HomeMy WebLinkAboutWD-50-88 TOWN OF NEWCASTLE
REPORT File
Res. #( '/ r '-"' `u
By-Law #
trEETING: GENERAL PURPOSE AND ADMINISTRATION MEETING
DATE: SEPTEMBER 6, 1988
REPORT #: WD-50-88 FILE #:
W&ECT: HAMPTON MILL POND,
MILL STREET AND MILL STREET BRIDGE
HAMPTON
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and
Administration Committee recommend to Council the following:
1. THAT this report be received; and,
2. THAT an Information Centre be held in the Hampton Community Hall
from 4:00 p.m. to 9:00 p.m. , Wednesday, September 28, 1988; and
3. THAT the reconstruction of the Mill Street Bridge and Mill Street be
considered in the 1989 Budget.
4. THAT a copy of this report be sent to Mr. Bill Richardson, R.R. #1.
Hampton, Ontario, LOB 1JO and to the Central Lake Ontario Conservation
Authority, 100 Whiting Avenue, Oshawa, Ontaro, L1H 3T3.
REPORT
1.0 BACKGROUND
1.1 At a regular meeting of the General Purpose and Administration
Committee held on February 3, 1986, Resolution #GPA-135-86 was passed,
as follows:
"THAT staff be directed to investigate the status of the road
relative to Hampton Mill Pond, and that a report be submitted
to the General Purpose and Administration Committee Meeting
Page 2
WD-50-88
2.0 COMMENTS
2.1 The location of the Mill Street Bridge is shown on Attachment No.l.
2.2 On January 25, 1988 the Mill Street Bridge was closed to traffic for
repairs. A letter was circulated to the residents of Hampton advising
them of the closing (Attachment N0.2) .
2.3 The deck from the existing bridge was removed and a Bailey Bridge,
which is on loan from the Ministry of Transportation, was erected.
The bridge provides for single lane traffic and has a sidewalk on the
north side of the bridge for pedestrians.
2.4 On March 4, 1988 a letter was circulated to the residents of Hampton
advising them of the progress on the replacement of the bridge
(Attachment No.3) . The bridge and Mill Street were opened to traffic
on March 31, 1988.
2.5 Provision was made in the 1988 Budget for the design of a new bridge
and for the widening of Mill Street to accommodate two way traffic.
2.6 INFORMATION CENTRE
An Information Centre will be held for the Mill Street project on
Wednesday, September 28, 1988 from 4:00 p.m. to 9:00 p.m held at the
Hampton Community Centre. Representatives from the Central Lake Ontario
Conservation Authority will also be present to explain the Conservation
Authority's plans for the Mill Pond.
2.7 DELEGATION: MR. BILL RICHARDSON
On March 14, 1988, Mr. Bill Richardson presented a petition to Council
on behalf of the residents of Hampton. They requested that the Town
make every effort to replace the Mill Pond Bridge removed earlier by
Town forces, with a permanent bridge, not a Bailey Bridge.
. . .3
Page 3
Report WD-50-88
2.8 At the March 14, 1988 meeting, Council passed Resolution #kC-203-88°
"THAT Mr. Willaim Richardson's delegation be acknowledged; and
THAT the Works Department note the concerns and further that
Mr. Richardson be contacted by staff when the bridge and roadway
serving the bridge are to be reviewed; and
THAT C.L.O.C.A. be advised that the Council of the Town of Newcastle
would appreciate their full co-operation with respect to the
rehabilitation of the Hampton Pond and bridge and C.L.O.C.A. be
invited to attend any meetings established to review the area;
AND FURTHER THAT Mr. Richardson be advised of Council's decision.
2.9 Although the Bailey Bridge solved the problem for the time being,
it must not be considered to be a permanent solution. Since the
completion of the erection of the Bailey Bridge, erosion has taken
place under the old bridge abutments and on the steep embankments of
Mill Street.
3.0 CONCLUSION AND RECOMMENDATION
3.1 Based on the above, it is concluded that the Town should replace the
Bailey Bridge with a permanent structure and that Mill Street should
be widened to provide for two way traffic and for pedestrians.
3.2 It is, therefore, recommended that the reconstruction of the
Mill Street Bridge on Mill Street be considered in the 1989 Budget
and that a copy of this report be forwarded to Mr. Bill Richardson.
Respectfully submitted, Recommended for presentation
to the Committee,
A,, cv_ar_��
Walter A. Evans, P. Eng., Lawrence IC tseff,
Director of Public Works. Chief Admini t ative Officer.
:llv
August 11, 1988
CON. R0. 6
19 4 18 C7
o
a
U
N
J
O
P S�
S1Mp RR� PvE
} �•�. •3 KE�� Pv�o� � w
•� �•• PSG �,�•
t_d c A.%t o ht o ,�� �ci CO
T-R E M 1 t-t- r
--SfLt OGG
TAUNTON ROAD
REG. R0. 4
MANN WO-1
! HAMPTON .
S
CORP "4TION OF THE+TOWN OF NEWC
;.
AO XEMPE�ANCE STREET '
BOWMANVILLE, ONTARIO
L1C3A6 TELEPHONE 623-3379
January 25, 1988.
i
II
I
Dear Resident:
RE: Hampton Mill Street Bridge
please be advised that effective January 25, 1988, the Mill Street Bridge
in Hampton will be closed to vehicular and pedestrian traffic in order to
determine structural deficiencies in the bridge and make the necessary
repairs to maintain the bridge in a safe operating condition.
it is anticipated that the bridge will be out of service for several weeks.
depending on the extent of the repairs and weather conditions. Since the
area is considered treacherous under normal circumstances, it is not
recommended for pedestrian travel. As well, the ice at the dam is
thin and should not be used to cross the creek while the bridge is out of
service.
If you have any questions with regard to the repairs, please contact the
public Works Office at 263-2231.
We thank you in advance for your co-operation in this matter.
yours r y,
ter A. ans, P. Eng.,
Director o public Works.
DTG:jco
cc: L.E. Rotseff, C.A.O.
G. Smith, Foreman ATTACK UT `0.2
it
CORP RATION OF THE.TOWN OF NEWr&STLE
,40 TEMC-ERANCE STREET
BOWMANVILLE, ONTARIO .
LiC3A6 TELEPHONE 623-3379
I
March 4, 1988. j
Dear Resident:
RE: Mill Street Bridge, Hampton
On January 25, 1988, you were advised by letter that the Mill
Street Bridge and Mill Street would be closed to vehicular
and pedestrian traffic for several weeks. thesdeck arehe
closing was that the steel beams which support
rusted so badly that they are no longer capable of safely
supporting traffic.
Arrangements have been made with the Ministry of Transportation,
Ontario, to borrow a Bailey Bridge to provide a temporary
solution to the problem. The bridge will provide for single
land traffic with a sidewalk for pedestrians.
We expect to have the Bailey Bridge installed and the road open
to vehicular traffic by the end of March.
During 1988, the various alternatives available to provide a
permanent solution to the replacement of the Mill Street Bridge
and the widening of Mill Street will be examined. Provision
will be made in the 1989 Budget, for Council' s consideration, to
provide funds for a permanent solution.
We realize that the closing of Mill Street has been a serious
inconvenience and for this we apologize.
If you have any questions, please contact the Public Works
Office at 263-2231.
Yours truly,
Walter A. Evans, P. Eng. ,
Director of Public Works.
WAE:Jco
ATTACI UT i403
. �•�-50-3