Loading...
HomeMy WebLinkAboutPDS-026-25Public Meeting Report If this information is required in an alternate accessible format, please contact the Accessibility Coordinator at 905-623-3379 ext. 2131. Report To: Planning and Development Committee Date of Meeting: June 19, 2025 Report Number: PDS-026-25 Authored By: Submitted By: Reviewed By: File Number: Report Subject: Amanda Crompton, Principal Planner Darryl Lyons, Deputy CAO, Planning and Infrastructure Services Mary-Anne Dempster, CAO COPA2025-0005 (PLN 41.7) Resolution#: Courtice Transit-Oriented Community Secondary Plan Statutory Public Meeting Purpose of Report: The purpose of this report is to provide information and seek input from the public and Council regarding the draft Courtice Transit-Oriented Community Secondary Plan. It does not constitute, imply or request any degree of approval. Recommendations: 1.That Report PDS-026-25 and any related communication items be received; 2.That any received comments be considered during preparation of the recommended Courtice Transit-Oriented Community Secondary Plan and Urban Design and Sustainability Guidelines; 3.That Staff report back to Council with a Recommendation Report, including the Official Plan Amendment for the Courtice Transit-Oriented Community Secondary Plan; and, 4.That all interested parties listed in Report PDS-026-25 and any delegations be advised of Council’s decision. Municipality of Clarington Page 2 Report PDS-026-25 Report Overview This report provides an overview of the planning process for the draft Courtice Transit - Oriented Community (Secondary Plan), details key policy directions and summarizes public and agency comments received to date. The Secondary Plan includes principles, objectives and policies intended to create a complete, inclusive, and sustainable community that accommodates a diverse population through a mix of medium and high-density housing. The Courtice GO Station presents a unique opportunity for this area to evolve into a transit -oriented community, supported by active commercial streets, community amenities, green spaces and a connected network of streets, trails and transit. The purpose of the Statutory Public Meeting is to obtain comments from the public, members of Council, landowners, and commenting agencies on the Secondary Plan. These comments will inform revisions to the Secondary Plan before it’s recommended to Council in Fall 2025. 1. Background 1.1 The draft Courtice Transit-Oriented Community Secondary Plan (Secondary Plan) is a new Secondary Plan for a mostly undeveloped area that will feature the future Courtice GO Station and the surrounding Protected Major Transit Station Area. 1.2 The Secondary Plan and accompanying Urban Design and Sustainability Guidelines provide detailed direction on how the area will grow and develop over time. The Secondary Plan will capitalize on the future Courtice GO Station by creating a complete mixed-use community with high-density housing, jobs, amenities, and open space. 1.3 The preparation of a Secondary Plan follows the same procedures as an Official Plan Amendment under the Planning Act. This includes the preparation of supporting technical studies, public engagement, a statutory public meeting, and Council a doption. 1.4 The Province is the approval authority for this Secondary Plan as the Official Plan Amendment establishes policies for a Protected Major Transit Station Area (PMTSA). 2. Courtice Transit-Oriented Community Secondary Plan 2.1 The Secondary Plan is located south of Bloor Street, north of Highway 401, east of Robinson Creek, and west of Tooley Creek and Highway 418, as shown in Figure 1. The Secondary Plan area is almost 400 hectares in size and surrounded by the Southwest Courtice, Southeast Courtice, and Courtice Waterfront and Energy Park Secondary Plans. Municipality of Clarington Page 3 Report PDS-026-25 2.2 Currently, the Secondary Plan area is comprised of natural features, farmland, and industrial and commercial uses along Baseline Road. The greenfield nature of the area presents a unique opportunity to create a vision for a new transit-oriented community. Figure 1: Courtice Transit-Oriented Community Secondary Plan Area Initiation of the Secondary Plan 2.3 The Secondary Plan was originally initiated in 2018 as the Courtice Employment Lands Secondary Plan. The area had been designated for employment uses and was envisioned as a major employment and innovation centre. 2.4 In December 2021, the Region of Durham adopted Regional Official Plan Amendment 186, which delineated seven PMTSAs, including the future Courtice GO Station. The Courtice GO Station PMTSA includes lands north and south of the GO Station and must Municipality of Clarington Page 4 Report PDS-026-25 be planned to achieve a minimum density of 150 people and jobs per hectare to support transit service. 2.5 At the same time, the Region endorsed employment land conversions within the Secondary Plan area. The vision for the Secondary Plan changed from an employment and innovation centre to a mixed-use, transit-supportive and complete community. 2.6 Recently, the Secondary Plan area boundary was slightly expanded to include some lands east of Courtice Road and south of Bloor Street that are designated Community Areas within the 2051 Urban Expansion Areas overlay in the Durham Region Official Plan (ROP). Lands within the 2051 Urban Expansion Areas were added to the Urban Boundary through the latest Regional Municipal Comprehensive Review, Envision Durham, approved by the Province in late 2024 and represent new land within the urban system for the purpose of facilitating development. 2.7 The ROP directs that detailed planning for lands within the 2051 Urban Expansion Areas be done primarily through secondary plans. Expanding the boundary to include these lands (approximately 15 hectares) supports a coordinated approach to planning for residential lands near the future Courtice GO Station. The lands will be addressed by all technical studies to ensure infrastructure is appropriately planned to service the expanded area. 2.8 The draft Official Plan Amendment (Attachment 1) will amend the Clarington Official Plan to add a new Courtice Transit-Oriented Community Secondary Plan (Attachment 2) and amend the Regional Official Plan to remove a portion of the 2051 Urban Expansion Areas overlay and modify the PMTSA boundary slightly to limit its extension east of the Tooley Creek Valley. 2.9 The Secondary Plan is supported by Urban Design and Sustainability Guidelines (UDSG) (Attachment 3) that are intended to help implement the urban design and sustainability policies of the Clarington Official Plan and this Secondary Plan. 3. Secondary Plan Process 3.1 Development of the Secondary Plan was informed by a comprehensive public engagement program and several technical background studies. 3.2 The Secondary Plan process for the Courtice Transit-Oriented Community involves four phases as described below.  Phase 1 (Initial Engagement and Analysis) focused on conducting background research and technical analysis to inform the development of three land use options. An initial Public Information Centre was held on June 18, 2019 , and this phase was concluded with a Public Information Centre held on September 29, 2020. Municipality of Clarington Page 5 Report PDS-026-25  Phase 2 (Principles and Land Use Option) involved the preparation of land use options illustrating different arrangements of open spaces and land uses. The land use options were shared through multiple engagement events, including a Public Information Centre and a Stakeholder Workshop, both held on March 22, 2022.  Phase 3 (Preferred Land Use Plan and Draft Deliverables) resulted in the development of a preferred land use plan and key policy directions. On May 29, 2023 a design workshop was held with the Courtice Transit -Oriented Community Landowner Group. The preferred land use plan and key policy directions were presented at a Public Information Centre on November 6, 2023.  Phase 4 (Finalize Deliverables) will focus on the preparation of the draft and final Secondary Plan and Urban Design and Sustainability Guidelines. This includes the Statutory Public Meeting and Recommendation Report. In addition, the technical studies will be finalized along with the integrated Environmental Assessment report. 3.3 Public engagement included four Public Information Centres held between June 18, 2019 and November 6, 2023, and landowner workshops held throughout the process. Feedback received over the last several years was used to inform the creation of this Secondary Plan. Attachment 4 provides a summary of the engagement activities and notice procedures completed to date. Staff have also provided background information and copies of notice materials for input and comment to each Indigenous community with rights and interests in the area. 3.4 All comments submitted on the Secondary Plan will be addressed in a future Recommendation Report to Council. Technical Studies 3.5 Preliminary technical background work was completed in 2022 to evaluate the land use options based on transportation, servicing, land use and other technical analysis in tandem with the Municipal Class Environmental Assessment (MCEA) process. A draft Functional Servicing Report has been prepared, and the draft Transportation Impact Study is expected shortly. These studies will be finalized based on agency, staff and public comments prior to recommendation. Attachment 5 provides a summary of the technical work that was completed to date. 3.6 A MCEA is required for all new or realigned major roads needed to service the Secondary Plan. The MCEA is being completed using the ‘Integrated Approach’ which jointly satisfies the requirements of the Planning Act and the Environmental Assessment Act. All public notices, communications and review periods have been designed to ensure that they conform to the requirements of both the Planning Act and the Environmental Assessment Act. Municipality of Clarington Page 6 Report PDS-026-25 3.7 Council adopted the Robinson Creek and Tooley Creek Subwatershed Study in 2023, and an associated flood mitigation study was completed which refined the flood plain limits in the Secondary Plan area. 3.8 In addition, individual landowners have submitted Environmental Impact Studies (EIS), which provide additional information to support the modification of the Environmental Protection Area. Some of these studies are still underway and being reviewed by Staff. Further refinements to the Environmental Protection Area may occur prior to recommendation. 4. Secondary Plan Vision and Framework 4.1 The Courtice Transit-Oriented Community is envisioned to evolve as a complete, inclusive, and sustainable community that accommodates a diverse population through a mix of housing, employment and community amenities. Serviced by the future Courtice GO Station, this area in Clarington is well-suited to accommodate medium and high-density housing that is accompanied by active commercial streets, community amenities, green spaces and a connected network of streets, trails and transit. 4.2 The policy framework in the Secondary Plan is guided by these nine principles: 1. Protect, enhance, and value significant natural features 2. Conserve and integrate the area’s cultural heritage 3. Optimize planned rapid transit facilities 4. Build a welcoming and inclusive community with a range of housing types at all levels of affordability 5. Accommodate a range of businesses 6. Create an accessible, walkable and bikeable community 7. Ensure all residents have access to parks, schools and other community facilities 8. Ensure climate change mitigation and adaptation are critical considerations in planning, design and construction, and strive to achieve net zero carbon emissions 9. Coordinate the phasing of private development and public investments 4.3 The Land Use Plan (Figure 2) identifies the distribution of land uses and the policies in the Secondary Plan describe their planned function, land use and built form permissions, minimum and maximum height allowances and minimum density. 4.4 The Courtice Transit-Oriented Community is centred on the future Courtice GO Station. The built form surrounding the future Courtice GO Station must be designed to support the significant investment being made to extend rail service to Clarington. 4.5 The lands designated Mixed Use Core, located around the future Courtice GO station, will be the area for the highest density of development, the tallest buildings and the greatest range of uses. This will be the place to find a variety of options for housing, Municipality of Clarington Page 7 Report PDS-026-25 working, shopping, dining and entertainment. Development will be less intense at the edges of the core to provide a transition to lower-scale neighbourhoods (lands designated Mixed Use Transition Area). 4.6 Low density and medium density residential neighbourhoods, with neighbourhood- oriented commercial amenities, will be located north and west of the Mixed Use Core and Mixed Use Transition Area. 4.7 Lands south of the rail corridor, adjacent Highway 401, will be maintained mostly for industrial uses that benefit from convenient highway access to broaden employment opportunities for Courtice residents. Complementing the Clarington Energy Park, these areas will provide a stable environment for the growth of established and new businesses that diversify Clarington’s economy. 4.8 The Secondary Plan is surrounded by the valleylands of Robinson Creek and Tooley Creek, which provide a rich green setting for the community. Municipality of Clarington Page 8 Report PDS-026-25 Figure 2: Schedule A - Land Use Plan Municipality of Clarington Page 9 Report PDS-026-25 4.9 To complement the Land Use Plan, the Parks and Community Facilities Plan (Figure 3) identifies the approximate location and size of parks and schools, conceptual trail network and key active transportation connections and the intended location for community facilities. 4.10 Future residential and mixed-use neighbourhoods will be centred on four Neighbourhood Parks to ensure most residents are within short walking distance of public green space. In addition, a central Special Park will serve the Courtice Transit- Oriented Community and is expected to be a civic destination for all Courtice residents. 4.11 Six elementary schools and two secondary schools are planned for in the Courtice Transit-Oriented Community. The preferred locations for potential schools are shown on the Land Use Plan (Figure 2) and Parks and Community Facilities Plan (Figure 3). The Secondary Plan includes policies that provide flexibility regarding the site and size of future schools. If a school is relocated or not needed, the underlying land use designation will apply. Final locations and configurations of school sites will be determined at the development application stage. 4.12 Multi-use paths and mid-block connections throughout the community will further contribute to a connected green framework for development. 4.13 The preferred location for a library, a recreation centre, and major cultural facilities is identified as Preferred Location for Other Central Community Facilities in the Mixed Use Core designation. Locating these facilities centrally will reinforce the civic and cultural heart of the Courtice Transit-Oriented Community. Municipality of Clarington Page 10 Report PDS-026-25 Figure 3: Schedule B - Parks and Community Facilities Municipality of Clarington Page 11 Report PDS-026-25 4.14 The Roads and Active Transportation Network Plan (Figure 4) identifies the road classification, key active transportation connections, and a zone for transit facilities related to the future Courtice GO Station. 4.15 In addition to the roads identified in Figure 4, development will be structured by an interconnected and grid-like network of local roads that facilitate direct pedestrian, cyclist, transit, and vehicular movement throughout the community. 4.16 Between Trulls Road and Courtice Road, a continuous north -south landscaped multi- use path will function as a green active transportation corridor that connects neighbourhoods, parks and forests in the north half of the PMTSA to the future Courtice GO Station and other destinations in the south half. In the long term, the green spine may be extended to the Courtice W aterfront via a pedestrian/bicycle bridge over Highway 401. Municipality of Clarington Page 12 Report PDS-026-25 Figure 4: Schedule C - Roads and Active Transportation Network Municipality of Clarington Page 13 Report PDS-026-25 4.17 The Secondary Plan is supported by Urban Design and Sustainability Guidelines (UDSG) (Attachment 5) that are intended to help implement the urban design and sustainability policies of the Clarington Official Plan and this Secondary Plan. 4.18 The UDSG provide further direction and guidance on policy intentions respecting urban design, streetscapes, built form and environmental sustainability. 5. Policy Directions 5.1 The future Courtice GO Station presents an exciting opportunity for this area of Courtice to evolve into a mixed-use community that offers inviting places to live, work and play. Key policy directions of the Secondary Plan are detailed below. Environmental protection, green development and energy innovation is foundational to the Secondary Plan 5.2 Consistent with the Clarington Official Plan, the draft policies prioritize the protection and enhancement of natural heritage features that surround the Secondary Plan area. 5.3 Development in the Secondary Plan is encouraged to meet high standards for energy efficiency and sustainability in building design and construction. Development applications will be required to include a Sustainability Report that indicates how the development meets the sustainable development policies and objectives contained within the Secondary Plan and Clarington Official Plan. 5.4 The Municipality of Clarington, in close collaboration with the Region of Durham, is exploring the feasibility of a district heating system for the Secondary Plan area. The draft policies require new development in the Mixed Use Core, and encourage development outside the Mixed Use Core, to connect to the district heating system once established. A mix of high-density uses are concentrated close to the future Courtice GO Station 5.5 The arrival of GO Train service to Courtice is a catalyst for higher density development within the Secondary Plan area. The presence of this major transportation hub will stimulate travel into and out of the Municipality. 5.6 Minimum densities for the residential and mixed-use designations are set out in the Secondary Plan to ensure a density of 150 people and jobs per hectare within the PMTSA is achieved over time. The Secondary Plan area is planned to accommodate close to 30,000 residents and a range of jobs for more than 8,000 workers. The density is supported by direct connections to the station that encourage the use of transit for daily trips. Municipality of Clarington Page 14 Report PDS-026-25 5.7 The built form proposed for this community is unlike the current Courtice context . The station and surrounding lands provide a focus for high -density housing, office development and commercial amenities that, together with a pedestrian-friendly public realm, contribute to creating a unique mixed-use district. 5.8 To help facilitate this unique mixed-use district, the Secondary Plan includes a policy requiring buildings fronting Street C and Farmington Drive within the Mixed Use Core to contain retail, restaurants or commercial services for a minimum of 70% of the frontage on the ground floor. 5.9 In addition, office and institutional uses are strongly encouraged, and in some cases required (a minimum of 10% of the total gross floor area), in the Mixed Use Core. The Secondary Plan protects for the future Courtice GO Station 5.10 The future development of the Courtice Transit-Oriented Community is based on the expectation that it will be anchored by a GO Train Station. 5.11 On December 4, 2023, the Ontario Government passed the GO Transit Station Funding Act, 2023. The GO Transit Station Funding Act provides a new funding tool to enable municipalities to raise revenues to help design and build new GO Transit stations through the implementation of a Transit Station Charge on new development in the surrounding area. 5.12 The Municipality has been working closely with the Region to develop a framework for implementation; however, the Province has yet to release the associated regulations. 5.13 The Secondary Plan includes a policy that indicates Council may impose a transit station charge against land to pay for costs related to the construction of the GO Station. 5.14 To ensure adequate land is set aside for transit facilities related to the GO Station, the Secondary Plan identifies as Transit Facilities Zone. This zone, north of the rail corridor, is the preferred location for transit facilities related to the GO station, including commuter parking, passenger pick-up and drop-off areas, bus terminals and the GO station building itself. The portion of the Transit Facilities Zone south of the rail corridor is not reserved for only transit facilities but opportunities to integrate such facilities will be considered before future applications are approved. The Secondary Plan promotes a diverse range of housing types at all levels of affordability 5.15 To meet the needs of a diverse population, the Secondary Plan includes a collection of policies intended to support the Municipality’s housing objectives. Policies in the Municipality of Clarington Page 15 Report PDS-026-25 Secondary Plan strongly encourage the integration of affordable housing, including subsidized non-market housing units. 5.16 In addition, the Secondary Plan proposes a range of housing forms, sizes and tenures across the community, and even within multiple-unit buildings. For example, a minimum of 25 percent of units within a building must be two or more bedrooms. 5.17 There are limited tools available to the Municipality to require the delivery of affordable housing units; however, as a portion of the Secondary Plan is delineated a PMTSA, inclusionary zoning is one available tool. 5.18 The Secondary Plan outlines that the Municipality will undertake an inclusionary zoning Municipal Assessment Report in compliance with Provincial regulations to determine the feasibility of implementing inclusionary zoning in the Secondary Plan area. Depending on the results of the Municipal Assessment Report, the Secondary Plan may be updated to implement inclusionary zoning requirements. 5.19 To further support the provision of affordable housing, the Municipality will explore potential incentives such as reduced application fees and fast-tracked application approvals. 5.20 Staff will use the affordable housing policies included within the Clarington Official Plan and Secondary Plan to negotiate the delivery of affordable housing at the development application stage. Parks, schools and other amenities are strategically located to service future residents 5.21 The Secondary Plan strategically locates four major Neighbourhood Parks and three smaller Neighbourhood Parks within a short walking distance of most residents. Of the seven neighbourhood parks shown in the Secondary Plan, six are co-located with elementary schools, which facilitates sharing of open spaces and parking. 5.22 A central Special Park will serve the entire Courtice Transit-Oriented Community, acting as a multi-purpose space for events. Other community amenities, such as a library, recreational centre and/or cultural facilities, are encouraged to be located in (no more than 20% of the park area) and directly surrounding the Special Park . 5.23 In addition, five Parkettes are shown in the Mixed Use Core and/or Mixed Use Transition Area to facilitate passive recreational opportunities and provide places for people to gather and socialize in an urban setting. 5.24 Planning for parks and other community amenities within the Secondary Plan was guided by Clarington’s Park, Recreation and Culture Master Plan (PRCMP). The PRCMP recommends maximizing physical park dedication in Secondary Plan Areas Municipality of Clarington Page 16 Report PDS-026-25 and suggests working with landowners within Secondary Plan Areas to create a master parks agreement. The Secondary Plan includes a policy that encourages landowners to enter into a Master Parkland Agreement with the Municipality to ensure parks are planned community-wide, rather than on a site-by-site basis. Existing and future industrial-type employment is protected 5.25 On October 20, 2024, the new Provincial Planning Statement, 2024 (PPS, 2024) came into effect, integrating and replacing the existing Provincial Policy Statement, 2020 and the A Place to Grow – Growth Plan for the Greater Golden Horseshoe, 2020 (Growth Plan, 2020) into a single, Province-wide policy document. The PPS, 2024 includes a narrowed definition of ‘employment area’ relative to how Clarington has been defining employment areas as prescribed by the Growth Plan. The PPS, 2024 definition is consistent with that recently implemented in the Planning Act (through Bill 97), and permits industrial, manufacturing, and warehousing uses, but excludes institutional and commercial uses, including office and retail. 5.26 Prior to these changes, all of Clarington’s Employment Area designations in the Official Plan were considered protected. Requests to convert lands to another land use designation had to be done through a Municipal Comprehensive Review of Clarington’s employment needs over the long term and the decision by Council on convers ion requests was final (protected from appeal). 5.27 For Clarington’s employment areas to continue to benefit from the current employment protection provisions, land use permissions for these areas need to align with the new Provincial definitions. For this reason, the land use permissions in the Light Industrial and General Industrial designations have been narrowed to only include manufacturing facilities, warehousing and distribution facilities and ancillary office and retail. 5.28 The Secondary Plan does include a Business District designation that is planned to accommodate a variety of non-residential uses, such as office, hotel, and institutional. This designation does not align with the new definition of employment area. 5.29 As part of the Official Plan Review an Employment Study will be undertaken to comprehensively assess employment areas and lands to ensure Clarington is able to accommodate the 2051 employment forecasts assigned in the Durham Region Official Plan. 5.30 Until this comprehensive Employment Study is complete, staff believe it is appropriate to protect the lands as employment area by amending the list of permitted uses in the employment designations to align with the narrowed definition described in paragraph 5.25. Council’s decision on requests to convert lands within employment areas are protected from appeal to the Ontario Land Tribunal (OLT). Municipality of Clarington Page 17 Report PDS-026-25 6. Conformity with Provincial Planning Framework Planning Act 6.1 The Planning Act is Provincial legislation that sets out the framework and rules for land use planning in Ontario. Section 2 of the Planning Act outlines matters of Provincial Interest, including: the protection of ecological systems, the provision of a full range of housing, including affordable housing, the provision of employment opportunities, the appropriate location of growth and development, the promotion of development that is designed to be sustainable, to support public transit and to be oriented to pedestrians and the promotion of public spaces that are of high quality, safe, accessible, attractive and vibrant. 6.2 The Secondary Plan has been developed to align with these matters of Provincial Interest by protecting the natural heritage system, promoting housing diversity, encouraging affordable housing, protecting an employment area for light and general industrial uses, focusing density at the core to encourage the use of public transit, walking and cycling and planning for a connected network of public spaces that are safe, accessible and inviting. Provincial Planning Statement, 2024 6.3 The Provincial Planning Statement (PPS, 2024) lays out the Province's overarching direction on matters related to land use planning and development. It directs municipalities to plan healthy, livable, and safe communities by accommodating an appropriate range and mix of housing types. 6.4 On October 20, 2024 the new PPS, 2024 came into effect, integrating and replacing the existing Provincial Policy Statement, 2020 and the Growth Plan, 2020 into a single, Province-wide policy document. 6.5 The PPS, 2024 directs growth to settlement areas and promotes compact urban forms that efficiently use land and existing infrastructure. Complete communities with a range and mix of land uses, housing options, and transportation options should be planned to support accessibility for people of all ages, abilities, and incomes. In addition, the PPS, 2024 specifies a minimum density target of 150 residents and jobs combined per hectare for major transit station areas served by commuter or regional rail. 6.6 The Secondary Plan proposes the creation of a compact and complete community, with the highest densities located around the future Courtice GO station. Minimum densities are included in each land use designation to ensure a minimum density of 150 people and jobs per hectare is achieved within the PMTSA. Municipality of Clarington Page 18 Report PDS-026-25 6.7 The PPS, 2024 also directs municipalities to support the economy by protecting for employment uses and identifying strategic sites for employment. The PPS, 2024 definition of Employment Area includes manufacturing, warehousing, goods movement, and associated ancillary uses. The Light Industrial and General Industrial land use designations are considered Employment Areas, which will ensure that they are protected. 6.8 While the PPS, 2024 allows private requests to remove lands from an Employment Area at any time (i.e., outside of a Municipal Comprehensive Review), Council’s decision on employment area conversion requests continue to be protected from appeal to the OLT. 7. Conformity with Official Plans Durham Region Official Plan 7.1 The Durham Region Official Plan (ROP), Envision Durham, guides growth and change within the Region. It sets out a framework for managing growth in an orderly fashion and creating healthy and complete, sustainable communities. As of January 1, 2025, the Municipality is responsible for implementing the ROP. 7.2 Lands in the Secondary Plan area are designated PMTSA, Community Areas, Major Open Space Areas and Employment Areas in the ROP. In addition, lands east of Courtice Road have a Regional Corridor overlay and a 2051 Urban Expansion Areas overlay. 7.3 The Secondary Plan conforms with the policies related to PMTSAs. This includes policies that plan for a minimum 150 people and jobs per hectare, permit a range of uses including medium and high density residential, office, institutional, and commercial, and community amenities, and promote sustainable transportation by designing roads to prioritize transit use, pedestrian travel, and cycling. 7.4 Community Areas are intended to be developed as complete communities and provide a range of housing, transportation and lifestyle choices, and create opportunities for residents to live, shop, work and access services and amenities within the community. Major Open Space Areas form a component of the Region’s Greenlands System. The Secondary Plan is in conformity with the ROP as it permits low and medium density residential in the Community Areas (which are located outside the PMTSA), along with parks, open space and schools, to foster a complete community and designates the Major Open Space Areas as Environmental Protection Area. 7.5 Employment Areas are intended for uses such as manufacturing, warehousing, storage, major facilities, and other uses that require access to highway, rail, shipping facilities, and separation from sensitive land uses. The ROP requires that designated Employment Areas adjacent major highway interchanges be protected and preserved. Municipality of Clarington Page 19 Report PDS-026-25 As described in this Report, the Secondary Plan includes land use designations and policies intended to protect lands within the Employment Areas as employment for the long-term. Uses are restricted to industrial, manufacturing and warehousing in keeping with the updated provincial policy framework to protect and preserve the area for employment. 7.6 The draft Official Plan Amendment (Attachment 1) amends the Regional Official Plan by removing a portion of the 2051 Urban Expansion Areas overlay to correspond with the Secondary Plan boundary expansion. The expansion supports a coordinated approach to planning for residential lands near the future Courtice GO St ation as described in paragraph 2.7. Clarington Official Plan 7.7 The Clarington Official Plan (OP) provides a vision for future growth and development of the Municipality to the year 2031. The OP focuses on the principles of sustainable development, healthy communities, and growth management. New neighbourhoods will be walkable, provide a variety of uses, and create a sense of place. Economic vitality will be supported by a diverse economy. 7.8 Lands in the Secondary Plan are currently designated General Industrial Area, Light Industrial Area, Prestige Employment Area, Transportation Hub, Regional Corridor and Environmental Protection Area. In addition, the lands form Special Study Area 4 and include Special Policy Area D. 7.9 As outlined in paragraphs 2.4 and 2.5 of this Report, in late-2021 the Region delineated the Courtice GO Station PMTSA and endorsed employment land conversions within the Secondary Plan area. The vision for the Secondary Plan evolved from an employment centre to a mixed-use, transit-supportive, and complete community. The purpose of the draft Official Plan Amendment is to add the Courtice Transit-Oriented Community Secondary Plan to the OP and bring the OP into conformity with the ROP. 8. Comments Public Comments 8.1 Development of the Secondary Plan was informed by extensive public engagement that occurred throughout the planning process. Public comments and feedback were collected through in-person and virtual events. A summary of the public comments received since 2019 is provided in Attachment 4. 8.2 Public comments generally support the vision and objectives presented in the Secondary Plan. There was support among the comments received for a concentration of higher-density residential and mixed-use buildings around the future Courtice GO Municipality of Clarington Page 20 Report PDS-026-25 Station. A range of feedback was received when participants were asked to ide ntify appropriate heights for buildings near the future GO Station. Many participants indicated support for buildings up to 20 storeys. Building heights of more than 40 storeys received the second highest amount of support. 