Loading...
HomeMy WebLinkAboutPDS-025-25Public Meeting Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Special Planning and Development Committee Date of Meeting: June 19, 2025 Report Number: PDS-025-25 Authored By: Submitted By: Reviewed By: File Number: Report Subject: Jane Wang, Senior Planner, Community Planning Darryl Lyons, Deputy CAO, Planning and Infrastructure Services Mary-Anne Dempster, CAO COPA-2025-0008(PLN 41.16) Resolution#: Soper Hills Secondary Plan Statutory Public Meeting Purpose of Report: The purpose of this report is to provide information and seek input from the public and Council regarding the draft Soper Hills Secondary Plan. It does not constitute, imply or request any degree of approval. Recommendations: 1.That Report PDS-025-25 and any related communication items, be received; 2.That any received comments be considered during preparation of the recommended Soper Hills Secondary Plan and Urban Design and Sustainability Guidelines ; 3.That Staff report back to Council with a Recommendation Report, including the Official Plan Amendment for the Soper Hills Secondary Plan; and 4.That all interested parties listed in Report PDS-025-25 and any delegations be advised of Council’s decision. Municipality of Clarington Page 2 Report PDS-025-25 Report Overview This report provides an overview of the planning process for the draft Soper Hills Secondary Plan (Secondary Plan), details key policy directions and summarizes public and agency comments received to date. The Secondary Plan is envisioned to create a compact, complete, connected and walkable community in Bowmanville, that is interconnected with the natural environment. The Plan will reflect and enrich the character of the area, creating a sense of place for residents and visitors and provide for a sustainable built form. The purpose of the Statutory Public Meeting is to obtain comments from the public, Council members, landowners, and commenting agencies on the Secondary Plan and draft Urban Design and Sustainability Guidelines. These comments will inform potential revisions to the Secondary Plan before it is recommended to Council for approval that is targeted for the Fall 2025. 1. Background 1.1 The draft Soper Hills Secondary Plan (Attachment 1) provides an outline for the development of a connected, complete community with residential, commercial, employment, and recreation opportunities. The Secondary Plan will lead to a sustainable built form that protects the significant scale of the natural environment, promotes alternative modes of transportation, and supports a healthy l ifestyle for current and future generations. 1.2 The purpose of this Secondary Plan and accompanying Urban Design and Sustainability Guidelines is to establish goals and policies to guide development within Soper Hills Secondary Plan area over time, as it is implemented through subdivision, zoning and site plan control. 1.3 The preparation of this Secondary Plan follows the same procedures as an Official Plan Amendment under the Planning Act. This includes the preparation of supporting technical studies, public engagement, a statutory public meeting and Council approval. The draft Official Plan Amendment (Attachment 2) will amend the Clarington Official Plan to add the Soper Hills Secondary Plan . 2. Soper Hills Secondary Plan 2.1 The Secondary Plan Area is generally bound by Regional Highway 2 to the south, Lambs Road to the west, the Canadian Pacific Railway to the north and Providence Municipality of Clarington Page 3 Report PDS-025-25 Road and its unopened road allowance to the east. The area is approximately 193 hectares in size and is located east of Bowmanville. Figure 1: Soper Hills Secondary Plan Area 2.2 Currently, the Secondary Plan Area consists of agricultural fields and associated single detached dwellings, single detached dwellings along Regional Highway 2, institutional uses, and the Soper Creek valleylands. To the west of the secondary plan area are residential subdivisions, and to the south is the planned Technology Business Park Secondary Plan area. The agricultural fields and natural areas to the north and east are identified for future urban boundary expansion to 2051 by the Durham Region Official Plan. Initiation of the Secondary Plan 2.3 The Municipality of Clarington received a request from the Bowmanville East (Soper Hills) Landowners Group to initiate the Secondary Plan with their commitment to cover 100% of the costs as required by Clarington Official Plan policies. In April 2018, Council authorized staff to commence the Soper Hills Secondary Plan (PSD-031-18). Staff were Municipality of Clarington Page 4 Report PDS-025-25 authorized to finalize the draft Terms of Reference and issue a Request for Proposal to retain the necessary consultants. 2.4 SGL Consulting was hired to assist staff in preparing the Secondary Plan, including undertaking the technical and professional work, and other deliverables outlined in the Terms of Reference. Coordination of Initiatives 2.5 The following processes have been undertaken at the same time as the Soper Hills Secondary Plan and have been incorporated into the study process. Environmental Assessment 2.6 An Environmental Assessment (EA) is required for all new or realigned major roads needed for the Soper Hills Secondary Plan. 2.7 This project is being undertaken using the ‘Integrated Approach’, which jointly satisfies the requirements of the Planning Act and the Environmental Assessment Act. All public notices, communications and review periods have been designed to ensure that they conform to the requirements of both the Planning Act and the Environmental Assessment Act. Soper Creek Subwatershed Study 2.8 The Soper Creek Subwatershed Study (Soper Creek SWS) is required to inform the preparation of the Soper Hills. The purpose of the Study includes assessing the potential impact of proposed land use changes on natural features, providing recommendations for mitigating the impacts, and developing an implementation and monitoring plan. 2.9 The first phase of the study is complete and provided an understanding of the environmental features, functions, and constraints to inform the development of the Soper Hills Secondary Plan. The draft Phase 2 and 3 reports were completed to provide subwatershed management strategies, implementation and monitoring plans. The draft Phase 2 and 3 report was presented at a Public Information Centre on April 10, 2025. Recommendations from the draft Soper Creek SWS are integrated into the Secondary Plan and draft Urban Design and Sustainability Guidelines. Finalization of the Soper Creek SWS is required prior to the completion of the Secondary Plan. 3. Secondary Plan Process 3.1 The development of the Secondary Plan was informed by a comprehensive public engagement process and several technical background studies. Municipality of Clarington Page 5 Report PDS-025-25 3.2 The Secondary Plan process for Soper Hills involves four phases (Figure 2). Figure 2: The Soper Hills Secondary Plan Process 3.3 The following section generally describes the process that was undertaken to develop the Secondary Plan. A sequence of events summary table is provided in Attachment 3 , Sequence of Events for reference.  Phase 1: Public Input and Technical Analysis. This phase included technical analysis through background studies and initial consultation with the community to determine the vision for the new neighbourhood. A Public Information Centre was hosted in March 2019 to introduce the Study to the public and seek input into the Secondary Plan vision and guiding principles. The findings received from the background review and public engagement informed the development of the land use alternatives and the evaluation criteria for the preferred land use plan. The Phase 1 Background and Analysis Summary Report was completed in June 2020 .  Phase 2: Urban Design and Sustainability Principles and Alternative Land Uses. This phase developed Urban Design and Sustainability principles that were used to guide the development of the Secondary Plan, three land use options and an evaluation criterion to evaluate the options. This phase also included a Public Information Centre in June 2022. A Phase 2 Summary Report was completed in December 2022. Municipality of Clarington Page 6 Report PDS-025-25  Phase 3: Preferred Land Use Plan. In this phase, a Joint Public Information Centre (with Soper Springs Secondary Plan and Soper Creek SWS) was held in December 2023. At this meeting, a Preferred Land Use Plan as well as draft Environmental Protection Areas were presented for feedback. The comments received from the Steering Committee, the public and agencies regarding the Preferred Land Use Plan contributed to the creation of the emerging land use plan and policy direction. The Joint Public Information Centre presentation, the draft Alternative Land Use Plan Report and the Environmental Protection Area Schedule are posted on the project webpage.  Phase 4: Final Secondary Plan and Zoning By-law. This final phase will focus on the finalization of the Secondary Plan. This includes the Statutory Public Meeting and Recommendation Report. In this phase, the supporting technical documents will be finalized, and the preparation of the implementing zoning by-law will take place. 3.4 Public engagement included three Public Information Centres, which included interactive presentations and surveys. Feedback received through various methods over the last several years focused on the sustainability vision, environmental protection and creation of a mixed density, mixed-use neighbourhood. 3.5 All comments submitted on the Secondary Plan will be addressed in a future recommendation report to Council. Technical Studies 3.6 Preliminary technical background work was completed prior to the June 2022 Public Information Centre #2. The Phase I Background and Analysis Summary Report outlined the findings and analysis to inform the development of the Secondary Plan . 3.7 A draft Transportation Assessment Report was prepared by TYLin to establish the preferred road network for the Secondary Plan and evaluate how the Secondary Plan area will affect the traffic generated by future growth, with consideration for existing traffic conditions, land use planning alternatives, forecasted traffic growth rates and identifying any shortcomings and recommendations. 3.8 A draft Functional Servicing Study Report (FSSR) was prepared by TYLin for the Soper Hills Secondary Plan area to demonstrate how the Secondary Plan area can be efficiently serviced in terms of water supply and distribution, wastewater and stormwater. Taking all comments and consideration from the agencies, findings, and recommendations of the Soper Creek SWS , stormwater management facilities and locations are recommended within the Secondary Plan area. 3.9 Attachment 4 provides a summary of the technical work that has been completed to date. These reports will be finalized prior to completion of the Secondary Plan. Municipality of Clarington Page 7 Report PDS-025-25 4. Secondary Plan Vision and Framework 4.1 The Secondary Plan is envisioned to reflect and enrich the history and character of both the Municipality of Clarington and the Secondary Plan Area by creating a sense of place for residents and visitors and provide for a sustainable built form that protects the natural environment, promotes alternative modes of transportation, and supports a healthy lifestyle for current and future generations. 4.2 To implement the vision for the Secondary Plan area, principles were developed based on the Sustainability and Green Principles Report, including:  Provide for the efficient use of land with the creation of a compact, complete, connected, age-friendly and walkable community.  Reduce dependence on personal vehicles and prioritize active transportation modes of travel by creating an active transportation network that encourages walking and cycling, and improve overall health for the residents and community.  Protect, enhance and value significant natural features within and adjacent to Environmental Protection Areas.  Design parks and open spaces that are highly visible, accessible and usable.  Respect cultural heritage through conservation and appropriate incorporation into the community. 4.3 The draft Land Use Plan (Figure 3) identifies the distribution of land uses and the Secondary Plan policies describe their permitted land use, built form, height permissions and minimum density. 4.4 Four collector roads will support development in the Secondary Plan Area:  A north-south collector road located central to the Secondary Plan area;  An east-west collector road north of Concession Street East between Lambs Road and Providence Road; and  Two east-west collector roads south of Concession Street East between Lambs Road and Providence Road. 4.5 The Secondary Plan Area is designed with higher densities and opportunities for transit - oriented development (e.g. High Density Regional Corridor) along Regional Highway 2. Medium densities are also located along the Local Corridors, which are found along the boundary roads (e.g. Lambs Road and Providence Road) as well as along Concession Municipality of Clarington Page 8 Report PDS-025-25 Street East. A Neighbourhood Centre, permitting a mix of commercial and residential uses, is located at the Concession Street East and north-south collector road intersection. 4.6 In terms of parkland, one Community Park, three Neighbourhood Parks abutting elementary schools and two parkettes are proposed. The Secondary Plan Area also centrally locates a variety of uses that together will act as a central node for this community, including the Neighbourhood Centre, the Community Park, and Medium Density uses along Concession Street East. Municipality of Clarington Page 9 Report PDS-025-25 Figure 3: Schedule A Land Use Plan (Draft) Municipality of Clarington Page 10 Report PDS-025-25 4.7 The draft Environmental Constraint and Transportation Schedule B (Figure 4) provides greater details on environmental constraints, road classification and active transportation planned for the Secondary Plan area. 4.8 Two types of trails are identified in the Secondary Plan Area: Multi-Use Paths and Trails. Multi-Use Paths are pathways separated from vehicular traffic that accommodate pedestrian and cycling routes within the road right of way. Multi-Use Paths are proposed to be located along collector roads and midblock between residential land uses to provide connections to Trails in the Environmental Protection Area. 4.9 Trails can be paved or unpaved and may provide access to environmental features in the Environmental Protection Area designation. They are intended to keep users on a designated path to minimize disruption to the surrounding landscape. Municipality of Clarington Page 11 Report PDS-025-25 Figure 4: Schedule B- Environmental Constraint and Transportation (Draft) Municipality of Clarington Page 12 Report PDS-025-25 4.10 The Secondary Plan is supported by draft Urban Design and Sustainability Guidelines (Guidelines) (see Attachment 5), which are built on the Sustainability and Green Principles Report (see Section 4.2). The draft Guidelines were also informed by the Municipality of Clarington’s Green Development Framework. 4.11 The draft Guidelines provide direction for the design of streets and blocks, built form, streetscape design, community focal points, environmental protection area interface, parks and open spaces as well as sustainability. The draft Guidelines will provide a level of expectation for the design and assist with the review and evaluation of future development applications. Key Policy Directions 4.12 The Secondary Plan has been prepared to respond to provincial policy changes, the local context and technical studies. Key policy directions are detailed below: Housing Diversity and Density 4.13 The Secondary Plan facilitates and promotes an inclusive community by permitting a range of housing types in support of Clarington’s Pledge to build 13,000 new residential units by 2031. A variety of building types and heights are supported throughout the Secondary Plan, ranging from detached dwellings and townhouses to mid-rise apartments and mixed-use buildings. The estimated number of residential units to be accommodated in the Secondary Plan area is 5,250 units. Affordable Housing Framework 4.14 The Secondary Plan includes a collection of policies intended to support the Municipality’s objective for a minimum of 30% of all new housing units to be affordable. The Secondary Plan proposes a range of housing forms, sizes and tenures to meet the needs of a diverse population and households of various sizes, incomes and age compositions. 4.15 There are limited tools available to the Municipality to require the delivery of affordable housing units. The draft policies encourage the integration of affordable housing into the community, especially in locations that are easily accessible to transit and services. A policy permitting additional height for development that provides affordable housing in the High Density / Mixed Use Regional Corridor land use designations is also included . 4.16 To support achieving the affordable housing objectives, the Municipality will explore potential incentives such as reduced application fees and fast -tracked application approvals. One incentive included within the Secondary Plan is the opportunity to reduce the minimum parking requirements. This incentive would be explored on a site - Municipality of Clarington Page 13 Report PDS-025-25 by-site basis, where affordable housing is provided as part of a development application. Alignment with Soper Creek Subwatershed Study 4.17 Consistent with the Clarington Official Plan, lands designated Environmental Protection Area do not permit any development besides low intensity recreation and uses related to conservation, flood or erosion control projects. 4.18 In addition to the lands designated as Environmental Protection Area, three Environmental Constraint Overlays are introduced based on the Soper Creek SWS findings and recommendations. These ‘overlay’ areas are not land use designations; they identify areas where potential environmental constraints need to be considered or studied as part of future development applications. 4.19 Policies in the Secondary Plan specify that a site -specific environmental impact study is required to determine appropriate natural heritage feature boundaries, compatible development and appropriate mitigation strategies that may refine the boundaries of the Environmental Constraint Overlay as part of the development review process. 