behalf of circulations To:Development Applications Coordinators Subject:RE: Overdue Comments RE: ZBA-2026-0016: 1631 Baseline Road - 1st Submission Date:May 25, 2026 2:10:35 PM EXTERNAL Hi, Bell Canada has no comments at this time. Thanks Laura Anthony /Bell Canada Network Provisioning / MOC Office: 416 296 6038