8.3 In addition, support was expressed for including a range of business and employment opportunities in the Courtice Transit-Oriented Community. There was some concern surrounding potential impacts of development on existing businesses and a desire to ensure existing and future small businesses are supported. 8.4 Members of the public expressed support for affordable housing options and rental opportunities being included in the Courtice Transit-Oriented Community. 8.5 Comments also emphasized the importance of improving access to local public transit and increasing connectivity for cyclists and pedestrians. Steering Committee Comments 8.6 The Steering Committee is made up of staff from Clarington, Durham Region, Central Lake Ontario Conservation Authority (CLOCA), Metrolinx, Kawartha Pine Ridge District School Board, the Peterborough Victoria Northumberland and Clarington Catholic District, and the Courtice Transit-Oriented Community Landowner Group. 8.7 Steering Committee meetings are held on a regular basis to provide upda tes on the Secondary Plan and seek feedback. The last Steering Committee meeting was held on April 10, 2025 to present the Secondary Plan , which was informed by comments received from the Steering Committee in 2024. 8.8 The latest comments from the Region of Durham include concerns with the status of the Transportation Impact Study. The Transportation Impact Study is underway and will be circulated to the Region of Durham. The Secondary Plan will not be finalized until the Transportation Impact Study is completed. Additional comments from the Region of Durham on the Secondary Plan are expected. 8.9 Comments received from CLOCA indicate general satisfaction that the Secondary Plan sufficiently addresses their concerns. 8.10 Joint comments from the Kawartha Pine Ridge District School Board and the Peterborough Victoria Northumberland and Clarington Catholic District are generally supportive of the Secondary Plan. The School Board’s comments suggest minor refinements to policies to ensure that schools are adequately sized based on the needs of schools, childcare centres, and community facilities. It was also suggested that that shared outdoor play space between school boards, community facilities, and municipalities be clearly supported. Municipality of Clarington Page 21 Report PDS-026-25 8.11 Staff have been working closely with the Courtice Transit-Oriented Community Landowner Group and have made revisions, as appropriate, to address their comments. Staff will continue working with the Landowner Group as the Secondary Plan is finalized. 8.12 Additional feedback received from the Steering Committee will be incorporated into the revised version of the Secondary Plan that will be recommended to Council. 9. Next Steps 9.1 Following the Statutory Public Meeting, staff will review comments received and propose revisions, as appropriate, for inclusion in the recommended Secondary Plan. Technical studies, including the Functional Servicing Report and Transportation Impact Study, will be reviewed and finalized as appropriate. 9.2 A report will be prepared that presents the recommended Secondary Plan. Upon adoption, the Secondary Plan will be forwarded to the Province for approval. 10. Financial Considerations 10.1 The Clarington Official Plan requires that a Fiscal Impact Analysis (FIA) be undertaken for Secondary Plans to understand the long-term financial impacts of proposed development. The FIA will be completed in advance of staff reporting back to Council with a Recommendation Report. 11. Strategic Plan 11.1 The preparation of the draft Courtice Transit-Oriented Community Secondary Plan directly addresses the following actions in the 2024-2027 Clarington Strategic Plan:  C.1.1.2 Update Secondary Plan policies to include connectivity considerations and work to address gaps  C.1.2.1 Support the development of the Major Transit Station Areas  C.2.2.1 Identify the range of housing needed  G.2.1.3 Update and complete identified Secondary Plans 12. Climate Change 12.1 The Secondary Plan has been planned with sustainability as a key priority. The Secondary Plan contains policies that facilitate and integrate opportunities for renewable Municipality of Clarington Page 22 Report PDS-026-25 and district energy and encourage high standards for energy efficiency and high- performance building envelopes. In addition, the Secondary Plan proposes a dense built form that supports transit use, efficiently uses land, and preserves natural areas. 13. Concurrence Not applicable. 14. Conclusion 14.1 The purpose of this staff report is to provide an overview of the planning app roach and process undertaken to develop the Secondary Plan. The report also details the vision, guiding principles, and key policy directions of the Secondary Plan. 14.2 The Secondary Plan lays out a framework to develop a complete, sustainable and mixed-use community with high-density housing, jobs, amenities, and greenspace. 14.3 Staff request that the recommendations be approved and the process towards completion of the Secondary Plan continue. Staff Contact: Amanda Crompton, Principal Planner, 905-623-3379 ext. 2444 or acrompton@clarington.net; Lisa Backus, Manager of Community Planning, 905-623-3379 ext. 2419 or lbackus@clarington.net. Attachments: Attachment 1 – Draft Official Plan Amendment Attachment 2 – Draft Courtice Transit-Oriented Community Secondary Plan Attachment 3 – Urban Design and Sustainability Guidelines Attachment 4 – Engagement Summary Attachment 5 – Summary of Technical Studies Interested Parties: List of Interested Parties available from Department. Amendment No. to the Durham Region Official Plan and Clarington Official Plan Purpose: The purpose of this Amendment is to include the new Courtice Transit-Oriented Community Secondary Plan in the Clarington Official Plan. This Secondary Plan will facilitate the development of a sustainable, livable and inclusive community in south Courtice. The Secondary Plan includes Urban Design and Sustainability Guidelines, which are not an operative part of the Clarington Official Plan. Key to this Secondary Plan area is the future Courtice GO Transit Station and delineation of a portion of the Secondary Plan area as a Protected Major Transit Station Area (PMTSA), which will be the focus for high-density mixed-use development. The presence and protection of the Robinson Creek and Tooley Creek valleys and the associated natural environment is also a primary objective. The Secondary Plan area will further include office and commercial development, industrial and institutional uses, community facilities, and residential units in high-rise, mid-rise and low-rise forms. This mix of uses will allow people to live close to jobs and to meet many needs locally, while having access to a range of amenities. Location: This Amendment applies to an approximately 400-hectare area generally bounded by the Robinson Creek Valley in the west, the Tooley Creek Valley in the east, the Southeast Courtice Secondary Plan area in the north and Highway 401 in the south. Basis: Clarington Council authorized the commencement of this Secondary Plan at a public meeting in June 2018. The Secondary Plan has been prepared in anticipation of a new GO Station in an area of Courtice that is largely undeveloped, except for industrial and commercial uses along Baseline Road, which presents a unique and exciting opportunity to create a vision for a new transit- oriented community. The Secondary Plan vision and policies will guide growth and transformation of the area into a new mixed -use, transit-supportive and complete community in south Courtice. This Amendment is based on extensive technical study and public engagement. It incorporates recommendations of the Robinson Creek and Tooley Creek Subwatershed Study and has been informed by a Land Use and Urban Design Analysis, a Functional Servicing Study, a Traffic Impact Study and Environmental Impact Studies. Public and landowner input was received through Public Information Centres held in June 2019, September 2020, March 2022 and November 2023. The Steering Committee’s input also provided direction for the Secondary Plan. Actual Amendment: Unless otherwise indicated, in the Amendment, newly added text is shown with underlining, and deleted text is shown with a strike- through. The Region of Durham Official Plan is hereby amended as follows: 1. Existing Region of Durham Official Plan, Map 1 Regional Structure – Urban and Rural Systems, is amended by removing a portion of the 2051 Urban Expansion Areas overlay to correspond with the Courtice Transit-Oriented Community Secondary Plan area boundary as shown on Exhibit A attached hereto and forming part of this amendment. 2. Existing Region of Durham Official Plan, Map 1 Regional Structure – Urban and Rural Systems, is further amended by slightly revising the Courtice Protected Major Transit Station Area boundary to limit the boundary from extending east of the Tooley Creek Valley. The Clarington Official Plan is hereby amended as follows: 3. By amending existing Policy 4.3.5 by adding “Protected Major Transit Station Areas” following “Transportation Hubs” to the list of Intensification Areas and deleting reference to Courtice and Bowmanville as follows: “4.3.5 The Priority Intensification Areas have been identified as the primary locations to accommodate growth and the greatest mix of uses, heights and densities. Priority Intensification Areas include: • Urban and Village Centres; • Regional and Local Corridors; • Courtice and Bowmanville Transportation Hubs and Protected Major Transit Station Areas; and • Port Darlington and Port of Newcastle Waterfront Places.” 4. By amending existing Table 4-2 as follows: Table 4-2 Durham Region Long Term Targets General Locational Criteria Minimum Gross Density (Units Per Gross Hectare) Floor Space Index Urban Centres 75 2.5 Village Centre 30 1.0 Regional Corridors 60 2.5 Local Corridors 30 2.0 Courtice and Bowmanville Transportation Hubs 75 2.5 Courtice Protected Major Transit Station Area 150 2.5 Port Darlington and Port of Newcastle Waterfront Places 60 2.0 5. By amending existing Table 4-3 as follows: Table 4-3 Summary of Urban Structure Typologies General Locational Criteria Minimum Net Density (Units Per Net Hectare) Standard Minimum and Maximum Height (storeys) Predominant Residential Built Form and Mix Urban Centres 120 4-12 Mid Rise: 4-6 storeys (40%) High Rise: 7-12 storeys (60%) Includes: Mixed use buildings, apartment Village Centre 45 2-6 Low Rise: 2-4 storeys (80%) Mid Rise: 5-6 storeys (20%) Includes: Mixed use buildings, apartments, townhouses Regional Corridors 85 3-12 Low Rise: 3-4 storeys (40%) Mid Rise: 5-6 storeys (40%) High Rise: 7-12 storeys (20%) Includes: Mixed use buildings, apartments Local Corridors 40 2-6 Low Rise: 2-4 storeys (80%) Mid Rise: 5-6 storeys (20%) Includes: Mixed use buildings, apartments, townhouses Courtice and Bowmanville Transportation Hubs 200 5-no maximum Mid Rise: 5-8 storeys (20%) High Rise: min. 8 storeys (80%) Includes: Mixed use buildings, apartments Courtice Protected Major Transit Station Area 200 3-no maximum Mid Rise: 3-6 storeys (20%) High Rise: 4-40 storeys (80%) Includes: Mixed use buildings, apartments, townhouses Port Darlington and Port of Newcastle Waterfront Places 40 2-12 Ground Related: 2-3 storeys (40%) Low Rise: 2-4 storeys (20%) Mid Rise: 5-8 storeys (20%) High Rise 9-12 storeys (20%) Includes: Apartments, townhouses, semi-detached dwellings, detached dwellings Edge of neighbourhoods and adjacent to arterial roads 19 1-3 Ground Related: 1-3 storeys (100%) Includes: Limited apartments, townhouses, semi-detached dwellings, detached dwellings Internal to neighbourhood 13 1-3 Ground Related: 1-3 storeys (100%) Includes: limited townhouses, semi- detached dwellings, detached dwellings 6. By amending existing Policy 10.1.6 by adding “Protected Major Transit Station Areas” following “Transportation Hubs” as follows: “10.1.6 To develop the Transportation Hubs and Protected Major Transit Station Areas in Courtice and Bowmanville as a mixed use, higher density place to support the timely expansion of the GO train to Clarington.” 7. By amending existing Policy 10.2.2 by adding “Protected Major Transit Station Areas” following “Transportation Hubs” as follows: “10.2.2 To develop and improve Urban and Village Centres, Waterfront Places, Neighbourhood Centres, and the Transportation Hubs and Protected Major Transit Station Areas with a pedestrian focus and with a high quality public realm including civic squares, parks, walkways and building forms and styles that reflect the character of the community.” 8. By amending existing Policy 10.3.1 by adding “Protected Major Transit Station Areas” following “Transportation Hubs” as follows: “10.3.1 Urban and Village Centres, Neighbourhood Centres, Gateway Commercial Centres, Regional and Local Corridors and Transportation Hubs and Protected Major Transit Station Areas are shown on Map A and B.” 9. By amending existing Policy 10.8.3 as follows: “10.8 Transportation Hubs and Protected Major Transit Station Areas 10.8.1 Transportation Hubs and Protected Major Transit Station Areas are identified on Map A. Transportation Hubs and Protected Major Transit Station Areas shall provide for a mix of uses at higher densities, which are complementary in terms of scale, design and context and designed to support transit services. Transportation Hubs 10.8.2 The Bowmanville Transportation Hub is located within the Bowmanville West Town Regional Centre. The Bowmanville Town Centre Secondary Plan Area policies are complementary and supportive of the Bowmanville GO Transit station and collectively create the type of development intended by section 10.8.1. Protected Major Transit Station Areas 10.8.3 The Courtice Transportation Hub Protected Major Transit Station Area is located within Special Study Area 4 the Courtice Transit-Oriented Secondary Plan area. Detailed land uses in this Transportation Hub Protected Major Transit Station Area will be further defined in the Courtice Transit-Oriented Community Employment Lands Secondary Plan. The Secondary Plan shall include policies for a high density, mixed use compact development within 750 metres of the GO Transit site.” 10. By deleting the existing Section 16.5 as follows: “16.5 Special Policy Area D - Auto Wrecking Yard – Deleted” 16.5.1 Special Policy Area D is located within Special Study Area 4 Courtice Employment Area. The redevelopment of the site may not take place until such time as sewer and water services are available. In the interim, the existing uses may continue. 16.5.2 Prior to the redevelopment of the site and as a condition of approval of any development application, the proponent shall ensure that the soil conditions and ground and surface water conditions on the site are suitable for the proposed use. Developm ent proposals on the site shall be subject to the provisions of Section 3.7.20 of this Plan” 11. By deleting the existing Section 17.5 as follows: “17.5 Special Study Area 4 – Courtice Employment Area – Deleted” 17.5.1 The Courtice Employment Area is the largest concentration of designated employment lands in Clarington. This area is the gateway to Courtice. These lands have easy access to Highways 401 and 418, proximity to the Energy Business Park and the waterfr ont and it is centred around the future GO Rail Station. The synergy of these attributes offer unique possibilities for the Municipality to create employment and mixed use developments. The future GO Rail station will be a multi-modal transportation centre with connections to the road system, Regional transit network and the future Highway 418 bus rapid transit system and an active transportation network. 17.5.2 The Municipality will prepare a Secondary Plan for the area that would create the policy framework to guide the development of these lands, with particular attention to develop transit supportive uses around the future Courtice GO Rail Station. In preparing the Secondary Plan, the Municipality will examine: • Land uses that would best enable the full development of a transportation hub; • The means of increasing employment densities; • The redistribution of employment uses along the Highway 418 corridor and consideration of residential and mixed -uses around the Courtice Road corridor; • The development of an active transportation network; and • The protection of the natural heritage system. 17.5.3 It is recognized that Special Study Area 4 includes lands currently outside of the urban area boundary and that the full implementation of the planning concept will be dependent on consideration in the next Regional Official Plan comprehensive review.” 12. By amending existing Policy 19.4.3 as follows: 19.4.3 “a) Implement the approved eastern extension of GO Rail service to the Courtice Protected Major Transit Station Area and the Bowmanville Transportation Hubs by 2024, recognizing that GO Rail service is critical to achieving many of the land use objectives of Provincial Plans and the Durham Regional Official Plan and this Plan;” 13. By amending existing Policy 19.4.4 as follows: 19.4.4 “a) Direct higher density development and economic activity around the Transportation Hubs and Protected Major Transit Station Areas, along or near the Regional Transit Spine, and along Regional and Local Corridors;” 14. Existing Clarington Official Plan, Map A1 Land Use West Clarington Rural Area, is amended by expanding the Courtice Urban Boundary to reflect the Secondary Plan boundary as demonstrated on Exhibit B. The expanded Urban Boundary is reflected on all subsequent exhibits. 15. Existing Clarington Official Plan, Map A2 Land Use Courtice Urban Area, is amended as demonstrated on Exhibit C. 16. Existing Clarington Official Plan, Map B Urban Structure, is amended by identifying the newly expanded Courtice Urban Boundary lands as Greenfield and depicting the Protected Major Transit Station Area on the map as demonstrated on Exhibit D. 17. Existing Clarington Official Plan, Map C Secondary Plan Areas, is amended by changing the status to “Completed” as demonstrated on Exhibit E. 18. Existing Clarington Official Plan, Map J2 Transportation Network Roads and Transit Courtice Urban Area, is amended by adding five new collector roads as demonstrated on Exhibit F. 19. Existing Part Six, Section 3 “General Policies for Secondary Plans” is hereby amended as follows: “3. Secondary Plans have been prepared for the following areas: a) Bowmanville East Urban Centre; b) Bowmanville West Town Centre; c) Courtice Main Street; d) Newcastle Village Main Central Area; e) Port Darlington Neighbourhood; f) Bayview (Southwest); g) Clarington Energy Business Park h) Brookhill Neighbourhood; i) Clarington Technology Business Park; j) Foster Northwest; k) Southeast Courtice; l) Wilmot Creek Neighbourhood; and m) Courtice Transit-Oriented Community” 20. Existing Part Six, SECONDARY PLANS, is amended by adding the new Courtice Transit-Oriented Community Secondary Plan shown in Attachment 1. !( !( !( !( !( !( !( 5 5 55 5 5 5 5 !( s s s s s !( !( !( !( !( 5 k k k k k k k CONCESSION ROAD 3 PROVIDENCEROADREGIONAL ROAD 42ROADLAMBS ROADGREENCONCESSION ROAD 10 BOUNDARY ROAD COCHRANEROADTOWNLINE ROAD NORTHCONCESSION ROAD 9 ENFIELDROADWOTTENROADCONCESSION ROAD 9 REGIONAL ROAD 3 OLDSCUGOG ROADREGIONAL ROAD 57GRASSHOPPERPARKROADWOODLEYROADREGIONAL ROAD 20 LIBERTY STNORTHAKEDROADCONCESS ION ROA D 8LONGSAULT ROADMURPHY ROADDARLINGTON-CLARKE TOWNLINE ROADCONCESSION ROAD 7ROAD BETHESDACLEMENS ROADLIBERTY ST NMIDDLE ROADHOLT ROADROADROADLEASK ROAD(ENFIELD ROAD)VANNEST ROADSOLINAROADCONCESSION ROAD 7 OLD SCUGOG ROADREGIONAL ROAD 57STREET NORTHCONCESSION ROAD 6 DARLINGTON-CLARKETOWNLINE RDACRES ROADHIGHWAY 407 (TAUNTON ROAD)HOLT ROADRUNDLEWASHINGTON ROADREGIONAL ROAD 34LANGMAID ROADPEBBLESTONE ROAD TOWNLINE ROAD NORTHTRULLS RDREGIONALROAD 34ROADOLD SCUGOG ROADBASELINE ROAD REGIONAL ROAD 57LIBERTYMEARNSAVENUEBETHESDAROADSTEPHENS MILLROAD CONCESS ION ROA D 4 MAPLEGROVEROADROADHOLTRUNDLEROADSOLINAROADHANCOCKROADBRAGGCONCESS ION STREE T REGIONAL ROAD 20 CONCESSION ROAD 10 SKELDING ROAD MOSPORTROADBESTROADALLIN ROADHIGHWAY 35/115WILCOX ROADHIGHW AY 115HIGHWAY 35CONCESSION ROAD 8 H IG H W A Y 4 0 7 BROWN ROADHIGHWAY 35/115COONEY ROADBEST ROADLESKARD ROADREGIONAL ROAD 4 (TAUNTON ROAD) CON C ESSION ROA D 5 OCHONSKI ROADGAMSBY ROADVICKERS ROADHIGHWAY 35/115SQUAIR ROADROADCONCESSION ROAD 4 POLLARDCONCESSION BELLWOODDRIVEDURHAM HIGHWAY 2 DURHAM HIGHWAY 2 LOCKHART ROADCONCESSION ROAD 4 HIGHWAY 401 ORONO URBAN AREA(SEE MAP A5) COURTICEURBAN AREA(SEE M AP A2) BOWMANVILLEURBAN AREA(SEE M AP A3) SOLINA ENNISKILLEN HAMPTON BURKETON TYRONE MITCHELLCORNERS HAYDON MAPLEGROVE KIRBY ENFIELD LESKARD NEWCASTLEVILLAGEURBAN AREA(SEE MAP A4) TRANS-CANADA PIPELINE INTER-PROVINCIAL PIPELINEHYDRO CORRIDORCORRIDOR HYDRO CORRIDOR HYDRO CORRIDOR 29333435 13 1516171819202122232428272625303132 23 LOT 182973334354561211109141516171819202122232428272625303132 CONC. 10CONCESSION 9CONCESSION 8CONCESSION 7CONCESSION 6CONCESSION 5CONCESSION 4CONCESSION 3CONCESSION 2CONCESSION 1CONCESSION B.F.H Y D R O C O R R ID O R H Y D R O C O R R ID O R HYDRO HYDRO CORRIDORTRANS-NORTHERN PIPELINE C.N.R. C .P.R .TRANS-CANADA PIPELINE INTER-PROVINCIAL PIPELINE l C.P.R NASH ROAD HIGHWAY 418REG I ON AL RO AD 4 BLOOR STREET NEWCASTLE VILLAGEURBAN AREA(SEE MAP A4) HYDRO CORRIDOR La k e O n t a r i o³ URBAN UTILITY COMMUNITY PARK HAMLET PARK NATURALCORE AREA NATURALLINKAGE AREA ENVIRONMENTAL PROTECTION AREA ESTATE RESIDENTIAL HAMLET AGGREGATEEXTRACTION AREA PRIMEAGRICULTURAL AREA RURAL !CP ORM BOUNDARY GREENBELT BOUNDARY TOURISM NODE GOLF COURSE ks D3-DEFERRED BYTHE REGION OF DURHAM WEST CLARINGTON RURAL AREA OFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 LAND USE MAP A1 !CP !HP !HP !HP !HP !HP !HP !HP Expand Urban Boundar y Exhib it 'B', Am end ment No. To the Mun ic ipality of Claring ton Official Plan, Map A1. Cour tice Urban Boundar y will be amended on all subsequent schedules of the OP 5 5 !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!DURHAM HIGHWAY 2 BASELINE ROADHIGHWAY 418 RUNDLE ROADCOURTICE ROADHIGHWAY 401TOWNLINE ROADDURHAM HIGHWAY 2 TRULLS ROADBLOOR STREET NASH ROADVARCOE ROADCENTERFIELD DRIVETOOLEY ROADGEORGEREYNOLDS DRIVE ROBERT ADAMSDRIVEPRESTONVALE ROADRIDRIVENGHAMSANDDRIVEAVONDALEGLENAB BEY DRIVE ROADFENNING DRIVEPRESTONVALEROADTRULLS ROADBASELINE ROAD ENER GY DR IVE PEBB LE STONE ROAD HIGHWAY 418SPECIALSTUDYAREA 1 SPECIALSTUDYAREA 1 C.N.R ME A DOW GL A D E AV E N U E C .P.R CRAGO ROADHANCOCKk COURTICE ROADSOLINA RAODSOLINA ROADA107-6 ³ McLau gh linBay Lake Ontario URBAN RESID ENTIAL URBAN CEN TRE LIGH TINDUSTR IAL AR EA GREEN SPAC E WAT ER FR ONTGREENWAY BU SINESS PARK EN VIRO NMENTAL PR OTECT ION AREA GEN ERALINDUSTRIAL AR EA UTILITY REGIO NAL COR RIDOR MU NIC IPAL WIDE PAR K URBAN BOUN DAR Y !!!!!!!!!!SPEC IAL STU DY AR EA COMMUN ITY PARK å SEC OND ARY SCH OOL NEIGH BOUR HOODCENTRE !MP D4-DEFERRED BYTHE REGION OF DURHAM APPEALED TO THE OMBA107 COURTICE URBAN AREA OFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 LAND USE MAP A2 GO PR ESTIGEEMPLOYMEN T AREA PR OTECT ED MAJOR ST AT ION AREAGO HIGHWAY 401 MPMP !CP CP CP Exhib it 'C', Ame ndm ent No. To the Municipality of Clarington Official Plan, Map A2. Expand Urban Boundar y Remove Special Policy Area D Change From Light Industrial To General Industrial Change From Light Industrial ToUrban Residential Change From Prime Agricultural Area to Regional Corridor Change From Prime Agr icultural Area to Urban Residential Change From Regional Corridor to Protected Major Transit Station Area Change From Prestige Employment Area to Protected Major Transit Station Area Change from Transpor tation Hub to Protected Major Transit Station Area Change From Prime Agr icultural Area to Protected Major Transit Station Area Remove Special Study Area 4 Change from Transpor tation Hub to Protected Major Transit Station Area SPEC IAL POLIC Y AREA Remove From Legend CONCESSION ROAD 3 PROVIDENCEROADROADREGIONAL ROAD 42ROADLAMBSAVENUELIBERTYSTREET NORTHGREENENFIELDREGIONAL ROAD 3 BETHESDACLEMENS ROADLETNER ROADROADCAMBRIANROADROADHOLTWILLIAMMILL ROADBAKER SCHOOLROADROADROAD(ENFIELD ROAD)VANNEST ROADWERRY ROADSOLINAROADCONCESSION ROAD 7 SCUGOGOLDREGIONAL ROAD 57CEDAR PARK ROADNORTHSTREETROADCONCESSION ROAD 6 DARLINGTON-CLARKETOWNLINE RDCOLE ROADACRESREGIONAL ROAD 4 (TAUNTON ROAD)HOLT ROADRUNDLEWASHINGTON ROADREGIONAL ROAD 34LANGMAID ROADFICES ROADPEBBLESTONE ROAD TOOLEYROADTOWNLINE ROAD NORTHTRULLSROADREGIONALROAD 34ROADOLD SCUGOG ROADNASH ROAD REGIONAL ROAD 57MIDDLEROADLIBERTYMEARNSAVENUEBETHESDAROADSTEPHENS MILLROAD CONCESSION ROAD 4 COWANVILLE ROAD ROADBROWNSVILLEROADMAPLEGROVEROADROADHOLTRUNDLEROADSOLINAROADHANCOCKROADCOURTICEROADTRULLSROADPRESTONVALEROADBASELINE ROAD REGIONAL ROAD 57LIBERTY ST S.MEARNSLAMBSROADBRAGGRICKARDROADCONCESSION STREET CONCESSION HIGHWAY 35/115MORTONROADBESTLESKARDNIXON ROADREGIONAL ROAD 4 (TAUNTON ROAD) CONCESSION ROAD 5 OCHONSKI ROADREGIONAL ROAD 17(MAIN STREET)GAMSBY ROADVICKERS ROADJEWELPATTERSONROADHENRYCONCESSION ROAD 5 CEDAR VALLEYROADROADCOVENROADWALSH ROADLAWRENCE ROADBUCKLEYROADHIGHWAY 35/115BLEWETT ROAD SQUAIR ROADROADCONCESSION ROAD 4 GIBSON ROADPOLLARDMOFFAT ROADCONCESSION ROAD 3 ROADGOLF COURSEGRAHAMROADMORGANS ROADARTHUR STREETHIGHWAY 2BELLWOODDRIVEHIGHWAY 2 HIGHWAY 2 HIGHWAY 401 BROWVIEWROAD MILLSTREETRILEYROADSTEPHENSONROADADAMSROADGIFFORDROADLAKESHOREWILLIAM ALLINCTLOCKHART ROADCONCESSION ROAD 4 HIGHWAY 401ENERGY DRIVEHIGHWAY 418ROADOSBORNE³Lake Ontario COURTICE BOWMANVILLE NEWCASTLE VILLAGE ORONO GO GO CLARINGTON URBAN AREASOFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 URBAN STRUCTURE MAP B Exhibit 'D', Amendment No. To the Municipality of Clarington Official Plan, Map B. Expand Urban Boundar y BUILT BOUNDARY BUILT UP AREA GREENFIELD URBAN BOUNDARY PRIORITYINTENSIFICATION AREAS TRANSPORTATION HUBS AND PROTECTED MAJOR TRANSIT STATION AREAS CENTRE REGIONAL CORRIDOR WATERFRONT PLACE LOCAL CORRIDOR GO PROTECTED MAJOR TRANSIT STATION AREA Add To Legend CONCESSION ROAD 3 PROVIDENCEROADROADREGIONAL ROAD 42ROADLAMBSAVENUELIBERTYSTREET NORTHGREENBETHESDACLEMENS ROADROADHOLTWIL LIA MMILL RO A DBAKER SCHOOLROADROAD(ENFIELD ROAD)VANNEST ROADWERRY ROADSOLINAROADCONCESSION ROAD 7 SCUGOGOLDREGIONAL ROAD 57CEDAR PARK ROADNORTHSTREETROADCONCESSION ROAD 6 DARLINGTON-CLARKECOLE ROADACRESREGIONAL ROAD 4 (TAUNTON ROAD)HOLT ROADRUNDLEWASHINGTON ROADREGIONAL ROAD 34LANGMAID ROADFICES ROADPEBBLESTONE ROAD TOOLEYROADTOWNLINE ROAD NORTHROADROADREGIONALROAD 34ROADOLD SCUGOG ROADNASH ROAD REGIONAL ROAD 57MIDDLEROADLIBERTYMEARNSAVENUEBETHESDAROADSTEPHENS MILLROAD CONCESSION ROAD 4 MAPLEGROVEROADROADHOLTRUNDLEROADSOLINAROADHANCOCKROADCOURTICEROADTRULLSROADPRESTONVALEROADBASELINE ROAD REGIONAL ROAD 57LIBERTY ST S.MEARNSLAMBSROADBRAGGRICKARDROADCONC ESSION STREET BESTLESKARDNIXON ROADREGIONAL ROAD 4 (TAUNTON ROAD) CONC ES S ION ROA D 5 OCHONSKI ROADMAIN STREETGAMSBY ROADVICKERS ROADJEWELPATTERSONROADHENRYWALSH ROADLAWRENCE ROADBUCKLEYROADHIGHWAY 35/115BLEWETT ROAD SQUAIR ROADROADCONCESSION ROAD 4 GIBSON ROADPOLLARDMOFFAT ROADCONCESSION ROAD 3 ROADGOLF COURSEGRAHAMARTHUR STREETHIGHWAY 2BELLWOODDRIVEHIGHWAY 2 HIGHWAY 2 BROWVIEWROAD L O V E K IN R O A D MILLSTREETRILEYROADROADLOCKHART ROADHIGHWAY 407 CONCESSION ROAD 4 HIGHWAY 401ENERGY DRIVEHIGHWAY 418ROADOSBORNETRULLS³Lake Ontario Courtice Newcastle Village Bowmanville NOTE: ALL EXISTING SECONDARY PLANS NEEDTO BE UPDATED TO CONFORM TO THEOFFICIAL PLAN EXCEPT FOR COURTICEMAIN STREET SECONDARY PLAN. Orono CLARINGTON URBAN AREASOFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 SECONDARY PLAN AREAS MAP CSETTLEMENT AREA BOUNDARY SECONDARY PLAN BOUNDARIES NOT COMPLETED COMPLETED Exhibit 'E', Amendment No. To the Municipality of Clarington Official Plan, Map C. Update Secondar yPlan Boundar y Change Status To Completed Expand Urban Boundar y !!!! ! !!!!!!!!!!!!!!!!!!!!!!!! ! ! ! ! ! ! ! ! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!XY !(XY XY !( !( !( XYXY !(!( !( !( !( !(TOOLEY ROADTRULLS ROADCOURTICE ROADHANCOCK RDDURHAM TOWNLINE ROADC . P . R . HIGHWAY 2 HIGHWAY 418BASELINE ROAD C. N. R. BLOOR STREET HIGHWAY 401 MEADOWGLADE ROAD PEBBLESTONE RD AVENUE REYNOLDS HANCOCK RDD R I V EGEORGE A D E L A ID E PRESTONVALE ROADFUTUREFREEWAY INTERCHANGE PROPOSEDGRADE SEPARATION !!!!RAIL TRANSIT LINE ³ L a k e O n t a r i o RAILWAY TYPE B ARTERIAL ROAD TYPE C ARTERIAL ROAD PROTECTED MAJOR TRANSIT STATION AREA REGIONAL TRANSIT SPINE EXISTINGFREEWAY INTERCHANGE EXISTINGGRADE SEPARATION COLLECTOR ROAD FREEWAY URBAN AREA TYPE A ARTERIAL ROAD !( !( XY XY GO FREEWAY BUSRAPID TRANSIT LINE!!!!! GO COURTICE URBAN AREA OFFICIAL PLANMUNICIPALITY OF CLARINGTON June, 2025 TRANSP ORTATION NETWORKROADS AND TRANSIT MAP J2 Exhibit 'F', Amendment No. To the Municipality of Clarington Official Plan, Map J2. Expand Urban Boundar y Add Collector Roads Secondary Plans DRAFT Courtice Transit-Oriented Community Secondary Plan Municipality of Clarington Official Plan June 2025 Table of Contents Courtice Transit-Oriented Community (CTOC) Secondary Plan ............................... 7 1 Introduction ...................................................................................................... 7 2 Vision and Principles ....................................................................................... 8 2.1 Vision .............................................................................................................. 8 2.2 Principles ........................................................................................................ 8 3 Community Structure....................................................................................... 9 4 Environment and Energy ............................................................................... 11 4.1 Objectives ..................................................................................................... 11 4.2 General Policies ............................................................................................ 12 4.3 Environmental Protection Areas.................................................................... 12 4.4 Urban Forest ................................................................................................. 15 4.5 Energy .......................................................................................................... 16 4.6 Green Development ...................................................................................... 16 5 Land Use and Built Form ............................................................................... 17 5.1 Objectives ..................................................................................................... 17 5.2 General Policies ............................................................................................ 18 5.3 Mixed Use Core ............................................................................................ 19 5.4 Mixed Use Transition Area ............................................................................ 20 5.5 Medium Density Residential ......................................................................... 22 5.6 Low Density Residential ................................................................................ 23 5.7 Business District ........................................................................................... 23 5.8 Light Industrial............................................................................................... 24 5.9 General Industrial.......................................................................................... 24 5.10 Environmental Protection Area .................................................................. 25 5.11 Utility .......................................................................................................... 25 6 Urban Design .................................................................................................. 26 6.1 Objectives ..................................................................................................... 26 6.2 General Policies ............................................................................................ 26 6.3 Placemaking and Streetscapes..................................................................... 26 6.4 Building Siting and Design ............................................................................ 27 7 Housing ........................................................................................................... 29 Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 4 7.1 Objectives ..................................................................................................... 29 7.2 General Policies ............................................................................................ 30 7.3 Affordable Housing ....................................................................................... 30 8 Parks and Community Facilities ................................................................... 31 8.1 Objectives ..................................................................................................... 31 8.2 General Policies ............................................................................................ 31 8.3 Special Park .................................................................................................. 32 8.4 Neighbourhood Parks and Parkettes ............................................................ 32 8.5 Urban Parks and Squares ............................................................................. 33 8.6 Schools ......................................................................................................... 33 8.7 Other Community Facilities ........................................................................... 34 9 Cultural Heritage ............................................................................................ 35 9.1 Objectives ..................................................................................................... 35 9.2 Policies ......................................................................................................... 35 10 Transportation ................................................................................................ 36 10.1 Objectives .................................................................................................. 36 10.2 General Policies ........................................................................................ 36 10.3 Arterial Roads ............................................................................................ 