5. Alignment with Provincial Planning Framework Planning Act 5.1 The Planning Act mandates how planning should be carried out in the Province of Ontario and requires municipalities to have regard for matters of provincial interest. These matters of provincial interest include but are not limited to the protection and conservation of the environment; the provision of housing, community services and facilities, education, and health facilities; appropriate growth and development; and consideration for public and private interests. 5.2 The Secondary Plan has had regard for matters of provincial interest by providing for a variety of housing forms and options, including detached and semi-detached dwellings, a full range of townhouses and apartment buildings. The Environmental Protection Area designation has been delineated based on the findings of the draft Soper Creek SWS. A variety of community services and amenities, including parks, are also planned within the preferred land use plan. Provincial Planning Statement, 2024 5.3 On October 20, 2024, the new Provincial Planning Statement, 2024 (PPS, 2024) came into effect, integrating and replacing the existing Provincial Policy Statement, 2020 and the A Place to Grow – Growth Plan for the Greater Golden Horseshoe, 2020, into a single, province-wide policy document. PPS, 2024 sets out high level policy direction for Municipality of Clarington Page 14 Report PDS-025-25 planning across Ontario related to housing, growth, infrastructure, protecting the environment and public health. Land Use and Housing Mix 5.4 The PPS,2024 promotes the creation of complete communities by accommodating a mix of land uses, housing options, transportation options with multimodal access, employment, public service facilities and other institutional uses, recreation, parks and open space, and other uses to meet long-term needs. The PPS, 2024 also directs that settlement areas shall be the focus of growth and development and land use patterns shall be based on densities and land uses which efficiently use land and resources, including infrastructure and public service facilities. 5.5 The Secondary Plan proposes a range of densities and a mix of residential land use designations, including the High Density/Mixed Use Regional Corridor, Medium Density Residential, Low Density Residential and Neighbourhood Centre. It encourages a variety of housing types and provides appropriate transitions between land uses. The Secondary Plan also proposes a mix of retail and commercial uses, parks and open spaces. These land uses and densities provide for an efficient use of the land, infrastructure and planned public service facilities Parks and Open Space, Natural Heritage and Community Facilities 5.6 The PPS, 2024, encourages the long-term preservation and protection of natural features and recognizes the linkages between natural heritage features and areas, surface water features and ground water features. 5.7 The Parks and Open Space System in the Secondary Plan consists of Environmental Protection Areas, parks and stormwater management ponds. These components provide spaces to support the ecological and hydrological functions of the Secondary Plan Area. The proposed parks will provide a variety of opportunities for passive and active recreation to contribute to the area’s sense of identity. 5.8 In combination with Official Plan policies and draft Soper Creek SWS directions, minimum vegetation protection zones will also be required to preserve the ecological integrity of the natural heritage system. No development shall be permitted within the Environmental Protection Area designation. Economic Prosperity 5.9 The PPS, 2024 encourages supporting a modern economy by providing for an appropriate mix and range of employment, institutional and broader mixed uses to meet long-term needs. Municipality of Clarington Page 15 Report PDS-025-25 5.10 The Secondary Plan provides opportunities for employment as well as economic development through the provision of retail, commercial and service uses integrated within the community and residential areas. The proposed elementary schools will also provide employment opportunities in this neighbourhood. 5.11 The Neighbourhood Centre will be the focal point of the neighbourhood and leasable non-residential floor space for retail and service commercial uses to meet the needs of residents and visitors. Commercial uses are also permitted and encouraged within the Regional and Local Corridors. 5.12 The Secondary Plan is consistent with the PPS, 2024. 6. Conformity with Official Plans Durham Region Official Plan 6.1 The Region of Durham Official Plan (ROP), Envision Durham, aims to guide long-term growth and development in the Region to foster a complete, healthy, sustainable, diverse and welcoming place to live, learn and thrive for current and future residents of Durham. As of January 1, 2025, the Region of Durham is no longer the planni ng approval authority for the Municipality. The Municipality is responsible for implementing the ROP. The Secondary Plan conforms to the Durham Region Official Plan. 6.2 Lands in the Secondary Plan area are designated ‘Community Areas’ and ‘Regional Corridor’ in the ROP. Community Areas are intended to be developed as complete communities and provide a range of housing, transportation and lifestyle choices, and create opportunities for residents to live, shop, work and access services and amenities within the community. 6.3 The Secondary Plan intends to achieve a complete community to support healthy and active living for people of all ages by providing a diverse mix of housing types and options, jobs, retail options, transportation and land uses. Residential, reta il, commercial, parks and open space, recreation and institutional uses are proposed to create a complete and vibrant community in Soper Hills. The Secondary Plan Area will be designed based on a modified grid pattern of streets, complemented by multi-use paths and trails to improve connectivity within the Secondary Plan Area and enhance the pedestrian permeability of the area and access to transit. Regional Corridor 6.4 The Regional Corridor is where higher density and more compact built forms of development are encouraged. Regional Corridors also support the movement of people and goods and the achievement of transit supportive densities. Regional Corridor Municipality of Clarington Page 16 Report PDS-025-25 policies encourage built forms to be higher densities, multi-storey, compact, pedestrian friendly and transit supportive. 6.5 The High Density/Mixed Use Regional Corridor designation which aligns with the Regional Corridor is located at the south portion of the Secondary Plan Area along Regional Highway 2. Permitted uses in this designation will primarily con sist of mid and high-rise residential built forms combined with retail and service commercial uses, and office uses at-grade. The permitted height range is 7 - 12 storeys and site densities shall be at least 150 units per net hectare to encourage the highest and most dense forms of development within the Regional Corridor. Two additional storeys may be permitted if affordable housing units are provided. Clarington Official Plan 6.6 The Municipality of Clarington Official Plan (COP) guides and manages development to the year 2031 by fostering economic, environmental, cultural, physical and social well- being of residents. The COP also guides the future form of development while mitigating land use conflict and evaluating land use opportunities in Clarington by collaboratively working with stakeholders and other levels of government. 6.7 Lands in the Secondary Plan area are designated Regional Corridor, Urban Residential, Community Park and Environmental Protection on Map A Land Use in the COP. The predominant use of lands designated Urban Residential is intended to develop compatible residential uses with a variety of housing and neighbourhood services. Map B in the COP identifies the regional corridor along Highway 2 and the local corridors along Lambs Road, Providence Road, and Concession Street, which are intended to encourage a higher density and mixed-use development. 6.8 The Secondary Plan land use designations permit a wide range of uses compatible with the Urban Residential designation of the COP. The Secondary P lan encourages a broad range of housing types and tenures to meet the evolving housing needs of people of all ages, abilities and income groups. It also contributes to achieving the objective of facilitating the opportunity for affordable housing units within urban areas. Affordable housing will be directed towards the Regional Corridors and Local Corridors, as they offer convenient access to public transit. 6.9 The High Density/Mixed use designation allows for the greatest concentration of densities and mix of uses along Regional Highway 2(Regional Corridor) and permits apartment buildings, mixed use buildings and townhouse dwellings. The highest and densest forms of development are encouraged along Regional Highway 2. In addition, the Local Corridors along Lambs Road, Providence Road and Concession Street will contain a mix of medium density uses. Environmental Protection Area Municipality of Clarington Page 17 Report PDS-025-25 6.10 The Environmental Protection Area is recognized as the most significant co mponent of the Municipality’s natural environment. These areas and their ecological function are to be preserved and protected from the effects of human activity. No development shall be permitted on these lands with the exception of low-intensity recreation, forest, fish and wildlife management, erosion control and stormwater management . 6.11 No development with the exception of trails, low-impact development features, erosion control and stormwater management outlets is proposed to occur within the Environmental Protection Area in the Secondary Plan to ensure the protection and long- term functioning of the natural heritage system. Parks and Trails 6.12 The parks system described in the COP is comprised of Municipal Wide Parks, Community Parks, Neighbourhood Parks, Parkettes, Public Squares and Hamlets. A Community park is identified at the intersection of Lambs Road and Concession Street . 6.13 The Parks, Recreation and Culture Master Plan (PRCMP) was developed to create a vision and make recommendations for future spaces and services that are fiscally and environmentally sustainable while suiting the unique needs of the community, and was approved by Council in 2024. 6.14 In accordance with the above, the parks system will include urban design elements and be located as centrally as possible within the community to be accessible and walkable, utilizing trails, bicycle paths, walkways, sidewalks and utility corridors. The parks system will serve different levels of the recreational, leisure, and amenity needs of surrounding residents. 6.15 The Secondary Plan contains a Community Park designation at the northeast intersection of Concession Street East and Lambs Road. The Community Park is sufficiently sized (12 hectares) to provide programming to support the residents in this neighbourhood and the surrounding area. 6.16 Three Neighbourhood Parks situated adjacent to schools and two parkettes are planned to serve the recreational needs of the Secondary Plan area. All parks are augmented by a multi use path and trail network that can connect to the larger trail system identified in the COP. 6.17 The configuration and intended uses of the parks, as well as the connected network of multi use paths and trails provided for in the Secondary Plan, also align with the recommendations from the PRCMP. Municipality of Clarington Page 18 Report PDS-025-25 7. Comments Public Comments 7.1 Development of the Secondary Plan was informed by public engagement throughout the planning process. Public comments and feedback were received at in person as well as virtual events. 7.2 Feedback during Phase 1 engagement found that residents would like to see more parks and trails, and generally dislike high rise apartment buildings. Participants desired amenities such as long term care facilities, child care facilities and shopping centres. 7.3 During phase 2, at the virtual PIC held in June 2022, the Vision for the Secondary Plan was presented. “To develop a community that reflects and enriches the history and character of both the Municipality of Clarington and the Study Area; to create a sense of place for residents and visitors; and to design a sustainable built form that protects the natural environment, promotes alternative modes of transportation and supports a healthy lifestyle for current and future generations”. 7.4 The PIC attendees were asked what they liked or though t should be added to the vision. Graphically, as provided in the Phase 2 Summary report, these were the responses. Figure 5: Attendees' Visions for the Soper Hills Secondary Plan Municipality of Clarington Page 19 Report PDS-025-25 7.5 In Phase 3, a third PIC was held ( December 2023), to present the Draft Preferred Land Use Plan to the public. The public were generally supportive of the Draft Preferred Land Use Plan. Agency Comments 7.6 Durham Region staff, Central Lake Ontario Conservation Authority (CLOCA) staff, the Peterborough Victoria Northumberland & Clarington Catholic District School Board (PVNCCDSB) and Kawartha Pine Ridge District School Board (KPRDSB) have provided comments that are reflected in the Secondary Plan. Steering Committee 7.7 The Steering Committee is made up of staff from the Municipality of Clarington, Durham Region, CLOCA, the KPRDSB, PVNCCDSB, and the Land Owner Group. 7.8 Overall, Steering Committee members support the Secondary Plan. Steering Committee comments concentrated on common themes including: location and amount of medium density residential land uses along the Local Corridor, size of the Neighbourhood Centre, and appropriate locations for schools and parks. 7.9 In addition, they indicated the Secondary Plan should be consistent with, and consider, findings from the SWS and the Environmental Assessment process. 8. Next Steps 8.1 Following the Statutory Public Meeting, staff will review comments received and propose revisions, as appropriate, for inclusion in the recommended Secondary Plan that is targeted for Council decision in the Fall 2025 . Technical studies, including the Functional Servicing Study Report and Transportation Assessment Reports will be updated and finalized as appropriate, The Soper Creek SWS will also be completed prior to the recommendation. 9. Financial Considerations 9.1 The Clarington Official Plan requires that a Fiscal Impact Analysis (FIA) be undertaken for Secondary Plans to understand the long-term financial impacts of proposed development. The FIA will be completed and addressed in the recommendation report to Council. Municipality of Clarington Page 20 Report PDS-025-25 10. Strategic Plan The preparation of the Hills Secondary Plan directly addresses the following actions in the 2024-2027 Clarington Strategic Plan;  C.1.1.2: Update Secondary Plan policies to include connectivity considerations and work to address gaps  C.2.2.1 Identify the range of housing needed  G.2.1.3 Update and complete identified Secondary Plans 11. Climate Change 11.1 The Secondary Plan has been planned with sustainability as a key priority. The policies establish a community integrated into the surrounding natural environment and minimize negative impacts on natural heritage features, and include policies that encourage high standards for energy efficiency and high -performance infrastructure and buildings. 12. Concurrence Not Applicable. 13. Conclusion 13.1 The purpose of this staff report is to provide an overview of the planning approach and process undertaken to develop the Secondary Plan. The report also details the vision, guiding principles, and key policy directions of the Secondary Plan. 13.2 The Secondary Plan lays out a framework to develop a complete, sustainable and mixed-use community with housing, commercial, amenities, and greenspace. 13.3 Staff request that the recommendations be approved and the process towards completion of the Secondary Plan continue. Any comments received will inform potential revisions to the Secondary Plan before it is recommended to Council for approval in Fall 2025 (targeted). Staff Contact: Jane Wang, Senior Planner, 905-623-3379 ext.2335 or jwang@clarington.net; Lisa Backus, Manager of Community Planning, 905 -623-3379 ext. 2419 or lbackus@clarington.net. Municipality of Clarington Page 21 Report PDS-025-25 Attachments: Attachment 1 - Draft Official Plan Amendment Attachment 2 - Draft Soper Hills Secondary Plan Attachment 3 – Sequence of Events Attachment 4 – Summary of Technical Studies Attachment 5 – Urban Design and Sustainability Guidelines Interested Parties: List of Interested Parties available from Department. Amendment No. to the Clarington Official Plan Purpose: The purpose of this Amendment is to add the Soper Hills Secondary Plan that includes a residential neighbourhood leading to a sustainable built form that protects the significant scale of the natural environment to the Clarington Official Plan. The Secondary Plan includes Urban Design and Sustainability Guidelines, which are not an operative part of the Clarington Official Plan The Soper Hills Secondary Plan creates a planning framework that will guide and facilitate the development of a complete community consisting of residential, commercial, natural environmental features, and recreation opportunities in the Secondary Plan area. Location: This Amendment applies to a 193-hectare area located on the east side of Bowmanville. The Secondary Plan Area is generally bounded by Regional Highway 2 to the south, Lambs Road to the west, the Canadian Pacific Railway to the north, and Providence Road, as well as its unopened road allowance. Basis: The Bowmanville East (Soper Hills) Landowners Group is an incorporated body representing the majority of the land within the Secondary Plan Area. Weston Consulting, on behalf of the landowners group, requested the initiation of the Secondary Plan process in early 2018. Council authorized the commencement of the Soper Hills Secondary Plan in April 2018. This Secondary Plan is based on extensive technical studies and public engagement. It incorporates recommendations of the Soper Creek Subwatershed Study and has been informed by a Preferred Land Use Alternative Report, a Functional Servicing Study, a Transportation Impact Assessment, and a Background and Analysis Summary Report. Public and landowner input was received through Public Information Centres held in March 2019, June 2022 and December 2023, as well as through Steering Committee Meetings. Actual Amendment: Unless otherwise indicated, in the Amendment, newly added text is shown with underlining, and deleted text is shown with a strike- through. Attachment 1 to PDS-025-25 The Clarington Official Plan is hereby amended as follows: 1.Existing Clarington Official Plan, Map C Secondary Plan Areas Clarington Urban Areas, is amended by changing the status to ‘Completed’ as demonstrated on Exhibit A. 2.Existing Clarington Official Plan, Map J3 Transportation Network Roads and Transit Bowmanville Urban Area, is amended by adding a new collector road and moving a collector road as demonstrated on Exhibit B. 3.Existing Part Six, Section 3 “General Policies for Secondary Plans” is hereby amended as follows: “3. Secondary Plans have been prepared for the following areas: a)Bowmanville East Urban Centre; b)Bowmanville West Town Centre; c)Courtice Main Street; d)Newcastle Village Main Central Area; e)Port Darlington Neighbourhood; f)Bayview (Southwest); g)Clarington Energy Business Park; h)Brookhill Neighbourhood; i)Clarington Technology Business Park; j)Foster Northwest; k)Southeast Courtice; and l)Wilmot Creek Neighbourhood; and m)Soper Hills 4.Existing Part Six, SECONDARY PLANS, is amended by adding the Soper Hills Secondary Plan shown in Attachment 1. CONCESSION ROAD 3 PROVIDENCEROADROADREGIONAL ROAD 42ROADLAMBSAVENUELIBERTYSTREET NORTHGREENBETHESDACLEMENS ROADROADHOLTWILLIAMMILL ROADBAKER SCHOOLROADROAD(ENFIELD ROAD)VANNEST ROADWERRY ROADSOLINAROADCONCESSION ROAD 7 SCUGOGOLDREGIONAL ROAD 57CEDAR PARK ROADNORTHSTREETROADCONCESSION ROAD 6 DARLINGTON-CLARKECOLE ROADACRESREGIONAL R O A D 4 (TAUNTON ROAD)HOLT ROADRUNDLEWASHINGTON ROADREGIONAL ROAD 34LANGMAID ROADFICES ROADPEBBLESTONE ROAD TOOLEYROADTOWNLINE ROAD NORTHROADROADREGIONALROAD 34ROADOLD SCUGOG ROADNASH ROAD REGIONAL ROAD 57MIDDLEROADLIBERTYMEARNSAVENUEBETHESDAROADSTEPH E N S M I L L ROAD CONCESSION ROAD 4 MAPLEGROVEROADROADHOLTRUNDLEROADSOLINAROADHANCOCKROADCOURTICEROADTRULLSROADPRESTONVALEROADBASELINE ROAD REGIONAL ROAD 57LIBERTY ST S.MEARNSLAMBSROADBRAGGRICKARDROADCONCESSION STREET BESTLESKARDNIXON ROAD REGIONAL ROAD 4 (TAUNTON ROAD) CONCESSION ROAD 5 OCHONSKI ROADMAIN STREETGAMSBY ROADVICKERS ROADJEWELPATTERSONROADHENRYWALSH ROADLAWRENCE ROADBUCKLEYROADHIGHWAY 35/115BLEWETT ROAD SQUAIR ROADROADCONCESSION ROAD 4 GIBSON ROADPOLLARDMOFFAT ROADCONCESSION ROAD 3 ROADGOLF COURSEGRAHAMARTHUR STREETHIGHWAY 2BELLWOODDRIVEHIGHWA Y 2 HIGHWAY 2 BROWVIEWROAD LOVEKIN ROAD MILLSTREETRILEYROADROADLOCKHART ROADHIGHWAY 407 CONCESSION ROAD 4 HIGHWAY 401ENERGY DRIVEHIGHWAY 418ROADOSBORNETRULLS³Lake Ontario Courtice Newcastle Village Bowmanville NOTE: ALL EXISTING SECONDARY PLANS NEEDTO BE UPDATED TO CONFORM TO THEOFFICIAL PLAN EXCEPT FOR COURTICEMAIN STREET SECONDARY PLAN. Orono CLARINGTON URBAN AREASOFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 SECONDARY PLAN AREAS MAP CSETTLEMENT AREA BOUNDARY SECONDARY PLAN BOUNDARIES NOT COMPLETED COMPLETED Exhibit 'A', Amendment No. To the Municipality of Clarington Official Plan, Map C. Change Status To Completed !!! ! ! !!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!! XY XY XY XY XY !( !( !( !( !( !( XYXY !( !( !( !( !( !( !( !( !(!( !(!( !( !( !(LIBERTY STREETREGIONAL ROAD 42 AVENUE CONCESSION STREET KING STREET BASELINE ROAD C. P R.C. N. R. HIGHWAY 401REGIONAL ROAD 57CONCESSION ROAD 3 SCUGOG STREETLIBERTY STREETAVENUESIMPSON AVENUEPROVIDENCE ROADGREEN ROADLONGWORT H MEARNSLAMBS ROADNORTHGLEN BOULEVARD NASH ROAD MAPLE GROVEROADMIDDLE ROADBENNETT ROAD ³ Lake Ontario GO FUTUREFREEWAY INTERCHANGE PROPOSEDGRADE SEPARATION EXISTINGFREEWAY INTERCHANGE EXISTINGGRADE SEPARATION !( !( XY XY BOWMANVILLE URBAN AREA OFFICIAL PLANMUNICIPALITY OF CLARINGTONMAY, 2025 TRANSPORTATION NETWORK ROADS AND TRANSIT MAP J3 Exhibit 'B', Amendment No. To the Municipality of Clarington Official Plan, Map J3. RAILWAY TRANSPORTATION HUBGO ! ! ! RAIL TRANSIT LINE FREEWAY TYPE B ARTERIAL ROAD TYPE C ARTERIAL ROAD REGIONAL TRANSIT SPINE COLLECTOR ROAD URBAN AREA TYPE A ARTERIAL ROAD Add Collector RoadNORTH Move Collector Road Attachment 3 to PDS-025-25 Soper Hills Secondary Plan Sequence of Events Date Events Reports April 23, 2018 Public Meeting Report and Staff Presentation to receive Council authorization to initiate the Soper Hills Secondary Plan PSD-032-18 March 6, 2019 Public Information Centre #1 PIC #1 Summary Report March 6, 2019 Notice of Study Commencement, Schedule ‘C’ of the Municipal Class EA March 6, 2019 Steering Committee Meeting #1 October 31, 2019 Steering Committee Meeting #2 May 15, 2020 Landowner Group Meeting March 27, 2020 Steering Committee Meeting #3 May 31, 2022 Steering Committee Meeting #4 June 22, 2022 Public Information Centre #2 Alternative Land Use Plans Report December 6, 2023 Public Information Centre #3 February 29, 2024 Steering Committee Meeting #5 June 21, 2024 Landowner Group Meeting November 21, 2024 Steering Committee Meeting #5 May 30, 2025 Draft Secondary Plan materials are available on the website for the Public June 16, 2025 Statutory Public Meeting Report Key Findings and Next Steps Background and Analysis Summary Report Prepared by SGL Planning & Design Inc. June 2020 The purpose of the report is to summarize background information and analyses used to guide the preparation of the Secondary Plan. The landscape analysis evaluates, describes and interprets the existing topography, built form and natural features to inform the planning and design of the Secondary Plan. The following landscape opportunities and constraints have been identified: 1.Views from elevated knolls 2.Integration of Natural Features 3.Public Access to Nature 4.Canadian Pacific Railway An Agricultural Analysis and Assessment found that the existing livestock operations in proximity to Soper Hills are not expected to be impacted or restricted from expanding because of the development of the Secondary Plan Area. The following recommendations are made. -Recommendation 1: Policies should be included in the Secondary Plan which require consideration of the urban agricultural interface. -Recommendation 2: The literature on mitigation related to the urban agricultural interface should be newly reviewed at the time of subdivision planning. The Land Budget Analysis establishes a potential capacity for population and employment. At 50 residents and jobs per hectare, Secondary Plan should be planned to accommodate approximately 8,750 residents and jobs. The Urban Design and Sustainability Principles establish urban design and sustainability principles for the preparation of the Secondary Plan: 1)Built environment: Promote the efficient use and preservation of land. 2)Mobility: Identify a transportation network that prioritizes sustainable modes of travel. 3)Natural Environment & Open Space: Preserve and enhance the natural heritage system. 4)Infrastructure & Buildings: Implement stormwater management techniques and ensure infrastructure is built to be energy efficient and adaptable. The Cultural Heritage Resource Assessment found identified twelve existing and potential municipal heritage resources within or adjacent to the Soper Hills Secondary Plan Study Area. A Stage 1 Archaeological Assessment identifies that 70% of the Study Area exhibits potential for the presence of Indigenous and/or Euro-Canadian archaeological resources. Attachment 4 to PDS-025-25 The Transportation and Functional Servicing Study Report found that there are no existing water services or sanitary sewers within or adjacent to the study area. Planned projects would bring sufficient water to the Secondary Plan area. As for existing transportation, there are four intersections in the study area. The closest Regional bus stop is 900 metres from the intersection of Concession Street East and Lambs Road while GO Transit Bus offers stops along Highway 2. A Constraints and Opportunities Analysis highlights important takeaways from the background reviewed in this report. Opportunities include a large portion of lands free from environmental constraints, some natural areas contributing to the aesthetic of the area, and opportunities for density in locations along Regional and Local Corridors. Constraints include the area abutting agricultural lands, limited existing and planned transportation infrastructure, the watercourse constraining development, potential delay for sanitary servicing, and parcel consolidation along Highway 2. Agricultural Analysis Summary Report Prepared by SGL Planning & Design Inc. September 2020 The agricultural analysis found that due to several factors including liability, cost, work involved, and requirements related to diseases, there has been diminished interest in livestock farming in Durham Region and Clarington. It was found that there are opportunities to increase livestock numbers without limitations due to Minimum Distance Separation between new development and existing livestock. Existing livestock operations within 1.5 km of Soper Hills are not expected to be impacted or restricted from expanding as a result of development. Mitigation is best considered and implemented later in the planning process at the subdivision design stage. Potential mitigation techniques include: - Roads at the boundary between agricultural and urban areas should be designed to accommodate large, wide, slow-moving farm machinery. - Visual barriers provided by tree plantings within the agricultural and urban areas would potentially reduce some impacts related to light and noise. - Areas of lower agricultural importance/priority should be chosen for non-agricultural development where that proposed non-agricultural development has a boundary adjacent to relatively lower priority agricultural lands. The report concludes with two recommendations: - Policies related to urban agricultural interface should be included in the Secondary Plan for consideration during the preparation of the draft plan of subdivision stage. - Literature on mitigation related to urban agricultural interface should be recently reviewed at the time of subdivision planning. Landscape Analysis Summary Report Prepared by SGL Planning & Design Inc. September 2020 The purpose of this report is to provide a landscape analysis that will guide the preparation of a Secondary Plan. The findings of the landscape analysis will be used to help inform Phase 2 of the Study. A mixture of agricultural fields and operations, natural areas including several wooden features, private residential properties, and institutional uses exist within and around the subject lands. The site’s topography is mostly flat, however, three knolls and a tributary of Soper Creek provide slight hills to the landscape. There is an opportunity to maintain the knolls to provide some variety to the site and allow for a potential view into Soper Creek. Based on the existing context, the following landscape opportunities and constraints within the Secondary Plan Area have been identified: 1. Views from elevated knolls 2. Integration of Natural Features 3. Public Access to Nature 4. Canadian Pacific Railway The Soper Creek Subwatershed Study will provide more detailed identification of significant natural heritage features requiring protection and maintenance. Stage 1 Archaeological Assessment Prepared by ASI Heritage June 2022 The Stage 1 background review included consideration of the proximity of previously registered archaeological sites and the original environmental setting of the study area. Seven archaeological sites have been registered within one kilometre of the study area, and the nearest archaeological site is approximately 200 metres west of the study area. Approximately 70% (135 hectares) of the study area exhibits potential for the presence of Indigenous and/or Euro-Canadian archaeological resources. The following recommendations were prepared based on the Stage 1 findings: - A Stage 2 Archaeological Assessment must take place before any development occurs within the study area. This work is required prior to any land disturbing activities to identify potential archaeological resources that may be present. - Any future developments within the study area should be preceded by a Stage 2 Archaeological Assessment. Engagement with Indigenous communities should be conducted as part of any further archaeological assessment as outlined in Section 35 of the Standards and Guidelines for Consultant Archaeologists and the Engaging Aboriginal Communities in Archaeology Technical Bulletin. Sustainability and Green Principles Report Prepared by SGL Planning & Design Inc. November 2020 The purpose of this report is to identify and summarize relevant policies and provide recommendations to inform the development of a sustainability framework and design principles to allow for the three key principles identified in Clarington’s Official Plan to be implemented within Soper Hills (Sustainability Development, Healthy Communities, and Management of Growth). The following sustainability themes inform principles for the Secondary Plan: - Built Environment: Components of the built environment that promote sustainability include safe, walkable streets and trails, a variety of housing types, and implementation of age friendly design throughout the community. - Mobility: Key sustainable travel must include an inter- connected transportation network that balances the needs for pedestrians, cyclists and vehicles. - Natural Environment: The preservation of the natural environment ensures the responsible development of communities that allows plants, animals, and people to live harmoniously together. - Infrastructure and Sustainability: Sustainable infrastructure includes stormwater management ponds, low impact development (LID) features, and implementation of green buildings standards. Cultural Heritage Resource Assessment Study Prepared by ASI Heritage September 2019 (Revised October 2019, February 2020) An examination of background historical material and a review of primary and secondary source material found that the Secondary Plan area has a rural land use history dating back to the mid-nineteenth century. The Cultural Heritage Assessment Report identified: - Four properties in the study area are potential cultural heritage resources. - The Bowmanville POW Camp, known as Camp 30, is adjacent to the study area. Bowmanville POW Camp is designated under Part IV of the Ontario Heritage Act, however one building on Lot 6 is not included in this designation and should be evaluated to determine if it should be included with the designation of the Bowmanville POW Camp. - Twelve existing or potential municipal heritage resources within or adjacent to the Study Area. - Five adjacent properties have been included in the Municipality of Clarington’s Heritage Inventory. - Two further adjacent properties have been identified as potential cultural heritage resources as part of this report. Recommendations to avoid or reduce adverse impacts to each cultural heritage resource include. - The Secondary Plan should incorporate policies that promote the conservation of existing cultural heritage resources and consider the presence of potential resources. - Any proposed development on or adjacent to an identified existing or potential cultural heritage resource should require a heritage impact under Ontario Regulation 9/06, ensuring that the existing cultural heritage resources in the study area are conserved. This report should be circulated to the Clarington Heritage Committee for its consideration. Transportation Assessment Report Prepared by T.Y. Lin International Canada Inc. October 2024 A Transportation Assessment Report was completed to determine the preferred road network for the Secondary Plan, and to examine how the expansion and development of the Secondary Plan zone will affect future traffic trends. Road network improvements in the study area are being recommended: - The intersection of Highway 2 and Lambs Road is a key gateway into the Secondary Plan area, and to accommodate acceptable traffic conditions it is recommended to be widened with an additional lane in both east and west directions. - The installation of traffic lights is recommended at the Highway 2 and Lambs Road intersection as well as at the intersection of Highway 2 with future collector Road D as indicated by traffic analysis. - Expanding Highway 2 to include an additional through lane is recommended to be continued from Lambs Road towards Providence Road. - It is forecasted that the increase in eastbound and westbound trips caused by vehicles entering and existing the Secondary Plan area will lead to travel delays along the study intersection, requiring sufficient lane capacity. The rest of the internal road network should be designed with a two-lane cross section with one lane in each direction. Functional Servicing Study Report Prepared by T.Y. Lin November 2024 A proposed sanitary servicing plan has been prepared for the study area. The lands will be graded towards the proposed stormwater management outlets, five of which are located adjacent to the Soper Creek watercourse that traverses the study area. Two outlets in the northern area are proposed to drain into smaller drainage features. The proposed grades must match existing elevations where the development is adjacent to existing developed lands, undeveloped lands, and the Natural Heritage System. A Master Environmental Servicing Plan will be required to support subsequent land use planning approvals. The Subwatershed Study will make recommendations regarding additional geomorphic analysis relating to stormwater management and erosion prevention. Additional review of the proposed stormwater management pond locations and associated outfalls relative to the natural hazards/constraints will be required. As part of the implementation of collector roads through the study area, a new crossing of the Soper Creek tributary will be required. Providence Road will also be extended northward to Concession Street, and this will require a new crossing over Soper Creek. The Soper Creek watercourse bisects the subject lands and divides the Secondary Plan area into a north and south sanitary catchment. Based on the preliminary servicing designs, the Secondary Plan study area shall be serviced with gravity sewers throughout. In discussions with Region of Durham staff regarding the wastewater strategy in the wider Clarington area, it is understood that as much wastewater flow as possible should be conveyed towards the future Baseline Road trunk sewer as part of the ultimate sanitary servicing design in the Soper Hills Secondary Plan area. Municipality of Clarington Soper Hills Secondary Plan Urban Design and Sustainability Guidelines Draft May 2025 Attachment 5 to PDS-025-25 1547 BLOOR STREET WESTTORONTO, ONM6P 1A5 info@sglplanning.ca T (416) 923-6630 Planning& Design Inc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`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• "DIJFWFIJHIRVBMJUZVSCBOEFTJHOUISPVHIPVUUIFDPNNVOJUZJOCPUIUIF QVCMJDBOEQSJWBUFSFBMN • &ODPVSBHFUIFEFTJHOBOECVJMEJOHPGBOBUUSBDUJWFBOETVTUBJOBCMF FOWJSPONFOUDPOTJTUFOUXJUIUIFWJTJPOGPSUIF4PQFS)JMMT4FDPOEBSZ1MBO BSFB • &OTVSFOFXEFWFMPQNFOUJTVOJRVF • *ODPSQPSBUFBOBDUJWFUSBOTQPSUBUJPOOFUXPSL 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT    • .BJOUBJODPNQBUJCJMJUZXJUIUIFTVSSPVOEJOHOBUVSBMIFSJUBHFBOE • 1SPWJEFDPOTJTUFOUEJSFDUJPOPGUIFEFTJHOPGUIFDPNNVOJUZGPSUIFQVCMJD  EFWFMPQNFOUDPNNVOJUZBOE.VOJDJQBM4UBGG  */5&313&5"5*0/"/%*.1-&.