38 10.4 Collector Roads ......................................................................................... 39 10.5 Local Roads and Mews ............................................................................. 39 10.6 Rear Lanes ................................................................................................ 40 10.7 Active Transportation ................................................................................. 41 10.8 Transit Facilities ......................................................................................... 42 11 Servicing ......................................................................................................... 42 11.1 Objectives .................................................................................................. 42 11.2 General Policies ........................................................................................ 43 11.3 Stormwater Management .......................................................................... 44 12 Implementation and Interpretation ............................................................... 46 12.1 Objectives .................................................................................................. 46 12.2 Policies ...................................................................................................... 46 Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 5 SCHEDULES AND APPENDICES Schedule A – Land Use Schedule B – Parks and Community Facilities Schedule C – Roads and Active Transportation Network Appendix A – Urban Design and Sustainability Guidelines (not included in this draft) Courtice Transit-Oriented Community (CTOC) Secondary Plan 1 Introduction The Courtice Transit-Oriented Community (CTOC) Secondary Plan area is located south of Bloor Street, north of Highway 401, east of Robinson Creek, and west of Tooley Creek and Highway 418. The Secondary Plan area is almost 400 hectares comprised of natural features, farmland and industrial uses at the time of this Plan’s adoption. The planned population for the area is approximately 2 9,000 residents and planned employment is approximately 8,000 jobs. The Municipality of Clarington initiated the CTOC Secondary Plan in 2019 to establish a framework and policies to guide the area’s development over the coming decades with a blend of residential, office, retail, institutional, industrial and other employme nt uses, oriented to a transit network centred on the planned Courtice GO station. Except for industrial and commercial uses along Baseline Road, the Secondary Plan area is largely undeveloped and today comprises mostly farmland and natural areas. A key driver of growth and development in the area will be the future Courtice GO station as well as access to Highways 401 and 418. The Region of Durham has delineated lands north and south of the future station as a Protected Major Transit Station Area (PMTSA) to provide a focus for transit-supportive development at high and medium densities. Formerly designated for employment uses, Durham Region, in recently updating its Official Plan, approved a series of employment land conversions to permit a broader mix of uses, including residential, to achieve the overall vision for a transit -oriented community centered on the future GO station. Outside of the PMTSA, adjacent to the highways, two areas within CTOC have been maintained for employment uses. In building on Clarington’s Official Plan with area-specific policies, the CTOC Secondary Plan conforms to the Region’s new Official Plan (Envision Durham), the Growth Plan for the Greater Golden Horseshoe and the Provincial Planning Statement. The purpose of this Secondary Plan is to establish goals and policies to guide development within the Secondary Plan area as it is implemented through subdivision, zoning and site plan control. The Urban Design and Sustainability Guidelines appended to the Plan support the policies and will also be used to guide development. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 8 2 Vision and Principles The vision, principles and community structure described in this section provide the foundation upon which the goals and policies of the Secondary Plan are based. 2.1 Vision The Courtice Transit-Oriented Community is envisioned to be a unique new green community offering all types of housing to accommodate approximately 29,000 residents, a variety of jobs for more than 8,000 workers, and a full range of amenities. CTOC will be inclusive. A range of housing choices will be provided, including single- detached and semi-detached houses, townhouses, duplexes, triplexes, quadplexes and apartment buildings. There will be a significant supply of affordable ownership and rental housing as well as supportive housing to ensure the needs of individuals and families at all stages of life can be met. CTOC will be diverse. A variety of housing and employment opportunities will help ensure the community is socially diverse. This will be matched with diversity in the built environment—housing at all scales; different styles of architecture; a mix of shops, restaurants and entertainment; and open spaces and indoor facilities for all manner of recreational interests. CTOC will be vibrant. The design of neighbourhoods, parks and streetscapes and a high-density, mixed-use core will encourage street life, social interactions and community gatherings. Institutional uses, a high -quality public realm and a diverse local economy will support ongoing vitality and attract visitors from across the region. CTOC will be connected. The future Courtice GO station, adjacent highways and existing arterial roads will connect residents and businesses to destinations and communities across the Greater Toronto Area. An interconnected network of local streets, trails, pathways and bike lan es will make it easy to get around by walking, cycling and taking local transit. CTOC will be green. The valley lands and forests that surround CTOC will provide a rich green setting for development, and neighbourhood parks scattered across the community will provide a gathering and play space for every neighbourhood. A central park and urban squares will offset the high density of development in the core and provide places for respite, picnicking and events. Environmental design features applied to buildings, open spaces, infrastructure and the community as a whole will help ensure CTOC supports Clarington’s Priority Green goals and standards for sustainability. 2.2 Principles The CTOC Secondary Plan is based on the following principles. 2.2.1 Protect, enhance, and value significant natural features, including Robinson Creek, Tooley Creek and Lake Ontario and their associated environmental and hydrologic features and natural hazards. 2.2.2 Conserve and integrate the area’s cultural heritage. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 9 2.2.3 Optimize planned rapid transit facilities and generally encourage the use of transit. 2.2.4 Build a welcoming and inclusive community with a range of housing types at all levels of affordability. 2.2.5 Accommodate a range of businesses and a high level of employment. 2.2.6 Create an accessible, walkable and bikeable community linked to adjacent and regional transportation networks. 2.2.7 Ensure all residents have access to parks, schools and other community facilities. 2.2.8 Ensure climate change mitigation and adaptation are critical considerations in planning, design and construction, and strive to achieve net zero carbon emissions. 2.2.9 Coordinate the phasing of private development and public investments. 3 Community Structure The CTOC Secondary Plan is supported by a community structure comprised of the following, as illustrated in Figure 1. Courtice GO Station: The growth and prosperity of CTOC will depend on a multi-modal transportation network centred on the future Courtice GO Station. The station and surrounding lands provide a focus for high -density housing, office development and commercial amenities that, together with a pedestrian -friendly public realm, contribute to creating a unique mixed-use district. High-Density Mixed Use Core: The core of CTOC, located around the future GO station, will be the area for the highest densities of development, the tallest buildings and the greatest range of uses. This will be the place to find a variety of options for housing, working, shopping, dining and entertainment. At the edges of the core, development will be less intense to provide a transition to lower scale neighbourhoods. Transit Corridor: Courtice Road is a Transit Corridor that will be the primary transportation route to and through CTOC for transit, commercial and personal vehicles. As such, it will be a focus for transit-oriented development and streetscaping that supports active transportation and reinforces Clarington’s identity as an attractive, sustainable community. Urban Residential Areas: North and west of the core, CTOC will comprise mostly low- rise neighbourhoods at varying densities and with a variety of housing types as well as neighbourhood-oriented commercial amenities. Within the PMTSA, medium-density forms of housing will be dominant, while west of Trulls Road there will be a full range of residential types, from detached homes to mid-rise apartment buildings. Interconnected local street networks will connect neighbourhoods to one another and to the attractio ns in the core. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 10 Employment Areas: South of the rail corridor, areas against Highway 401 will be maintained mostly for industrial uses that benefit from convenient highway access to broaden employment opportunities for Courtice residents. Complementing the Clarington Energy Park, these areas will provide a stable environment for the growth of established and new businesses that diversify Clarington’s economy. Parks: Future residential and mixed-use neighbourhoods will be centred on Neighbourhood Parks, including four significant parks, to ensure most residents are within short walking distance of public green space. In addition, a central “Special Park” will serve all of CTOC and, as a multi-purpose space for events, is expected to be a civic destination for all Courtice residents. Multi-use paths and mid-block connections throughout the community will further contribute to a green framework for development. Natural Areas: The valley lands of Robinson Creek and Tooley Creek, tributaries that feed them and forested areas all surround the CTOC Secondary Plan area, establish a rich and sensitive green setting for development. As these areas are protected and enhanced, they will become an amenity for future residents and visitors, fundamental to the community’s environmental health and social well-being. Green Active Transportation Spine: Between Trulls Road and Courtice Road, a continuous north-south landscaped multi-use path will function as a green active transportation corridor that connects neighbourhoods, parkland and forests in the north half of the PMTSA to the future GO Station and other destinations in the south half. In the long term, the green spine may be extended to the Courtice waterfront via a pedestrian/bicycle bridge over Highway 401. Highways: Highways 401 and 418 are not technically within the CTOC area but nevertheless play a vital role in its physical structure. They help to frame the area, and their presence will influence land uses and the road network. Employment uses, in particular, will benefit from the visibility and access the highways afford. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 11 Figure 1: Illustration of planned Community Structure 4 Environment and Energy 4.1 Objectives 4.1.1 Avoid adverse impacts on existing ecosystems and natural heritage features. 4.1.2 Enhance connectivity between natural heritage features. 4.1.3 Enhance the natural heritage network as an amenity. 4.1.4 Provide appropriate vegetation protection zones between development and sensitive natural heritage features. 4.1.5 Maintain the general topography of the area and encourage the use of natural drainage patterns, where possible, to minimize the risk of flooding. 4.1.6 Increase the tree canopy throughout the Secondary Plan area. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 12 4.1.7 Design buildings, infrastructure and the community as a whole to minimize greenhouse gas emissions and ensure high standards for energy and water conservation. 4.1.8 Design buildings, infrastructure and open spaces to mitigate the impacts of severe storms, flooding, droughts and the broader impacts of climate change. 4.1.9 Facilitate and integrate opportunities for renewable and district energy in development and the community as a whole. 4.2 General Policies 4.2.1 All development shall adhere to the policies of the Clarington Official Plan, as it pertains to the policy areas of the Natural Heritage System in Section 3.4, the Watershed and Subwatershed Plans policies in Section 3.5, the Natural Resources policies in Section 3.6, the Hazards policies in Section 3.7 and the Environmental Protection Areas policies in Section 14.4. 4.2.2 Environmental studies prepared in support of development applications shall address the Robinson Creek and Tooley Creek Subwatershed Study (Subwatershed Study). Such studies may refine on a site -by-site basis the recommendations from the Subwatershed Study. 4.2.3 For those properties not assessed for Headwater Drainage Features in the Subwatershed Study or where agricultural fields have gone fallow, Headwater Drainage Feature Assessments may be required prior to any development in order to accurately assess hydrologic functions of these features. 4.2.4 The revegetation of riparian corridors less than 30 metres wide shall be encouraged. 4.2.5 The preservation of mature trees, within and outside of the Environmental Protection Area, is strongly encouraged in order to fully derive benefits relating to microclimate, wildlife habitats, hydrology and scenic quality. In this regard, mitigation measures such as tree protection fencing, silt fence/sedimentation control, dust control, and protection of the soil moisture regime shall be utilized during construction adjacent to the Environmental Protection Areas. 4.2.6 In accordance with Clarington Official Plan Policy 5.6.5, development applications will be required to include a Sustainability Report that indicates how the development meets the sustainable development policies and objectives contained within the Clarington Official Plan and this Secondary Plan. 4.3 Environmental Protection Areas 4.3.1 Environmental Protection Areas, identified in Schedule A, include natural heritage features, hydrologically sensitive features, lands within the regulatory flood plain of a watercourse, headwater drainage features with a “Protection” classification and hazard lands associated with valley systems, including slope and erosion hazards. Areas associated with Environmental Protection Areas, Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 13 including vegetation protection zones and other natural heritage areas, support their ecological integrity. 4.3.2 The delineations of the boundary of lands designated as Environmental Protection Area are approximate and shall be detailed through appropriate studies prepared as part of the review of development applications in accordance with the policies of this Secondary Plan and the Clarington Official Plan. 4.3.3 Where an Environmental Impact Study or other site -specific study required as part of development proposals within 120 metres of a natural heritage feature, or where updated information from the Province or Central Lake Ontario Conservation Authority (“Conservation Authority”) results in refinements to the boundaries of the natural heritage feature or its related vegetation protection zone, such refinements shall not require an amendment to the Clarington Official Plan or this Secondary Plan. 4.3.4 Where the valley system is considered confined, the extent of the valley is determined based on either the visible and discernible Top of Bank or the Long - Term Stable Slope, whichever is greater. A vegetation protection zone of 15 metres as per Table 3-1 of the Clarington Official Plan is required from the valley feature. 4.3.5 The alteration of the natural state of watercourses and creeks is discouraged and shall require approval by the Conservation Authority, the Municipality, and other agencies as required. Any proposal to alter a section of a watercourse must be justified through appropriate studies and reports as required by the Official Plan, demonstrate a net gain to the feature and function of the watercourse and riparian corridor, maintain or improve its ecological state and incorporate natural channel design features to the satisfaction of the Conservation Authority and the Municipality of Clarington. 4.3.6 The vegetation protection zone shall be planted, maintained or restored with self- sustaining, native plant materials, in keeping with the Environmental Impact Study recommendations. 4.3.7 The Subwatershed Study identifies and assesses a number of Headwater Drainage Features. Those identified as “protection” are included in the Environmental Protection Area designation. For those Headwater Drainage Features identified as “conservation”, applications for development shall, in consultation with the Conservation Authority: a) Maintain, relocate on-site and/or enhance the drainage feature and its riparian corridor; b) If catchment drainage will be removed due to diversion of stormwater flows, restore lost functions through enhanced lot level controls as feasible; c) Maintain or replace on‐site flows using mitigation measures and/or wetland creation, if necessary; d) Maintain or replace external flows to the extent feasible; and Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 14 e) Use natural channel design techniques to maintain or enhance the overall productivity of the reach. 4.3.8 Headwater Drainage Features that have been relocated and the associated riparian corridors established through Policy 4.3.7 shall be considered to be designated Environmental Protection Area and shall be zoned appropriately to prohibit development. 4.3.9 A trail system shall be designed and built that connects the CTOC area to the Robinson Creek and Tooley Creek lands, while protecting and enhancing the natural features and functions of these lands. The Municipality and/or CLOCA may require trails conceptually identified on Schedule C to be assessed as part of an Environmental Impact Study undertaken for development on adjacent lands. 4.3.10 The Municipality may require Environmental Protection Areas to be conveyed to a public authority, where appropriate, as part of the development approval process at minimal or no cost to the receiving public authority. Conveyance of lands designated Environmental Protection Area and associated vegetation protection zones shall not be considered as contributions towards the parkland dedication requirements under the Planning Act. Moderate and Low Environmental Constraint Areas 4.3.11 Environmental constraints include features identified as “Moderate Constraint Areas” in the Robinson Creek and Tooley Creek Subwatershed Study and as an overlay on Schedule A of this Secondary Plan. These features are not currently identified as Environmental Protection Areas but have potential ecological and/or hydrological value that requires site-specific assessment prior to development. They include: a) Wetlands over 0.5 ha that are isolated and/or of lower sensitivity/quality; b) Category 1 and 2 Hedgerows identified as linkages; c) Vegetation protection zones; d) Species-at-risk setbacks; e) Complex Ecological Land Classification units containing both high/medium constraint and low constraint features; f) Agricultural/pasture lands with evidence of hydrological function; g) Areas providing candidate/unconfirmed species-at-risk habitat or significant wildlife habitat; and h) Headwater drainage features with a “Conservation” or “Mitigation” classification. 4.3.12 The presence and precise delineation of Moderate Constraint Areas shall be determined through an Environmental Impact Study prepared as part of the Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 15 review of development applications in accordance with the policies of this Secondary Plan and the Clarington Official Plan. If the Environmental Impact Study establishes that development can proceed, then the underlying designation shall apply over those lands without the requirement for an amendment to this Plan. Mitigation measures may be recommended to offset impacts. If the Environmental Impact Study determines that development may not proceed the underlying designation shall not apply and lands will be considered to be designated Environmental Protection Area and will be zoned appropriately. Further, in such cases the Environmental Impact Study shall identify the extent of vegetation protection zones and other protective measures as per the policies of this Secondary Plan and the Clarington Official Plan. 4.3.13 The Subwatershed Study referenced in Policy 4.3.11 also identifies “Low Constraint Areas”, comprising features in which development intrusion is not restricted by existing policies and regulations. It is encouraged that these features be incorporated into site‐level plans where possible to avoid net loss of natural cover. 4.4 Urban Forest 4.4.1 Together, new development and public realm improvements shall establish an urban tree canopy throughout the Secondary Plan area to minimize the heat island effect, provide shade and wind cover, support biodiversity, and contribute to a green and attractive environment. 4.4.2 All private development shall be supported by landscape plans that demonstrate how the development will contribute to the urban forest, improve the health and diversity of the natural environment, support other local plant and animal species, and further enhance the connectivity of the built environment to natural heritage features and hydrologically sensitive features. 4.4.3 Through development, the planting of new trees shall be required in public spaces and private spaces to achieve benefits relating to microclimate, wildlife habitats, hydrology and scenic quality. 4.4.4 Consultation is required with the Municipality prior to the removal of any trees, significant shrubs and/or features. Where trees, significant shrubs and/or other significant features are destroyed or harvested pre -maturely prior to proper study and approval, compensation should occur on site and shall be calculated at a 3:1 ratio. 4.4.5 A diversity of tree and shrub species shall be planted in parks and along right-of- ways to provide a healthy and more robust tree and shrub inventory that is less prone to insects and diseases. The selection of tree and shrub species within the Secondary Plan area will contribute to the Municipality’s species diversity objectives. 4.4.6 New trees generally shall be native species, non-invasive, tolerant of expected conditions and, where possible, of the largest size and maturity that the planting location permits. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 16 4.5 Energy 4.5.1 The Municipality shall work with appropriate partners to study the feasibility of a low carbon thermal energy network, commonly known as a district energy system, for the Secondary Plan area. Where a district energy system has been established, new development within the Mixed Use Core, including transit facilities and municipal buildings, will be required to connect to the district energy system. 4.5.2 Where a district energy system is planned, new development within the Mixed Use Core, including transit facilities and municipal buildings, will be required to be district energy ready, subject to the Municipality establishing district energy ready guidelines. 4.5.3 The Municipality will consider strategies for facilitating low carbon thermal energy technologies, which may permit the repurposing of mechanical space to other uses. 4.5.4 New development outside the Mixed Use Core shall consider and integrate, where feasible, the district energy system. Should connection to the district energy system not be feasible, new development shall consider the use of other low carbon thermal energy technologies such as geo -exchange, wastewater energy, and heat recovery from sources such as data centres and industry to reduce greenhouse gas emissions. 4.5.5 New development shall consider and integrate where feasible: a) Decentralized on-site renewable energy generation such as solar photovoltaic (PV) panels and energy storage, such as battery storage, to manage peak electricity demand, reduce emissions, and strengthen energy resilience; and b) Backup power for protection from area-wide power outages, including in residential buildings, as informed by guidelines developed by the Municipality. 4.6 Green Development 4.6.1 Development is strongly encouraged to: a) Meet high standards for energy efficiency and sustainability in building design and construction, exceeding the energy performance criteria of the Ontario Building Code. b) Utilize energy efficient lighting and appliances, passive building standards and high-performance building envelopes to reduce the amount of energy required to heat and cool buildings. c) Incorporate window shading or canopy systems to reduce glass reflections and save on cooling loads in the summer. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 17 d) Incorporate energy and water conservation measures, including consideration for renewable and/or alternative energy systems, such as solar panels. Individual buildings shall be encouraged to accommodate solar panels, a green roof or high albedo surfaces, o r a combination of these. e) Meet high standards for the use of low-impact development strategies and minimize impermeable surfaces, to aid in stormwater infiltration. f) Utilize water-efficient building design and practices in all new buildings, including measures such as ultra-low flow fixtures, dual flush toilets and rainwater harvesting. g) Integrate strategies to mitigate heat island effects, such as: i. Green roof and cool roof strategies that use high albedo materials to reduce heat gain; ii. The strategic use of deciduous trees to help with evapotranspiration and shading of buildings, sidewalks and hard surface areas in summer; iii. Solar access in winter; and iv. Light-coloured paving materials with an initial solar reflectance of at least 0.33 at installation or a solar reflectance index of at least 29. h) Apply designs, methods and materials that reduce embodied carbon emissions, such as: i. Using lower-carbon methods and materials such as mass timber, low-carbon concrete and biogenic insulation; ii. Adaptively reusing existing buildings; and iii. Repurposing on-site materials. 5 Land Use and Built Form 5.1 Objectives 5.1.1 Concentrate a mix of uses in a high-density format close to the future GO station with direct connections to the station that encourage residents, workers, and visitors to use transit for daily trips. 5.1.2 Achieve a minimum density of 150 people and jobs per gross hectare within the Protected Major Transit Station Area. 5.1.3 Build enough housing to accommodate a diverse population of approximately 29,000. 5.1.4 Ensure the development of mixed-use and employment areas provides opportunities for a variety of employment types and forms, including office, institutional, light industrial, retail and services. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 18 5.1.5 Accommodate a minimum of 8,000 jobs across CTOC and achieve a ratio of approximately one job for every four residents. 5.1.6 Ensure office and industrial uses have good access and visibility from major roads and Highway 401. 5.1.7 Ensure compatibility among the different land uses planned for CTOC. 5.2 General Policies 5.2.1 The land use designations are identified in Schedule A. Minor alterations to Schedule A may occur without amendment to this Secondary Plan through the development approval process provided such alterations are in conformity with the Clarington Official Plan and the intent of this Secondary Plan is maintained. 5.2.2 Minimum densities for the residential and mixed-use designations in CTOC, as set out below, will be required to ensure: a) A minimum density of 150 people and jobs per gross hectare within the Protected Major Transit Station Area is achieved over time; and b) A diversity of housing and employment opportunities are accommodated. 5.2.3 The minimum density for each residential and mixed -use land use designation shall be a net density and shall apply to each area bounded by a public road, Environmental Protection Area and/or other land use designation and shall exclude lands to be used for public roads, parks, schools, stormwater management facilities and other public uses. 5.2.4 The following uses are permitted in all land use designations, excluding Environmental Protection Areas, in this Secondary Plan: a) A use which is accessory to a permitted use; b) Public utilities, including water, wastewater, stormwater infrastructure; and, c) Institutional uses and public facilities. 5.2.5 Development adjacent or close to the rail corridor shall be subject to the Federation of Canadian Municipalities and Railway Association of Canada Guidelines for New Development in Proximity to Railway Operations (2013) or successor guidelines or policies adopted by Council. Generally, high-occupancy uses, including residential, commercial and institutional, shall be set back a minimum of 30 metres from the rail corridor, measured horizontally and vertically, with an earthen berm or crash wall located within the setback. 5.2.6 A setback of 14 metres will apply to all future developments that occur adjacent to the Highway 401 and Highway 418 rights-of-way in accordance with Ministry of Transportation policy and will be measured from the highway property line. 5.2.7 The Municipality may require new development to incorporate appropriate measures to mitigate any adverse impacts from existing or planned non - residential uses on residential and other sensitive uses. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 19 5.3 Mixed Use Core Planned Function 5.3.1 The planned function of the Mixed Use Core area is to accommodate a broad mix of residential, commercial and institutional uses at high residential and employment densities. The lands in this designation are intended to have the greatest intensity of use. Permitted Uses 5.3.2 The following uses are permitted within this designation: a) Residential; b) A full range of non-residential uses, including but not limited to commercial, offices, retail, restaurants, places of entertainment, financial institutions, personal and business services, hotels, conference facilities and commercial schools; and c) Institutional uses, including but not limited to public schools, colleges and universities, community centres, cultural facilities, libraries, day cares and places of worship. 5.3.3 Notwithstanding policy 5.3.2, large format retail and institutional uses shall generally only be permitted on lots fronting Courtice Road, Townline Road, Baseline Road and Trulls Road, unless they are located above or below the ground floor. 5.3.4 Office or institutional uses shall occupy a minimum of 10% of the total gross floor area of all buildings located on each block, or portion of a block, located within the area identified as “Areas Where Office Uses Required” on Schedule A. 5.3.5 Buildings located in the area identified for “Commercial Frontage” on Schedule A shall contain retail, restaurants or commercial services for a minimum of 70% of the frontage on the ground floor facing Street C and Farmington Drive with main entrances that front onto adjacent public sidewalks. Professional offices shall be discouraged on ground floors along these streets. Building Types 5.3.6 Permitted building types within this designation include: a) Apartment building, including an apartment building with grade -related units on the ground floor; b) Mixed-use building with commercial or institutional uses on the first and potentially second floors; c) Office or commercial building; d) Institutional building; and e) Stacked townhouses, subject to Policy 8.3.7. 5.3.7 Stacked townhouses shall be permitted provided they: Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 20 a) Do not occupy more than 20% of a block; b) Are a coordinated and contiguous element of a larger high -density development that achieves the minimum density in Policy 8.3.10 and supports the urban design objectives of this plan; and c) Do not front or flank an Arterial Road. Heights and Density 5.3.8 The minimum height shall be 4 storeys, except institutional buildings, which shall have a minimum height of 2 storeys, and buildings fronting Arterial Roads, which shall have a minimum height of 6 storeys. 5.3.9 The maximum height shall generally be 40 storeys. 5.3.10 The minimum density in the Mixed Use Core shall be 325 units per net hectare. Transit Facilities Zone 5.3.11 The Transit Facilities Zone identified on Schedule A within the Mixed Use Core is the preferred location for transit facilities related to the GO station, including commuter parking, passenger pick-up and drop-off areas, bus terminals and the GO station building itself. Such transit facilities associated with the GO Station shall not be subject to the minimum height and density requirements of this Plan. 5.3.12 The siting and design of transit facilities shall anticipate mixed-use development in the Transit Facilities Zone, and shall generally be compatible with residential, commercial and institutional uses. 5.3.13 If a parking structure is proposed within the Transit Facilities Zone, it shall be located east of Farmington Drive and should be set back a sufficient distance from Townline Road and Farmington Drive to allow the structure to be wrapped by future commercial or residential development. 5.3.14 The portion of the Transit Facilities Zone south of the rail corridor will not be reserved for transit facilities. However, the opportunity to integrate such facilities shall be considered, through consultation with Metrolinx, Durham Region Transit and other transit agencies, before applications for future redevelopment on lands within and adjacent to the zone are approved. 5.4 Mixed Use Transition Area Planned Function 5.4.1 The Mixed Use Transition Area, located at the edge of the Mixed Use Core, is intended to accommodate a broad mix of residential, commercial and institutional uses at generally high residential and employment densities and in forms that provide a transition between the more intense Mixed Use Core Area and the planned lower-scale neighbourhoods in CTOC. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 21 Permitted Uses 5.4.2 The following uses are permitted uses within this designation: a) Residential; b) A full range of non-residential uses shall be permitted, including but not limited to commercial, offices, retail, restaurants, places of entertainment, financial institutions, personal and business services, hotels, conference facilities and commercial schools; and c) Institutional uses, including but not limited to public schools, colleges and universities, community centres, cultural facilities, libraries, day cares and places of worship. 5.4.3 Notwithstanding policy 8.4.2, large format retail and institutional uses shall generally only be permitted on lots fronting Courtice Road, Townline Road, Baseline Road and Trulls Road, unless they are located above or below the ground floor. 5.4.4 Retail, restaurants and commercial service uses are encouraged on the ground floor of buildings at the intersections of two Arterial Roads, two Collector Roads or an Arterial Road and a Collector Road. Development is encouraged to protect for these non-residential uses on the ground floor. Building Types 5.4.5 Permitted building types within this designation include: a) Apartment building, including an apartment building with grade -related units on the ground floor; b) Mixed-use building with commercial or institutional uses on the ground floor; c) Office building; d) Institutional building; e) Stacked townhouses; and f) Traditional townhouses, subject to Policy 5.4.6. 5.4.6 Traditional townhouses shall be permitted provided they: a) Do not occupy more than 30% of a block; b) Are a coordinated and contiguous element of a larger high -density development that achieves the minimum density in Policy 8.3.9 and supports the urban design objectives of this plan; and c) Do not front or flank an Arterial Road. Heights and Density 5.4.7 The minimum height shall be 4 storeys, except institutional buildings, which shall have a minimum height of 2 storeys, traditional townhouses as per policy 5.4.6, Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 22 which shall have a minimum height of 3 storeys, and buildings fronting Arterial Roads, which shall have a minimum height of 6 storeys. 5.4.8 The maximum height shall generally be 25 storeys, except buildings adjacent to a Medium Density Residential or Low Density Residential area, which shall have a maximum height of 10 storeys. 5.4.9 The minimum density shall be 100 units per net hectare. 5.5 Medium Density Residential Planned Function 5.5.1 Medium Density Residential neighbourhoods are planned to accommodate a variety of mostly low-rise housing types in a compact form, as well as neighbourhood-oriented commercial amenities and community facilities. Permitted Uses 5.5.2 The following uses are permitted uses within this designation: a) Residential; b) Other uses in accordance with Clarington Official Plan Policies 9.3.1 and 9.3.3; and c) Small-scale retail, restaurant and commercial service uses provided they are located on a Collector or Arterial Road and each establishment has a gross leasable floor area no greater than 250 square metres. Building Types 5.5.3 Permitted building types within this designation include: a) Apartment buildings; b) Stacked townhouses, back-to-back townhouses and traditional townhouses; and c) Fourplexes and triplexes. Heights and Density 5.5.4 The minimum height shall be 3 storeys, except buildings adjacent to a Low Density Residential area, which may have a minimum height of 2 storeys, and buildings fronting an Arterial Road, which shall have a minimum height of 4 storeys. 5.5.5 The maximum height shall be 4 storeys, except buildings fronting an Arterial Road which shall have a maximum height of 6 storeys. 5.5.6 The minimum density in the Medium Density Residential area shall be 45 units per net hectare, expect on lots fronting Courtice Road, which shall have a minimum density of 60 units per net hectare. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 23 5.6 Low Density Residential Planned Function 5.6.1 Low Density Residential neighbourhoods are planned to accommodate a variety of low-rise housing and community facilities. Permitted Uses 5.6.2 The following uses are permitted uses within this designation: a) Residential; and b) Other uses such as small scale service, neighbourhood retail commercial uses and home-based occupation. Building Types 5.6.3 Permitted building types within this designation include: a) Detached and semi-detached houses; b) Traditional townhouses and stacked townhouses; and c) Fourplexes, triplexes and duplexes. Heights and Density 5.6.4 The maximum height shall be 3 storeys. 5.6.5 The minimum density in the Low Density Residential area shall be 25 units per net hectare. 5.6.6 Private streets and private rear lanes are not permitted within the Low Density Residential designation. 5.7 Business District Planned Function 5.7.1 The Business District is planned to accommodate primarily a mix of commercial, light industrial and institutional uses in compact forms. Permitted Uses 5.7.2 The following uses are permitted uses within this designation: a) Offices; b) Hotels; c) Commercial and technical schools; d) Research and development; e) Studios and workshops; f) Manufacturing; g) Communications and information technology development; Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 24 h) Media production facilities; i) Colleges and universities; and j) Retail and business services, provided they do not occupy more than 50% of the gross floor area on a site. 5.7.3 Light industrial uses, including research and development, workshops and manufacturing, shall be wholly enclosed within a building, with no outside storage. 5.7.4 Warehousing and distribution facilities shall not be permitted. Heights and Density 5.7.5 The minimum height shall be 2 storeys. 5.7.6 The maximum height shall be 10 storeys. 5.8 Light Industrial Planned Function 5.8.1 The Light Industrial area is intended to contain a mix of employment uses in a prestige business park setting where buildings and landscapes are designed to a high standard to attract businesses. Permitted Uses 5.8.2 The following uses are permitted uses within this designation: a) Manufacturing; b) Research and development associated with manufacturing; c) Warehousing and distribution facilities; and d) Offices and retail associated with any of the above permitted uses. 5.8.3 Industrial uses shall be wholly enclosed in a building, with no outside storage. Heights and Density 5.8.4 The maximum height shall be 4 storeys. 5.9 General Industrial Planned Function 5.9.1 The General Industrial land use is intended to contain a mix of employment uses in an industrial park setting where there is greater flexibility regarding how sites are configured and development is designed. Permitted Uses 5.9.2 The following uses are permitted uses within this designation: Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 25 a) Manufacturing; b) Research and development associated with manufacturing; c) Warehousing and distribution facilities; and d) Offices and retail associated with any of the above permitted uses. 5.9.3 Outside storage may be permitted, provided it is screened from public view and does not occupy more than 25% of the lot area. Height and Density 5.9.4 The maximum height shall be 4 storeys. 5.10 Environmental Protection Area Planned Function 5.10.1 Lands designated Environmental Protection Area include natural heritage features, hydrologically sensitive features, lands within the regulatory flood plain of a watercourse, headwater drainage features with a “Protection” classification and hazard lands associated with valley systems, including slope and erosion hazards. These lands contribute to the Municipality’s Natural Heritage System and are intended to be protected. Permitted Uses 5.10.2 In accordance with the Clarington Official Plan policies on the Natural Heritage System, development and site alteration is prohibited, except the following: a) Forest, fish and wildlife management; b) Conservation and flood or erosion control projects, but only if they have been demonstrated to be necessary in the public interest after all alternatives have been considered c) Transportation, infrastructure and utilities, but only if the need for the project has been demonstrated by an Environmental Assessment, there is no reasonable alternative, and it is supported by a project specific Environmental Impact Study; and d) Low impact recreation facilities, including but not limited to trails, pathways, pedestrian bridges, lookouts and seating areas, to the satisfaction of the Conservation Authority and the Municipality of Clarington. 5.11 Utility 5.11.1 The lands designated as Utility within the Secondary Plan contain the Canadian Pacific Kansas City railway corridor. 5.11.2 Expansion of the railway corridor and Utility designation shall not require an amendment to this plan. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 26 6 Urban Design 6.1 Objectives 6.1.1 Create a vibrant public realm that feels safe, comfortable and visually pleasing and supports economic development. 6.1.2 Design spaces that are accessible for people of all ages and abilities. 6.1.3 Facilitate street life, casual social interaction and community gatherings. 6.1.4 Support healthy living environments and a high quality of life for residents. 6.1.5 Ensure compatibility between developments of varying scales and forms. 6.1.6 Establish a distinct identify for CTOC through the design of open spaces, streetscapes and buildings. 6.2 General Policies 6.2.1 The Urban Design and Sustainability Guidelines appended to this Plan shall be used as guidance in the interpretation and implementation of this Secondary Plan’s policies. 6.2.2 Development shall contribute to the creation of a vibrant public realm that feels safe, comfortable and visually pleasing, encourages active transportation, and contributes to a distinct identity for CTOC. Buildings shall be oriented to and have their main entrance on a street. 6.2.3 Development that backs onto a public street generally shall not be permitted. 6.3 Placemaking and Streetscapes 6.3.1 Public art is encouraged to be incorporated into private development to enhance the pedestrian experience and contribute to the area’s identity. 6.3.2 Development shall enhance the experience of the community’s natural setting by framing views to natural features and providing pedestrian connections to parks and Environmental Protection Areas. 6.3.3 Gateways and Prominent Intersections identified in Schedule A represent special locations within the Secondary Plan area which will support a distinct sense of place and are subject to enhanced public realm treatments. Gateways and Prominent Intersections are to be designed in accordance with the Clarington Official Plan. 6.3.4 Prominent Intersections shall serve as community focal points through building height, massing and orientation, architectural treatment and materials, and landscaping. 6.3.5 Gateways and Prominent Intersections should include distinctive landscape and streetscape treatments, including but not limited to planters, public art, special paving, signage, and street furniture that enhance the public realm and mark entry points into the Secondary Plan area. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 27 6.3.6 New development or redevelopment adjacent to a Gateway should be designed to enhance the gateway through: a) Building orientation and massing that prioritizes street frontages and pedestrian access; b) Façade treatments and architectural elements to create visual interest; c) Continuity and connectivity between the public and private realms for pedestrians; and d) Consistent landscaping within the private realm including consideration for trees, seating, and shade structures. 6.3.7 Streetscape design elements within the public right -of-way should be coordinated with and enhance private development sites adjacent to Gateway and Prominent Intersection locations, to create a cohesive visual identity. 6.4 Building Siting and Design 6.4.1 The following shall apply to development in the Mixed Use Core and Mixed Use Transition areas: a) Where retail and other street-related commercial uses are proposed, buildings generally shall form a consistent streetwall that frames the pedestrian environment. Front setbacks along retail streets generally shall be 1-5 metres to accommodate retail displays, street furniture and restaurant patios. b) On streets lined mainly with residential uses, front setbacks generally shall be 3-5 metres to provide for front yards, gardens or patios, and stairs. c) Commercial frontages should contribute to a safe and inviting public realm with frequent entrances, weather protection and extensive glazing on the ground floor. d) Tall residential or mixed-use buildings over 10 storeys generally shall take a podium and tower form to appropriately frame streets and open spaces and contribute to a comfortable public realm while limiting shadow impacts. The following massing standards generally shall apply: i. Podiums shall have a minimum height of 3 storeys and a maximum height of 6 storeys. ii. Residential towers shall have a maximum floorplate of 850 square metres. iii. Residential towers partially or entirely facing one another shall be separated by a minimum of 30 metres. Towers not facing one another generally shall have a minimum separation of 25 metres. iv. Residential towers shall be set back from the edges of podiums. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 28 e) Tall office buildings shall not be subject to the above massing requirements. Appropriate separation distances between office towers shall be determined at the time of development applications for such uses. f) Mid-rise buildings of 5-10 storeys shall limit the adverse impact of their mass on the public realm and the pedestrian experience by generally limiting their length to no more than 70 metres, articulating their facades, varying materials and incorporating upper floor stepbacks. Stepbacks of at least three metres generally shall occur at the 6th storey along Local Roads and at the 8th storey along Collector Roads and Arterial Roads. g) Parking for residential uses shall be provided within the same block, and development shall limit the negative impacts of parking and loading on the public realm. Parking and loading generally shall be located within the building envelope in lands designated Mixed Use Core and Mixed Use Transition Area. h) Entrances to parking and servicing areas generally shall be on Local Roads, mews and/or Rear Lanes and should be consolidated to maximize and accentuate building frontages and/or front yards and minimize the number of curb cuts required. Shared driveways a nd parking ramps between properties shall be encouraged. i) Loading and service areas generally shall be enclosed within a building and located in the interior of a development block. Where loading and servicing is visible at the rear or side of a building, it shall be screened. j) Where underground parking is not feasible, parking may be located within a podium, above the ground floor, provided the podium is designed to look like an occupied building with windows. k) Front patios for ground-floor residential units, where appropriate, shall be raised or otherwise appropriately screened and designed to provide for privacy and a transition between the public and private realms. 6.4.2 To ensure development in Low Density and Medium Density Residential areas contributes to attractive streetscapes and an inviting, comfortable pedestrian realm, the following policies shall apply: a) Surface parking lots for multi-unit buildings in Medium Density Residential and Low Density Residential areas, excluding traditional townhouses but including stacked townhouses, may be permitted provided it is located at the rear of buildings, accessed from a shared driveway at the side of the building or, preferably, from a rear laneway. Off -street surface parking shall not be located between the building and the street. b) Blocks with a concentration of townhouses and/or lots containing other housing types that are less than 9 metres wide shall be encouraged to incorporate Rear Lanes. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 29 c) Parking for traditional townhouses, quadplexes, triplexes, duplexes, semi - detached houses and detached houses that front Courtice Road, Trulls Road, Townline Road, Street B and the east side of Street E, as identified in Schedule C, shall be accessed from a Rear Lane. d) Garages shall be recessed from the front wall of the house. e) Single garages and double garages with living space directly above them may extend partially beyond the front wall of the house. f) The width of a driveway generally shall correspond with the width of the garage, although in the case of single garages, a wider driveway may be permitted where it does not prevent soft landscaping in the front yard with a minimum width of three metres. g) Buildings on corner lots shall have articulated facades facing both streets. h) Front and exterior side yard porches shall be encouraged. i) Air conditioning units, utility meters and similar features should not be visible from the public realm (street/sidewalk) and should be well integrated into a building massing, recessed and screened. 6.4.3 The following shall apply to the Business District and the Light Industrial and General Industrial areas: a) Buildings shall contribute to a consistent streetscape along Baseline Road through the use of setbacks, landscaped front yards, well -designed buildings and the orientation of main entrances to the streets. b) Buildings that occupy at least 40% of the lot width shall be encouraged. c) Buildings on corner lots generally shall be oriented on the corner towards both streets. d) A minimum of 20% of the site area shall be landscaped. e) Parking lots generally shall be located to the interior side and/or rear of buildings. A limited amount of visitor or accessible parking may be located in the front yard. f) Service and loading areas shall be located at the rear of buildings and appropriately screened from public view. 7 Housing 7.1 Objectives 7.1.1 Build enough housing to accommodate a diverse population of approximately 29,000. 7.1.2 Ensure residential neighbourhoods and mixed-use areas within CTOC include a mix of dwelling types and sizes to meet the needs of individuals and families through all stages of life. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 30 7.1.3 Encourage the provision and retention of affordable housing and rental housing for low and moderately low income households. 7.1.4 Integrate supportive housing to meet a spectrum of needs. 7.2 General Policies 7.2.1 CTOC is planned to include a wide range of housing types and tenure types, including market ownership and rental units, as well as affordable housing units in accordance with the policies of the Clarington Official Plan and the Durham Region Official Plan (as applicable). 7.2.2 New development shall provide a range of unit sizes, in terms of number of bedrooms, within multiple-unit buildings. Generally, a minimum of 25 percent of units shall have two or more bedrooms. 7.2.3 The above minimum requirements for two - and three-bedroom units may be reduced where development is providing: a) Social housing or other publicly funded/subsidized housing; or b) Housing to meet identified specialized needs which do not require multi- bedroom units such as for health care institutions or residences owned and operated by a post-secondary institution. 7.2.4 In Low Density Residential and Medium Density Residential, development is encouraged to include additional dwelling units. 7.3 Affordable Housing 7.3.1 Affordable housing, including community housing, supportive housing and other types of subsidized non-market housing units, are encouraged to be integrated within neighbourhoods and combined in developments that also provide market housing to deliver opportunities for a range of housing tenures and prices that support diversity. 7.3.2 The Municipality will collaborate with community housing providers, including but not limited to, the Region of Durham, to encourage a supply of subsidized non - market housing units to be included within the Secondary Plan Area. 7.3.3 To support the provision of affordable housing units, the Municipality will explore other potential incentives, such as reduced application fees, grants and loans. The Municipality will also encourage the Region (as applicable) to consider further increasing financial incentives for affordable housing. 7.3.4 The Municipality may explore opportunities for inclusionary zoning in compliance with Provincial regulations. 7.3.5 The co-location of affordable housing with community service facilities and vertically integrated community hubs are encouraged. 7.3.6 The Municipality may prioritize development applications that include affordable housing units. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 31 8 Parks and Community Facilities 8.1 Objectives 8.1.1 Locate parks, elementary schools and basic commercial amenities within a 10 - minute walk for most residents. 8.1.2 Design buildings, infrastructure and open spaces to mitigate the impacts of severe storms, flooding, droughts and the broader impacts of climate change. 8.1.3 Design parks and school sites to incorporate low-impact development features for stormwater management. 8.1.4 Ensure parks and other open spaces are highly visible and accessible. 8.1.5 Locate parks to maximize the number of residents within a five-minute walk. 8.1.6 Provide parks of a sufficient size and configuration to accommodate a range of potential recreation facilities for residents of all ages and abilities. 8.1.7 Support the timely delivery of elementary schools and indoor recreation facilities within the community. 8.1.8 Integrate public art into the design of parks, streets and other public spaces. 8.2 General Policies 8.2.1 The dedication of lands for parkland shall be in accordance with the Planning Act. 8.2.2 Parkland shall be integrated and connected into a broader public realm network that also includes civic/institutional uses, streets, mid-block connections, trails and privately owned publicly-accessible open spaces. 8.2.3 The design and programming of parks shall be guided by the Municipality’s Parks, Recreation and Culture Master Plan and other applicable guidelines. 8.2.4 The park system as a whole shall provide a variety of opportunities for passive and active recreation and be comprised of well-designed spaces that contribute to CTOC’s identity. 8.2.5 Where feasible, parks should be designed to incorporate low -impact development features to manage stormwater. 8.2.6 Parks generally shall be bordered by public roads, Environmental Protection Areas, schools, and other community facilities. Residential and commercial uses backing onto parks shall be minimized and private access shall not be permitted. 8.2.7 Environmental Protection Areas, associated vegetation protection zones and stormwater management areas shall not be conveyed to satisfy parkland dedication requirements under the Planning Act. 8.2.8 The following types of parks are planned in CTOC: a) Special Park – a central multi-purpose gathering and recreation space serving all of CTOC and the Courtice community more broadly; Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 32 b) Neighbourhood Parks and Parkettes – traditional green spaces to meet the daily passive and active recreation needs of residents in the surrounding neighbourhood; c) Urban Parks and Squares – smaller, multi-purpose open spaces generally designed for passive uses but which also may accommodate programmed events and activities. 8.3 Special Park 8.3.1 The Special Park identified in Schedules A and B will be a central gathering place for residents, workers and visitors in CTOC and for the larger Courtice community. It shall have a minimum area of 2.5 hectares and be bounded by public streets on at least three sides. 8.3.2 The Special Park shall be designed to accommodate a range of civic, cultural and recreational activities within a heavily treed landscape. Grassed and hardscaped areas shall support special events and day-to-day uses. 8.3.3 The Special Park may include outdoor recreation facilities that are not land- consumptive, such as a basketball courts, tennis courts, a skating rink, a playground and/or a splashpad. Larger facilities, such as baseball diamonds, soccer pitches and cricket ovals, will not be appropriate. A small dog park may be accommodated. 8.4 Neighbourhood Parks and Parkettes 8.4.1 Schedule B identifies four Major Neighbourhood Parks intended to be central places for recreation and gathering for the future neighbourhoods surrounding them. The precise configuration and size of each of these parks shall be determined in plans of subdivision. Minor changes to their configuration and size shall not require an amendment to this Plan; however, their minimum sizes shall be as follows: • West Neighbourhood Park: 2.5 ha • North Neighbourhood Park: 2.0 ha • East Neighbourhood Park: 1.5 ha • Central Neighbourhood Park: 1.5 ha 8.4.2 In addition to the Major Neighbourhood Parks delineated on Schedule B, other Neighbourhood Parks and Parkettes will be required to meet the needs of residents, give neighbourhoods a strong green character and enhance CTOC’s natural environment. The location, size and configuration of these parks shall be determined at the time of development applications, guided by the general locations identified in Schedule B. 8.4.3 A Neighbourhood Park, notwithstanding the Municipality’s general standards, shall have an area greater than 1.0 hectares, and a Parkette shall be 0.5-1.0 hectare. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 33 8.4.4 To ensure Neighbourhood Parks are an accessible and prominent feature of the neighbourhood, a minimum of 50% of their boundaries, excluding any portion of a boundary abutting an Environmental Protection Area or stormwater management facility, shall front a public street.. Where a Neighbourhood Park abuts a school, the minimum 50% street frontage requirement may be reduced, provided the park has generous frontage on one street and public access from a second street, at minimum. 8.5 Urban Parks and Squares 8.5.1 To complement parks with additional space for gathering and landscaping, Urban Parks and Squares shall be encouraged in CTOC. Urban Parks and Squares may vary in size but generally will be less than 0.5 hectares. 8.5.2 The location, size and function of Urban Parks and Squares shall be determined at the time of development review and approval. 8.5.3 Urban Parks and Squares shall be defined by adjacent buildings and have at least one edge abutting a public right-of-way. 8.5.4 Urban Parks and Squares may be publicly owned or privately owned but, in either case, shall be publicly accessible. Publicly owned Urban Parks and Squares shall count toward a development’s parkland contribution. Privately owned Urban Parks and Squares may count toward parkland dedication where it is unencumbered by underground parking and there is an agreement with the landowner that the space will be maintained in perpetuity by the landowner. 8.5.5 Urban Parks and Squares shall be designed to offer a space for respite, outdoor dining and special events. Generally, they shall feature lighting, seating areas, trees and soft landscaping, low-impact development features, public art, or other amenities to encourage casual use and gathering. 8.6 Schools 8.6.1 Approximately six (6) elementary schools and two (2) secondary schools are planned in CTOC. The general locations for potential schools are identified on Schedules A and B. Notwithstanding the potential locations identified on Schedules A and B, schools may be located elsewhere in the Secondary Plan area, and additional school sites added, without am endment to the Plan. 8.6.2 Should an alternative site be selected for a school, or a school site not be required, the lands identified for the preferred site shall be developed in accordance with the policies for the underlying land use designation. Final locations and configurations for schools will be determined through the review of development applications, in coordination with the school boards. 8.6.3 All elementary school sites, wherever possible, shall abut a park or other usable green space to provide areas of shared amenity. 8.6.4 The size and configuration of each school site shall be to the satisfaction of the School Board and the Municipality. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 34 8.6.5 The sharing of sites by two elementary schools or a school and another community facility shall be strongly encouraged. 8.6.6 Shared parking between a school and an adjacent or nearby municipal facility or other institutional use shall be strongly encouraged. 8.6.7 Schools required within the designated Mixed Use Core and Mixed Use Transition areas are strongly encouraged to be located within the podium of larger mixed-use buildings or take a compact, multi-storey form to optimize their sites. Such schools shall provide their own outdoor play space on-site, which may be located at-grade or on a rooftop. 8.6.8 Elementary schools shall be located on Collector Roads or at the intersection of Collector Roads and Local Roads with a minimum right-of-way width of 20 metres. Road connections should facilitate easy and safe movement of school buses and avoid the need for students to cross major roads. 8.6.9 Schools sites should be designed to encourage walking and cycling and should be connected to the larger active transportation network of sidewalks, bike lanes and multi-use paths. 8.7 Other Community Facilities 8.7.1 Community facilities such as libraries, recreation centres, child care centres, and fire, ambulance and police stations will be required to meet the needs of residents and workers in the area. The Municipality shall monitor CTOC’s growth to ensure such facilities are provided in a timely manner and may require a community services and facilities needs assessment with development applications. 8.7.2 The preferred location for a library, a recreation centre and major cultural facilities is identified in Schedule B as Preferred Location for Other Central Community Facilities, where such facilities will reinforce the civic and cultural heart of CTOC. If such a facility is located in the Special Park, it shall not occupy more than 20% of the park area, including associated parking. 8.7.3 Community facilities generally shall be: a) Designed to meet the requirements of the City and public agencies, boards and commissions; b) Located in highly visible locations with strong pedestrian, cycling and transit connections for convenient access; and c) Have prominent pedestrian entrances on the main building façade fronting onto a public street. 8.7.4 Community facilities are encouraged, where appropriate, to promote partnerships and optimize the use of space, considering the following measures: Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 35 a) Providing for flexible, accessible, multi-purpose spaces that can be programmed in different ways and be adapted over time to meet the varied needs of different user groups; b) Supporting the creation of community hubs and co -located facilities; c) Exploring alternative delivery models, such as partnerships with non -profit organizations; d) Co-locating within mixed-use buildings; and e) Integrating and coordinating programs. 9 Cultural Heritage 9.1 Objectives 9.1.1 Recover and protect Indigenous and other archaeological resources. 9.1.2 Conserve and interpret significant built heritage resources and facilitate their integration with surrounding land uses, open spaces and built form. 9.1.3 Ensure opportunities for views and access to sites of cultural significance, as appropriate. 9.1.4 Interpret the area’s cultural heritage, including its Indigenous history, within the public realm. 9.1.5 Identify and protect view corridors and vistas to Lake Ontario down streets and from public spaces, where possible. 9.2 Policies 9.2.1 The conservation and enhancement of significant cultural heritage resources shall be consistent with the policies of the Clarington Official Plan and all relevant Provincial legislation and policy directives. 9.2.2 The Municipality will determine if a Cultural Heritage Evaluation Report is required prior to development on or adjacent to any properties that are identified on the Municipality of Clarington Cultural Heritage Resource List, and any properties that have been identified as having potential cultural heritage value or interest. 9.2.3 A Heritage Impact Assessment shall be conducted prior to development on or adjacent to properties that are designated under Part IV of the Ontario Heritage Act, or properties for which a Cultural Heritage Evaluation Report has been conducted and determined that the properties meet the criteria for cultural heritage value or interest as prescribed in O. Reg. 9/06, as amended, or any successors thereto. 9.2.4 Cultural Heritage Evaluation Reports and Heritage Impact Assessments shall consider and provide strategies for the conservation and protection of cultural heritage resources. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 36 9.2.5 Public art and/or other interpretive features recalling the area’s cultural heritage, including its Indigenous history, shall be integrated into the design of public open spaces. The Municipality will also encourage the integration of public art in publicly visible elements of the private realm. 10 Transportation 10.1 Objectives 10.1.1 Concentrate a mix of high-density uses close to the future GO station with direct connections to the station that encourage residents, workers, and visitors to use transit for daily trips. 10.1.2 Line main roads with transit-supportive development and pedestrian-friendly streetscapes. 10.1.3 Ensure the road network facilitates and encourages the use of public transit by allowing for efficient transit routes and minimizing walking distances to transit stops. 10.1.4 Ensure roads and municipal services required for any part of the neighbourhood are in place and operative prior to or coincident with development. 10.1.5 Ensure engineering and other design standards for the public realm and utilities are applied consistently across CTOC. 10.1.6 Develop an interconnected grid of streets throughout the area wherever possible, directly connected to the larger road network. 10.1.7 Establish an interconnected network of active transportation infrastructure across CTOC linked to networks and trails in surrounding areas. 10.1.8 Minimize surface parking and its impact on the public realm. 