&/5"5*0/ 5IF(VJEFMJOFTBSFJOUFOEFEUPJNQMFNFOUUIF4FDPOEBSZ1MBOEJSFDUJPOGPSUIF 4PQFS)JMMT$PNNVOJUZBOEQSPWJEFEJSFDUJPOPOVSCBOEFTJHO TUSFFUTDBQFT CVJMU GPSN BOETVTUBJOBCJMJUZJOJUJBUJWFT 5IF(VJEFMJOFTBSFUPCFSFBEJODPOKVODUJPOXJUI BOEDPNQMFNFOUUIFQPMJDJFTPG UIF4PQFS)JMMT4FDPOEBSZ1MBO PCKFDUJWFTBOEQPMJDJFTPGUIF.VOJDJQBMJUZPG $MBSJOHUPO0GGJDJBM1MBO UIFQSPWJTJPOTPGUIF.VOJDJQBMJUZPG$MBSJOHUPO;POJOH #ZMBX UIF1SJPSJUZ(SFFO%FWFMPQNFOU'SBNFXPSLBOE*NQMFNFOUBUJPO1MBO BOE PUIFSHVJEFMJOFT *OUIFFWFOUPGBDPOGMJDUCFUXFFOUIF(VJEFMJOFTBOEUIF4FDPOEBSZ1MBO UIF QSPWJTJPOTPGUIF4FDPOEBSZ1MBOTIBMMQSFWBJMPWFSUIFQSPWJTJPOTPGUIFTF (VJEFMJOFT  1-"$&.",*/("/%%&4*(/&9$&--&/$& 1MBDFNBLJOHJTCPUIBQIJMPTPQIZBOEBNVMUJGBDFUFEBQQSPBDIUPQMBOOJOHBOE VSCBOEFTJHO8IJMFOPUBOFXDPODFQU QMBDFNBLJOHIBTSFDFOUMZDPNFUPUIF GPSFGSPOUPGQMBOOJOHGPSTVDDFTTGVM TVTUBJOBCMFBOEDPNQMFUFDPNNVOJUJFT 5ISPVHIBDPMMBCPSBUJWFQSPDFTT UIFJOUFOUPGQMBDFNBLJOHJTUPDBQJUBMJ[FPOB DPNNVOJUZ`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z  5IFVSCBOEFTJHOBOETVTUBJOBCJMJUZQSJODJQMFTSFGMFDUUIFWJTJPOBOEGSBNFXPSL TFUPVUCZUIF$MBSJOHUPO0GGJDJBM1MBOBOEUIF.VOJDJQBMJUZ`T1SJPSJUZ(SFFO1MBO  BOENPSFTQFDJGJDBMMZUIF1SJPSJUZ(SFFODIFDLMJTUGPSTFDPOEBSZQMBOT5IFTF QSJODJQMFTXFSFVTFEUPJOGPSNUIFQSFQBSBUJPOPGUIF4FDPOEBSZ1MBOQPMJDJFTBOE XJMMCFVTFEUPJOGPSNUIF(VJEFMJOFT*O1IBTFPGUIF4FDPOEBSZ1MBO4UVEZ  4(-QSFQBSFEUIF4VTUBJOBCJMJUZBOE(SFFO1SJODJQMFT3FQPSU5IF3FQPSU JEFOUJGJFEGPVSNBJOUIFNFTBOEQSJODJQMFTGPSFBDIPGUIFUIFNFTUIBUXJMMBMTP JOGPSNUIF(VJEFMJOFT5IFGPMMPXJOHTVNNBSJ[FTFBDIPGUIFGPVSLFZUIFNFT  CVJMUFOWJSPONFOU NPCJMJUZ OBUVSBMFOWJSPONFOUBOEPQFOTQBDF BOE JOGSBTUSVDUVSFBOECVJMEJOHTBOEJEFOUJGJFTUIFVSCBOEFTJHOBOETVTUBJOBCJMJUZ QSJODJQMFTXJUIJOFBDIUIFNF 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     5)&-"/%64&4$)&%6-&  CP NP NP NP P P Schedule A - Land Use Legend High Density/Mixed Use Regional Corridor Community Park Neighborhood Park Elementary School Stormwater Management Facility (SWF)Parkette Neighbourhood Centre P Environmental Protection Areas Collector Roads Arterial Roads Potential Cultural Heritage Resources Prominent Intersection SHSP Boundary NP CP - Soper Hills Secondary Plan -Watercourse Medium Density Residential Railway MAY 2025Low Density Residential Concession Street East Providence RoadLambs RoadRegional Highway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r*OUSPEVDUJPO  4&$5*0/r$PNNVOJUZ4USVDUVSF  4&$5*0/r4USFFUTBOE#MPDLT  4&$5*0/r#VJMU&OWJSPONFOU  4&$5*0/r.PCJMJUZ  4&$5*0/r/BUVSBM&OWJSPONFOU  4&$5*0/r(SFFO*OGSBTUSVDUVSFBOE#VJMEJOHT    4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     $0..6/*5:4536$563&  5IF4PQFS)JMMT4FDPOEBSZ1MBOQSPWJEFTB GSBNFXPSLGPSUIFEFWFMPQNFOUPGB DPNQBDU XBMLBCMF BOEBDDFTTJCMF DPNNVOJUZ5IJTTFDUJPOJTNFBOUUP QSPWJEFBEFTDSJQUJPOPGXIBUUIF 4FDPOEBSZ1MBOFOWJTJPOTGPSUIFEJGGFSFOU TUSVDUVSFDPNQPOFOUT5IF(VJEFMJOFT QSPWJEFEFTJHOHVJEBODFGPSUIFEJGGFSFOU DPNQPOFOUTPGUIFDPNNVOJUZ  3&(*0/"-$033*%03 5IF3FHJPOBM$PSSJEPSJTMPDBUFEBMPOH)XZ BOEJTDPNQSJTFEPG.FEJVNBOE)JHI %FOTJUZ.JYFE6TFEFTJHOBUJPOT.JEBOE IJHISJTFBQBSUNFOUTBOENJYFEVTF CVJMEJOHTDBOCFVQUPTUPSFZTJOIFJHIU  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     -0$"-$033*%03 .&%*6.%&/4*5: -BNCT3PBE 1SPWJEFODF3PBE BOE $PODFTTJPO4USFFUBSFJEFOUJGJFEBT -PDBM$PSSJEPSTBOEDPOUBJO.FEJVN %FOTJUZMBOEVTFT-PDBM$PSSJEPSTBSF JOUFOEFEUPQSPWJEFSFTJEFOUJBMBOE NJYFEVTFEFWFMPQNFOUXJUIBWBSJFUZ PGVTFTUPBDIJFWFIJHIFSEFOTJUJFT BOEUSBOTJUPSJFOUFEEFWFMPQNFOU 1FSNJUUFEIPVTJOHUZQFTJODMVEF NJYFEVTFCVJMEJOHT BQBSUNFOUT  TUBDLFEUPXOIPVTFT CBDLUPCBDL UPXOIPVTFTBOEUPXOIPVTFT"MPOH -PDBM$PSSJEPST OPOSFTJEFOUJBMVTFT BSFPOMZQFSNJUUFEJONJYFEVTF CVJMEJOHT  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     /&*()#063)00%$&/53& "/FJHICPVSIPPE$FOUSFTFSWFTBTBGPDBMQPJOU UPUIFDPNNVOJUZBOEQFSNJUTBSBOHFPGSFUBJM BOETFSWJDFVTFTUPBDDPNNPEBUFEBJMZOFFETPG SFTJEFOUT*UQSPWJEFTUIFPQQPSUVOJUZGPS SFTJEFOUTUPXBMLPSCJLFUPUIFOPEFGPSEBJMZ OFFETBOEIFMQTUPDSFBUFBNPSFTVTUBJOBCMF QMBO      4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     1"3,4 $PNNVOJUZ1BSLTTFSWFNVMUJQMF OFJHICPVSIPPETBOEBSFUPIBJO TJ[F /FJHICPVSIPPEQBSLTBSFUPTFSWFUIF CBTJDBDUJWFBOEMPXJOUFOTJUZSFDSFBUJPOBM OFFETPGUIFTVSSPVOEJOHSFTJEFOUT /FJHICPVSIPPEQBSLTBSFCFUXFFOUP IBJOTJ[FEFQFOEJOHPOUIFBSFBTFSWFE BOEUIFBDUJWJUJFTUPCFQSPWJEFE 1BSLFUUFTBSFJOUFOEFEUPBVHNFOUUIF SFDSFBUJPO MFJTVSFBOEBNFOJUZOFFETPGB OFJHICPVSIPPECVUXJMMOPUDPOUBJOTQPSUT GJFMET5IFZBSFUPCFCFUXFFOIBBOE IBJOTJ[F5IFZBSFSFRVJSFEXIFSFWFS UIF.VOJDJQBMJUZEFFNTJUOFDFTTBSZUP BVHNFOUPSBEKVTUUIFQBSLSFRVJSFNFOUT PGBOZOFJHICPVSIPPE $01QPMJDZ  *OUIFMBOEVTFBMUFSOBUJWFT QBSLFUUFT SBOHFJOTJ[FGSPNBQQSPYJNBUFMZIBUP IB    4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     63#"/3&4*%&/5*"- "3&"4 0VUTJEFUIF3FHJPOBM$PSSJEPST NPTU MBOETBSFQMBOOFEGPS-PX%FOTJUZMBOE VTFT-PX%FOTJUZMBOEVTFBSFBTQFSNJU TFNJEFUBDIFEBOEEFUBDIFEIPVTFT 5PXOIPVTFTBSFMPDBUFEUISPVHIPVUUIF QMBO 5IF-PX%FOTJUZEFTJHOBUJPOTPVUIPG $PMMFDUPS3PBE# OPSUIPG$PODFTTJPO 4USFFU BOEOPSUIPG$PMMFDUPS3PBE" XJMMJODMVEFUPXOIPVTFT CBDLUPCBDL UPXOIPVTFTBOETUBDLFEUPXOIPVTFTUP QSPWJEFSFUBJMTVQQPSUJWFEFOTJUJFT5IJT UZQPMPHZXJMMCFMJNJUFEUPBNXJEUI POCPUITJEFTPGUIFDPMMFDUPSSPBE TPVUIPGUIF/FJHICPVSIPPE$FOUSF    4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     130.*/&/5*/5&34&$5*0/4 1SPNJOFOU*OUFSTFDUJPOTBSFMPDBUFEBU 1SPWJEFODF3PBEBOE$PODFTTJPO4USFFU  $PODFTTJPO4USFFUBOE-BNCT3PBE  $PODFTTJPO4USFFUBOE$PMMFDUPS3PBE%  )XZBOE-BNCT3PBEBOE)XZBOE 1SPWJEFODF3PBE1SPNJOFOU *OUFSTFDUJPOTBQQMZUPBMMGPVS DPSOFSTPGUIFJOUFSTFDUJPOBOEXJMM GPSNUIFQSJNBSZHBUFXBZJOUPUIF DPNNVOJUZ5IFTFBSFBTXJMMBMTPIBWF UIFHSFBUFTUDPODFOUSBUJPOPGIFJHIUBOE DPNNFSDJBMVTFT  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     53"*-4 .VMUJVTFQBUITBOE/)4QBSLTUSBJMTBSF QSPQPTFEGPS4PQFS)JMMT.VMUJVTFQBUIT BSFQBUIXBZTTFQBSBUFEGSPNWFIJDVMBS USBGGJDUIBUBDDPNNPEBUFQFEFTUSJBOBOE DZDMJOHSPVUFT5IFZBSFXJEFSUIBOUZQJDBM TJEFXBMLTBOEVTVBMMZJOEJDBUFBMBOFQFS EJSFDUJPOGPSTIBSFEXBMLJOHBOEDZDMJOH VTF 5IF/)4QBSLTUSBJMTBSFFJUIFSQBWFEPS VOQBWFEUIBUQSPWJEFBDDFTTUP FOWJSPONFOUBMBSFBTTVDIBTUIF&1"PS BSFDPODFQUVBMMZJMMVTUSBUFEJOQBSLTUP DPOOFDUUPNVMUJVTFQBUIT5IFZBSF JOUFOEFEUPLFFQVTFSTPOBEFTJHOBUFE QBUIUPNJOJNJ[FEJTSVQUJPOUPUIF TVSSPVOEJOHMBOETDBQF5IFTFUSBJMTBSF UIFTBNFXJEUIBTNVMUJVTFQBUITBOEBSF BIBSE BDDFTTJCMFTVSGBDFTVDIBT DPODSFUFPSBTQIBMU     4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     453&&54"/%#-0$,4  )VNBOTDBMFTUSFFUTBOETNBMMCMPDLTBSF JNQPSUBOUFMFNFOUTPGBXBMLBCMF OFJHICPVSIPPE$SFBUJOHBUJHIUOFUXPSLPG QFEFTUSJBOGSJFOEMZTUSFFUTBOECMPDLTIFMQT QFPQMFDIPPTFUPXBMLSBUIFSUIBOUBLFUIFJS DBS FTQFDJBMMZGPSTIPSUUSJQT  4USFFUTBOECMPDLTTIPVMECFEFTJHOFE UPIBWFBSFDUJMJOFBSPSNPEJGJFEHSJE  *SSFHVMBSTIBQFECMPDLTBSFBQQSPQSJBUF XIFOSFTQPOEJOHUPUPQPHSBQIJDPS VOJRVFDPOEJUJPOTPSUPBDIJFWFEJTUJODU OFJHICPVSIPPEDIBSBDUFS  #MPDLMFOHUITTIPVMEOPUFYDFFEN GPSDPMMFDUPSPSMPDBMSPBETUPTVQQPSU BDUJWFUSBOTQPSUBUJPOXIFSF BQQSPQSJBUF  #MPDLEFQUITTIPVMECFEFTJHOFEUP NBYJNJ[FEFOTJUZBOEBMMPXGPS BQQSPQSJBUFCVJMUGPSNUZQPMPHJFT  BDDPNNPEBUFBEFRVBUFTFUCBDLT  PVUEPPSBNFOJUZTQBDFT TFSWJDFBOE QBSLJOHBSSBOHFNFOUTBOEUSBOTJUJPOTJO TDBMF  8IFSFQPTTJCMF TUSFFUTBOECMPDLT TIPVMECFEFTJHOFEUPQSPUFDUFYJTUJOH NBUVSFUSFFTBOEWFHFUBUJPOPVUTJEF UIF&1"MBOET  4USFFUTBOECMPDLTTIPVMESFUBJO QSPUFDUBOEFOIBODFTJHOJGJDBOUDVMUVSBM IFSJUBHFSFTPVSDFT  %FTJHOPGTUSFFUTTIPVMEDSFBUFWJFXTUPMBOENBSLTPSOBUVSBMGFBUVSFT UISPVHIDBSFGVMQMBDFNFOUPGJOUFSTFDUJPOTBOEUFSNJOVT 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     8IFSFGFBTJCMFTUSFFUTBOECMPDLT TIPVMESVOQBSBMMFMUPDPOUPVSTBOE NJOJNJ[FHSBEFBMUFSBUJPOBOE NBYJNJ[FWJFXT  $VMEFTBDBOEEFBEFOETUSFFUT BSFEJTDPVSBHFE*GOFDFTTBSZ  QFEFTUSJBODPOOFDUJPOGSPNDVMEF TBDTBOEEFBEFOETUSFFUTUPPUIFS QBSUTPGUIFDPNNVOJUZTIBMMCFB QSJPSJUZ  #BDLMPUUJOHPSSFWFSTFMPU GSPOUBHFTTIPVMECFBWPJEFEXIFSF GFBTJCMFBOEOPUDPOTJEFSFEVOMFTT EFNPOTUSBUFEUPCFUIFPOMZPQUJPO  'PSCMPDLTXJUIHSBEFSFMBUFE SFTJEFOUJBMVOJUT FODPVSBHFTUSFFU BOECMPDLBMJHONFOUTXJUIJO EFHSFFTPGHFPHSBQIJDFBTUXFTUUP NBYJNJ[FQBTTJWFTPMBSPSJFOUBUJPO PGCVJMEJOHT  4USFFUTTIPVMEUFSNJOBUFBUQVCMJD GBDJMJUJFTTVDIBTQBSLT /)4PS MBOENBSLCVJMEJOHT   7JFXTBDDFOUVBUJOHOBUVSBMGFBUVSFTBOESPBEUFSNJOVTBU OFJHICPVSIPPEBNFOJUJFTTVDIBTTDIPPMTBOEQBSLT 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     #6*-5&/7*30/.&/5   -083*4& "TJEFOUJGJFEJO4FDUJPO MPXSJTFSFTJEFOUJBMBDDPVOUTGPSNPTUPGUIF6SCBO 3FTJEFOUJBM"SFBTPG4PQFS)JMMT-PXSJTFCVJMUGPSNJODMVEFTTJOHMFT TFNJ EFUBDIFE UPXOIPVTFEXFMMJOHT BOETUBDLFEUPXOIPVTFTVQUPTUPSFZTJO IFJHIU4PNFIJHIFSEFOTJUZMPXSJTFVTFT JEFOUJGJFEJO4FDUJPO QFSNJUNJYFE VTFCVJMEJOHT BQBSUNFOUT BOEBMMGPSNTPGUPXOIPVTFEXFMMJOHTVQUPTUPSFZT JOIFJHIU  (&/&3"-  "MMCVJMEJOHTTIBMMEFNPOTUSBUFEFTJHO FYDFMMFODFXJUIBSDIJUFDUVSBMEFUBJMJOH PGUIFIJHIFTURVBMJUZQPTTJCMF  /FXSFTJEFOUJBMTVCEJWJTJPOCMPDLT TIBMMDPOUBJOBNJYPGVOJUUZQFTBOE WBSJBUJPOJOFMFWBUJPOT  5IFEJGGFSFODFCFUXFFOBEKBDFOU CVJMEJOHIFJHIUTTIPVMEHFOFSBMMZOPU WBSZNPSFUIBOTUPSFZ IPXFWFSHSFBUFS WBSJBUJPONBZCFQFSNJUUFEJGDPNQBUJCJMJUZ CFUXFFOBEKBDFOUCVJMEJOHGPSNTDBOCFEFNPOTUSBUFE  (FOFSBMMZ MPUTTIPVMECFSFDUJMJOFBSJOTIBQF XIFSFUIFSFBSFWBSJBUJPOTJO UPQPHSBQIZBOEPUIFSMJNJUJOHGBDUPSTWBSJBUJPOTJOTIBQFBSFQFSNJUUFE  %JWFSTJUZJOIPVTJOHTJ[FBOEEFTJHOTIPVMECFGBDJMJUBUFECZBWBSJFUZPGMPU TJ[FT 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     0SJFOUCVJMEJOHTUPUIFTUSFFU  QBSLPSPQFOTQBDFUP FTUBCMJTIBTUSFFUXBMMUIBU DPOUSJCVUFTUPBOBDUJWFQVCMJD SFBMNFODPVSBHJOHXBMLJOH BOEDZDMJOH  5IFTJUJOHBOENBTTJOHPG EXFMMJOHTTIPVMECF DPNQBUJCMFBOEIBSNPOJPVT XJUIBEKBDFOUEXFMMJOHT  4JUFCVJMEJOHTDMPTFUPUIFTUSFFUFEHFUPIFMQEFGJOFUIFTUSFFUFEHF  %VFUPUIFJSQSPNJOFODFBUJOUFSTFDUJPOT DPSOFSMPUTTIPVMEIBWFBIJHI MFWFMPGEFTJHOEFUBJM  1SPWJEFFRVBMBOEQSPNJOFOUEFTJHODPOTJEFSBUJPOGPSCPUICVJMEJOH FMFWBUJPOTPODPSOFSMPUT  1SPNJOFOUBSDIJUFDUVSBMFMFNFOUTTVDIBTCBMDPOJFT XSBQBSPVOEQPSDIFT BSFFODPVSBHFE  &YQPTFEFMFWBUJPOTTIPVMEJODMVEFXFMMBSUJDVMBUFEGFOFTUSBUJPO   4*/(-&"/%4&.*%&5"$)&%%8&--*/(4  $SFBUFBDPOTJTUFOUTUSFFUXBMMCZ EFTJHOJOHEXFMMJOHTUPGSBNFUIF TUSFFUFEHFXJUIBDPOTJTUFOU TFUCBDL XJUIGSPOUEPPST XJOEPXT  BOEFOUSZGFBUVSFTGBDJOHUIFSPBE  3FEVDFUIFWJTVBMEPNJOBODFPGUIF HBSBHFBOEGSPOUESJWFXBZUISPVHI UIFEFTJHOPGUIFGSPOUFOUSBODFBOE BSDIJUFDUVSBMFMFNFOUT  1PSDIFT TUBJST DBOPQJFT BOEPUIFS FOUSBODFGFBUVSFTBSFFODPVSBHFEUPHJWFQSPNJOFODFUPUIFGSPOU FOUSBODF  (BSBHFTTIPVMEOPUQSPUSVEFCFZPOEUIFNBJOGSPOUXBMMPGUIFEXFMMJOH VOJUPSGSPOUQPSDI(BSBHFTTIPVMEHFOFSBMMZCFTFUCFIJOEPSGMVTIXJUI 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT    UIFNBJOCVJMEJOHGBDFPSBDDFTTFE GSPNBSFBSMBOF8IFSFBHBSBHF QSPUSVEFTCFZPOEUIFNBJOGSPOU XBMMJUTIPVMECFGMVTIXJUIUIF QPSDI  #PUIIBMWFTPGBTFNJEFUBDIFE EXFMMJOHTIPVMECFDPNQBUJCMFJO UFSNTPGEFTJHOFYQSFTTJPO 4ZNNFUSJDBMCVJMEJOHFMFWBUJPOTBSF FODPVSBHFE"TZNNFUSJDBM FMFWBUJPOTNBZCFQFSNJUUFE QSPWJEFEJUJTDPNQMFNFOUBSZBOE IBSNPOJPVTUPUIFPWFSBMMEXFMMJOH  #PUITFNJEFUBDIFEVOJUTTIPVMECF GVMMZBUUBDIFEBCPWFHSBEF  .BYJNJ[FDPOUJOVPVTHSFFOQMBOUJOH BSFBTBMPOHUIFTUSFFUCZQBJSJOH ESJWFXBZTBOEHBSBHFTXIFSF GFBTJCMFUPNBYJNJ[FUIFFYUFOUPG DPOUJOVPVTHSFFOQMBOUJOHBSFB  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     508/)064&4  $PPSEJOBUFUIFTJUJOH NBTTJOH BOE GBÇ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`TQMBZ 4VSGBDFQBSLJOHTQBDFT TIPVMECFMPDBUFECFIJOE UIFCVJMEJOHTGSPOUXBMMBU UIFTJEFPSSFBSPG CVJMEJOHT FJUIFSTFSWFE CZMBOFXBZTPS DPOTPMJEBUFECZCMPDL  4VSGBDFQBSLJOHMPUT TIPVMECFTDSFFOFEGSPN WJFXBMPOHBEKBDFOU TUSFFUT UISPVHIUIFVTF PGMPXMFWFMMBOETDBQFCVGGFSJOH  "DDFTTJCMFQBSLJOHTQBDFTTIPVMEIBWFEJSFDUBDDFTTUPCVJMEJOH FOUSBODFTBOETIPVMEOPUCFQMBDFEBDSPTTBESJWFBJTMF 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     130.*/&/5*/5&34&$5*0/4  %FTJHOQSPNJOFOU JOUFSTFDUJPOTBT DPNNVOJUZGPDBMQPJOUT  1SPNJOFOU*OUFSTFDUJPOT XJMMCFFNQIBTJ[FE UISPVHICVJMEJOH NBTTJOH BSDIJUFDUVSBM USFBUNFOUBOENBUFSJBMT  TUSFFUGVSOJUVSF  MBOETDBQJOH BOEQVCMJD BSU  1SPNJOFOU*OUFSTFDUJPOT XJMMCFUIFQSJNBSZ HBUFXBZTUPUIF4PQFS )JMMT$PNNVOJUZ5IF DPNNFSDJBMVTF CVJMEJOHTJOUIF /FJHICPVSIPPE$FOUSF TIPVMEQSPWJEFTQFDJBM BSDIJUFDUVSBMFMFNFOUT TVDIBTDPSOFSEFTJHO  NBTTJOHBOEIFJHIU  BXOJOHT BOEFOUSBODF EPPSGFBUVSFT  1SJWBUFMZPXOFEQVCMJDMZ BDDFTTJCMFQMB[BTTIPVME CFMPDBUFEBUUIFQSPNJOFOUJOUFSTFDUJPOUPDPOUSJCVUFUPJUTWJTVBM QSPNJOFODF JNQSPWFUIFSFMBUJPOTIJQPGCVJMUGPSNUPUIFQVCMJDSJHIUPG XBZ BOEDPOUSJCVUFUPUIFBSFB`TJEFOUJUZ 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     */45*565*0/"-#6*%-*/(44$)00-4 4PQFS)JMMT4FDPOEBSZ1MBO"SFBTQSPQPTFTFMFNFOUBSZTDIPPMT5IF 4FDPOEBSZ1MBOTIPXTUIFHFOFSBMMPDBUJPOPGGVUVSFTDIPPMTDPMPDBUFEXJUI OFJHICPVSIPPEQBSLT5IFGPMMPXJOHHVJEFMJOFTBQQMZUPTDIPPMTJUFT  5ISFFTUPSFZCVJMEJOHTMPDBUFE DMPTFUPUIFTUSFFUBSFFODPVSBHFE UPNJOJNJ[FMBOESFRVJSFEBOE QSPWJEFBNPSFDPNQBDUCVJMEJOH TJUF  $PMPDBUJPOPGQBSLTBOETDIPPMT JTTUSPOHMZFODPVSBHFEUPGBDJMJUBUF TIBSFEQMBZGBDJMJUJFT QBSLJOHBOE FGGJDJFOUVTFPGMBOE  4DIPPMTTIPVMECFMPDBUFEDMPTFUP UIFTUSFFUUPIFMQEFGJOFUIFTUSFFU BOEDSFBUFQSPNJOFODF  4DIPPMTTIPVMECFEFTJHOFEXJUI IJHIRVBMJUZGJOJTIFT BOE BSDIJUFDUVSBMEFUBJMT  5IFGSPOUEPPSTIPVMEGBDFUIF NBJOTUSFFUBOECFEJSFDUMZ BDDFTTJCMFGSPNUIFQVCMJD TJEFXBML  /PQBSLJOHPSESPQPGGTIPVMECF MPDBUFECFUXFFOUIFCVJMEJOHBOE UIFTUSFFUXJUIUIFGSPOUEPPS 1BSLJOHTIPVMECFMPDBUFEBUUIF TJEFPGUIFCVJMEJOH  3PPGUPQNFDIBOJDBMFRVJQNFOUTIPVMECFTDSFFOGSPNWJFXUISPVHIB QBSBQFUXBMMPSDPNQMFNFOUBSZNBUFSJBMT  4DIPPMTTIPVMECFEFTJHOFEUPFOTVSFTBGFDZDMJOHBOEQFEFTUSJBO BDDFTTBOEDSPTTJOH4UVEFOUTTIPVMECFBCMFUPSFBDIUIFFOUSBODFT XJUIPVUDSPTTJOHCVT[POFT QBSLJOHBOEESPQPGGBSFBT  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     .0#*-*5:   "$5*7&53"/41035"5*0/ 5IFBDUJWFUSBOTQPSUBUJPOOFUXPSL DPOTJTUTPGQFEFTUSJBO DZDMJOHBOEUSBJM OFUXPSLTUIBUJODMVEFCPUIPOBOEPGG TUSFFUGBDJMJUJFT5IF4PQFS)JMMTBDUJWF USBOTQPSUBUJPOOFUXPSLQSPWJEFT PQQPSUVOJUJFTGPSUIFDPNNVOJUZUP BDDFTTEJGGFSFOUNPCJMJUZPQUJPOT 4JEFXBMLT 5SBJMTBOE.VMUJ6TF1BUIT QSPWJEFGBDJMJUJFTGPSXBMLJOH DZDMJOHBOE PUIFSIVNBOQPXFSFEGPSNTPG USBOTQPSUBUJPO5IFOFUXPSLXJMMCFEFTJHOFEUPCFBDDFTTJCMFGPSBMMBHFTBOE BCJMJUJFT  (&/&3"-(6*%&-*/&4  $PNQMJNFOUJOHUIFSPBEOFUXPSL  UIFBDUJWFUSBOTQPSUBUJPOGBDJMJUJFT XJMMCFXFMMDPOOFDUFEBOEGBDJMJUBUF QFSNFBCJMJUZBOEDPOOFDUJWJUZCPUI JOUFSOBMMZBOEFYUFSOBMMZ  &OTVSFUIFOFUXPSLJTTBGFBOE DPNGPSUBCMFGPSBMMVTFST  *NQMFNFOUXBZGJOEJOHUIBUEJSFDUT VTFSTUPJOUFSTFDUJPOT MBOENBSLT BOECPUIPOBOEPGGTUSFFUGBDJMJUJFT  :FBSSPVOEVTFJTFODPVSBHFEUISPVHIXFMMNBJOUBJOFEDPOOFDUJPOTGPS TJEFXBMLTBOEUSBJMTUPEFTUJOBUJPOTTVDIBTQBSLT USBOTJUTUPQTBOE DPNNFSDJBMVTFT  &OTVSFPGGSPBEUSBJMTPS.VMUJVTFQBUIQSPWJEFBDPOUJOVPVTBOE DPOOFDUFEOFUXPSLUIBUMFBEUPEFTUJOBUJPOTTVDIBTBUSBOTJUTUPQTPS -PDBM$PSSJEPS  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     53"*-4  5SBJMTBSFBOJNQPSUBOUQBSUPGUIF BDUJWFUSBOTQPSUBUJPOOFUXPSLBOE TIPVMECFDPOOFDUFEUPTJEFXBMLT  QFEFTUSJBODPOOFDUJPOTBOEDZDMJOH JOGSBTUSVDUVSF  5SBJMTTIPVMECFEFTJHOFEUPTFSWFBMM BHFTBOEBCJMJUJFTCZNJOJNJ[JOH HSBEJOHBOETMPQJOH  5SBJMEFTJHOTIBMMDPNQMZXJUI"0%" BOE.VOJDJQBMJUZPG$MBSJOHUPO TUBOEBSET  $MFBSTJHOBHFTIPVMEJEFOUJGZTIBSFE PSEFEJDBUFEVTF  (FOFSBMMZQFSNJUUFEBEKBDFOUUPUIF &1" USBJMTTIBMMDPOOFDUUPQBSLTBOE PQFOTQBDFTUPQSPWJEFPQQPSUVOJUZ GPSQBTTJWFSFDSFBUJPO  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     $:$-*/(*/'3"4536$563&  0GGFSEFEJDBUFEPSTIBSFEDZDMJOH JOGSBTUSVDUVSFPOPSPGGSPBE UISPVHIPVUUIFDPNNVOJUZ  $ZDMJOHJOGSBTUSVDUVSFTIBMMCF EFTJHOFEUPNFFU.VOJDJQBMJUZPG $MBSJOHUPOEFTJHOTUBOEBSET  (SBEJOHBOETMPQJOHTIPVMECF NJOJNJ[FEUPNFFUBDDFTTJCJMJUZ SFRVJSFNFOUTBOETFSWFBMMVTFST  $MFBSTJHOBHFTIBMMCFQSPWJEFEGPSBMMDZDMJOHSPVUFT  53"/4*5  4USFFUEFTJHOTIPVMEDPOTJEFS MPDBUJPOTPGUSBOTJUTUPQTBOE TIFMUFST  *ODPSQPSBUFBQQSPQSJBUFBNFOJUJFT GPSBMMUSBOTJUTUPQT JODMVEJOHCVU OPUMJNJUFEUPUSBOTJUTIFMUFST  TFBUJOH UBDUJMFQBWJOH CJDZDMF SBDLT DVSCDVUTBOEBQQSPQSJBUF MJHIUJOH  -PDBUFUSBOTJUTUPQTOFBSBDUJWF USBOTQPSUBUJPOOPEFTBOEPUIFSGPDBMQPJOUTPGUIFDPNNVOJUZ JODMVEJOH CVUOPUMJNJUFEUPQBSLTBOEPQFOTQBDFT BOECVJMEJOHFOUSBODFTPGNJYFE VTF SFUBJMBOEDPNNFSDJBMEFWFMPQNFOUT  5SBOTJUTJHOBHFTIPVMECFMFHJCMFBOEQSPNJOFOU4USFFUTDBQFFMFNFOUT TVDIBTMJHIUJOHBOECJLFSBDLT TIPVMECFQMBDFEOFBSUSBOTJUTUPQT  1MBOUTIBEFUSFFTOFBSUSBOTJUTUPQTUPQSPWJEFSFMJFGGSPNUIFTVO  8BZGJOEJOHBOEBQQSPQSJBUFTJHOBHFUISPVHIPVUUIFDPNNVOJUZXJMM JOEJDBUFUSBOTJUTUPQTBOEGBDJMJUJFT   4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     30"%5:10-0(*&4"/%$30444&$5*0/4 5IFEFTJHOPGSPBETXJUIJOUIF4PQFS)JMMT$PNNVOJUZTIBMMGBDJMJUBUFUIF NPWFNFOUPGBMMVTFSTJOBTBGF DPNGPSUBCMFBOEBDDFTTJCMFFOWJSPONFOU5IF OFUXPSLPGSPBETDPOTJTUTPG$PMMFDUPS3PBETBOE-PDBM3PBETBOEJTCPVOECZ "SUFSJBM3PBET %FUBJMFESPBEEFTJHOTBSFUPCFGJOBMJ[FEBTQBSUPGUIFSFWJFXQSPDFTTJO BDDPSEBODFXJUI.VOJDJQBMJUZPG$MBSJOHUPOFOHJOFFSJOHTUBOEBSET4PQFS)JMMTJT TVSSPVOEFECZ5ZQF#"SUFSJBM3PBET$SPTT4FDUJPOTGPS-BNCT3PBE  $PODFTTJPO4USFFUBOE3FHJPOBM)JHIXBZ BTXFMMBTB5ZQF$"SUFSJBM3PBE $SPTT4FDUJPOGPS1SPWJEFODF3PBE5ZQJDBMTFDUJPOTGPSDPMMFDUPSBOEMPDBMSPBET BSFQSPWJEFECFMPX 3FDPNNFOEFENXJEFDSPTTTFDUJPOGPS-JCFSUZ4USFFU/PSUIBOE$PODFTTJPO3PBE 3FDPNNFOEFENXJEFDPMMFDUPSSPBEDSPTTTFDUJPO QSFQBSFECZ5:-JO  4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     3FDPNNFOEFENXJEFMPDBMSPBEDSPTTTFDUJPO  453&&54$"1&&-&.&/54 1SJNBSJMZMPDBUFEPOUIFCPVMFWBSE TUSFFUTDBQFFMFNFOUTGPSNBOJNQPSUBOUQBSU PGUIFPQFOTQBDFTZTUFNBOESFGFSTUPDPNQPOFOUTPGUIFQVCMJDSFBMNTVDIBT TUSFFUUSFFT MBOETDBQJOH GVSOJUVSF MJHIUJOH QVCMJDBSU BOEVUJMJUJFT8IFSF QPTTJCMF HSFFOJOGSBTUSVDUVSFTIPVMECFDPOTJEFSFEJOUIFCPVMFWBSE 4USFFUTDBQFFMFNFOUTIFMQUPDSFBUFBOBUUSBDUJWF DPIFTJWFBOETBGFTUSFFUTDBQF XJUIJO4PQFS)JMMT  4*%&8"-,4  4JEFXBMLTNVTUCFEJSFDUBOEDPOUJOVPVT  BOECFQSPWJEFEPOBUMFBTUPOFTJEFPG UIFTUSFFU  4JEFXBMLTTIBMMCFDPOTUSVDUFEUP NVOJDJQBMTUBOEBSET XJUIUIFJSXJEUI SFTQPOEJOHUPUIFMBOEVTFDPOUFYUBOE BDDFTTJCJMJUZSFRVJSFNFOUT  5IFTJEFXBMLOFUXPSLTIPVMECFEFTJHOFE UPDPOOFDUUPBEKPJOJOHUSBJMTBOE.61T  $POOFDUTJEFXBMLTXJUIPUIFSQVCMJDSFBMNDPNQPOFOUTTVDIBTQBSLTBOE PQFOTQBDFTBOEUJFEJSFDUMZXJUIUSBJMT    4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT     453&&553&&4"/%1-"/5*/(  4USFFUUSFFTTIBMMHFOFSBMMZCF QMBOUFEXJUITVGGJDJFOUTPJM WPMVNFTCFUXFFOUIFDVSCBOE UIFTJEFXBML  "WBSJFUZPGOBUJWFTQFDJFTTIPVME CFQMBOUFEUPFOIBODF CJPEJWFSTJUZ  (FOFSBMMZ TIBEFUSFFWBSJFUJFT TIPVMECFTFMFDUFEPWFSTNBMMFS PSOBNFOUBMWBSJFUJFT  5SFFTQFDJFTTIPVMECFTFMFDUFEUPTVQQPSUUIFDIBSBDUFSPGEJTUJODU OFJHICPVSIPPET  'PSNJYFEVTFEFWFMPQNFOUT FOIBODFMBOETDBQJOHTIPVMECFDPOTJEFSFE  453&&5-*()5*/(  -JHIUGJYUVSFEFTJHOTIPVMETVQQPSUBOEFOIBODFUIFJEFOUJUZPGDPSSJEPST BOEOFJHICPVSIPPETBOEBEESFTTGVODUJPOBMSFRVJSFNFOUT  1FEFTUSJBOMJHIUJOHTIPVMECFQSPWJEFEJOBSFBTXJUIHSFBUFSQFEFTUSJBO BDUJWJUZ  1FEFTUSJBOMJHIUJOHNBZCFJOUFHSBUFEXJUITUSFFUMJHIUJOHQPMFTPSMPDBUFE BTTUBOEBMPOFGJYUVSFT XJUIJOUIF'VSOJTIJOH;POF  65*-*5:1-"$&.&/5  6UJMJUJFTTIPVMECFDPOTPMJEBUFE BOETDSFFOFEGSPNWJFX  5IFMPDBUJPOPGTUSFFUUSFFT  MBOETDBQJOHBOEGVSOJUVSFTIPVME CFDPPSEJOBUFEXJUIVOEFSHSPVOE BOEBCPWFHSPVOEVUJMJUJFTBOE QMBOOFEDPODVSSFOUMZ  5IFQMBDFNFOUPGBCPWFHSPVOE VUJMJUJFTTIPVMEOPUPCTUSVDUQFEFTUSJBONPWFNFOUJOUIF$MFBSXBZ;POF BU JOUFSTFDUJPOT WJFXDPSSJEPST JOUFSTFDUJPOT PSEBZMJHIUJOHUSJBOHMFT8IFSF 4PQFS)JMMT 6SCBO%FTJHOBOE4VTUBJOBCJMJUZ(VJEFMJOFT    UIJTJTVOBWPJEBCMF VUJMJUJFTTIPVME CFDPOTPMJEBUFEBOETDSFFOFE  BOEQVCMJDBSUPQQPSUVOJUJFT TIPVMECFDPOTJEFSFEJO EJTDVTTJPOTXJUIBQQSPQSJBUF VUJMJUZBHFODJFT  4JUFBCPWFHSPVOEVUJMJUJFT TVDI BT#FMM%.46OJUT .JDSP)VCT  USBOTGPSNFSTBOEQFEFTUBMT UP NJOJNJ[FUIFJSOFHBUJWFWJTVBM JNQBDUPOUIFQVCMJDSFBMN"WPJE MPDBUJOHUIFNBUUIFFOEPGl5z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econdary Plans DRAFT Soper Hills Secondary Plan Municipality of Clarington Official Plan May 2025 Attachment 2 to PDS-025-25 Soper Hills Secondary Plan-Draft i Table of Contents 1 Introduction .................................................................................................................................................. 1 2 Vision and Principles ..................................................................................................................................... 2 2.1 Vision .......................................................................................................................................................... 2 2.2 Principles for the Soper Hills Secondary Plan .............................................................................................. 2 3 Community Structure ................................................................................................................................... 3 3.1 Regional Corridor ........................................................................................................................................ 3 3.2 Local Corridor.............................................................................................................................................. 4 3.3 Prominent Intersections .............................................................................................................................. 4 3.4 Urban Residential ....................................................................................................................................... 4 3.5 Parks and Open Space System .................................................................................................................... 5 4 Land Use ....................................................................................................................................................... 7 4.1 Objectives ................................................................................................................................................... 7 4.2 General Policies........................................................................................................................................... 7 4.3 High Density / Mixed Use Regional Corridor ............................................................................................... 8 4.4 Medium Density Residential ....................................................................................................................... 9 4.5 Neighbourhood Centre ............................................................................................................................. 10 4.6 Low Density Residential ............................................................................................................................ 11 5 Urban Design .............................................................................................................................................. 13 5.1 General Policies......................................................................................................................................... 13 5.2 Placemaking ............................................................................................................................................. 13 5.3 Prominent Intersections ............................................................................................................................ 14 5.4 Building Siting and Design ........................................................................................................................ 14 5.5 Mixed Use Buildings .................................................................................................................................. 15 5.6 Parking, Servicing and Loading ................................................................................................................. 15 6 Natural Heritage ......................................................................................................................................... 17 6.1 Objectives ................................................................................................................................................. 17 6.2 General Policies......................................................................................................................................... 17 6.3 Environmental Protection Area ................................................................................................................. 18 6.4 Environmental Constraint Overlays .......................................................................................................... 19 7 Parks and Community Facilities .................................................................................................................. 21 Soper Hills Secondary Plan – Draft ii 7.1 Objectives ................................................................................................................................................. 21 7.2 Parks ......................................................................................................................................................... 21 7.3 Elementary Schools ................................................................................................................................... 22 8 Community Culture and Heritage ............................................................................................................... 23 9 Transportation ............................................................................................................................................ 24 9.1 Objectives ................................................................................................................................................. 24 9.2 Transportation Network ........................................................................................................................... 24 9.3 Road Network ........................................................................................................................................... 25 9.4 Public Transit ............................................................................................................................................ 25 9.5 Active Transportation ............................................................................................................................... 26 10 Housing ...................................................................................................................................................... 27 10.1 Objectives ................................................................................................................................................. 27 10.2 General Policies......................................................................................................................................... 27 11 Infrastructure, Stormwater Management and Sustainability ...................................................................... 29 11.1 Objectives ................................................................................................................................................. 29 11.2 Infrastructure and Utilities ........................................................................................................................ 29 11.3 Stormwater Management and Low Impact Development ....................................................................... 29 11.4 Urban Forest and Native Plantings ........................................................................................................... 31 11.5 Sustainability ............................................................................................................................................ 31 12 Implementation and Interpretation ............................................................................................................ 33 12.1 Implementation ........................................................................................................................................ 33 12.2 Interpretation ........................................................................................................................................... 34 Soper Hills Secondary Plan-Draft 1 1 Introduction The Soper Hills Secondary Plan area is approximately 193 hectares in size and is located on the east side of Bowmanville. The Secondary Plan Area is generally bound by Regional Highway 2 to the south, Lambs Road to the west, the Canadian Pacific Railway to the north and Providence Road and its unopened road allowance. Prominent features within and around the Soper Hills Secondary Plan area Soper Hills include Soper Creek and the Bowmanville community to the west, Highway 401 to the south, and agricultural fields and natural areas to the north and east. The area’s topography is relatively flat, however, three knolls and a tributary of Soper Creek are located within the Soper Hills Secondary Plan area. One knoll is located on the west side of the Secondary Plan Area, just south of Concession Street East, the second knoll is at the southeast corner of the Soper Hills Secondary Plan area, and the third is at the northeast corner. The Soper Creek tributary runs through the southern portion of the Soper Hills Secondary Plan area, creating a gentle valley feature. The Soper Hills Secondary Plan is anticipated to undergo significant growth and development with an estimated population of 11,800 residents and 5,240 units. The purpose of the Secondary Plan is to establish objectives and policies to guide development within the Soper Hills Secondary Plan area, as it is implemented through subdivision, zoning and site plan control. Soper Hills Secondary Plan – Draft 2 2 Vision and Principles 2.1 Vision The Soper Hills Secondary Plan will reflect and enrich the history and character of both the Municipality of Clarington and the Secondary Plan Area creating a sense of place for residents and visitors and leading to a sustainable built form that protects the natural environment, promotes alternative modes of transportation, and supports a healthy lifestyle for current and future generations. 2.2 Principles for the Soper Hills Secondary Plan The following principles have been developed to achieve the vision of the secondary plan: 2.2.1 Provide for the efficient use of land with the creation of a compact, complete, connected, age-friendly and walkable community. 2.2.2 Reduce dependence on personal vehicles and prioritize active transportation modes of travel by creating an active transportation network that encourages walking and cycling and improve overall health for the residents and community. 2.2.3 Protect and, where possible, enhance significant natural features within and adjacent to Environmental Protection Areas (EPA) based on recommendations from the Subwatershed Study. 2.2.4 Design parks and open spaces that are highly visible, accessible and usable. 2.2.5 Respect cultural heritage through conservation and appropriate incorporation into the community. Soper Hills Secondary Plan-Draft 3 3 Community Structure The Community Structure for the Soper Hills Secondary Plan establishes a distribution of uses and intensities of development to achieve the principles identified in Section 2 of this Secondary Plan. The components of the Soper Hills Secondary Plan that define its Community Structure are identified below. 3.1 Regional Corridor 3.1.1 Lands along Regional Highway 2 are identified as Regional Corridors as shown on Map B of the Official Plan. Regional Corridors are Priority Intensification Areas and the routes for future transit service and shall be subject to Section 10.6 of the Official Plan except where greater detail is provided in this Secondary Plan. 3.1.2 Regional Corridors align with the High Density/Mixed Use Regional Corridor designation shown on Schedule A. 3.1.3 Regional Corridors shall be the location of the highest densities, tallest buildings and greatest mixing of uses in the Secondary Plan, in order to concentrate population in areas with good access to transit and amenities. 3.1.4 Regional Corridors shall be the location of commercial, retail and service uses to serve the community. Commercial, retail and service uses shall be concentrated to reinforce community focal points, while ensuring a good level of amenity within walking distance of all residential areas. 3.1.5 The Highway 2 Regional Corridor is the principal transportation route in Secondary Plan Area. It will feature the highest frequency and most direct transit connecting the area to the rest of Clarington and Durham Region. 3.1.6 Consolidation of small parcels is encouraged as well as shared access from side streets where available and feasible. Due to the close location of the Soper Creek tributary, continued individual access from Regional Highway 2 may be required as the properties. 3.1.7 Given volumes of vehicular traffic, particular care shall be given to creating an environment that is safe, comfortable, attractive and efficient for users of active transportation. 3.1.8 Within Regional Corridors, the public right-of-way and private built form shall be designed to create important and inviting public spaces which contribute significantly to the identity of the area and serve as community focal points. Soper Hills Secondary Plan – Draft 4 3.2 Local Corridor 3.2.1 Lands along Lambs Road, Concession Street East and Providence Road are shown as Local Corridors on Map B of the Official Plan. Local Corridors provide for intensification, mixed-use development and pedestrian and transit supportive development as set out in Section 10.6 of the Official Plan except where greater detail is provided in this Secondary Plan. 3.2.2 Local Corridors are generally designated Medium Density Residential as shown on Schedule A. 3.3 Prominent Intersections 3.3.1 Prominent Intersections are located at: • Lambs Road and Concession Street East; • Lambs Road and Regional Highway 2; • Providence Road and Concession Street East; • Providence Road and Regional Highway 2; and • Concession Street East and the new north-south collector road. 3.3.2 Prominent Intersections serve as community focal points, both visually in terms of building height, massing and orientation, architectural treatment and materials, and landscaping, and functionally in terms of destination uses and public spaces and amenities such as street furniture and public art in accordance with the Official Plan 3.3.3 The community park at the corner of Lambs Road and Concession Street East shall contribute to the Prominent intersection through public uses and amenities being situated near the intersection as a gateway to the community. 3.3.4 Mixed use developments at the intersection of Concession Street East and the new north-south collector road shall also contribute to the Prominent Intersection. 3.4 Urban Residential 3.4.1 Urban Residential areas are the residential areas outside of the Regional and Local Corridors, which will feature a built form of lower density and height in ground-related units. Urban Residential areas correspond with the Low Density Residential and Medium Density Residential designation shown on Schedule A. 3.4.2 A Neighbourhood Centre is located central to the Secondary Plan Area on Concession Street East providing neighbourhood retail commercial uses in stand-alone or a mixed use format. Soper Hills Secondary Plan-Draft 5 3.4.3 Urban Residential areas shall combine with other elements of the Community Structure to create neighbourhoods at a walkable scale which contain a mix of land uses and housing types, provide access to local retail and services, and are within a short walking distance to a Neighbourhood Park and/or Parkette. 3.5 Parks and Open Space System 3.5.1 The parks and open space system is comprised of Environmental Protection Areas, parks, and stormwater management ponds. Together, they provide spaces that support the ecological and hydrological functions of the area, serve as venues for outdoor community and recreational life, and through trails, contribute to pedestrian and cycling networks. Environmental Protection Areas and Associated Areas 3.5.2 Environmental Protection Areas are the primary component of the parks and open space system. The conservation and enhancement of Environmental Protection Areas will bring the imprint of the area’s natural features and original geography into the development of the Soper Hills Secondary Plan area in a way that defines Community Structure and identity. 3.5.3 The features of the Soper Creek systems contribute strongly to Community Structure and connect to a broader natural heritage system beyond the Secondary Plan area boundaries. 3.5.4 Access to Environmental Protection Areas through the development of public trails will be undertaken in a manner which conserves their ecological integrity. Environmental Protection Areas will serve as the backbone of network of parks, trails and open spaces. Parks 3.5.5 Parks are vital public spaces connecting to a broader public realm network. A quantity and quality of park space shall be provided that meets the needs of residents and enables a variety of opportunities for passive and active recreation. 3.5.6 Parks shall be located to achieve a number of objectives: a) create larger open spaces and realize co-benefits in terms of amenities by locating adjacent to other outdoor civic uses like schools and stormwater management ponds provided they are central to the neighbourhoods being served by the park; b) ensure that the entire community has good access to parks within a short walking distance of their homes; and c) ensure good access and visibility from public streets. Soper Hills Secondary Plan – Draft 6 Stormwater Management Ponds 3.5.7 Where appropriate, stormwater management ponds will be treated as public assets and part of the parks and open space system. Their amenity and ecological value will be realized as: a) areas of passive recreation through the inclusion of trails; b) areas of ecological value as enhanced wildlife habitat through appropriate planting; and c) visual extensions of other components of the parks and open space system. Soper Hills Secondary Plan-Draft 7 4 Land Use 4.1 Objectives 4.1.1 Realize efficient and transit-supportive urban densities by achieving a minimum density target of 50 people and jobs per gross hectare. 4.1.2 Feature a mix and range of uses and a variety of locations that enable residents to access services and needs within walking distance. 