10.1.9 Reduce the demand for parking over time. 10.2 General Policies 10.2.1 The road network shown in Schedule C identifies the road classifications, key active transportation connections and a zone for transit facilities related to the future Courtice GO station. The alignments of roads and active transportation connections In Schedule C are approximate. Minor modifications to alignments based on Municipal Class Environmental Assessments and detailed planning and engineering studies shall not require an amendment to this Plan. 10.2.2 Table 1 identifies the classification and intended right-of-way of each road identified in Schedule C. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 37 Road Classification Jurisdiction ROW Width (m) Courtice Rd Type A Arterial Durham Region 45 Townline Rd Extension (west of Courtice Rd) Type B Arterial MoC 36 Trulls Rd (north of Townline Rd Ext) Type B Arterial MoC 36 Townline Rd Extension (east of Courtice Rd) Type C Arterial MoC 30 Trulls Rd (south of Townline Rd Ext) Type C Arterial MoC 30 Baseline Rd Type C Arterial MoC 30 Street E Special Collector MoC 26 Street B Collector MoC 26 Farmington Dr (south of Street B) Collector MoC 26 Farmington Dr (north of Street B) Collector MoC 23 Street C (east of Trulls Rd) Collector MoC 26 Street C (west of Trulls Rd) Collector MoC 23 Granville Dr Collector MoC 23 Street A Key Local MoC 20-23 Street D Key Local MoC 20-23 Street F Key Local MoC 20 Street G Key Local MoC 20 Table 1: CTOC Road Classifications 10.2.3 In addition to the roads identified in Schedule C, development will be structured by an interconnected and grid-like network of Local Roads that facilitate direct pedestrian, cyclist, transit and vehicular movement throughout the community. Context Plans submitted with applications shall demonstrate how development will be connected to existing or planned development on surrounding lands. 10.2.4 CTOC’s network of streets shall be supplemented by landscaped mid -block active transportation connections that break up long blocks to further enhance the pedestrian permeability of the area, the efficiency and variety of pedestrian routes, and access to transit. Mid-block pedestrian connections should have a minimum width that accommodates a multi-use path with landscaping on both sides to provide a buffer to any adjacent private spaces. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 38 10.2.5 Complete, interconnected pathway networks shall be identified in Context Plans and plans of subdivision, demonstrating how the network will connect with pathway network on adjacent lands. 10.2.6 The design of roads shall be based on a complete streets approach, in accordance with the transportation master plans, standards and guidelines of the Municipality of Clarington and Regional Municipality of Durham , with further guidance provided in the CTOC Urban Design and Sustainability Guidelines (Appendix A to this Secondary Plan) 10.2.7 The incorporation of low-impact development measures in the design of all streets shall be encouraged. 10.2.8 On-street parking generally shall be accommodated on Collector Roads and Local Roads to provide for anticipated parking needs and to assist in calming traffic movement and thereby enhancing pedestrian safety. 10.2.9 Landscaped, pedestrian-friendly roundabouts may be considered for the prominent intersections of Baseline Road and Trulls Road, and Baseline Road and Courtice Road. Roundabouts may be considered elsewhere where two Arterial Roads, two Collector Roads or an Arterial Road and a Collector Road intersect. Roundabouts are generally discouraged along local roads, but small ones may be considered for the purposes of traffic calming. 10.2.10 The conveyance of land consistent with the widening of the rights -of-way identified in this Plan shall be required to permit the development of lands adjacent to existing roads. Additional dedication for road widenings may be required, such as for grading, drainage and stormwater management, auxiliary turn lanes, transit facilities and utilities. 10.3 Arterial Roads 10.3.1 Arterial Roads will generally be designed in accordance with the standards set out in Appendix C, Table C-2 of the Clarington Official Plan. Arterial Roads shall include the following elements: a) Townline Road, Trulls Road and Courtice Road may have a multi-use path on at least one side for the convenience, comfort and safety of pedestrians, cyclists and other active transportation modes. Where a multi -use path is provided on only one side, a sidewalk shall be provided on the other side. Alternatively, where these roads travel through mixed-use areas and a multi-use path is not provided, sidewalks shall be located on both sides to support retail and other active ground-floor uses. b) Landscaped boulevards and building setbacks shall provide a buffer between moving traffic and residential and non-residential land uses on either side of the street. c) Planting zones shall have sufficient width to accommodate appropriate low - impact development measures. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 39 d) Signalized intersections shall be spaced to provide convenient crossing points for pedestrians and cyclists and help distribute vehicular traffic evenly across CTOC. e) Turn lanes may be required at intersections. Double turn lanes and channelized right turn lanes shall be avoided. f) Driveway access from Arterial Roads shall be restricted except where unavoidable. 10.3.2 As the rail corridor is upgraded to support the GO Rail Expansion, Trulls Road will be upgraded at the rail corridor. Development on lands adjacent to the rail crossing, and on other lands that may be affected by a future upgrade, may be required to dedicate land and/or incorporate appropriate setbacks to accommodate the upgrades. 10.4 Collector Roads 10.4.1 Collector Roads shall be designed in accordance with the road classification criteria in Appendix C, Table C-2 of the Clarington Official Plan. Collector Roads shall include the following elements: a) A minimum of two through lanes shall be provided, and turn lanes may be required at intersections; b) Sidewalks shall be provided on both sides. c) Cycling shall be accommodated in separated bike lanes within the roadway, in raised lanes (cycle tracks) adjacent to the roadway or on a multi -use path on one or both sides of the road. d) Planting and furnishing zones shall be provided on both sides of the roadway and have sufficient width to accommodate appropriate low-impact development measures. 10.4.2 Notwithstanding policy 10.4.1, Street E shall have a 26-metre right-of-way to accommodate a continuous, generous tree-lined multi-use path on one side. 10.5 Local Roads and Mews 10.5.1 Development will be accessed and serviced by Local Roads generally with right- of-way widths between 18 and 20 metres, except the Streets A and D identified in Schedule C, which may require a width of 23 metres. New Local Roads shall be designed in accordance with the road classification criteria in Appendix C, Table C-2 of the Clarington Official Plan. They shall include the following: a) Local Roads shall feature sidewalks on both sides and generally shall also have street trees on both sides to enhance the tree canopy and establish a strong green character for CTOC. b) On-street parking shall generally be accommodated on one side of the right-of-way. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 40 c) A planting and furnishing zone shall be provided on both sides of Local Roads of sufficient width to accommodate appropriate low-impact development measures. d) A multi-use path including appropriate signage and/or pavement markings shall be provided on at least one side of the right-of-way or, alternatively, bike lanes shall be accommodated on Streets A and D as shown on Schedule C. 10.5.2 Local Roads generally shall be permitted to intersect with Arterial Roads, where the Municipality and Region are satisfied such intersections will not cause an undue safety risk to drivers, pedestrians and cyclists. 10.5.3 Private streets are vehicular connections between public streets that are deemed necessary to enhance vehicular and pedestrian permeability. Private streets may be permitted through the development application process, subject to the following to the satisfaction of the Municipality: a) They include pedestrian amenities such as sidewalks, lighting and street trees or other plantings; b) Access points to parking spaces shall meet municipal road standards; c) No buildings or off-street parking spaces shall encroach into the private street right-of-way; and d) The developer shall provide for the future transfer of the rights -of-way to the Municipality at the Municipality’s discretion. 10.5.4 Mews are streets designed primarily for pedestrians and cyclists and may be dedicated full-time or part-time to active transportation but generally also accommodate vehicles. Proposals for public and private mews will be subject to the approval of the Municipality on a case-by-case basis and shall demonstrate that they will support the placemaking objectives of this Plan and will not have a significant adverse impact on the functioning of the larger road network in the area. Mews may or may not include curbs but in all cases shall clearly demarcate zones for pedestrians. 10.6 Rear Lanes 10.6.1 Public or private Rear Lanes are strongly encouraged to support safe and attractive streets by providing access to driveways, garages, loading and servicing areas, and other back-of-house uses away from the street-facing frontage. Access to commercial loading areas shall generally be provided from Rear Lanes. 10.6.2 Rear Lanes may be required where development fronts onto an Arterial or Collector Road and for townhouse developments. 10.6.3 Public utilities may be located within public Rear Lanes subject to functional and design standards established by the Municipality. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 41 10.6.4 Rear Lanes shall be designed in accordance with the road classification criteria in Appendix C, Table C-2. They shall meet the following criteria: a) Rear Lanes shall allow two-way vehicular travel and incorporate a setback on either side of the right-of-way to the adjacent garage wall or private fence. b) Rear Lanes shall provide access for service and maintenance vehicles for required uses as deemed necessary by the Municipality and may include enhanced laneway widths and turning radii to accommodate municipal vehicles, including access for snowplows, garbage trucks and emergency vehicles where required. c) Rear Lanes shall be clear of overhead obstruction and shall be free from overhanging balconies, trees and other encroachments. d) Rear Lanes shall intersect with public roads. e) No municipal services, except for local storm sewers, shall be allowed, unless otherwise accepted by the Manager of Development Engineering. f) No Regional Municipality of Durham infrastructure shall be permitted. g) Rear Lanes shall be graded to channelize snow-melt and runoff. h) The design of Rear Lanes may incorporate appropriate elements of low - impact design, such as permeable paving, where sufficient drainage exists. i) Appropriate lighting shall be provided to contribute to the safe function of the roadway for all users, including pedestrians, cyclists, drivers and service/emergency vehicles. 10.7 Active Transportation 10.7.1 Key active transportation connections shall be implemented in general accordance with Schedule C and will include dedicated cycling lanes, sidewalks and multi-use paths in public rights-of-way. These will be complemented by multi- use paths within parks and other public open spaces . 10.7.2 Where a multi-use path is located within the right-of-way of a Collector Road or Key Local Road, as will be the case with Street E and may be the case with Streets A and D, private driveways crossing the path shall be minimized and generally shall not be permitted for accessing individual dwelling units to avoid conflicts between vehicles and path users. Short blocks that result in frequent Local Roads crossing multi-use paths shall be discouraged for the same reason. 10.7.3 The Municipality will work with the Conservation Authority to develop trail networks within and adjacent to the Robinson Creek and Tooley Creek valleys, as conceptually illustrated in Schedule C. The trail networks shall be accessible from parks and public roads. They shall include Primary and Secondary Trails as defined in Section 18.4 of the Clarington Official Plan. 10.7.4 The location, alignment and design of trails shall be subject to the following: Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 42 a) Trail design and type will be based on each site’s sensitivity to minimize environmental impacts and will be designed to accommodate a range of users and abilities. b) Trails will be directed outside of sensitive natural areas where possible or to the outer edge of vegetation protection zones. c) Trails located adjacent to natural features and stormwater management facilities should incorporate interpretive signage at various locations to promote understanding and stewardship of the features and functions of the natural environment. d) Trails should be integrated with the maintenance access route, where feasible, to minimize the impermeable surface area and natural heritage system disturbances. 10.7.5 Proposed trails in or adjacent to Environmental Protection Areas shall be subject to Environmental Impact Studies. 10.8 Transit Facilities 10.8.1 The Municipality will ensure that transit facilities are integrated early and appropriately throughout CTOC by including Durham Region Transit in all development pre-application meetings and ensuring that transit requirements are addressed through municipal capital works and private development applications. 10.8.2 The design of transit stops shall incorporate appropriate amenities, with the following to be considered: transit shelters, seating, tactile paving, bike racks, curb cuts and appropriate lighting. Generally, transit stops at major intersections shall include shelters and seating. 10.8.3 The Transit Facilities Zone identified in Schedule A is the preferred location for transit facilities related to the GO station, including commuter parking, passenger pick-up and drop-off areas, bus terminals and the GO station building itself. Such facilities may be standalone but shall be sited and designed to optimize the station area for concurrent or future mixed -use development and to accommodate direct pedestrian connections from the station to the public street network and future development. The policies in Section 12.2 of this Plan shall also apply. 11 Servicing 11.1 Objectives 11.1.1 Design buildings, infrastructure and the community as a whole to high standards for energy and water conservation. 11.1.2 Design buildings, infrastructure and open spaces to mitigate the impacts of severe storms, flooding, and the broader impacts of climate change. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 43 11.1.3 Ensure servicing infrastructure is located and designed to serve the planned population efficiently while providing capacity for intensification over time. 11.1.4 Ensure roads and municipal services required for any part of the neighbourhood are in place and operative prior to or coincident with development. 11.1.5 Ensure engineering and other design standards for the public realm and utilities are applied consistently across CTOC. 11.1.6 Ensure the Municipality’s capital budget anticipates infrastructure and community facilities required within CTOC in the long term. 11.2 General Policies 11.2.1 All new development within the CTOC Secondary Plan area will be serviced by municipal water and sewer services and stormwater management facilities. Existing development within the Secondary Plan area shall, over time, also be connected to these same services, where appropriate. 11.2.2 New development will proceed based on the sequential extension of full municipal services in accordance with the municipal capital works program. 11.2.3 Development applications are required to demonstrate there is adequate servicing supply and capacity available to support the proposed level of density in the context of existing and proposed development across the Plan area. 11.2.4 Any Regional infrastructure required to support the development of CTOC is subject to the annual budget and business planning process. 11.2.5 The Municipality will work with the landowners and the Regional Municipality of Durham to develop a plan for the phasing of extensions to existing services. A phasing plan will be prepared as part of a functional servicing report by development proponents at the time an application for draft plan of subdivision is submitted. 11.2.6 Approval of development applications shall be conditional upon commitments from the appropriate authorities and the proponents of development to the timing and funding of required stormwater management, sanitary sewer and water supply facilities. These works shall be provided for in subdivision and site plan agreements. Phasing of development, based on the completion of external sewer and water services, may be implemented if required by the Municipality of Clarington. 11.2.7 Development proponents and the Municipality will seek to incorporate infrastructure and utilities in a manner that is sensitive to the quality of the public realm and design of the street network, and which reduces the impact of development on hydrologic and ecological systems. 11.2.8 A Master Drainage Plan for CTOC Secondary Plan area shall be completed to the Municipality’s satisfaction prior to the submission of development applications for new land uses. The Master Drainage Plan shall address the recommendations of the Robinson and Tooley Creek Flood Mitigation Study. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 44 Regulatory Storm control may be required and must be designed to the satisfaction of the Conservation Authority and the Municipality of Clarington 11.3 Stormwater Management 11.3.1 Schedule A identifies general locations for stormwater management facilities in CTOC. These locations shall be confirmed by a Master Drainage Plan and Stormwater Management Reports submitted with development applications, and the areas for stormwater management facilities shall be identified in plans of subdivision. Alternative locations for stormwater management facilities may be approved by the Municipality without amendment to this Plan. Stormwater management facilities generally shall be located away from arterial roads, wherever possible, to optimize arterial corridors for development. 11.3.2 Stormwater management facilities, such as ponds and low-impact development features, shall be used to mitigate the impacts of development on water quality and quantity, consistent with the Robinson Creek and Tooley Creek Subwatershed Study and the policies of Section 20 of the Clarington Official Plan. Such facilities shall not be located within natural heritage features but may be permitted within the vegetation protection zone provided the intent of the vegetation protection zone is maintained and it is supported by an Environmental Impact Study. 11.3.3 The precise siting of stormwater management facilities shall make use of natural drainage patterns to minimize the risk of flooding. Stormwater management facilities will not drain lands located in another subwatershed. 11.3.4 Any crossings of valley features, flood plains and water courses shall be required to consider wide open bottom culverts that have the width and height to facilitate floodplain conveyance as well as wildlife crossings for mammals off roads to avoid vehicle and wildlife fatalities. 11.3.5 Drainage patterns shall have regard for the existing drainage divide between Robinson Creek and Tooley Creek lands. 11.3.6 Future stormwater system updates shall consider the 2051 urban expansion area in upcoming secondary plans and include analysis for Regional release rate targets to verify the flood mitigation strategy and any additional work need to understand the impacts of additional lands upon downstream flooding and stormwater management requirements. 11.3.7 Proposed stormwater management quality, quantity, erosion control and water balance for ground water and natural systems may be assessed during the development approval process to determine the impact on the natural heritage system and environmental features. 11.3.8 The submission of the following plans and reports, prepared in accordance with the Subwatershed Study, shall be required to determine the impact of stormwater quality/quantity, erosion and water balance of the proposed development: Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 45 a) Stormwater Management Report and Plan; b) Erosion and Sediment Control Plan; c) Servicing Plans; d) Grading Plans; e) Geotechnical reports; f) Hydrogeologic reports; and g) Other technical reports as deemed necessary. 11.3.9 The Stormwater Management Report and Plan identified in policy 11.3.8 and prepared in accordance with the Subwatershed Study shall explore and consider the feasibility of and opportunities to implement such low-impact development measures as: a) Permeable hardscaping; b) Bioretention areas; c) Exfiltration systems; d) Bioswales and infiltration trenches; e) Third pipe systems; f) Vegetation filter strips; g) Green roofs (multi-unit buildings); h) Rainwater harvesting; and i) Other potential measures. 11.3.10 The Stormwater Management Report and Plan identified in policy 11.3.8 shall demonstrate how the water balance target set in the Subwatershed Study is achieved. If the water balance target is not achieved, a justification shall be submitted for review and acceptance by the Municipality of Clarington. 11.3.11 Stormwater management for all development shall be undertaken on a volume control basis and shall demonstrate the maintenance of recharge rates, flow paths and water quality to the greatest extent possible. Peak flow control, off peak storage, water reclamation and/or reuse and the maintenance of pre- development water balance shall be demonstrated. 11.3.12 High Volume Recharge Areas shall maintain a pre-development water balance. 11.3.13 Stormwater management facilities shall incorporate naturalized landscaping and accommodate trails and seating areas where appropriate. 11.3.14 Development of all low- and medium-density dwellings shall demonstrate the use of an adequate volume of amended topsoil or equivalent system to improve surface porosity and permeability over all turf and landscaped areas beyond three metres of a building foundation a nd beyond tree protection areas. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 46 11.3.15 Development is encouraged to promote water conservation and efficiency, including through strategies such as installing rainwater harvesting and recirculation/reuse systems, using water efficient and drought resistant plant materials where appropriate, supporting oth er agencies with programs related to water conservation and water demand management, and considering technological and other system improvements. 11.3.16 Green roofs, where applicable, shall be designed to help manage stormwater. 11.3.17 The public realm will be designed to manage the quantity and quality of stormwater run-off and mitigate the potential for downstream erosion during storm events. 11.3.18 Xeriscaping using native, drought-tolerant plants as a cost-effective landscape method to conserve water shall be encouraged. 11.3.19 The irrigation of street trees through green infrastructure or other passive means may be considered as part of the broader stormwater management system to improve the resilience of the urban tree canopy. 12 Implementation and Interpretation 12.1 Objectives 12.1.1 Ensure roads, road improvements, and municipal services required for any part of the neighbourhood are in place and operative prior to or coincident with development. 12.1.2 Support the timely delivery of public access to parkland, schools and other community amenities. 12.1.3 Ensure engineering and other design standards for the public realm and utilities are applied consistently across CTOC. 12.1.4 Ensure the Municipality’s capital budget anticipates infrastructure and community facilities required within CTOC in the long term. 12.2 Policies 12.2.1 A Zoning By-law shall be an essential tool used to implement the policies of this Secondary Plan. 12.2.2 The policies of this Secondary Plan shall be considered when making decisions related to development of the lands within the CTOC Secondary Plan Area. The policies of this Secondary Plan shall be implemented by exercising the powers conferred upon the Municipality by the Planning Act, the Municipal Act and any other applicable statues, and in accordance with the applicable policies of the Official Plan. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 47 12.2.3 Submission of a Context Plan may be required with applications for rezoning, plan of subdivision or site plan approval. 12.2.4 The purpose of a Context Plan is to demonstrate how proposed development will relate and connect to existing or planned development on surrounding lands and guide coordinated implementation of required infrastructure and community facilities. Context Plans will identify the following: a) The limits of Environmental Protection Areas based on area-specific Environmental Impact Studies; b) Planned public roads and active transportation connections, including mid - block pathways; c) Private streets, where appropriate, and other privately -owned connections where a public easement may be required; d) Existing and planned land uses; e) Planned parks; f) Delineated sites planned or reserved for schools and other community facilities; g) Areas for stormwater management facilities and low-impact development features; and h) Proposed sites and frontages for retail uses. 12.2.5 The boundaries of Context Plans will be determined by the Municipality and generally will extend to the second Arterial or Collector Road beyond the development site. Consultation with landowners within the Context Plan area may be required to ensure the plan accurately reflects intended, proposed and planned development in the area. 12.2.6 Alternative development standards for infrastructure may be developed and approved for specific areas or all of CTOC without amendment to this Plan, provided they meet the intent and support the objectives of the Plan. 12.2.7 An existing use of land, building or structure that is lawfully in existence prior to the passage of the implementing Zoning By-law, and which does not conform to this Secondary Plan but continues to be used for such purposes, shall be deemed to be legal non-conforming. Expansions and extensions of legal non- conforming uses will require an application to the Committee of Adjustment and may be permitted provided the expansion or extension continues the non- conforming use. 12.2.8 Non-conforming uses shall be encouraged to relocate or redevelop so that the subject land may be used in conformity with the policies of this Secondary Plan and the provisions of the implementing Zoning By-law. 12.2.9 It is the intent of the Municipality to permit some flexibility in accordance with Official Plan policy 24.1.5 in the interpretation of the policies, regulations and numerical requirements of this Secondary Plan except those regarding minimum Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 48 densities and minimum and maximum heights, where this Secondary Plan is intended to be prescriptive. 12.2.10 The Urban Design and Sustainability Guidelines appended to this Secondary Plan as Appendix A provide specific guidelines for both the public and private realms. They clarify the Municipality’s expectations with respect to the form, character and qualities of development in the CTOC area. 12.2.11 The Municipality encourages utility providers such as hydroelectric power, communications/telecommunications facilities and utilities, broadband fibre optics, and natural gas to ensure that sufficient infrastructure is or will be in place to serve the Plan area. 12.2.12 All new development within the Secondary Plan area shall proceed on the basis of the sequential extension of full municipal services through the Regional and Municipal capital works programs and plans of subdivision. 12.2.13 Development applications for lands abutting existing Arterial Roads and Collector Roads may require the dedication of land for road widenings or road upgrades, as determined by the Municipality or Region. 12.2.14 Approval of development applications shall be conditional upon commitments from the appropriate authorities and the proponents of development to the timing and funding of required infrastructure and community facilities, including roads, sanitary sewers, water services, stormwater management facilities, parks, schools and other community facilities. These works shall be provided for in the subdivision and site plan agreements. Phasing of development, based on the completion of the external public works, may be required by the Municipality. 12.2.15 The Secondary Plan recognizes that comprehensive planning requires the equitable sharing amongst landowners of the costs associated with the development of land. It is a policy of this Secondary Plan that prior to the approval of any draft plan of subdivision, applicants/landowners shall have entered into appropriate cost sharing agreements that establish the means by which the costs of developing the property, which may include parks, roads, road improvements, external services, stormwater management facil ities, public/private utilities, schools, fire and emergency facilities, and all related community costs, are to be shared. The Municipality will require, as a condition of draft approval, that proof be provided to the Municipality that landowners have met their obligations under the relevant cost sharing agreements prior to registration of a plan of subdivision. 12.2.16 Landowners are encouraged to enter into a Master Parkland Agreement with the Municipality prior to the approval of any draft plan of subdivision. The Master Parkland Agreement shall identify the minimum size and general location of parks that shall be provided and dedicated in accordance with Schedule A. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 49 12.2.17 The Municipality will require, as a condition of draft approval, that proof be provided to the Municipality that landowners have satisfied all their parkland obligations with respect to the Master Parkland Agreement prior to registration of a plan of subdivision. 12.2.18 In accordance with Provincial legislation and regulations, Council may impose a transit station charge against land to pay for costs related to the construction of the GO Transit Station (should the Municipality choose to fund the station). 12.2.19 Development applications shall include the following information : a) Net residential density by land use designation; b) Identification of total area of non-residential land uses; c) Number and type of units by land use designation; d) Total development application unit count; e) Estimated population; f) Amount/type of non-residential space and number of jobs; and g) Number of purpose-built additional dwelling units. 12.2.20 All policies of the Clarington Official Plan shall apply to this Secondary Plan Area. Policies that cite specific Clarington Official Plan policies have been provided for convenience only. 12.2.21 The CTOC Secondary Plan has been prepared to align with the policies of the Official Plan. The policies of this Secondary Plan, along with Maps and Appendices shall be read and interpreted in conjunction with the policies of the Official Plan. 12.2.22 In the event of a conflict between the Official Plan and this Secondary Plan, the policies of the Secondary Plan shall prevail. 12.2.23 Where examples of permitted uses are listed under any specific land use designation, they are intended to provide examples of possible uses. Other similar uses may be permitted provided they conform to the intent and all applicable provisions of this Secondary Plan. 12.2.24 The Municipality recognizes the need for a degree of flexibility and allow for well-designed buildings that respond appropriately to the conditions of their site and its surroundings and are consistent with the principles of this Plan and meet the general intent of its policies. Where “generally” is used to qualify a built form policy found in Section 9.5 of this Plan, it is expected the requirement will be met except where an applicant has demonstrated to the Municipality’s satisfaction that site-specific conditions warrant the consideration of alternatives, and that the proposed alternative built form parameters meet the general intent of the policy. Such exceptions shall not require an amendment to this Secondary Plan. Courtice Transit-Oriented Community (CTOC) Secondary Plan – Draft for Review 50 12.2.25 The Municipality will monitor the policies of this Secondary Plan and propose updates as deemed necessary. DRAFT LEGEND DRAFT Schedule B - Parks and Community Facilities LEGEND LEGEND DRAFT Schedule C - Roads and Active Transportation Network Courtice Transit Oriented Community APRIL 2025 URBAN DESIGN & SUSTAINABILITY GUIDELINES DRAFT Appendix A TABLE OF CONTENTS 1. INTRODUCTION 1 1.1. PURPOSE OF THE GUIDELINES 2 1.2. STRUCTURE OF THE GUIDELINES 2 1.3 HOW TO INTERPRET AND USE THE GUIDELINES 2 2. CTOC VISION AND COMMUNITY STRUCTURE 3 2.1. VISION 4 2.2. COMMUNITY STRUCTURE 4 3. PRIVATE REALM GUIDELINES 7 3.1. HIGH-RISE AND MID-RISE MIXED USE AND RESIDENTIAL BUILDINGS 8 3.2. LOW-RISE BUILDINGS 13 3.3. OFFICE BUILDINGS 17 3.4. INDUSTRIAL BUILDINGS 19 4. PUBLIC REALM GUIDELINES 21 4.1. ROAD NETWORK AND BLOCK PATTERN 22 4.2. TRANSPORTATION NETWORK 23 4.3. STREETSCAPES 37 4.4. TRANSIT FACILITIES ZONE 41 4.5. PARKS AND OPEN SPACES 41 4.6. SCHOOLS AND OTHER COMMUNITY FACILITIES 46 4.7. ENVIRONMENTAL PROTECTION AREAS 47 5. GREEN DESIGN GUIDELINES 49 5.1. ENERGY AND WATER CONSERVATION AND EFFICIENCY 50 5.2. LANDSCAPE AND STORMWATER MANAGEMENT 51 1 INTRODUCTION The Municipality of Clarington is committed to building well-designed urban environments that support sustainability goals, ecomomic prosperity and a high quality of life. This section sets the context for the Courtice Transit Oriented Community Urban Design and Sustainability Guidelines. It addresses the document’s purpose and explains how it is organized and intended to be used. 2Urban Design and Sustainability Guidelines 1.1. Purpose of the Guidelines The Courtice Transit Oriented Community (CTOC) is within Courtice’s urban boundary, south of Bloor Street, east of Robinson Creek, west of Tooley Creek and north of Highway 401. These Guidelines apply to the CTOC Secondary Plan Area, including the Protected Major Transit Station Area (PMTSA) around the future Courtice GO Station. The CTOC Urban Design and Sustainability Guidelines (CTOC Guidelines) complement and support the CTOC Secondary Plan. They provide a comprehensive set of design principles and urban design direction applicable to all forms of development to guide the CTOC area’s transformation into a complete, mixed-use, transit- supportive community. 