4.1.3 Locate the highest intensity of development and greatest mix of uses along the Highway 2 Regional Corridor to foster access to transit. 4.1.4 To create a central Neighbourhood Centre providing a range of commercial uses to support the residents of the Secondary Plan area. 4.2 General Policies 4.2.1 The following land use designations apply within the Secondary Plan Area as shown on Schedule A: a) High Density/Mixed Use Regional Corridor; b) Medium Density Residential; c) Neighbourhood Centre; d) Low Density Residential; e) Parks (See Section 7); and f) Environmental Protection Areas (See Section 6). 4.2.2 Schedule B identifies three overlays that establish areas where further study is required before development, as per the underlying designation, may be permitted: a) Environmental Constraint: Low Constraint Area Overlay; b) Environmental Constraint: Vegetation Protection Zone Overlay; and c) Environmental Constraint: Additional Area of Further Study Overlay. 4.2.3 New development shall provide a range of residential unit sizes, in terms of number of bedrooms, within multiple-unit buildings. 4.2.4 Drive-through facilities are not a permitted use in any land use designation. 4.2.5 Service stations are not a permitted use in any land use designation Soper Hills Secondary Plan – Draft 8 4.3 High Density / Mixed Use Regional Corridor 4.3.1 Lands designated as High Density/Mixed Use are located within the Regional Corridor. 4.3.2 The High Density/Mixed Use designation allows for the greatest concentration of density and mix of uses in the Secondary Plan Area along the Highway 2 Regional Corridor. Permitted Uses 4.3.3 The predominant use of lands within the High Density/Mixed Use designation is residential in mid and high-rise building forms combined with concentrations of retail, service commercial and office uses . 4.3.4 Permitted built form shall include: a) Apartment buildings; b) Dwelling units within a mixed use building; and c) Townhouses and stacked townhouses and other ground-related multiple unit buildings in association with mid rise or high rise buildings on the same site provided: i) a minimum of 75% of the dwelling units are located in mid rise or high rise buildings; and ii) the mid rise or high rise buildings are built prior to or at the same time as the ground related multiple unit buildings; and iii) the mid rise or high rise buildings front onto Regional Highway 2 with the ground-related multiple unit buildings constructed to the rear. 4.3.5 The High Density/Mixed Use designation supports mixed use buildings with commercial uses located within a building podium base and/or at-grade. 4.3.6 No restrictions on the amount of non-residential floor space shall apply in a mixed use building. 4.3.7 Stand- alone retail, service commercial or office use is not permitted within this designation. 4.3.8 All buildings located adjacent to the intersection of two arterial roads, or the intersection of a collector and arterial road shall provide for ground floor commercial uses. 4.3.9 A compatibility study may be required for any residential development within this designation to address potential noise and air quality nuisances from the employment area to the south of Regional Highway 2 and recommend mitigation measures to be incorporated in the design of the residential development to ensure compatibility with the employment area and any established individual industries. Soper Hills Secondary Plan-Draft 9 Height and Density 4.3.10 Building heights shall be a minimum of 7 storeys and a maximum of 12 storeys, except that townhouses or stacked townhouses secondary to a mid rise or high rise building on the same lot shall be a minimum height of 3 storeys. 4.3.11 Development on lands designated High Density/Mixed Use shall have a minimum site density of 150 units per net hectare. 4.3.12 Notwithstanding Policy 4.3.10, an additional two storeys are permitted if affordable housing units are provided. 4.3.13 The highest and most dense forms of development shall be located fronting the Regional Corridor. Development shall provide a transition, locating less dense and lower scale buildings in locations adjacent to lower density designations. 4.4 Medium Density Residential 4.4.1 Lands designated as Medium Density are generally located along the Local Corridors as well as adjacent to the railway and adjacent to High Density/ Mixed Use Regional Corridor. Permitted Uses 4.4.2 The predominant use of lands within the Medium Density Residential designation is residential in a mix of housing types and tenures in low-rise and mid-rise building forms with mid-rise buildings required at collector and arterial road intersections. 4.4.3 Retail and service uses shall be permitted at strategic locations to reinforce the Community Structure and provide access to local amenities within walking distance for residents of the surrounding areas. 4.4.4 Permitted built form shall include: a) Apartment buildings; b) Townhouses; c) Stacked townhouses; d) Back to back townhouses; e) mixed use building; and f) Other built form that provide housing at the same or higher densities as those above. 4.4.5 Within mixed use buildings, retail, and service commercial uses including and office uses along with residential lobbies shall only be permitted on the ground floor of a mixed use building with an entrance and frontage onto an arterial road. Soper Hills Secondary Plan – Draft 10 4.4.6 The implementing zoning by-law shall identify sites adjacent to the intersections of collector and arterial roads where mixed use buildings are required. Height and Density 4.4.7 Building heights shall be a minimum of 3 storeys and a maximum of 6 storeys. 4.4.8 Notwithstanding Policy 4.4.7, the highest and densest forms are encouraged to be located at key intersections along the Local Corridors to provide built form and housing type variety along the Local Corridors . As such, a minimum of 5 storeys shall be required adjacent to the intersection of two arterial roads and the intersection of collector and arterial roads subject to a compatible transition to adjacent cultural heritage resources and Low Density Residential designations. 4.4.9 Development within the Medium Density designation shall have a minimum site density of 60 units per net hectare. 4.4.10 Notwithstanding Policy 4.4.9, a minimum of site density of 100 units per net hectare shall be required adjacent to the intersection of two arterial roads and adjacent to the intersection of collector and arterial roads. 4.4.11 The highest and most dense forms of development shall be located fronting the Local Corridor. Development shall provide a transition, locating less dense and lower scale buildings in locations adjacent to the Low Density Residential designation within the Urban Residential area. 4.5 Neighbourhood Centre 4.5.1 Lands designated as Neighbourhood Centre are located on Concession Street East at the intersection with the north-south collector road. 4.5.2 The Neighbourhood Centre shall be developed in accordance with the policies of Section 10.5 of the Official Plan and the additional policies of this Section. 4.5.3 The Neighbourhood Centre will be the focal point of the neighbourhood, a hub of activity with a concentration of commercial uses in a pedestrian -oriented main street format along the north-south collector road, complemented by adjacent Medium-Density Residential uses. 4.5.4 On street parking adjacent to the Neighbourhood Centre shall be encouraged. Permitted Uses 4.5.5 The predominant use of lands within the Neighbourhood Centre designation is a mix of retail, service commercial and office uses serving the day to day needs of residents in the Secondary Plan area as set out in Section 10.5 of the Official Plan. Soper Hills Secondary Plan-Draft 11 4.5.6 The permitted retail, service commercial and office uses may be developed as a stand-alone commercial development or in a mixed use format with residential uses above the commercial uses or in a live-work units. 4.5.7 Residential uses shall be permitted in mixed use buildings in conjunction with permitted non-residential uses. 4.5.8 Stand-alone residential buildings, containing the dwelling types set out in Policy 4.4.4, may be permitted provided the intent of the designation as a focal point for the neighbourhood providing a range of retail, service commercial and office uses to meet day to day needs is achieved and provided commercial uses are developed prior to or at the same time as the stand -alone residential uses. 4.5.9 Notwithstanding Section 10.5 of the Official Plan, no individual store maximum area shall apply. 4.5.10 Buildings will generally be located at the lot line to frame the street. Retail, service commercial and office uses will have active frontages along Concession Street East and the north-south collector road. Height and Density 4.5.11 Residential and mixed use building heights shall be a minimum of 3 storeys and a maximum of 6 storeys. 4.5.12 Residential development within the Neighbourhood Centre designation shall have a minimum site density of 100 units per net hectare. 4.5.13 Taller buildings up to the maximum permitted in Policy 4.5.11 are encouraged to frame the intersections as part of the Prominent Intersection. Where mixed use building and stand-alone residential buildings are proposed as part of the Prominent Intersection, a minimum of 5 storeys shall be required adjacent to the intersection of Concession Street and the north-south collector. 4.6 Low Density Residential Permitted Uses 4.6.1 The predominant use of lands within the Low Density Residential designation is residential with a mix of housing types and tenures in low-rise building forms. 4.6.2 The following residential built form are permitted: a) Detached dwellings; b) Semi-detached dwellings; c) Street Townhouses; d) Stacked townhouses; e) Back to back townhouses; and f) Low-rise Apartments; Soper Hills Secondary Plan – Draft 12 4.6.3 Detached and semi-detached dwelling units shall account for a minimum of 80 percent of the total number of units in the Low Density Residential designation, with various forms of townhouses and apartments accounting for the remainder. 4.6.4 Permitted street townhouses, stacked townhouses, low rise apartments and back to back townhouses shall generally be located adjacent to collector roads with higher density townhouse forms and apartments clustered near intersections of collector roads, adjacent to community and neighbourhood parks, and adjacent to the Medium Density designation. 4.6.5 Other uses, including small scale service, neighbourhood retail commercial uses and community amenities, which are supportive of and compatible with residential uses, are also permitted in accordance with Section 9 and18 of the Official Plan. Height and Density 4.6.6 Buildings within the Low Density Residential designation shall not exceed 3 storeys in height. 4.6.7 Development on lands designated Low Density Residential shall have a minimum density of 20 units per net hectare. Soper Hills Secondary Plan-Draft 13 5 Urban Design 5.1 General Policies 5.1.1 The Soper Hills community shall be developed in accordance with the urban design policies of Section 5 of the Official Plan and the additional policies of this section. 5.1.2 The Secondary Plan area shall be developed based on a modified grid pattern of streets, complemented by multi-use paths and trails, to serve as a network of fine-grained connectivity between all parts of the Secondary Plan area and, where appropriate, to surrounding areas. 5.1.3 The network of streets shall be supplemented by mid-block pedestrian connections to break up long blocks (generally blocks longer than 250 metres) and to further enhance the pedestrian permeability of the area and access to transit. 5.1.4 Views to key landmarks and natural features shall be maintained through the location of open space and the layout of the street network wherever feasible. 5.1.5 Development shall have appropriate regard for the Municipality’s General Architectural Design Guidelines, where applicable. 5.1.6 The Soper Hills Urban Design and Sustainability Guidelines, appended to this Secondary plan, as Appendix A, provide specific guidelines for the public and private realms. They clarify the Municipality’s expectations with respect to the form, character and qualities of development in the Soper Hills Secondary Plan area. If there is conflict between a Secondary Plan policy and the Urban Design and Sustainability Guidelines, the Secondary Plan policy prevails. 5.1.7 The Demonstration Plan in the Urban Design and Sustainability Guidelines illustrates the planning principles that are inherent to the Secondary Plan. It is one example of how the Secondary Plan might be implemented within the Secondary Plan area. 5.2 Placemaking 5.2.1 Public art should be incorporated into the public realm, especially at Prominent Intersections, to contribute to the neighbourhood’s sense of identity. 5.2.2 A dense tree canopy should be provided along public streets to enhance the pedestrian experience of the community. 5.2.3 Animated streets should be created by incorporating public spaces which are designed to achieve animation and passive surveillance and through the provision of outdoor amenity areas and street furniture. Soper Hills Secondary Plan – Draft 14 5.2.4 Buildings should animate the frontage and flankage of streets through the location of building entrances and outdoor amenity areas, street facing windows. 5.2.5 In order to maximize the amount of tree planting and to minimize the removal of in-situ trees, the co-location of utilities is encouraged. 5.3 Prominent Intersections 5.3.1 For Prominent Intersections, buildings should respond to their prominent location, framing and orienting views towards adjacent streets to signify points of entry and exit. Streetscape design elements within the public right-of-way should be coordinated with and enhance private development sites adjacent to the gateway location, to create a distinctive identity. 5.3.2 Built form policies in the Official Plan on transparent glass and location of public entrances shall only apply where commercial or mixed use buildings are proposed adjacent to the Prominent intersection. 5.3.3 Privately owned publicly accessible plazas shall be located at Prominent Intersections to contribute to their visual prominence, reinforce their role as community focal points, improve the relationship of built form to the public right- of- way, and contribute to the area’s identity. Alternative locations that provide a similar level of amenity may be considered to satisfy this requirement. 5.3.4 Land conveyances will not be required to achieve the Prominent Intersection policies although urban squares or privately owned public accessible open spaces are encouraged at Prominent Intersections. 5.4 Building Siting and Design 5.4.1 Built form shall be massed and sited to frame streets and public spaces in a consistent manner. 5.4.2 Mid-rise and high rise buildings should have a clear base, middle and top to provide articulation and high quality design. 5.4.3 A building stepback shall be provided above the third storey for mid -rise buildings. 5.4.4 Development shall provide a transition between areas of different heights and density within the Secondary Plan area and to the areas and uses outside its boundaries through separation, step-backs and intervening land uses. 5.4.5 Site buildings to avoid front-to-back and/or overlook conditions. Where this cannot be achieved, impacts should be minimized with appropriate screening through architectural or landscape treatment. Soper Hills Secondary Plan-Draft 15 5.4.6 Reverse frontage development generally shall not be permitted within the Secondary Plan Area. 5.4.7 Townhouses shall generally not comprise more than 6 attached units. 5.4.8 Corner lots should have a high level of design with equal and prominent design for both building elevations which face the street. 5.4.9 Porches are encouraged for all ground oriented dwellings. 5.4.10 Air conditioning units, utility metres and similar features should not be visible from the public realm (street/sidewalk) and should be well integrated into a building massing, recessed and screened. 5.4.11 Rooftop mechanical structures and fixtures shall be screened including, without limitation satellite dishes and communications antenna, and where feasible integrate within the design of the building. Parapets may be utilized to accommodate such screening. 5.5 Mixed Use Buildings 5.5.1 Development will have a consistent street wall and active street frontages. 5.5.2 The public realm adjacent to mixed use buildings will support a high level of pedestrian activity and include wider sidewalks and street furniture. 5.5.3 Ground floor non-residential uses should have a floor-to-floor height of approximately 4.5 metres in support of larger display windows and signage area as well as providing opportunities for awnings, lighting, and other facade enhancements. 5.5.4 Direct access from at-grade retail/commercial uses to the street shall be provided. 5.6 Parking, Servicing and Loading 5.6.1 Parking and loading facilities should be located at the side or rear of commercial, mixed use and apartment buildings to promote an attractive public realm and encourage pedestrian activity. 5.6.2 On-street parking should be provided along collector roads. 5.6.3 The visual impact of garages in Low Density Residential areas should be reduced by: a) Encouraging parking via laneways; b) Recessing garages located at the front of the building facing a street; Soper Hills Secondary Plan – Draft 16 c) Limiting driveways widths so that they do not exceed the width of the garage; and d) Minimizing the garages’ appearance and area on a building façade so that windows, doors, and active elements of a residential building’s façade take visual primacy. 5.6.4 The visual impact of off-street parking areas should be reduced by: a) Screening parking lots from view of the public realm where possible; b) Encouraging joint access to parking lots on adjoining properties; and c) Using hard and soft landscaping within the parking area ; and d) Where appropriate, providing a visual buffer between parking areas and adjacent residential properties. 5.6.5 Loading, servicing and other functional elements are encouraged to be integrated within the building envelope. Where this is not possible, these elements shall not be located adjacent to public spaces and shall be screened from view to avoid visual impact to the public realm or surrounding residential areas. 5.6.6 Garbage and recycling facilities shall be integrated within the building envelope. 