1.2. Structure of the Guidelines Section 1: Introduction – provides an overview of the context for the CTOC Guidelines and addresses their purpose, how they’re structure and how they are to be used. Section 2: Vision and Community Structure – describes the vision for CTOC and the key elements that will organize future development. A Demonstration Plan conceptually illustrates the vision, showing one potential outcome of applying the Secondary Plan policies and these Guidelines. Section 3: Private Realm Guidelines – contains guidelines for various building types, such as high-rise, mid-rise and Section 4: Public Realm – contains guidelines applicable to the street network, active transportation facilities, transit facilities, streetscapes, parks and open spaces, community facilities and environmental protection areas. Section 5: Green Design Guidelines - provides direction on how development can promote environmental sustainability, with a focus on energy and water conservation and stormwater management. 1.3 How to Interpret and Use the Guidelines The CTOC Guidelines will help to implement the Secondary Plan policies and provide greater clarity on policy intentions for urban design, streetscapes, built form and environmental sustainability. The Guidelines will be Plan policies, the implementing Zoning By-law and the Municipality of Clarington’s General Architectural Design Guidelines in reviewing development applications to ensure a high level of urban design and sustainability is achieved. Development proposals that differ from these Guidelines may still be considered if they meet the intent of the CTOC Secondary Plan and Guidelines. Evaluation will be based on the merits of the development proposal. Where there Architectural Design Guidelines, the CTOC Guidelines shall prevail. The CTOC Guidelines are intended to be used by the building and development industry in the preparation of development proposals. Municipal staff will refer to the Guidelines in their review of development applications, including draft plan of subdivision, zoning by-law amendment, and site plan control applications. 2 CTOC VISION AND COMMUNITY STRUCTURE 4Urban Design and Sustainability Guidelines 2.1. Vision The Courtice Transit Oriented Community is envisioned to be a unique new green community offering all types of housing to accommodate 29,000 residents, a variety of jobs for more than 8,000 workers, and a full range of amenities. CTOC will be inclusive. A range of housing choices will be provided, including single-detached and semi-detached houses, townhouses, duplexes, triplexes, quadplexes and of affordable ownership and rental housing as well as supportive housing to ensure the needs of individuals and families at all stages of life can be met. CTOC will be diverse. A variety of housing and employment opportunities will help ensure the community is socially diverse. This will be matched with diversity in the built environment—housing at all scales; different styles of architecture; a mix of shops, restaurants and entertainment; and open spaces and indoor facilities for all manner of recreational interests. CTOC will be vibrant. The design of neighbourhoods, parks and streetscapes and a high-density, mixed-use core will encourage street life, social interactions and community gatherings. Institutional uses, a high-quality public realm and a diverse local economy will support ongoing vitality and attract visitors from across the region. CTOC will be connected. The future Courtice GO station, adjacent highways and existing arterial roads will connect residents and businesses to destinations and communities across the Greater Toronto Area. An interconnected network of local streets, trails, pathways and bike lanes will make it easy to get around by walking, cycling and taking local transit. CTOC will be green. The valley lands and forests that surround CTOC will provide a rich green setting for development, and neighbourhood parks scattered across the community will provide a gathering and play space for every neighbourhood. A central park and urban squares will offset the high density of development in the core and provide places for respite, picnicking and events. Environmental design features applied to buildings, open spaces, infrastructure and the community as a whole will help ensure CTOC supports Clarington’s Priority Green goals and standards for sustainability. 2.2. Community Structure The vision, principles, and objectives of the CTOC Secondary Plan are supported by a community structure Natural Areas: The valley lands of Robinson Creek and Tooley Creek, tributaries that feed them and forested areas together surround the CTOC Secondary Plan Area, and establish a rich and sensitive green setting for development. As these areas are protected and enhanced, they will become an amenity for future residents and visitors, fundamental to the community’s environmental health and social well-being. Highways: Highways 401 and 418 are not technically within the CTOC area but nevertheless play a vital role in its physical structure. They help to frame the area, and their and access the highways afford. Future Courtice GO Station: The growth and prosperity of CTOC will depend on a multi-modal transportation network centred on the future Courtice GO Station. The station and surrounding lands provide a focus for high-density housing, together with a pedestrian-friendly public realm, contribute to creating a unique mixed-use district. Transit Corridor: Courtice Road is a Regional Corridor that will be the primary transportation route to and through CTOC for transit, commercial and personal vehicles. As such, it will be a focus for transit-oriented development and streetscaping that supports active transportation and reinforces Clarington’s identity as an attractive, sustainable community. Green Active Transportation Spine: Between Trulls Road and Courtice Road, a continuous north-south landscaped multi-use path will function as a green active transportation corridor that connects neighbourhoods, parkland and forest in the north half of the PMTSA to the future GO Station and other destinations in the south half. In the long term, the green spine may be extended to the Courtice waterfront via a pedestrian/bicycle bridge over Highway 401. Parks and Open Space Network: Future residential and mixed-use neighbourhoods will be centred on ensure most residents are within short walking distance of public green space. In addition, a central “Special Park” will serve all of CTOC and, as a multi-purpose space for 5 Courtice Transit Oriented Community (CTOC) Secondary Plan events, is expected to be a civic destination for all Courtice residents. Multi-use paths and mid-block connections throughout the community will further contribute to a green framework for development. High-Density Mixed-Use Core: The core of CTOC, centred on the future GO station, will be the area for the highest densities of development, the tallest buildings and the greatest range housing, working, shopping, dining and entertainment. At the edges of the core, development will be less intense to provide a transition to lower scale neighbourhoods. Urban Residential Areas: North and west of the core, CTOC will comprise mostly low-rise neighbourhoods at varying densities and with a variety of housing types as well as neighbourhood-oriented commercial amenities. Within the PMTSA, medium-density forms of housing will be dominant, while west of Trulls Road there will be a full range of residential types, from detached homes to mid-rise apartment buildings. Interconnected local street networks will connect neighbourhoods to one another and to the attractions in the core. Employment Areas: South of the rail corridor, areas against Highway 401 will be maintained mostly for industrial broaden employment opportunities for Courtice residents. Complementing the Clarington Energy Park, these areas will provide a stable environment for the growth of established and new businesses that diversify Clarington’s economy. Figure 1: Community Structure 6Urban Design and Sustainability Guidelines 3 PRIVATE REALM GUIDELINES The private realm encompasses properties that will remain in private ownership and includes both buildings and the sites they occupy. This represents the majority of development areas within the Courtice Transit Oriented Community. A wide variety of new development is planned, ranging from low-rise to high-rise and containing industrial uses. The design and quality of to creating a livable and healthy new community. 8Urban Design and Sustainability Guidelines 3.1. High-Rise and Mid-Rise Mixed Use and Residential Buildings High-rise and mid-rise buildings are permitted in the Mixed Use Core and Mixed Use Transition Area land use designations, providing the highest densities around the GO Station and along Arterial Roads. Mid-rise buildings are also permitted along major roads and across from parks and other open spaces within the Medium Density Residential area. High-rise buildings are generally those above 10 storeys, while mid-rise buildings are generally 5-10 storeys. Both building typologies may contain a mix of uses or solely residential uses, depending on their location. In the Mixed Use Core and Mixed Use Transition Area, high-rise and mid- rise buildings will support the development of a community hospitality, retail, commercial and institutional uses. These building types will form the foundation of this new urban area, and will be carefully designed with a high quality of realm, prioritize pedestrian movement, and be well-integrated with adjacent uses and buildings. 3.1.1. GENERAL SITE AND BUILDING DESIGN A. Buildings should be oriented towards streets and open spaces to frame the public realm and support pedestrian-friendly environments. B. and planned context and mitigate potential impacts of height, massing, and shadow on their surroundings, including nearby lower scale areas, cultural heritage resources, planned open spaces, and existing natural areas. C. Main building walls should establish a consistent streetwall to create a sense of enclosure and frame the public realm. D. In the Mixed Use Core and Mixed Use Transition Area, mixed-use buildings should have a consistent setback along the street between 2 and 5 metres to provide space for a wide walking zone, restaurant patios and retail displays, where appropriate. E. setbacks generally should be 1-3 metres, except where forecourts are appropriate. F. with entrances on the street, a setback of 3-5 metres should be provided for a buffer between the public and private realms and room for stairs, porches and elevated patios. G. On large sites, through-block pedestrian connections and grade-related, publicly accessible open spaces should be provided on-site to complement, connect, and extend the existing network of public streets, parks, and open space. H. Sites should be designed to integrate natural constraints and features on the site, where applicable. I. Buildings should be located and oriented to maximize penetration and minimize shadow and wind impacts on the public realm and surrounding properties. J. Building design should include environmental controls such as canopies, awnings, and louvers to regulate sun and wind exposure. K. Building design should, where possible, incorporate sustainable building features, such as water collection and storage, photovoltaic applications, green roof design, high albedo surfaces and extended eaves for sunshade. Buildings should be articulated with high- design excellence, innovation and building longevity. Mixed-use high-rise building framing the street 9 Courtice Transit Oriented Community (CTOC) Secondary Plan L. Architectural variation, texture, and materiality should be incorporated into the design of buildings to establish community identity and enhance visual interest. M. Building façades should incorporate bird-friendly design elements, such as sunshades or louvers, visual markers minimize the potential for bird collisions. N. On corner sites where the intersecting streets are different types, buildings should be designed to respect and respond to the planned height, scale, and built-form character of both streets. O. Vehicular access and loading/servicing areas should be located away from streets and major open spaces to maintain a pedestrian-friendly public realm. P. Vehicular access should be located off secondary streets, where feasible, integrated into the design of the building to mitigate their visual impact on the public realm. Q. Where high-rise or mid-rise buildings are adjacent to lower-scale buildings, transitions in the form of separation and /or stepped massing should be provided to maintain privacy and mitigate the potential for overlook and shadowing. R. Building frontages should be articulated, and where appropriate, breaks should be introduced along the streetwall to help break up the perceived mass of longer buildings and to mitigate wind impacts. S. residential uses, or the potential to convert uses in 4 metres for commercial uses and 3.5-4.5 metres for residential uses. 3.1.2. MASSING OF HIGH-RISE BUILDINGS A. High-rise apartment buildings may generally be in the range of 11 to 40 storeys, and in some cases up to 45 storeys, depending on their location, in accordance with CTOC Secondary Plan policies. B. High-rise buildings should be architecturally interesting and create a cohesive design composition through their proportion, scale, massing and building materials. or podium that can support and frame the public realm, helping to create an inviting and comfortable pedestrian environment; a middle section, or tower, that can mitigate the perception of bulk and impacts on the public realm; and a top section that creates an interesting skyline. C. Podiums should have heights that related to the width of the adjacent road right-of-way, generally 3-6 storeys. Above the building base, stepbacks should generally be incorporated to distinguish the tower from the building base. This perception of articulation can also be achieved in alternative ways, including the use of cantilevers, canopies and material changes. 10Urban Design and Sustainability Guidelines D. The building tower should be designed to ensure access to sky views and daylight, mitigate shadows and adverse microclimate conditions on the public realm and private amenity areas, and maintain privacy i. Staggering towers on a block and across blocks wherever possible. ii. Floorplates should not exceed 850 square metres iii. Towers facing one another, partially or entirely, including projections, should be separated by a minimum of 30 metres. Staggered towers should be a minimum of 25 metres apart. 3.1.3. MASSING OF MID-RISE BUILDINGS A. Mid-rise apartment buildings may be up to 10 storeys, depending on their location, in accordance with CTOC Secondary Plan policies. B. Mid-rise buildings should be designed as compact, street-related building forms with a strong streetwall C. Long mid-rise buildings should break up their mass with offset facades, vertical recesses and/or changes in material or colour. Generally, mid-rise buildings should not exceed 70 metres in length. 3.1.4. FACADES AND ENTRANCES A. On commercial streets, the base building should include continuous active commercial, institutional or other active uses, with the exception of areas required for lobbies. B. On secondary street frontages where a commercial be provided to accommodate the transition to active commercial uses over time. C. Additional setbacks from the property line should be incorporated in strategic locations to accommodate urban squares, seasonal retail and patio space, extensions of the streetscape, public art, and entrances to above-grade uses. D. Building façades visible from the public realm should be well-articulated and incorporate a rhythm of transparent glass and solid materials, while avoiding blank walls. E. Principal entrances to commercial units should be designed to be oriented towards and highly visible from the public realm and located at the same level as the sidewalk. F. should be designed in highly visible locations with direct access from the public realm. Commercial entrances set back from the pedestrian clearway, with bicycle parking, street furniture and weather protection 11 Courtice Transit Oriented Community (CTOC) Secondary Plan G. Architectural treatments, accent illumination and landscaping may also be incorporated to accentuate building entrances. H. Ground level residential units directly accessed from the public realm should establish a transition between public and private space through a combination of setbacks, low fencing, stairs, hedges, planters and/or elevated patios. I. Weather protection elements, such as awnings, canopies, and projecting façade elements, should be incorporated to provide coverage at main entrances, entrances. Where provided, these elements should provide a generous vertical clearance above grade. J. Balconies and other projections should be architecturally integrated into the structure and detailing of the building. Generally, balconies should be partially or wholly recessed to avoid being a dominant architectural feature and mitigate the visual impact of balconies used for private storage on the public realm. Balcony railings made entirely of transparent glass should be avoided. 3.1.4. ROOFTOP ELEMENTS, MECHANICAL EQUIPMENT AND UTILITIES A. The architectural treatment of the rooftop should be designed to complement the overall building design and integrate penthouses, stair towers, elevator towers and mechanical equipment. B. Roof-top mechanical or telecommunications equipment, signage, and amenity space, where appropriate, should be integrated into the design and be screened with durable materials integrated with the design of the building. C. Mechanical systems and utilities, such as drainage pipes, vents and meters, should be architecturally integrated into the façade and building design and screened from view from the public realm. 3.1.5. PEDESTRIAN CIRCULATION, LANDSCAPING AND AMENITY A. Landscape design should incorporate trees and a mix of soft and hard landscaping. Existing mature trees should be retained, where possible B. Clear, direct and accessible walkways should be provided from the sidewalk to the main entrance of buildings. C. Mid-block pedestrian connections should be provided in blocks over 100 metres long to improve pedestrian permeability and connectivity. D. Green roofs should be integrated into mid-rise and high- rise building rooftops. E. Shared private outdoor amenity space should be provided within building sites for residential and some non-residential uses, located at grade and/or on building rooftops. F. Amenity spaces should be designed to maximize access to sunlight, minimize noise and air quality impacts from site servicing and mechanical equipment, and include elements that facilitate use year-round for people of all ages and abilities. The following accessible, and environmentally sustainable materials; four-season landscaping; seating; pedestrian-scale lighting; trees and other vegetation; shade structures; weather protection; privacy screening; children’s play structures; and barbecue equipment. G. Where possible, interior amenity spaces should be located adjacent to shared outdoor amenity areas and provide windows and doors for direct physical and visual access between these spaces. H. Places for pet runs either at the rear or side of the building at-grade or on a shared rooftop space are encouraged. I. In residential or mixed-use developments, family-sized units should have access to secure outdoor play space and equipment, and should be located with windows and balconies overlooking outdoor play areas. Wide and landscaped mid-block connection 12Urban Design and Sustainability Guidelines 3.1.6. VEHICULAR CIRCULATION, PARKING, LOADING AND SERVICING A. Vehicular entrance locations should be minimized in width and consolidated and shared where possible in order to reduce the extent of curb cuts in the streetscape, maximize opportunities for soft pedestrians along the sidewalk. B. Wherever possible, vehicular access ramps should be provided from a secondary street and separated from parks, amenity spaces or other open spaces. C. Vehicular circulation should be located and designed to minimize visual impacts on adjacent properties, pedestrian movement and the public realm. D. All required vehicle parking should be provided on-site. E. Underground parking is strongly encouraged, with driveway entrances integrated into the building design and envelope. F. Surface parking may be located at the rear of buildings and is not permitted in the front or side yard of buildings, with the exception of accessible parking spaces. G. Above-ground structured parking should be wrapped with residential units or active uses or otherwise integrated into the design of a building to separate parking areas from the public realm. H. Above-ground structured parking facilities should be designed to allow for conversion to other uses in the future. 3.1.7 LOADING AND SERVICING A. Buildings should be designed to accommodate separated waste stream storage and collection. B. Waste and recycling collection areas should be located within the building structure. C. Loading and service areas should be integrated into the building envelope or placed away and screened from any street, park, amenity space or public open space. Screening measures include landscaping and/or solid panel fencing. D. Utility meters, transformers and mechanical equipment should be located in compliance with utility authority requirements and should be located away from public view and/or screened with landscaping or a decorative wall. E. Noise attenuation measures should be incorporated into the design of loading and service areas. Mixed-use building with screened utilities at the side 13 Courtice Transit Oriented Community (CTOC) Secondary Plan 3.2.1. GENERAL SITE AND BUILDING DESIGN A. Low-rise buildings should be oriented to public streets and open spaces to frame the public realm and support a safe, comfortable pedestrian environment. B. Front setbacks along a street should generally align to ensure visual continuity along the streetscape. C. Building setbacks should be generous enough to enable suitable areas for soft landscaping and provide setbacks should be a 3-5 metres, except where parking is located at the front of a house, in which case the garage should be setback a minimum of 6 metres. D. Building projections, such as covered porches, balconies and stairs are encouraged and may project into the front yard setback. E. On long blocks greater than 200 metres, mid-block pedestrian connections should be provided to complement, connect, and extend the existing network of public streets and parks. F. Sites should be designed to integrate natural constraints and features on the site, where applicable. G. A variety of lot sizes is envisioned for low-rise building types. This allows for variation in scale, massing and form to create visual interest, while also ensuring a diversity of housing types across CTOC. 3.2. Low-Rise Buildings Low-rise buildings include a wide range of typologies up to 4 storeys in height, including apartment buildings; traditional townhouses; stacked townhouses (including back-to-back stacked townhouses); quadplexes, triplexes and duplexes; and semi-detached and detached houses. They contain predominantly residential uses, though they may also contain home businesses, and apartment buildings on main streets may contain compatible Low-rise apartment buildings, stacked townhouses and traditional townhouses are permitted in the Medium Density Residential area of CTOC. For clarity, traditional townhouses are attached side-to-side in blocks of at least three, are typically 3 storeys tall and have rear yards. Stacked townhouses are attached side-to-side and may also be attached back-to-back; generally they have balconies, patios and/or rooftop decks rather than rear yards for amenity space. Traditional townhouses, quadplexes, triplexes, duplexes, semi-detached houses and detached houses are permitted in the Low Density Residential area. These forms are generally 2-4 storeys in height and contain one to six dwelling units in one building, although up to two additional dwelling units are permitted in traditional townhouses and semi-detached and detached houses. Low-rise apartments framing pedestrian friendly streets 14Urban Design and Sustainability Guidelines H. Vehicular access and loading/servicing areas for multiple-unit developments should be consolidated and located away from the street to maintain a pedestrian- friendly public realm. I. A variety of architectural expression among publicly exposed elevations is encouraged, including variation in roof lines, architectural styles, and material articulation. 3.2.2. HEIGHT AND MASSING A. Long low-rise apartment buildings should break up their mass with offset facades, vertical recesses or changes in material or colour to create visual interest along the streetscape. B. Blocks of townhouses should not exceed 8 units along the street, and blocks of stacked townhouses should not exceed 16 units. C. Adequate separation should be provided between townhouse blocks to allow for landscaping, fencing and outdoor storage screened from view. Where no pathway is required between townhouse blocks, 3 metres of separation is generally adequate, where a private pathway to access the interior of the site is provided, the separation should be a minimum of 4 metres. 3.2.3. FACADES AND ENTRANCES A. Exterior walls of buildings should be articulated through use of bays, gables and porches, or designed to provide visual interest through the use of material changes. B. Main building or unit entrances should be oriented towards the public realm to improve legibility and contribute to a comfortable pedestrian environment. i. For stacked townhouses, a separate and clearly articulated main front door for each unit should be provided. ii. Multi-unit buildings with shared lobby spaces or entrances should promote visibility and views between interior and exterior spaces. Main building entrances should be designed to be at-grade with barrier free access from the public sidewalk. iii. Where provided, upper storey residential apartment units should be accessed via a consolidated lobby. iv. public walkways are encouraged to have individual entrances accessing the sidewalk. Front porches or porticos are encouraged, where applicable, to give prominence to grade-related main entrances. v. All apartment building entrances should be well lit. Natural lighting is encouraged through the use of sidelights, fanlights or door glazing. Wall-mounted down-cast lighting is also appropriate adjacent to building entrances. Design continuity along a block of townhouses Wood frame construction stacked townhouses fronting onto a park 15 Courtice Transit Oriented Community (CTOC) Secondary Plan D. Private outdoor amenity spaces should generally be provided in the rear; however, balconies and terraces may be provided at the front. Screening elements, including landscaping and fencing, should be provided between the private outdoor amenity spaces or rear yards of neighbouring units. E. Where privacy fencing is proposed, it should be of high architectural quality and the extent of fencing should be minimized to avoid being an expansive visual barrier. 3.2.5. VEHICULAR ACCESS, PARKING, LOADING AND UTILITIES A. Vehicular entrance locations to multiple-unit developments should be minimized in width and consolidated and shared where possible in order to reduce the extent of curb cuts in the streetscape, maximize opportunities for soft landscaping, and sidewalk B. Pick-up and drop-off access should be provided at the rear of apartment buildings, or in layby zones within the on-street parking lane, where provided. C. All required vehicle parking should be provided on-site. D. Underground parking for apartment buildings is strongly encouraged. Surface parking may be located at the rear of buildings and is not permitted in the front or exterior side yard of buildings. Rear yard parking should be buffered from private amenity areas. C. Architectural elements, primarily at the front elevation or public-facing elevation, should be proportionate. This includes, but is not limited to, window sizes and shapes, D. Large areas of uninterrupted rooftops are encouraged, particularly on south facing facades, to accommodate solar photovoltaic infrastructure. E. Dwellings on a corner lot, including townhouses, should have side elevations that includes windows and details consistent with the front elevation. Front porches should wrap around the corner of the house. 3.2.4. PEDESTRIAN CIRCULATION, LANDSCAPING AND AMENITY AREAS A. Landscape design should incorporate trees and a mix of soft and hard landscaping. Existing mature trees should be retained, where possible. B. Clear, direct and accessible walkways should be provided from the sidewalk to the main entrance of buildings or units. C. A range of outdoor amenity areas should be incorporated in the design of buildings and sites, as appropriate to the building type. This may include private outdoor amenity areas such as porches, rear yards, terraces and balconies or common outdoor amenity areas such as courtyards, accessible rooftops and forecourts. in setback areas Pedestrian pathway between facing blocks of townhouses 16Urban Design and Sustainability Guidelines E. Rear lanes are strongly encouraged to provide access to parking, especially for townhouse developments of more than four units, and may be required for housing that fronts a major road. F. On corner lots, driveways should be accessed from the G. Other than the permitted driveway, paving in the front yard generally should be limited to walkways. H. Where front yard driveways are provided, they should parking entirely within private properties, without obstructing adjacent sidewalks or vehicle sightlines. I. Driveways, parking pads and walkways should be adequately illuminated with low level, pedestrian-scaled lighting. J. The use of permeable surface materials are encouraged for driveways, parking pads and surface parking areas. K. Individual unit garages may be provided for townhouses, detached and semi-detached houses. i. Garage entrances should be incorporated, either architecturally integrated into the main building massing. ii. Where front yard garages are provided, the garage should not dominate the width of the front façade and they should have materials, colour and other design elements consistent with the architecture of the primary dwelling unit. iii. The width of a driveway generally should correspond with the width of the garage. L. Front garages are encouraged to be expressed as two- storey structures with usable space above to better integrate this structure into the overall design of the dwelling unit. M. Front double-car garages are encouraged to have two separate openings and two doors. Single doors for double car garages should be articulated vertically and horizontally to give the appearance of two doors. Windows are encouraged, to avoid a blank-wall effect. 3.2.6. LOADING AND UTILITIES A. Utilities should be concealed or buried. Where not possible, utilities should be integrated into the architectural composition of buildings or screened from public view to minimize their visual impact on the public realm. B. Utilities and servicing areas should be located so that they do not interfere with existing trees, mature tree growth or landscaping. C. Garbage and recycling storage areas should be located at the side or rear of buildings and in rear laneways where provided. Where not possible, garbage and recycling storage areas should be screened from public view. 17 Courtice Transit Oriented Community (CTOC) Secondary Plan 3.3.2. HEIGHT AND MASSING A. materiality to break up their perceived mass and create visual interest. B. C. Rooftop mechanical and other equipment should be integrated into the overall building massing and design and screened from public view. 3.3.3. FACADES AND ENTRANCES A. Building facades should contain a high degree of transparency and working windows to allow for views and access to natural ventilation and daylight for employees. B. Building entrances and lobbies should be visually prominent, have pedestrian access directly from a public street and include weather protection. C. Building signage should be designed to be compatible with the overall building design D. Units designed for mixed uses, including institutional, retail, and services uses are encouraged on the ground are permitted throughout the Mixed Use Core and the Mixed building heights range from 2 to 10 storeys, while taller Mixed Use Transition Area. 3.3.1. GENERAL SITE AND BUILDING DESIGN A. Within the Mixed Use Core and Mixed Use Transition podiums of mixed-use buildings that include residential may not have retail and commercial service uses on the B. should be developed, through measures that include compact building forms, building placement along street edges, consistent streetwalls, and parking and servicing located at the rear of buildings, away from the public realm. C. open spaces to frame the public realm and contribute to pedestrian-friendly streetscapes. D. back further from the property line than residential and mixed-use buildings to allow for generous soft and hard landscaping and tree planting on site edges. E. Sites should be designed to integrate natural constraints and features on the site, where applicable. F. Building design should, where possible, incorporate sustainable building features, such as water collection and storage, photovoltaic applications, green roof design, high albedo surfaces and extended eaves for sunshade. 18Urban Design and Sustainability Guidelines 3.3.4. PEDESTRIAN CIRCULATION, LANDSCAPING AND AMENITY AREAS A. Landscape design should incorporate trees and a mix of soft and hard landscaping. Existing mature trees should be retained, where possible. B. Amenity areas, such as forecourts, courtyards and plazas should be incorporated into site design to provide gathering, outdoor seating and break areas for building employees. Amenity areas may be located at- grade or on rooftops. C. Pedestrian walkways should connect building entrances to parking areas, nearby transit shelters and adjacent developments. 3.3.5. VEHICULAR CIRCULATION, PARKING, LOADING AND SERVICING A. Provide separation between vehicular routes (especially truck access/loading) and pedestrian routes on-site to driving surfaces. B. Structured parking, loading and waste storage areas are encouraged to be integrated into the building design, particularly within the Mixed Use Core and Mixed Use Transition Area. C. Where loading and waste storage areas are located at- grade and outside a building envelope, they should be and located in interior side yards or rear yards. D. Surface parking areas, where provided, should be located to the rear of buildings and should be designed to incorporate areas of soft landscaping, and clear, safe pedestrian routes. E. Buildings should be designed to accommodate separated waste stream storage and collection. F. Pick-up and drop-off access and short-term delivery areas should be provided at the side or rear of buildings, or in lay-by zones within the on-street parking lane, where provided. pedestrian circulation 19 Courtice Transit Oriented Community (CTOC) Secondary Plan F. Building design should, where possible, incorporate sustainable building features, such as water collection and storage, photovoltaic applications, green roof design, high albedo surfaces and extended eaves for sunshade. G. Industrial sites consisting of multiple buildings should consider establishing a micro-grid system using renewable and low-carbon sources of energy. 3.4.2. FACADES AND ENTRANCES A. public road, with weather protection. B. should contain a high degree of transparency and working windows to allow for views and access to natural ventilation and daylight for employees. C. Building signage should be designed to be compatible with the overall building design and character. 3.4. Industrial Buildings Industrial buildings will be located within the Light Industrial and General Industrial land use designations. Light industrial uses are also permitted within the Mixed footprints and may be up to 4 storeys in height. industrial buildings will follow the guidance in Section 3.3 and should be designed to be compatible with, and sensitive to, future mixed-use developments in that area. 3.4.1. GENERAL SITE AND BUILDING DESIGN A. In general, industrial buildings should be located to frame public streets, with parking, loading, servicing and other functions located to the side or rear, with the exception of short-term visitor parking and delivery drop-off, and accessible parking. B. Buildings should be massed and located to provide visual and physical separation from adjacent uses, allow for landscaping and screen mechanical and service areas. C. buildings should be located along the primary street edge and should be designed to address the street and provide direct pedestrian entry from the street or customer/visitor parking areas. D. Building facades may be set back further from the property line to allow for generous soft and hard landscaping and tree planting along site edges. Generally, front yard setbacks should be a minimum of 6 metres and a maximum of 18 metres where front yard parking is provided. E. Sites should be designed to integrate natural constraints and features on the site, where applicable. and bicycle parking located at main building entrance 20Urban Design and Sustainability Guidelines 3.4.3. PEDESTRIAN CIRCULATION, LANDSCAPING AND AMENITY AREAS A. Landscape design should incorporate trees and a mix of soft and hard landscaping. Existing mature trees should be retained, where possible. B. The edges of industrial sites should incorporate soft landscaping, attractive fencing and tree planting to act as a visual screen. Landscape buffers should be a minimum of 3 metres wide. C. Employee and visitor amenities should be located in convenient locations, close to building entrances. D. Clear, direct and accessible walkways should be provided from the public sidewalk to the main entrance of buildings. E. Pedestrian walkways should connect building entrances to parking areas, nearby transit shelters and adjacent developments. F. Green infrastructure should be incorporated within industrial sites, where feasible, including low-impact development practices such as using native and drought resistant vegetation; minimal maintenance design; bioswales; and impervious paving materials in appropriate locations. 3.4.4. VEHICULAR ACCESS, PARKING, LOADING AND SERVICING A. Provide separation between vehicular routes (especially truck access/loading) and pedestrian routes on-site to driving surfaces. B. Surface parking areas should be designed to incorporate areas of soft landscaping, and clear, safe pedestrian routes. C. Loading and waste storage should be enclosed within the building envelope. Where this is not possible, they should be screened, separated from vehicle and rear yards. D. Vehicular circulation areas should be designed to manage dust and mud tracking where appropriate. E. Outdoor storage, where permitted, as well as utilities and mechanical systems, should be screened with walls or landscaping. Clearly delineated walkway through a parking areaNaturalized stormwater management feature integrated into industrial site design 4 PUBLIC REALM GUIDELINES The public realm is comprised of interconnected places and spaces that are available for use by everyone for everyday life – streets, parks, other open spaces, multi-use paths and trails, and community facilities. The public realm collectively structure, identity and character of CTOC. A successful public realm consists of well- designed spaces that provide engaging places for social interaction and community life, support commercial vitality, encourage outdoor activity, and maintain the ecological well-being and hydrological function of the community. 22Urban Design and Sustainability Guidelines 4.1. Road Network and Block Pattern The layout of roads and blocks provides the framework for development and circulation patterns, for all modes of travel. The following guidelines apply to the design and layout of all existing and planned roads within the CTOC community. A. design principles, balancing the needs of all users. B. Roads should form an interconnected network and grid pattern across the CTOC area. Figure 2 conceptually illustrates how local roads can contribute to a grid network; however, it is not intended to be prescriptive with respect to the layout of local roads, with the exception of Key Local Roads. C. Blocks should generally have a maximum length of 300 metres. Where block lengths exceed 200 metres, mid- block pedestrian connections should be provided. D. Variation in block sizes is encouraged where they facilitate the development of a mix of building typologies. E. Cul-de-sacs are generally discouraged as they reduce connectivity, increase walking distances and typically result in streetscapes dominated by driveways and garages. Where cul-de-sacs are unavoidable, pedestrian connectivity should be prioritized. F. Rear laneways are encouraged throughout the CTOC area to provide for access to parking, servicing and loading off public streets. 23 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.2. Road Hierarchy The transportation network in CTOC will take a complete streets approach to support a vibrant, walkable, mixed- pedestrians, cyclists, transit and private vehicles. The road network will prioritize connectivity and supporting a comfortable public realm. The road hierarchy consists of the following street types, with typical cross-sections • Arterial Roads • Collector Roads • Local Roads • Key Active Transportation Connections • Rear Lanes In addition to Key Active Transportation Connections, the • Other multi-use paths • Bike lanes • Sidewalks • Trails The guidelines in this section should be read in conjunction the relationship between the transportation network and intended built form. A. Roads within the CTOC area will all be designed to balance the needs, safety and comfort of all users, while being designed to prioritize safety for the most vulnerable users. B. The width of the right-of-way dedicated to vehicular movement should be minimized, offering ample room for cycling and pedestrian infrastructure as well as planting and furnishing areas. C. Landscaping should allow for adequate soil volumes for mature street tree growth within and on both sides of the public right-of-way. D. Boulevard landscaping should consider opportunities to incorporate low impact development features, including road-side bioswales, rain gardens or the use of permeable pavers, where appropriate. E. Permeable pavers should not be used for the public sidewalk or portions of other public space with high F. Curb extensions or bump-outs may be provided at key intersections with higher pedestrian volumes. Local Road and streetscape alongside an urban institutional use mixed use urban area 24Urban Design and Sustainability Guidelines 25 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.2.1. ARTERIAL ROADS Arterial Roads are intended to support high-density, mixed lands in the south of the CTOC area. Arterial Road design of vehicles and transit and the comfort and safety of pedestrians and cyclists. Given the role of Arterial Roads community, driveway access from Arterial Roads shall be restricted except where unavoidable. The following guidelines conform to the Region of Durham’s Arterial Corridor Guidelines for Regional Corridors and provide further guidance to achieve complete streets and the intended built form and public realm for the different road types. TYPE A ARTERIAL (COURTICE ROAD) a direct north-south connection through the community, from Highway 401 and the waterfront, to the GO Station and north to Southeast Courtice, Bloor Street and beyond. Type A Arterials will feature a right-of-way width up to 45 metres, including two vehicular lanes in either direction, street trees, plantings, sidewalks on both sides and cycling infrastructure. Where Courtice Road will be fronted by mostly residential uses, a generous multi-use path divided by a landscape strip can be built on both sides. Where the road travels through commercial areas, there is an option to locate either separated bike lanes in the roadway or cycle tracks in the boulevard, adjacent to the curb. In both options, there will be an opportunity to accommodate a landscaped centre median that breaks near intersections to accommodate left turn lanes. 26Urban Design and Sustainability Guidelines Cycle Track Cycle Track 27 Courtice Transit Oriented Community (CTOC) Secondary Plan TYPE B ARTERIALS Type B Arterials that act as major connections through the community and the wider Courtice area. Type B Arterials will feature a right-of-way width up to 36 metres, including two vehicular lanes in either direction, street trees, plantings and sidewalks on both sides. The boulevards will be wide enough to also accommodate dedicated bike paths on both sides; alternatively, multi-use paths could replace the sidewalks and bike paths. Cycle Track Cycle Track 28Urban Design and Sustainability Guidelines TYPE C ARTERIALS Baseline Road, Trulls Road south of Street H, Street H east of Courtice Road and Hancock Road will be Type C Arterials. These roads will feature a right-of-way width up to 30 metres, which will accommodate two vehicular lanes in either direction, street trees, plantings and sidewalks on both sides, and bike lanes. There will also be an opportunity to accommodate a landscaped median, which can give way to turning lanes at intersections. Raised separators should be included to enhance safety for cyclists; alternatively, raised cycle tracks at the curbs could replace on-road bike lanes, increasing the boulevard widths to approximately 6 metres. Multi-use paths on both sides can also be considered. 29 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.2.2. COLLECTOR ROADS Granville Drive, Farmington Drive, Street B and Street C will function as Collector Roads, providing connections between Arterial Roads and Local Roads. Collector Roads will feature right-of-way widths of 23-26 metres and will have a Two types of Collector Roads are planned for CTOC. Neighbourhood collectors should have a right-of-way of 23 metres to accommodate a 10-metre roadway with space for on-street parking on one side. Boulevards of approximately 6.5 metres should accommodate on both sides a raised cycle track near the curb, a landscape strip for street trees and a sidewalk. Mixed use collectors will be sections of Collector Roads where commercial uses are planned in the Mixed Use Core and Mixed Use Transition areas. The should have a right-of- way of 26 metres to accommodate parking on both sides within a 12-metre roadway. Boulevards of approximately 7 metres should be similar to those of neighbourhood collectors but with slightly wider sidewalks. On both neighbourhood and mixed use collectors, bump- outs should be incorporated, particularly at intersections, to accommodate additional landscaping, street furniture, 30Urban Design and Sustainability Guidelines 31 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.2.3. SPECIAL COLLECTOR ROAD Street E will play a special role in CTOC as a Collector Road for drivers and cyclists and a landscaped green north-south spine providing direct connections to the future Courtice GO Station and ultimately to the Courtice Waterfront. Street E should have a right-of-way of 26 metres to accommodate a roadway of 9.5-10 metres, which will provide space for parking parking on one side, and boulevards of 4.5-5 metres on the west side and 11-12 metres on the east side. The wider east boulevard will accommodate a multi-use path of 5-6 metres between two rows of trees and other landscaping. Benches and other pedestrian amenities should also be provided in the landscape zones. Driveways crossing the multi-use path should be avoided. Where Street E is adjacent to parks or other public open spaces, the path may meander and be partially located within the open space. Striping or differentiated paving should be used to delineate zones for pedestrians and cyclists. Wide multi-use path adjacent to road 32Urban Design and Sustainability Guidelines 33 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.2.4. LOCAL ROADS Most development in CTOC will be directly accessed via Local Roads, which will be designed to create intimate, low-speed, pedestrian-priority streetscapes that encourage walking and allow cyclists to share the roadway with vehicles. An interconnected grid-like network of Local Roads will be designed to weave together the community with short walkable blocks. Most Local Roads will require a right-of-way of 18-20 metres to accommodate underground utilities, a single travel lane in each direction and parking on one side. Both sides will have sidewalks and preferably street trees. Local Roads in areas of medium-density and high-density housing, particularly where commercial uses are clustered may require on-street parking on both sides of the street, in which case the right-of-way should be a minimum of 20 metres. Transportation Connections, should have a right-of-way of 23 metres to accommodate dedicated cycling infrastructure. The design of these roads should be guided by the cross- section for neighbourhood Collector Roads. Local road in a high-density neighbourhood Local road in a low-density neighbourhood 34Urban Design and Sustainability Guidelines 4.2.5. REAR LANES Rear Lanes support safe and attractive public streets by providing access to driveways, garages, loading and servicing and other back-of-house uses away from the street-facing frontage. Public Rear Lanes also provide alternative pedestrian routes through a community and, in areas of traditional townhouses and detached and semi- detached houses, may facilitate additional dwelling units, i.e., laneway housing. A. Rear Lanes should allow for two-way vehicular travel and incorporate a setback on either side of the right-of- way to the adjacent garage or parking pad. B. Rear Lanes should be prioritized where development fronts onto an Arterial or Collector Road and for townhouse developments. C. Rear Lanes should provide access for service and maintenance vehicles for required uses as deemed necessary by the Municipality. They may include enhanced laneway widths and turning radii to accommodate municipal vehicles, including access for snowplows, garbage trucks and emergency vehicles. D. buildings should be accessed from Rear Lanes, wherever possible. E. Lanes shall be clear of overhead obstructions and shall be free from overhanging balconies and other encroachments. F. Rear Lanes should be graded to channelize snow-melt and runoff. G. The design of Rear Lanes should incorporate appropriate low-impact development measures, exists. H. Appropriate lighting should be provided to contribute to safety in Rear Lanes for all users. 35 Courtice Transit Oriented Community (CTOC) Secondary Plan On-road cycling facility with a physical buffer G. Active transportation facilities should be designed to facilitate winter maintenance, including snow storage. H. be implemented to direct users at key intersections, landmarks, and attractions. I. The active transportation network should connect to and through both the public and private realms, incorporating mid-block connections and privately owned but publicly accessible spaces. CYCLING INFRASTRUCTURE J. Where shared multi-use paths are provided for cycling, a generous width of at least 3 metres should ensure safety for all modes of movement. K. Dedicated cycling facilities should be separated from or furnishing zones, curbs or other physical buffers. L. Signage and clear design treatments should indicate routes of travel for cyclists and whether facilities are shared with other users. SIDEWALKS M. and unobstructed path. N. Sidewalks should be designed to serve all users including but not limited to children, elders, and those with accessibility needs. Grading and sloping should be minimized to facilitate ease of movement. 4.2.6. BROADER ACTIVE TRANSPORTATION NETWORK The CTOC Secondary Plan area will promote the use infrastructure designed to create a comfortable, well connected and safe environment. The active transportation network is intended to be inclusive for all users and abilities, encompassing pedestrian, cycling and trail networks. A. The active transportation network will be interconnected and complement the road network to minimize travel distances for pedestrians and cyclists. B. Sidewalks, cycling infrastructure and trails should be located to connect major destinations, neighbourhood facilities such as parks and community facilities, the GO station and transit stops. C. Infrastructure should promote improved safety and visibility of vulnerable road users. D. Pedestrian-activated signals or crosswalks should be provided at major crossings or signalized intersections. E. Planting and furnishing zones within the road right- of-way should be designed to act as a buffer between different modes of movement, while maintaining clear sight lines and visibility. F. Planting and furnishing zones within the road right-of-way should provide space for pedestrian amenities such as seating, transit shelters and active transportation facilities such as bicycle racks. 36Urban Design and Sustainability Guidelines TRAIL NETWORK O. Trails should be seamlessly incorporated into the active transportation and open space network. P. Trails are generally permitted to be located within Environmental Protection Areas, subject to guidance in Section 4.7. Q. Trails should be designed to avoid, minimize or mitigate disturbance to sensitive natural areas. R. Trails should have multiple access points, clear S. Amenities for trails, including but not limited to parking, washrooms, furniture, waste and recycling bins, signage, interpretive facilities, and lighting, are encouraged. T. Trails should be a minimum width of 2 metres to provide barrier-free access. U. Where trails are for multiple types of users, trails should be sized appropriately and clear signage should be provided to indicate shared or dedicated uses. V. Trail materials should be sensitive to the preservation and protection of the surrounding natural heritage, while being designed to accommodate maintenance equipment, where required. W. The design and construction of trails shall comply with universal accessibility standards. 37 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.3. Streetscapes Streets are more than transportation routes; they serve as places for economic activity, social interaction and community identity. Streetscape design considers the character of a street and the functions of its components within the built form and landscape setting. Guidance in this section focuses primarily on mixed- otherwise noted. 4.3.1. BUILDING INTERFACE ZONE The building interface zone accommodates the transition between the public and private realms. Generally, the interface zone along a mixed-use street will be 1-3 metres wide. A. A continuous streetwall of building facades should be established and maintained to provide a sense of enclosure and a backdrop to pedestrian activities. B. Primary building facades and entrances should be oriented directly towards streets. C. Patios and outdoor retail displays should be designed and constructed to be compatible with the surrounding streetscape elements and architectural qualities of abutting buildings. These features should not obstruct pedestrian movement. D. Canopies and awnings should be incorporated into building facades to provide weather protection for pedestrians. 4.3.2. PEDESTRIAN ZONE The pedestrian zone is intended for predictable, continuous, unobstructed, and barrier-free movement. The width of the pedestrian zone depends on various factors, including the function of the street, the width of the roadway, and the A. Sidewalks should be at least 1.8 metres wide in residential areas, and at least 2.3 metres wide in mixed- use areas. B. Continuous, unobstructed, and barrier-free sidewalks should be provided on both sides of all streets. C. Special paving materials or painted asphalt/concrete should be used to highlight pedestrian zones and crossings at intersections, and to generally enhance streetscapes. D. Where warranted, curb extensions should be incorporated at intersections and mid-block locations to expand the pedestrian zone, shorten crossings, provide additional pedestrian queuing space, and accommodate transit facilities. 4.3.3. PLANTING AND FURNISHING ZONE The planting and furnishing zone helps to create an inviting, comfortable pedestrian environment and allows for soft landscaping and tree planting to mitigate the urban heat island effect, enhance biodiversity and support stormwater management. It also provides a buffer between the pedestrian zone, cycling facilities and the roadway. A. Street trees should be native and non-invasive species, well suited to harsh urban conditions and of medium to large stature. Seed-dropping plants along barrier-free paths should be avoided, and pollinator species are encouraged. B. Adequate soil volumes, good soil structure, proper drainage and, where possible, irrigation should be provided to support the long-term health of street trees. Where street trees are desirable in locations with limited surface areas, soil cell systems should be used. C. Where warranted, the installation of street trees with continuous soil trenches, advanced rooting techniques where soil volume targets cannot be achieved with traditional planting methods, and/or drainage systems is recommended. D. utilities and located far enough away from obstructions and building faces to all for growth to maturity. E. should be established to adapt to the function of the streetscape. Where possible, groupings of street tree plantings should be integrated without impeding transit facilities, pedestrian circulation and street furniture. F. Planting beds should be incorporated into street tree planting areas or designed as stand alone greening features. G. used to support a comfortable environment, reinforce a sense of place and aid navigation. H. roadway and sidewalk should be selected to minimize the number of poles needed for adequate lighting. I. Where warranted, supplemental pedestrian-oriented lighting standards should be incorporated to illuminate primary walkways and wider sidewalks. 38Urban Design and Sustainability Guidelines Pedestrian clearway and coordinated street furnishings alongside an J. Municipal standards will guide street lighting, emphasizing downward illumination to reduce light pollution and preserve dark night skies. K. Public bicycle parking facilities should be located within the planting and furnishing zone, close to transit stops, building entrances, and parks and open spaces. Where space permits and activity levels warrant, these facilities can be located within the building interface zone. L. The integration of public art into streetscape elements should be considered. M. Transit stops and shelters should be located in convenient and barrier-free locations, and should consider passenger pick-up and drop-off. N. Transit shelters and seating should be provided at all transit stops on Arterial Roads and at transit stops at the intersections of two Collector Roads. 4.3.4. CURB ZONE The curb zone accommodates utilities and provides for pedestrian movement between parked vehicles and the pedestrian path. The pedestrian and planting/furnishing zones may encroach into the curb zone when additional extension of the pedestrian environment is necessary. A. Utilities and their associated equipment should generally be located underground. B. Above-ground utilities, where required, should be integrated within the streetscape design or screened from view from the public realm. C. Barrier-free curb ramps with detectable warning surfaces should be provided at all intersections. mixed use area as well as curb extensions 39 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.4. Transit Facilities Zone The Transit Facilities Zone surrounds the GO Station and will act as the central location for major transit facilities and supportive uses associated with station. It will include the GO Station itself, a bus terminal, commuter parking areas, pick-up and drop-off facilities, active transportation infrastructure, and complementary open spaces. The design of elements in this zone will prioritize transit, pedestrian and cycling movement. 4.4.1. STATION AREA LAYOUT AND ORIENTATION The orientation and layout of station facilities should be a clear structure around which movement and access occurs. Achieving the optimal layout and orientation of facilities within the station area is crucial to support station functions and enable the Transit Facilities Zone’s full potential over time. A. A well-structured station area should be created with the station building as the main organizing element. B. The station area should be designed to provide obvious materials, clear sightlines and highly visible signage. C. at the entrance to the station building. The plaza should act as the primary receiving area for pedestrians entering the station by foot, bike, bus or car. In the event that the station straddles both sides of the rail corridor, a pedestrian plaza should be provided on each side of the tracks. D. Bus loops and passenger pick-up and drop-off areas (PPUDOs) should be located adjacent to the pedestrian plaza. E. Landscaping should be incorporated to ensure that the station area is both attractive and comfortable for users and supportive of functional considerations such as stormwater management and snow removal and storage. 4.4.2. STATION BUILDING A. The station building, designed as a visible landmark, should serve as the central focus for all transit-related activity in and around the broader station area. B. As the principal interface between the user and various connecting transit services, the station building should display the highest level of pedestrian/passenger amenity and supportive services. C. The station building should be highly transparent, with extensive use of glass to provide clear sightlines between all elements of the station area, especially passenger waiting areas associated with train, bus, and PPUDO facilities. D. The station must be designed for universal access. 4.4.3. SUPPORTING PEDESTRIAN MOVEMENT A. Sidewalks and pedestrian pathways should be designed are comfortable for pedestrians of all ages and abilities. B. Pedestrian waiting areas should be designed and located to provide direct, easy pedestrian access to and from the station building. C. Pedestrian waiting areas should be designed to maximize the comfort of waiting passengers and provide the information and resources needed to support customers and facilitate their journeys onward. D. pathways throughout the station area, capable of serving both walk-in users and drivers walking between their cars and the platform area, should be created. E. Pedestrian routes within the Transit Facilities Zone and should be organized to create continuous direct connections between the station and area destinations. F. Buffer zones should be provided between pedestrian routes and roadways/parking lots. 40Urban Design and Sustainability Guidelines Sheltered waiting and bicycle parking areas G. maintain clear sight lines to ensure safe pedestrian movement. H. Pedestrian crossings should be designed to be highly visible, obstacle-free, seamlessly integrated into the pedestrian path system and designed to minimize crossing distances. I. Crossings should be located where they can act as a direct continuation of the pedestrian path network, and should be signalized where appropriate. J. Curb cuts should be installed at all street-level crossing points to ensure fully accessible crossings and to maintain a consistent grade for the length of the crossing. K. Where required, pedestrian overpasses and i. Create clear, generous pedestrian routes that enable users to see from one side of the connection through to the other. ii. Incorporate generous lighting or use of skylights where appropriate to enhance a sense of safety iii. Provide weather protection. Secure bicycle locker 4.4.4. ENHANCING ACCESS FOR CYCLISTS Providing priority access and enhanced amenities for cyclists within the station area is an important strategy towards redistributing the modal split and reducing the need for expensive parking. Stations should promote and enhance the cycling experience by providing secure and convenient bicycle routes and secure bicycle parking facilities with a range of supportive amenities. A. Multi-use paths should be extended into and through the station area and be sited where they will not interfere with the function and safety of passenger waiting areas or pedestrian pathways. B. be provided along adjacent arterials to direct cyclists towards the appropriate points of access. C. Where the use of stairs is unavoidable along bicycle access routes, a bicycle ramp should be provided and alternative stair-free routes should be marked. D. Dedicated, sheltered bicycle parking should be provided within the pedestrian plaza, the station building or a separate bike parking structure. E. Bicycle parking should be located in areas where minimized. F. Supportive amenities such as air pumps, drinking fountains, and repair stands next to bicycle parking areas are encouraged. 41 Courtice Transit Oriented Community (CTOC) Secondary Plan 4.4.5. SUPPORTING LOCAL TRANSIT A. Station area planning should accommodate a bus terminal close to the GO station and allow for its expansion over time. B. A generous and clearly marked pedestrian route should be provided between the bus terminal and the GO station that avoids crossing vehicular routes. C. Canopies and other forms of weather protection should be provided for waiting passengers, as well as an appropriately sized, enclosed heated area for all- season use. 4.4.6. ACCOMMODATING TAXIS AND RIDE SHARING A. Access to taxi service within the GO station should be provided to integrate transportation networks, allowing passengers without vehicles direct access to destinations beyond walking distance from the station or beyond the reach of local transit service. B. Taxi stands should be located adjacent to the station plaza to enhance pedestrian accessibility and visibility. C. The taxi drop-off and pick-up location should ideally be abutting the pedestrian plaza or a raised sidewalk to ensure passenger safety when disembarking the vehicle. D. 4.4.7. COMMUTER PARKING A. Surface parking may be provided within the Transit Facilities Zone as an interim use and should be designed to be replaced over time by structured parking or other uses. B. Where surface parking is provided, it should be designed to establish clear pedestrian pathways to and from the station building and pedestrian plaza. C. Surface parking areas should be designed to include clear and dedicated pedestrian routes as well as landscaped areas throughout that can accommodate mature tree growth. D. Where surface parking areas are oriented perpendicular to the rail corridor, lots should be located on either side of the primary access drive, lined with sidewalks and pedestrian amenities. Where surface parking areas are oriented parallel to the rail corridor, a clear pedestrian path should also be created running along the “bottom” of the lot between the rail corridor and the parking areas. 4.5. Parks and Open Spaces The parks and open space system is a fundamental organizing element for the CTOC area and serves a critical role in providing recreational amenities, green spaces, play areas and connectivity throughout the community. Parks and open spaces will contribute to the area’s identity and will be strategically located to ensure convenient access for all residents and employees within the CTOC area. A hierarchy of parks and open spaces throughout CTOC will support a balanced distribution of facilities and activities across the area. 4.5.1. GENERAL GUIDELINES A. Parks and a central “Special Park”. The precise location, and Parkettes will be determined through Sector Structure Plans and plans of subdivision. B. i. ii. iii. iv. v. vi. vii. viii. C. i. Uninterrupted by major physical barriers, such as rail lines, roads, and other physical barriers that restrict access; ii. Accessible by transit, bicycle and walking; iii. Highly visible with prominent public street frontages; iv. Connected to other parks, open spaces, and natural features through the active transportation network. D. Parks should be designed to maintain existing natural features, topography and trees. E. Where buildings or structures that support the planned function of parks and open spaces are proposed within parks and open spaces, they should be sited and i. Incorporate public amenities, including year-round public washrooms and public art, to enhance the user experience; 42Urban Design and Sustainability Guidelines ii. Enhance open space linkages, public access, visibility and effective use of the park or open space. F. Parks should include furnishings such as benches, seating, tables and secure bicycle parking. These elements should be coordinated in their design and built of durable, low-maintenance materials. G. Parks should incorporate universal design principles and provide for a range of activities for people with disabilities. H. Parks should be designed to incorporate best practice principles of sustainable design, including natural heritage enhancement, naturalized stormwater management features, use of native plant species, incorporation of environmental education features and and landscapes. I. Plantings should generally consist of hardy, native species and provide a transition between park green space and natural areas, where relevant. J. Public art should be integrated into the design of park facilities or landscape features, including pieces/elements that interpret the area’s history and geography. K. Utility infrastructure should be located away from park and open space frontages. L. Alternative methods of screening or integrating utility services may be considered, including covers, wraps or public art features, in compliance with utility authority requirements. M. Where development is proposed adjacent to parks and i. Be sited and designed to minimize shadows on the park or open space. ii. Be oriented to maximize public access and views to such spaces. iii. Present a primary façade to the park or open space. iv. Buffer private amenity space with low fencing, hedges, pathways and, where appropriate, grade changes. 