5.6.7 The visual impact of garage doors to below-grade structured parking should be minimized by locating them discreetly away from main pedestrian entrances and primary frontages, and where feasible, accessed from a lane. 5.6.8 Above-grade structured parking adjacent to a public street(s) should be lined with active retail and commercial uses with direct access to the public street(s). Soper Hills Secondary Plan-Draft 17 6 Natural Heritage 6.1 Objectives 6.1.1 Protect, maintain and enhance the natural heritage system, including its ecological integrity and function. 6.1.2 Protect natural heritage features and functions from incompatible development. 6.1.3 Incorporate the natural heritage system into the parks and open space system. 6.1.4 Use the landscape to contribute to a sense of place and integrate the natural heritage system in a manner which defines community identity. 6.1.5 Where appropriate, provide access to the natural heritage system through low- intensity recreation and pedestrian permeability through trails and linkages. 6.1.6 Maintain ecological functions while integrating the natural heritage system with the stormwater management system. 6.1.7 Protect public health and safety and property from natural hazards. 6.2 General Policies 6.2.1 All development within and adjacent to the Environmental Protection Area designation shall adhere to the policies of the Clarington Official Plan, as it pertains to the policy areas of the Natural Heritage System in Section 3.4, the Watershed and Subwatershed Plans policies in Section 3.5 , the Hazards policies in Section 3.7 and the Environmental Protection Areas policies in Section 14.4 and the policies of this Section and shall have appropriate regard for the recommendations of the Soper Creek Subwatershed Study. 6.2.2 In addition to these policies, the Soper Creek Subwatershed Study shall form the basis for any study undertaken regarding the natural heritage system and natural hazards. More detailed studies and staking of natural features and natural hazards including flooding and erosion may refine and/or confirm development limits as well as the presence of features on a site by site basis based on the recommendations from the Soper Creek Subwatershed Study; however, the more detailed studies must address the matters raised by the Soper Creek Subwatershed Study. 6.2.3 For those properties not assessed for Headwater Drainage Features in the Subwatershed Study or where agricultural fields have gone fallow, Headwater Drainage Feature Assessments may be required prior to any development in order to accurately assess hydrologic functions of these features. Soper Hills Secondary Plan – Draft 18 6.2.4 Revegetation of riparian corridors that are less than 30 metres wide is encouraged using native plantings. 6.3 Environmental Protection Area 6.3.1 Lands designated Environmental Protection Area are shown on Schedule A. 6.3.2 Environmental Protection Areas include natural heritage features, hydrologically sensitive features, lands within the regulatory flood plain of a watercourse, headwater drainage features with a “Protection” classification and hazard lands associated with valley systems, including slope and erosion hazards. Areas associated with Environmental Protection Areas support their ecological integrity and include vegetation protection zones and other natural heritage areas. Vegetation protection zones will form part of the Environmental Protection Area once delineated. 6.3.3 Stormwater management ponds except for the outfall, shall not be permitted to be developed in lands designated Environmental Protection Area or within the vegetation protection zones to an Environmental Protection Area. 6.3.4 Low Impact Development features may be permitted in the outer 5 metres of the vegetation protection zone provided: a) the vegetation protection zone has not been reduced below that required in Table 3-1 of the Official Plan; b) filling and/or grading to facilitate construction of the low impact development feature does not extend more than 5 metres into the vegetation protection zone; and c) it is supported by the findings of the appropriate studies. 6.3.5 The delineation of the boundary of lands designated as Environmental Protection Area on Schedule A is approximate and shall be detailed through appropriate studies prepared as part of the review of development applications in accordance with the policies of this Secondary Plan and the Clarington Official Plan. 6.3.6 The Municipality may require Environmental Protection Areas to be conveyed to a public authority, where appropriate, as part of the development approval process at minimal or no cost to the receiving public authority. Conveyance of lands designated Environmental Protection Area and associated vegetation protection zones shall not be considered as contributions towards the parkland dedication requirements under the Planning Act. 6.3.7 Access to Environmental Protection Areas through the development of public trails will be undertaken in a manner which conserves their ecological integrity as determined through an Environmental Impact Study. Soper Hills Secondary Plan-Draft 19 6.3.8 The Soper Creek Subwatershed Study identified and assessed a number of Headwater Drainage Features. Those identified in the Subwatershed Study as “protection” are included in the Environmental Protection Area designation and are to be protected in situ. 6.3.9 For those Headwater Drainage Features identified in the Subwatershed Study as “conservation” and located outside of an Environmental Protection Area designation, applications for development shall: a) Maintain and enhance or relocate and enhance drainage features and its riparian corridor; b) If catchment drainage has been previously removed or will be removed due to diversion of stormwater flows, restore lost functions through enhanced lot level controls (i.e., restore original catchment using clean roof drainage), as feasible; c) Maintain or replace on‐site flows using mitigation measures and/or wetland creation, if necessary; d) Maintain or replace external flows; e) Use natural channel design techniques to maintain or enhance the overall productivity of the reach; f) Ensure that the drainage feature is connected to downstream; and g) Apply an appropriate vegetation protect zone to either side of the drainage feature. 6.3.10 Headwater Drainage Features that have been relocated and the associated riparian corridors established by permissions in policy 6.3 .9 shall be designated Environmental Protection Area and shall be zoned appropriately to prohibit development. 6.4 Environmental Constraint Overlays 6.5.1 Environmental Constraints shown as an overlay on Schedule B Environmental Constraint Overlays are not land use designations, they identify lands identified in the Soper Creek Subwatershed Study as requiring additional levels of study prior to development. 6.5.2 There are three types of Environmental Constraint Overlays shown on Schedule B and include Vegetation Protection Zone, Additional Area of Further Study, and Low Constraint Area. 6.5.3 Environmental Constraint: Vegetation Protection Zone Overlay represent s the lands identified as a Vegetation Protection Zone based on the findings of the Soper Creek Subwatershed Study. An Environmental Impact Study prepared in support of development applications shall confirm the extent of the Vegetation Protection Zone based on the sensitives of the adjacent feature and in accordance with minimum Vegetation Protection Zone requirements of the Soper Hills Secondary Plan – Draft 20 Official Plan. Refinements to the Environmental Constraint:Vegetation Protection Zone will not require an amendment to this Plan. 6.5.4 Environmental Constraint: Additional Area of Further Study Overlay represent s areas providing candidate and / or unconfirmed significant wildlife habitat or potential wildlife linkages identified in the Soper Creek Subwatershed Study. An environmental impact study prepared in support of development applications shall confirm the presence or absence of the habitat and /or linkage and the extent of sensitivity of the habitat, in accordance with the policies of the Official Plan to the satisfaction of the municipality and appropriate agencies. 6.5.5 Environmental Constraint: Low Constraint Area Overlay identified in the Soper Creek Subwatershed Study comprise features in which development intrusion is not restricted by existing policies and regulations. It is encouraged that these features be incorporated into site level plans where possible to avoid net loss of natural cover. Should net loss of natural cover not be avoidable, appropriate compensation opportunities within other areas of the Secondary Plan area may be considered where appropriate. 6.5.6 Until the environmental impact studies required in this Section 6.5 have been completed, land uses within the Environmental Constraint Overlays shall be limited to existing lawfully permitted uses. 6.5.7 Following the completion of the required studies to the satisfaction of the Municipality, development may be permitted in the Environmental Constraint Overlays as deemed appropriate by the study, without amendment to this Plan, and the underlying land use designation in Schedule A will apply. Where development in an Environmental Constraint Overlay is determined not to be appropriate, or the limits of the Vegetation Protection Zone is confirmed, the Environmental Constraint Overlay will be deemed to part of the Environmental Protection Area designation. 6.5.8 The Zoning By-law shall be amended as appropriate following the completion of the required studies to implement new land use permissions for the study area. Soper Hills Secondary Plan-Draft 21 7 Parks and Community Facilities 7.1 Objectives 7.1.1 Provide a quantity and quality of park space that meets the needs of residents and enables a variety of opportunities for passive and active recreation. 7.1.2 Use the design of parks and open spaces to create unique places that contribute to the area’s sense of identity. 7.1.3 Integrate parks into a broader open space and public realm networks. 7.1.4 Provide appropriate levels of service in terms of schools and community facilities. 7.1.5 Locate schools, parks and other community amenities to promote safe and convenient access by walking and cycling. 7.2 Parks 7.2.1 Parks are symbolically illustrated in Schedule A. Final location and size of parks shall be determined at the draft plan of subdivision stage. 7.2.2 Parks within the Soper Hills Secondary Plan shall provide a variety of opportunities for passive and active recreation and be comprised of well- designed spaces that contribute to the area’s sense of identity. 7.2.3 The following types of parks are included in the Parks designation: a) Community Park; b) Neighbourhood Parks; and c) Parkettes. 7.2.4 The functions and sizes for the parks listed in Policy 7.2.3 are set out in Section 18.3 of the Official Plan. 7.2.5 The locations of the Community Park, Neighbourhood Parks and Parkettes are shown on Schedule A. The precise size and location of Neighbourhood Parks and Parkettes shall be determined at the time of development review and approval, based on the parkland dedication requirements of the Planning Act. 7.2.6 Parks shall be designed to be accessible and shall have street frontage on not less than 30% of the park perimeter. Backing of residential and commercial uses onto parks shall be minimized with flankage of lots preferred. Soper Hills Secondary Plan – Draft 22 7.2.7 Areas conveyed for parkland purposes will be programmable lands. However, to protect the views from the knoll east of Lambs Road and south of Concession Street East portions of this Neighbourhood Park may not be programmable. 7.2.8 Environmental Protection Areas, associated vegetation protection zones and stormwater management areas shall not be conveyed to satisfy parkland dedication requirements under the Planning Act. 7.2.9 Privately owned and publicly accessible open space shall be encouraged within the Secondary Plan Area but shall not contribute to required parkland dedication. 7.3 Elementary Schools 7.3.1 School sites are shown symbolically on Schedule A and shall be further delineated through the development review process. In the event an Elementary School is not required, the land use surrounding the symbol will be the applicable land use designation. 7.3.2 School sites will be developed in accordance with the relevant policies of Section 18.5 of the Clarington Official Plan. 7.3.3 In the event that all or part of a school site should not be required by a School Board, the Municipality of Clarington shall be given the first opportunity to purchase all or part of the school site for a community use. 7.3.4 Elementary school sites shall be located centrally to promote accessibility by walking and, where feasible, adjacent to planned Neighbourhood Park sites. 7.3.5 Where a school site adjoins a Neighbourhood Park, the respective School Board will consider opportunities for joint use with the Municipality and the site will be designed accordingly. 7.3.6 When selecting school sites, consideration will be given to locating schools in joint-use facilities shared with co-terminus boards, the Municipality, local community organizations and/or other third party partners. Soper Hills Secondary Plan-Draft 23 8 Community Culture and Heritage 8.1.1 The conservation and enhancement of significant cultural heritage resources shall be consistent with the provisions of Section 8 of the Clarington Official Plan and all relevant Provincial legislation and policy directives. 8.1.2 The following properties of cultural heritage value or interest have been identified within the Secondary Plan area and are shown on Schedule A: a) 2906 Regional Highway 2; b) 1717 Lambs Road; and c) 2876 Concession Street East. 8.1.3 A Cultural Heritage Evaluation Report will be required for each property listed in Policy 8.1.2 as part of a complete application. 8.1.4 A Heritage Impact Assessment that includes measures to avoid direct impacts, and actions to avoid or reduce indirect impacts to the heritage attributes of a cultural heritage resource shall be conducted prior to development on or adjacent to properties for which a Cultural Heritage Evaluation Report has been conducted and determined that the properties meet the criteria for cultural heritage value or interest as prescribed in O. Reg. 9/06. 8.1.5 The naming and design of parks and public spaces and the naming of public streets shall have regard for local heritage or natural influences including historic names, interpretive features, vernacular building elements, and plantings. Soper Hills Secondary Plan – Draft 24 9 Transportation 9.1 Objectives 9.1.1 Foster a community where walking, cycling and transit are viable and attractive alternatives to travel by automobile. 9.1.2 Establish a street and block pattern that creates fine -grained connectivity throughout the community. 9.1.3 Create routes for active transportation that are direct and efficient and offer high levels of connectivity with multiple choice of routes. 9.1.4 Establish a network that connects the interior lower density neighbourhoods and the higher density along Local and Regional Corridors where transit will be most frequent and direct. 9.1.5 Use mid-block connections and trails to augment the network established by streets to improve permeability for users of active transportation. 9.1.6 Design streets as complete streets to ensure that all kinds of traffic can use them in a safe and comfortable manner: motorists, transit users, cyclists, pedestrians and people with accessibility challenges. Prioritize active modes of transportation and the needs of the most vulnerable users. 9.1.7 Design streets as important public places. Create environments which are safe, inviting, comfortable and visually pleasing for pedestrians and other forms of active transportation. 9.2 Transportation Network 9.2.1 The transportation network in the Soper Hills Secondary Plan area facilitates the movement of people and goods through an integrated, efficient, comfortable, safe, and accessible transportation system. 9.2.2 The transportation network in the Soper Hills Secondary Plan area shall be developed in accordance with Schedule B Environmental Constraint and Transportation and the policies of this Secondary Plan, with further guidance provided in the Urban Design and Sustainability Guidelines and the Soper Hills Transportation Report. 9.2.3 New roads shall be designed to create a rectilinear grid pattern of roads that defines development blocks and establishes a highly interconnected and permeable network that supports active transportation and maximizes accessibility and support for transit. The rectilinear grid pattern may be modified to accommodate natural heritage areas and other constraints. Connectivity by active transportation throughout the Secondary Plan area and to surrounding Soper Hills Secondary Plan-Draft 25 areas shall be further enhanced by mid-block connections and trails through and across Environmental Protection Areas where appropriate and feasible 9.2.4 Where the road network includes a stream crossing in the Environmental Protection Area, the stream crossing shall be designed to allow for larger mammal wildlife crossing under the road where feasible. 9.2.5 Residential buildings shall be set back 30 metres from any adjacent railway corridor. 9.3 Road Network 9.3.1 The road network set out on Schedule B serves as the primary framework for all forms of mobility and connectivity in the Soper Hills Secondary Plan area. The road network includes a hierarchy of road types which is consistent with the hierarchy and road classifications in the Official Plan and the road classification criteria in Appendix C, Table C-2 of the Official Plan. 9.3.2 The collector road network shown in Schedule B has been confirmed through Phases 1 and 2 of the Class C Environmental Assessment process. Further refinements will be considered through Phases 3 and 4 conducted during the draft plan of subdivision process without amendment to the Secondary Plan. 9.3.3 The Municipality may consider development on private roads outside of the Low Density Residential designation. 9.3.4 Jogs in the arterial road network at Lambs Road and Concession Street East, Providence Road and Concession Street East and future Providence Road and Regional Highway 2 shall be eliminated when adjacent development occurs. 9.4 Public Transit 9.4.1 The Municipality should encourage that transit facilities are integrated early and appropriately within and adjacent to the Soper Hills Secondary Plan area and ensure that transit requirements are addressed through municipal capital works and private development applications. 9.4.2 The design of transit stops shall incorporate appropriate amenities and shall consider transit shelters, seating, bike racks, curb cuts and appropriate lighting. 