43 Courtice Transit Oriented Community (CTOC) Secondary Plan landscaping and a library 4.5.2. SPECIAL PARK The Special Park will be a prominent outdoor space in the heart of CTOC. It will be designed and programmed as a multi-purpose space that accommodates a range of outdoor activities and community events. A. The Special Park will have street frontage on at least three sides to ensure it is highly visible and accessible and park users feel safe. B. Most of the park should be vegetated with trees, lawns and gardens. Hardscaped areas should be integrated to support casual gatherings, special events, and seasonal food vendors/kiosks C. not include baseball diamonds, soccer pitches or other casual games. D. A playground for children of all ages should be included, and small dog park may also be considered. E. Smaller recreations facilities, such as a skating rink, a splash pad, a basketball court, tennis/paddle board courts (maximum 2) and a skateboard park may be considered F. The park may also include a community facility, such as a recreation centre, club house or library, provided the building and any associated parking/servicing areas do not occupy more than approximately 20% of the park. 44Urban Design and Sustainability Guidelines Playground in a Neighbourhood Park 4.5.3. NEIGHBOURHOOD PARKS Neighbourhood Parks serve as social and recreational focal points of a neighbourhood, generally located within a 5-minute walk from the majority of residents. These parks play a key role in shaping each community’s unique identity through distinct design and landscaping. They provide a balance of active and passive uses, such as children’s playgrounds, skateboarding facilities, basketball gathering spaces. Neighbourhood Parks meet the needs of the local community, and in some instances, may accommodate facilities serving the broader Courtice or Clarington community. Where possible, Neighbourhood Parks should be coordinated with elementary school sites A. At least 40% a Neighbourhood Park’s boundary, excluding where any portion of teh boundary abutting an Environmental Protection Area, must abut a public street. B. Neighbourhood Park programming should include a diverse range of both passive and active recreational and facilities over time. C. The North, West and East Neighbourhood Parks should be designed as an extension of and entry point to adjacent natural heritage areas, integrating trail connections and trailhead elements, such as waste bins, signage, maps and seating. D. Neighbourhood Parks should be designed to accommodate year-round use and should complement the amenities of nearby parks and open spaces. E. Neighbourhood Parks are the most appropriate locations for dog parks. children’s play areas 45 Courtice Transit Oriented Community (CTOC) Secondary Plan Parkette featuring benches, play elements and public art installation 4.5.4. PARKETTES Most parkettes will serve many of the same functions as Neighbourhood Parks but in a smaller area, and some may play a critical connecting role within the broader open space network. A. Parkettes should generally be centrally located with a highly visible and local gathering area for the neighborhood. B. Parkettes should have frontage on at least two streets and may be located mid-block. C. i. Be connected to buildings and sidewalks with landscaped pathways; ii. Create barrier-free environments for all users and adapt to both short and long-term needs of users; iii. Support year round use and prolong the daily and seasonal life of the space through illumination and weather protection; iv. Provide a comfortable microclimate for pedestrians, including maximum sunlight access. D. Parkettes should include grassy areas for casual recreation and may be appropriate for court sports, such as basketball, tennis or paddleboard. 4.5.5. URBAN SQUARES Urban Squares are more intimate gathering spaces that generally will be most appropriate in the high-density areas of CTOC, where they will provide relief from the massing of buildings and contribute to a vibrant public realm. They will create opportunities to expand the public realm of streets, providing room for relaxation in green space, socializing and outdoor dining. A. Urban Squares should have unique identities that enhance the character of an area. Fundamental elements, all of which should have a coordinated design and be durable, should include seating, lighting, trees and soft landscaping, low impact development features, public art, or other amenities that encourage casual use and gathering. B. The preferred location for an Urban Square will be at the corner of a block for maximum visibility and access. Mid-block squares with frontage on just one street or which extend through a block, however, may also be considered where they will be enlivened on all sides by C. Buildings adjacent to an Urban Square should front it help make it feel safe. Restaurant patios should be allowed to encroach on the public space of the square. D. Grade-related residential units may front an Urban Square provided they are appropriately set back 3-5 metres to accommodate a buffer between the private and public realms. 46Urban Design and Sustainability Guidelines E. Urban Squares generally should feature mostly hardscaping to accommodate intensive use but should and stormwater management. At a minimum, there should be trees and planting beds, and grassy areas should be considered. F. Seating will be a critical element in Urban Squares. In addition to benches, movable chairs and tables should be considered where squares are surrounded by retail 4.6. Schools and Other Community Facilities Community facilities are crucial to healthy and complete communities. These may include schools, recreation centres, child care centres, libraries and shared multi- purpose spaces. Based on the projected CTOC population, up to eight elementary schools and two secondary schools may facilities will respond to the community’s needs as it grows. The clustering of facilities into community hubs for A. Elementary schools generally will be located centrally within neighbourhoods, with frontage on a Collector Secondary Plan. Secondary schools generally will be located on Arterial Roads. B. Elementary schools and recreation centres are encouraged to be co-located with Neighbourhood Parks or Parkettes to facilitate the sharing of open space and reinforce such facilities as civic spaces. C. Community facilities are encouraged to connect, wherever possible, to active transportation systems to enhance overall connectivity. D. Alternative standards for schools will be encouraged to ensure their form is compatible with the vision for CTOC the use of land by promoting multi-storey school buildings and minimizing parking and pick-up/drop-off areas. E. Where possible, partnerships between private landowners and public agencies, boards and commissions to achieve the integration of schools and other community facilities within mixed-use developments will be encouraged. F. Community facility design shall prioritize pedestrian connectivity and be accessible by various modes of transportation, including walking, cycling, and transit, i. Visibly marked pedestrian crossings with appropriate lighting and signage; ii. Clearly delineated cycling connections should be provided from the adjacent cycling lanes to the site; iii. Sidewalks on both sides of the street, particularly where crossings are required; 47 Courtice Transit Oriented Community (CTOC) Secondary Plan nearby housescirculation iv. Pedestrian-oriented lighting standards to illuminate parking areas, driveways, and walkways; v. Walkways to and through parking areas to provide routes separated from vehicle movements to vi. Vehicular parking areas at the side or rear of the building, with the exception of accessible parking; vii. Pick-up and drop-off where it will minimize impacts on the pedestrian realm. G. Public buildings should achieve the highest standard of urban design and architectural quality, incorporating sustainable building features. 4.7. Environmental Protection Areas Environmental Protection Areas are recognized as the environment and include natural heritage features, hydrologically sensitive features, lands within the regulatory associated with valley systems. A. While connectivity through Environmental Protection Areas is encouraged, trails should be directed outside of sensitive areas or to buffer areas, and creek crossings should be minimized. B. Where parks, trails and adjacent development connect to Environmental Protection Areas, their interface, access, and usage should be managed in a way that preserves the area’s ecological integrity and adheres to the policies and guidelines of the Central Lake Ontario Conservation Authority (CLOCA). C. Developments adjacent to Environmental Protection Areas should optimize public exposure and views to them through the provision and incorporation of parks and trails to provide access and additional linkages to the natural heritage system. D. Development, including the road network, will consider drainage patterns and topography around Environmental Protection Areas, including limited watercourse crossings. 48Urban Design and Sustainability Guidelines 5 GREEN DESIGN GUIDELINES The green design guidelines are intended to support environmental sustainability in the CTOC Secondary Plan area through green building design, resource conservation, alternative energy sources, site and building performance, and conservation of natural areas. Progress toward achieving a low-carbon community relies on a holistic “green design” approach to infrastructure, buildings and landscapes. 50Urban Design and Sustainability Guidelines 5.1. Energy and Water Conservation Buildings and sites in the CTOC Secondary Plan area on renewable and electric sources of energy, and conserve energy, water and other resources. Green development will help to reduce pollution and address climate change by reducing carbon emissions. A public district energy (DE) system to service CTOC reduced carbon emissions in powering, heating and cooling buildings, in which case, future development would be required by the CTOC Secondary Plan to connect to the DE system (or be DE ready if development precedes the system being in place). The guidelines below should be considered whether DE is implemented or not. A. Buildings should be designed with high performance envelopes. B. building designs that provide opportunities for passive design strategies and maximize the potential for passive solar and natural ventilation. C. South facing roofs should be designed to expanses of roof with no penetrations or articulated D. Low-carbon and sustainable material alternatives should be considered for the proposed structure or envelope of buildings. E. Green building material standards should be considered to reduce the impact on the environment and ensure materials are purchased/obtained from responsible ethical sources; and, where possible, materials should F. Buildings should incorporate energy saving measures such as window shading, daylight design, daylight and lighting. G. Building systems should be set up to automatically turn off major lighting after hours or close blinds once the sun has set to reduce energy use and minimize H. recycling. I. Buildings should use electric sources of hot water heating as well as water heat recovery technologies. J. If a DE system is not implemented, renewable energy sources for all or some of a building’s energy, heat and cooling needs is encouraged. If not integrated at the time of construction, provisions for future installations should be considered. K. Renewable energy use to reduce electric energy supply in the public realm, such as solar-powered lighting for trails and parks and open spaces, is encouraged. L. and multi-unit residential buildings. Where green roofs should be incorporated for medium and high density residential buildings in order to reduce solar heat absorption and energy demand. Bioretention area along a local street 51 Courtice Transit Oriented Community (CTOC) Secondary Plan 5.2 Landscapes and Stormwater Management Development in the CTOC Secondary Plan area should incorporate landscapes and stormwater management techniques that manage all stormwater on-site and promote sustainability by providing habitat and enhancing ecosystem functions, thereby contributing to the community’s overall environmental health. A. Low-impact development (LID) techniques are encouraged, such as naturalized stormwater manage stormwater. B. Landscaping should feature native and adaptive, non- invasive species that are drought-tolerant and require associations to minimize maintenance, create natural habitats for bird and pollinator species, and enhance biodiversity. C. Landscaped areas should be located to optimize the D. Bio-retention areas, both on publicly- and privately- owned lands, are encouraged to capture and treat stormwater runoff, where feasible. They can be integrated into a range of landscape areas including medians and boulevards. A variety of planting and landscape treatments should be employed to provide wildlife habitat. E. landscape features that provide neighbourhood amenities while achieving functional objectives related F. Stormwater management ponds should be designed to blend with the natural landscape, featuring grading for natural and variable side slopes and curved contours. Inlet and outlet structures should be concealed through a combination of planting, grading, and natural stone to create a seamless integration with the surrounding environment. G. Stormwater management ponds should be accessible to pedestrians and cyclists via trails that are part of, or provide connections to, the broader trail network. H. Stormwater management ponds should be integrated, wherever feasible, with parkland and treated as an extension of the parks and open space system. They are not permitted within Environmental Protection Areas. I. Where development is adjacent to a stormwater management pond, access for maintenance shall be provided. J. Where there is a need to discourage public access to areas around the perimeter of the stormwater management ponds, living fences and barrier planting should be used in place of, or to visually disguise, fencing. K. Stormwater channels may be designed with meandering and naturalized slopes in designated parks including the Central, West, North and East Neighbourhood Parks. L. to treat runoff from roads, roof downspouts and low M. Bioswales are encouraged, where feasible, particularly for treating road runoff outside high-density urban areas. Naturalized stormwater pond with trail 52Urban Design and Sustainability Guidelines S. Permeable paving and other pervious surface materials for hard landscaping and on-site parking may be and water quality treatment. N. Designated snow storage areas should be provided through the CTOC area to limit the entry of salt and other substances into the stormwater sewer system. O. Rainwater harvesting systems are encouraged, where appropriate, and should incorporate treatment technologies to improve the quality of rainwater before and/or after storage while also accounting for both P. Rainwater collection for reuse within buildings and/ or for irrigation purposes is encouraged wherever possible. Q. be installed in areas where soil permeability is high and designed to complement the landscape, on a base of granular material and with tolerant plant material. R. Green roofs are encouraged throughout the CTOC area, to absorb rainwater and reduce stormwater runoff, provide additional insulation to the building envelope, and create habitat for wildlife. The use of native, low-maintenance plant species is encouraged, and biodiverse green roofs should be considered to support pollinator species where possible. Rain garden within streetscape Green roof on rooftop terrace Courtice Transit-Oriented Community Secondary Plan – Engagement Summary As outlined in Figure 1, the Courtice Transit-Oriented Community Secondary Plan process has comprised four phases, with each phase providing opportunities for public input and feedback. Figure 1: Secondary Plan Process Phases Phase 1: Initial Engagement and Analysis Public Information Centre – PIC #1 The flrst Public Information Centre (PIC) was held on June 18, 2019. The objective of the PIC was to introduce the secondary plan process for both Southwest Courtice (SWC) and the Courtice Employment Lands Secondary Plan (CEL), which has since been renamed to the Courtice Transit-Oriented Community (CTOC). The project team shared background information, an initial analysis of existing conditions in the plan areas, and draft guiding principles for feedback. The PIC was advertised in the Orono Times and Clarington This Week in the two weeks preceding the meeting. All residents within the two study areas, as well as those within 120 meters and on the project’s interested parties list, received a copy of the PIC notice. Approximately 60 members of the public attended the PIC. Attachment 4 to PDS-026-25 Key themes from PIC #1 include: • Participants expressed a preference for more fiexibility in permitted land uses in the CTOC Secondary Plan area. Comments focused on a desire for mixed-use development around the future Courtice GO station and for land use conversions from employment to residential uses. • Participants expressed concerns with uncertainty over the Courtice GO Station and how the area around the station would be impacted in terms of land uses and traffic. • Participants voiced support for more trail connections and active transportation infrastructure throughout the project areas. • Participants expressed that maintenance of and access to green spaces are priorities in the community. • Participants reinforced the need for municipal servicing in the area and potentially fiood mitigation measures. Public Information Centre – PIC #2 The COVID-19 pandemic was declared in March 2020. As a result, the second PIC that had been scheduled for March 31, 2020 was held virtually on September 29, 2020 via Zoom. Over sixty people participated and, following a presentation, provided feedback through a series of live polls. The objective of the meeting was to update the public on the status of the Lakeshore East GO train extension, inform the public regarding past studies in the Secondary Plan area, outline opportunities and constraints for employment uses and transit-oriented development, and present updated Guiding Principles. Notice of the PIC was distributed to all landowners in the Secondary Plan area and within 120 metres of the area. Invitations were also distributed to relevant municipal departments, public agencies and more than 80 interested parties. Notice of the PIC wa s advertised in the Orono Times on September 16th and 23rd, 2020, and in the Clarington Weekly on September 17th and 24th. Notice was also posted twice on the Municipality’s Facebook and Twitter accounts. Members of the general public were also able to register for the webinar through the project website. Key themes from PIC #2 were obtained through the live polling using precedent photographs as summarized below: • Participants recognized the need for a complete, transit-oriented community. • Participants highlighted the need to respect existing residential, industrial and agricultural uses as the area develops. • Participants stressed the need for the protection of natural features. • Participants wished to see enhanced trail, cycling, and transit networks. • Participants indicated support for an expanded urban boundary and to consider the area between Courtice Road and Highway 418 given the investments in both the GO extension and highway network. • Participants expressed a preference for the following to be included in future development in the CEL and MTSA area (i.e., CTOC): o Prestige employment uses; o Mixed-use developments with co -working space; o Mid-rise apartment buildings (6-15 storeys); o Low-rise apartment buildings, townhomes and stacked townhouses; o A range of community uses (library, recreation centre, cultural facilities) o Pedestrian-oriented retail areas; o Neighbourhood parks and squares; o Multi-use trails; and o Green design features (e.g., secure bike parking and low impact development approaches to stormwater management). Phase 2: Principles and Land Use Options The second phase of the project involved preparing land use options and evaluating them against the Guiding Principles. Public Information Centre – PIC #3 The third PIC was held via a Zoom webinar on March 22, 2022. The objective of the meeting was to provide an update on the Secondary Plan process for the CTOC area and to review and receive feedback on the three land use options. Approximately sixty people participated and, following a presentation, provided feedback through a series of live polls. Key themes that emerged at this meeting included: • Participants generally expressed support for the planning objectives and vision presented in the options for CTOC. • Participants expressed support for the concentration of higher-density residential and mixed-use buildings around the future Courtice GO station. • Participants expressed support for including a range of business and employment opportunities in CTOC. • There was interest in understanding how future development might affect existing employment uses and support for promoting existing and future small businesses. • Participants expressed support for affordable housing options and rental opportunities being included in CTOC. • Participants were interested in prioritizing local public transit and active transportation, including increasing connectivity for cyclists and pedestrians. • Participants expressed a desire to see a mix of housing typologies and tenures, including apartment buildings and townhomes, with options for owning and renting. Phase 3: Preferred Land Use Plan and Draft Deliverables Public Information Centre – PIC #4 The fourth PIC was held on November 6, 2023. The purpose of the meeting was to provide an update on the Secondary Plan process and present the Draft Preferred CTOC Land Use Plan, Road Network and Policy Directions for feedback. Participants, most of whom had followed the planning process, did not raise major concerns with the emerging directions for the Secondary Plan and focused their comments on speciflc items of concern, including: - Whether provincial funding exists for the Courtice GO station and expanding active transportation to the waterfront. - The potential impact of the Secondary Plan on existing businesses and residents. - Status of employment land conversion requests. - Mapping and status of environmental protection areas and potential impacts of development on wildlife. - Location of water infrastructure and the status of the Functional Servicing Report. - Proposed park locations. - The alignment and nature of the proposed north-south active transportation corridor (“green spine”) and cycling infrastructure generally. Phase 4: Finalize Deliverables (current phase) The intent of Phase 4 of the process is to flnalize the Secondary Plan and Urban Design and Sustainability Guidelines, along with technical studies regarding transportation and servicing. This phase includes the Statutory Public Meeting and Recommendation Report to Council for Adoption. Feedback from the public heard during the June 2025 Public Meeting and received following the meeting will inform flnal revisions to the Secondary Plan and Guidelines. Responses to all comments will also be included with the Recommendation Report. Courtice Transit-Oriented Community Secondary Plan – Summary of Technical Studies Report Key Findings and Next Steps Stage 1 Summary Report Prepared by Urban Strategies Inc. August 2019 This report includes an overview of the work completed since project initiation, including: analysis of the policy context, consultation summary, preliminary technical analysis of the existing conditions, identification of the key issues and opportunities and development of the preliminary guiding principles. The following reports were prepared as part of Stage 1 and are appended to the Summary Report: - Cultural Heritage Assessment Report, prepared by Golder Associates Limited - Stage 1 Archaeological Assessment Report, prepared by Golder Associated Limited - Transportation Impact Assessment Report, prepared by CIMA+ - Servicing Existing Conditions, Opportunities and Constraints Report, prepared by CIMA+ Cultural Heritage Assessment Report Prepared by Golder Associates Limited August 2019 The report provides an overview of heritage legislation and policies in Ontario, an outline of the methods used to investigate and evaluate cultural heritage resources, and a summary of the historical development and existing conditions. Properties with buildings or structures 40 or more years old were field documented and evaluated as having potential cultural heritage value or interest if they met one or more of the criteria prescribed in O. Reg. 9/06. The second part of this report identifies and assesses the potential direct and indirect impacts on known and potential cultural heritage resources. The following was identified within the Courtice Employment Lands study area: - Two (2) properties listed (not designated) on the Heritage Inventory - Eleven (11) properties of potential cultural heritage value or interest - Four (4) potential cultural heritage landscapes Recommendations to avoid or reduce adverse impacts to each cultural heritage resource in study area are provided in the report. Attachment 5 to PDS-026-25 Stage 1 Archaeological Assessment Report Prepared by Golder Associated Limited August 2019 The objective of the Stage 1 archaeological assessment was to compile available information about the known and potential archaeological resources within the study area and to determine if a field survey (Stage 2) is required. 60 archaeological sites have been identified within a 1 km radius of the study area. Areas that have been subject to previous assessment and cleared of archaeological potential no longer exhibit archaeological potential. No further archaeological assessment of these areas is recommended. Areas that have been identified as cemeteries or burial grounds retain archaeological potential and are recommended for Stage 2 archaeological assessment. Areas identified as retaining archaeological potential are recommended for Stage 2 archaeological assessment prior to ground disturbance. Transportation Impact Assessment Report Prepared by CIMA+ August 2019 The Transportation Impact Assessment Report documents existing conditions, as of 2019, related to the road network, intersections, and transit. The Report then details planned area network changes for freeways and interchanges, the arterial and collector road network, provincial (GO Transit) and regional transit (BRT) facilities and active transportation. Servicing Existing Conditions, Opportunities and Constraints Report Prepared by CIMA+ August 2019 The report purpose is to summarize the existing and previously planned municipal infrastructure that will provide water, wastewater and stormwater management services to future development within the study area. The Regional Municipal of Durham (Durham) is responsible for the delivery of municipal water and wastewater services across Durham Region, while stormwater infrastructure is the responsibility of the Municipality of Clarington. There are no major constraints associated with the provision of water servicing to support growth within the study area. The existing facilities have been planned to support growth and over the long-term the planned projects will provide a feedermain system capable of supplying water to local watermains in the study area to support development. The planned trunk wastewater infrastructure within the study area will provide the framework for a network of local sanitary sewers to service development within the area. Stormwater Management (SWM) objectives for the study area are to be confirmed through the completion of a subwatershed study for the Robinson Creek and Tooley Creek catchment areas (which has since been completed). Courtice Employment Lands Secondary Plan: Employment Growth Outlook Prepared by Hemson December 2020 This report analyzes job growth, employment land uses and the economic structure of Clarington, Durham Region and the GTHA with a view of understanding the potential growth outlook for the Courtice Employment Lands (CEL) Secondary Plan area. Sustainability Best Practices Report Prepared by Urban Strategies Inc. August 2021 This report informs the Courtice Employment Lands and MTSA Secondary Plan (now Courtice Transit-Oriented Community) by describing best practices in sustainability and green development. The findings of this report will be used in subsequent project phases. The best practice precedents fall into three categories: 1) Transit-Oriented Communities 2) Urban Centres 3) Employment Districts Key themes: - Integration of uses: Incorporate a wide mix of uses that are all in close proximity to one another. - Supporting transit and active transportation: An urban form that is efficient for commuting. - Protecting natural features and functions: Ensuring development does not have adverse impacts on the surrounding natural environment. - Linkages to the natural environment and accessible, useable open spaces: Strengthening the social sustainability of a community. - Stormwater management and green infrastructure: Implementing alternative stormwater management techniques such as low-impact development (LID). - Green development standards: Opportunities to encourage high levels of energy performance at the district/building scales. - District energy: Potential for system that distributes thermal energy to multiple buildings in an area. Draft Preferred Land Use Plan and Key Policy Directions Prepared by Urban Strategies Inc. June 2023 This document summarizes the draft preferred land use plan, which is comprised of the following land uses: - A mixed-use core provides the broadest mix of residential, office, retail, and institutional uses at high densities. - The core transition area features predominantly residential uses at medium and high density, with some commercial uses. - Transit-oriented neighbourhood designation provides low-rise housing at medium densities, with small-scale retail permitted on major road intersections. - Outer neighbourhood designation allows for a mixture of lower-density and low-rise residential, with small-scale retail permitted on major road intersections. - Institutional overlay is an appropriate location for public uses requiring larger sites including schools, community centres, and community parks. - Mixed use office district features office and other employment uses in a campus-like setting. - The industrial area designation features a mixture of non-noxious employment uses. Summary of draft policy directions - Local and collector streets will form an interconnected network and a grid pattern within the MTSA. - Within the MTSA, buildings shall frame public streets, with tall buildings taking podium and tower form. Underground parking is encouraged. - Parks and public open spaces will comprise a minimum of 10% of the net developable area. Four primary Neighbourhood Parks are identified on the Draft Land Use Plan. - Anticipated requirement of six primary schools and two secondary schools Draft Functional Servicing Report Prepared by CIMA+ February 2024 An analysis of servicing needs was completed through a Functional Servicing Study Report. Currently, there is limited water distribution infrastructure within the Secondary Plan area. The Region of Durham has planned projects to provide additional feedermain capacity to support growth within the Secondary Plan area. The undeveloped lands in the Secondary Plan area are within a catchment area that will flow directly to the Courtice Water Pollution Control Plant (WPCP) by gravity via the Courtice Trunk Sanitary Sewer (CTSS), a planned project by the Region of Durham. The development of a local sanitary sewer network that will drain to the planned trunk and sub-trunk sanitary sewer will likely influence the sequence and progression of development in the area. The study area is located within the watersheds of Robinson Creek and Tooley Creek. The lands generally drain towards Robinson and Tooley Creeks via roadside ditches and smaller drainage courses that follow the natural topography of the area. Stormwater Management (SWM) objectives and a preferred SWM strategy have been established through the Robinson Creek and Tooley Creek Subwatershed Study prepared by Aquafor Beech Limited. Traditional Stormwater Management combined with Low Impact Development measures was identified as the preferred strategy. Transportation Impact Study Prepared by CIMA+ Underway (Not yet complete) A Transportation Impact Study is being undertaken to evaluate the traffic operations within the study area , while considering the impacts identified in the Southwest and Southeast Courtice Secondary Plans. The Study will include the following: - Data collection and information gathering; - Existing conditions traffic modelling; - Calibration and validation of existing conditions; - Updating traffic modelling with 2051 forecasts; - Traffic operations evaluation; and - Active transportation recommendations. Study areas for Courtice Transit-Oriented Community Secondary Plan overlap with study areas for the Courtice Waterfront and Energy Park Secondary Plan and will be coordinated to address overlapping study intersections. The Transportation Impact Study will be delivered prior to a final Recommendation Report.