9.4.3 To facilitate the creation of a transit-supportive urban structure, in addition to Section 19.4 of the Official Plan, the following measures shall be reflected in development proposals, including the subdivision of land: a) Transit-supportive densities provided on lands within the Local and Regional Corridors in keeping with municipal density targets; b) An active transportation network that promotes direct pedestrian access to transit routes and stops; Soper Hills Secondary Plan – Draft 26 c) Transit stops located in close proximity to activity nodes and building entrances; d) Provision for transit stops and incorporation of bus-bays where appropriate into road design requirements; and e) Where feasible, the integration of transit waiting areas in buildings located adjacent to transit stops. 9.5 Active Transportation 9.5.1 The policies of the Soper Hills Secondary Plan are an extension of the Active Transportation policies of Section 19.5 of the Official Plan and are intended to ensure the local provision and ongoing development of an active transportation network within the Secondary Plan area. 9.5.2 The active transportation network within the Soper Hills Secondary Plan area includes off-street facilities including trails and multi-use paths for pedestrians and cyclists. Some elements of the Active Transportation System are shown on Schedule B of this plan. 9.5.3 Collector roads shall incorporate a multi-use path on one side and a sidewalk on the other. Local roads shall incorporate a sidewalk on one side. 9.5.4 Active transportation connections across barriers (natural and related to infrastructure) shall be planned at appropriate walking/cycling intervals to reduce barriers between areas and increase accessibility for all ages and abilities. 9.5.5 To support increased network connectivity, mid-block connections shall be established throughout the Secondary Plan Area and in particular through high and medium density blocks within the Regional Corridor. 9.5.6 Destinations such as the Environmental Protection Area, parks, schools, and stores and connections to surrounding will be integrated through the off-street active transportation network including off-street bike lanes and multi-use trails. 9.5.7 All collector and local roads shall also be planned to include a vibrant and healthy tree canopy, consisting of primarily native plantings. The tree canopy will provide shade and enhance and establish a vibrant urban environment. A tree canopy plan shall be prepared for each plan of subdivision. Soper Hills Secondary Plan-Draft 27 10 Housing 10.1 Objectives 10.1.1 Encourage a variety of housing forms, sizes and tenures, that allow households of various sizes and incomes to find a home within the Soper Hills Secondary Plan area. 10.1.2 Encourage the provision of affordable housing and rental housing. 10.1.3 Foster aging in place by encouraging a range of housing that can meet the needs of residents during all phases of life. 10.2 General Policies 10.2.1 A variety of housing forms, sizes and tenures shall be provided in the Soper Hills Secondary Plan area to meet the needs of a diverse population and households of various sizes, incomes and age compositions. This housing mix is encouraged to include purpose built rental and seniors housing. 10.2.2 Additional dwelling units are encouraged in all new single, semi-detached and townhouse dwellings. 10.2.3 Affordable housing, including community housing, supportive housing and other types of subsidized non-market housing units, are encouraged to be integrated within neighbourhoods and combined in developments that also provide market housing to provide opportunities for a range of housing tenures and prices that support diversity. 10.2.4 Affordable housing is encouraged within the Local and Regional Corridors to provide residents with close access to public transit. 10.2.5 The Municipality should collaborate with the Region of Durham and public and nonprofit community housing providers to encourage a supply of subsidized non-market housing units to be included within the housing mix in the Secondary Plan area. 10.2.6 To support the provision of affordable housing units, the Municipality will explore potential incentives such as, reduced application fees, grants and loans, to encourage the development of affordable housing units. The Municipality will also encourage the Region (as applicable) to consider further increasing financial incentives for affordable housing. 10.2.7 As an incentive for the provision of affordable housing, reductions in the minimum parking requirement under the Zoning By-law may be considered by the Municipality on a site-by-site basis where affordable housing or purpose built rental housing is provided as part of a development proposal. Soper Hills Secondary Plan – Draft 28 10.2.8 The Municipality will give priority to development applications that include affordable housing units and purpose built rental units that are being funded by federal and provincial government programs, community housing providers other non-profit groups, the Region of Durham and the private sector. 10.2.9 A range of unit sizes are encouraged within apartment and multi -unit buildings, including those suitable for single people, and larger households and families. Soper Hills Secondary Plan-Draft 29 11 Infrastructure, Stormwater Management and Sustainability 11.1 Objectives 11.1.1 Reduce the impact of development on hydrologic and ecological systems through the use of the principles of Low Impact Development and Green Infrastructure. 11.1.2 Encourage native plantings, which include a diversity of tree species that contribute to the urban forest and a vibrant and healthy tree canopy. 11.1.3 Promote the use of technologies and methods which improve the environmental performance of development. 11.2 Infrastructure and Utilities 11.2.1 Infrastructure and utilities should be developed in accordance with the policies of Section 21 of the Official Plan. 11.2.2 In addition, super mailboxes shall not be located in a municipally owned park but may be located adjacent to the park. 11.3 Stormwater Management and Low Impact Development 11.3.1 Stormwater management facilities shall be planned and developed in accordance with the policies of Section 20 of the Official Plan , the Soper Creek Subwatershed Study and the policies of this Section. 11.3.2 Wherever feasible stormwater management ponds should be located in Low Density Residential designations. 11.3.3 Stormwater management facilities shown on Schedule A are illustrative and final location and sizing shall be determined through the development application process. 11.3.4 Proposed stormwater management quality, quantity, erosion control and water balance for ground water and natural systems shall be assessed during the development approval process to determine the impact on the natural heritage system and environmental features. 11.3.5 A Master Drainage Plan / Master Environmental Servicing Plan shall be completed for the Secondary Plan Area prior to the submission of the first development application within the Secondary Plan Area. Soper Hills Secondary Plan – Draft 30 11.3.6 Stormwater Management Reports shall be prepared for each draft plan of subdivision application building on the recommendations of the Soper Creek Subwatershed Study and the Master Drainage Plan/ Master Environmental Servicing Plan. As recommended by the Soper Creek Subwatershed Study, the required Stormwater Management Report and Plan shall incorporate: a) Infiltration-based LID practices located on private property and municipal property; b) Evaluation of erosion risks to receiving watercourses; and c) A site-specific water budget. 11.3.7 The submission of the following plans and reports shall be required to determine the impact of stormwater quality/quantity, erosion and water balance of the proposed development. All reports shall be prepared in accordance with the Soper Creek Subwatershed Study including: a) Master Drainage Plan; b) Stormwater Management Report and Plan; c) Erosion and Sediment Control Plan; d) Servicing Plans; e) Grading Plans; f) Geotechnical reports; g) Hydrogeologic reports; and h) Other technical reports as deemed necessary. 11.3.8 The Stormwater Management Report and Plan identified in Policy 11.3.6 shall apply a range of stormwater management practices including Low Impact Development techniques to ensure water quality control, baseflow management, water temperature control and the protection of aquatic habitat consistent with municipal guidance and CLOCA guidelines. 11.3.9 Stormwater management plans shall demonstrate how the water balance target set in the Soper Creek Subwatershed Study is achieved. 11.3.10 Stormwater management for all development shall be undertaken on a volume control basis and shall demonstrate the maintenance of recharge rates, flow paths and water quality to the greatest extent possible. Peak flow control and the maintenance of pre-development water balance and prevention of erosion shall be demonstrated to the satisfaction of the Municipality of Clarington in consultation with CLOCA. 11.3.11 Development of all detached, semi-detached and townhouse dwellings shall demonstrate the use of an adequate volume of amended topsoil or equivalent system to improve surface porosity and permeability over all turf and landscaped areas beyond 3 metres of a building foundation and beyond tree protection areas. Soper Hills Secondary Plan-Draft 31 11.4 Urban Forest and Native Plantings 11.4.1 Together, new development and public realm improvements shall establish an urban tree canopy throughout the Secondary Plan area to minimize the heat island effect, provide for shade and wind cover and contribute to a green and attractive environment. 11.4.2 New development and public realm improvements are required to use native plant species wherever feasible, particularly along rights-of-way and pedestrian trails. 11.4.3 New development and public realm improvements shall only use native plantings within 30 metres of Environmental Protection Areas. 11.4.4 Draft plans of subdivision and site plan applications shall as a condition of approval be supported by landscape plans which demonstrate how the development will contribute to the urban forest. 11.4.5 A diversity of tree species shall be planted in parks and along rights -of-way to provide a healthy and more robust tree inventory that is less prone to insects and diseases. 11.4.6 Selection of tree species within the Secondary Plan area will contribute to the Municipality’s species diversity objectives. 11.4.7 Where trees, shrubs and other natural heritage features are destroyed or harvested pre-maturely prior to proper study and approval, compensation should occur on site and shall be calculated at a 3:1 ratio and be subject to a restoration / compensation plan. 11.5 Sustainability 11.5.1 Development shall consider incorporating energy and water conservation measures, including consideration for renewable and/or alternative energy systems, such as solar panels. 11.5.2 Development shall consider the use of technologies such as green roofs and reflective roof surface materials with high thermal reflectivity. 11.5.3 Development is encouraged to meet high standards for energy efficiency and sustainability in building design and construction, exceeding the energy performance criteria of the Ontario Building Code. 11.5.4 Development is encouraged to meet high standards for the use of low-impact development strategies and minimize impermeable surfaces, to aid in stormwater infiltration. Soper Hills Secondary Plan – Draft 32 11.5.5 Water-efficient building design and practices should be utilized in all new buildings, including measures such as ultra-low flow fixtures, dual flush toilets and rainwater harvesting. 11.5.6 Development should apply designs, methods and materials that reduce embodied carbon emissions, such as using lower-carbon methods and materials such as mass timber, low-carbon concrete and biogenic insulation and repurposing on-site materials. Soper Hills Secondary Plan-Draft 33 12 Implementation and Interpretation 12.1 Implementation 12.1.1 Detailed studiesprepared in support of a development application, to the satisfaction of the Municipality, may refine the recommendations of the Soper Creek Subwatershed Study on a site by site basis however the study must address the issues raised by the Subwatershed Study. 12.1.2 As part of a complete application the following information is required: i. Net residential density by land use designation; ii. Identification of total square footage of non-residential land uses; iii. Number and type of units by land use designation; iv. Total residential unit count; v. Estimated population; vi. Amount/type of non-residential space and number of jobs; and vii. The number of purpose built additional dwelling units by land use designation. 12.1.3 All new development within the Soper Hills Secondary Plan area shall proceed on the basis of the sequential extension of full municipal services either by servicing through adjacent plans of subdivision, including servicing through provisions or through the Regional and Municipal capital works programs and plans of subdivision and may be advanced by landowners/proponents with appropriate agreements with the Region and/or Municipality. 12.1.4 The Municipality encourages utility providers such as hydroelectric power, communications/telecommunications facilities, broadband fiber optics, and natural gas to ensure that sufficient infrastructure is or will be in place to serve growth in the Secondary Plan area. 12.1.5 Development applications for lands abutting the arterial road and collector roads shown in Schedule B shall dedicate lands for road widenings as determined by the Municipality or Region of Durham. 12.1.6 Approval of development applications shall be conditional upon commitments from the appropriate authorities and the proponents of development to the timing and funding of the required road and transportation facilities, parks and community facilities. These works shall be provided for in the subdivision and / Soper Hills Secondary Plan – Draft 34 or site plan agreements. Phasing of the development, due to partial construction of internal collector roads as a result of non-participating landowners or based on the completion of the external road works, may be required by the Municipality of Clarington. 12.1.7 Approval of development applications shall also be conditional upon commitments from the appropriate authorities and the proponents of development to the timing and funding of required stormwater management, sanitary sewer and water supply facilities. These works shall be provided for in subdivision and / or site plan agreements. Phasing of development, based on the completion of external sewer and water services, may be implemented if required by the Municipality of Clarington. Phasing may include interim road and infrastructure solutions prior to full build-out. 12.1.8 Certain benefitting landowners within the Secondary Plan area have entered, or will enter, into an agreement or agreements amongst themselves to address the distribution of all costs of development including those which may not be recoverable by the Municipality under the Development Charges Act, 1997, or any successor legislation, particularly but not limited to the provision of community and infrastructure facilities such as parks, roads, road improvements, external services, stormwater management facilities, public/private utilities and school sites. 12.1.9 In order to implement Policy 12.1.8, the Municipality shall include conditions of Draft Plan Approval that may require the benefitting landowners to enter into agreements with other benefitting landowners with respect to the provision of servicing. If a benefitting landowner chooses not to enter into such agreements, it is the Municipality’s intention that no development shall be permitted until it has been demonstrated that the benefitting landowner has entered into required agreements with other affected landowners with respect to the prov ision of services and other infrastructure. 12.1.10 Landowners are encouraged to enter into a Master Parkland Agreement with the Municipality prior to the approval of any draft plan of subdivision. The Master Parkland Agreement shall identify the minimum size and general location of parks that shall be provided and dedicated in accordance with Schedule A 12.1.11 The Municipality will require, as a condition of draft approval, that proof be provided to the Municipality that landowners have satisfied all their parkland obligations with respect to the Master Parkland Agreement prior to registration of a plan of subdivision. 12.2 Interpretation 12.2.1 The Soper Hills Secondary Plan has been prepared to align with the policies of the Official Plan. The policies of this Secondary Plan, along with Maps and Soper Hills Secondary Plan-Draft 35 Appendices shall be read and interpreted in conjunction with the applicable policies of the Official Plan. 12.2.2 In the event of a conflict between the Official Plan and this Secondary Plan, the policies of the Secondary Plan shall prevail inclusive of density and intensification policies of the Official Plan. 12.2.3 The pattern of land use is identified in Schedule A of the Secondary Plan. Minor alterations to the boundaries of land use designations and location of symbols, which maintain the general intent of the policies of this Secondary Plan, may occur without amendment to this Secondary Plan through the developme nt approval process in accordance with Section 24.1 of the Official Plan. 12.2.4 Where examples of permitted uses are listed under any specific land use designation, they are intended to provide examples of possible uses. Other similar uses may be permitted provided they conform to the intent and all applicable provisions of this Secondary Plan. CP NP NP NP P P Schedule A - Land UseLegend High Density/Mixed Use Regional Corridor Community Park Neighborhood Park Elementary School StormwaterManagement Facility (SWF)Parkette Neighbourhood Centre P Environmental Protection Areas Collector Roads Arterial Roads Potential Cultural Heritage Resources Prominent Intersection SHSP Boundary NP CP - Soper Hills Secondary Plan -WatercourseMedium Density Residential Railway MAY 2025Low Density Residential Concession Street East Providence RoadLambs RoadRegional Highway 2 Draft Legend Collector Roads Potential Local Road Connection Additional Area of Further Study Schedule B - Environmental Constraint and Transportation SHSP Boundary Environmental Protection Areas Environmental Constraint:Vegetation Protection Zone Environmental Constraint:Low Constraint Areas - Soper Hills Secondary Plan - Multi-Use Path Arterial B Arterial C Concession Street East Providence RoadLambs RoadRegional Highway 2 Headwater Drainage Features Protection Conservation Watercourse MAY 2025 Off-Road Trail Draft