Loading...
HomeMy WebLinkAboutPD-153-96THE CORPORATION OF THE MUNICIPALITY OF CLARINGTON DN: PD153.96 ry REPORT Meeting: General Purpose and Administration Committee File #' Lam, Date: Monday, November 18, 1996 n; �- Res. 4 {,h - _�� >�_� Report #: PD- 153 -96 File fLN 12.3 By -law # COURTICE MAIN CENTRAL AREA STUDY SECONDAR PLAN D URBAN DESIGN PLAN AND GUIDELINE FILE: PLN 12.3 1 Recommendations: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report PD- 153 -96 be received for information; 2. THAT the interested parties listed at the end of this report receive a copy of Report PD- 153 -96 and be advised of Committee's and Council's decision. 1. BACKGROUND 1.1 The Courtice Main Central Area is approximately sixteen hectares in size and is bounded by Highway No. 2 to the north, Trulis Road to the west, Sandringham Drive to the south and the future Maplefield Street road allowance to the east. The Courtice Main Central Area is identified as Special Study Area No.1 on Map A2 to the Clarington Official Plan (see Attachment #1) and is subject to the provisions of Section 17 of the Plan. The Main Central Area Study envisioned by Section 17.2 would be comprised of two components: • a secondary plan study • an urban design study to be undertaken concurrently with the secondary plan study. REPORT PD- 153 -96 PAGE 2 1.2 Staff received a letter on February 1, 1996 from one of the two major land owners within the study area (see Attachment #2). The land owner requested staff to commence with the preparation of the Terms of Reference for the Main Central Area Study. 1.3 Staff proceeded to prepare a draft Terms of Reference. In order to minimize costs, the Terms of Reference proposed to utilize municipal staff for the planning component and a consultant only for the urban design component. The various responsibilities of the Planning and Development Department and the consultant are specified within the Terms of Reference (see Attachment #3). 1.4 Staff subsequently met with the two major landowners, Valiant Property Management and Bonneydon Limited to review the Terms of Reference and to discuss the timing and funding of the Study. The developers indicated concerns about funding a Municipal study which may be detrimental to their objectives. They also indicated that it was a difficult time for commercial development and that they were not able to fund a study at this time. However, Valiant Property Management subsequently offered to prepare an urban design study. This offer was not accepted since in staff's opinion the study should be commissioned by the Municipality for the public interest of all landowners. 2. STAFF COMMENTS 2.1 The Courtice Main Central Area is identified as Special Study Area No. 1 in the Clarington Official Plan. Staff would like to proceed with the secondary plan portion of the Courtice Main Central Area Study within the Department's 1997 work program. Being the future downtown of Courtice, this is viewed as a critical component to completing the Official Plan. It is also important to Courtice since it is the focal point for the community. However, it is important in this type of study that the urban design concept be 608 REPORT PD- 153 -96 PAGE 3 the major development interests, Staff estimate that this would require a budget allocation of approximately $30,000 to $40,000. Recognizing the Municipality's financial situation for 1997, it does not seem to be possible to proceed with the necessary studies in the coming year. 2.2 Accordingly, unless directed otherwise, staff do not propose to incorporate the Courtice Main Central Area Study in the 1997 budget. The Study will be deferred until 1998 or until such time as funding is available from the development interests. Staff will proceed with the many other priority items arising from the Official Plan Review. Franklin Wu, M.C.I.P., R.P.P., Director of Planning and Development WM *DC *FW *km 30 October 1996 ��(: f`r- W. H. 8t6ckwell Chief Administrative Officer Interested parties to be notified of Council and Committee's decision. Valiant Property Management 177 Nonquon Road 20th Floor Oshawa, Ontario L1 G 3S2 Bonneydon Limited 7111 Dufferin Street Thornhill, Ontario L4J 2K2 609 ATTACHMENT No. 1 MAIN CENTRAL AREA, MUNICIPALITY OF CLARINGTON OFFICIAL PLAN, MAP A2, LAND USE, COURTICE URBAN AREA ATTACHMENT NO. 2 The Corporation of the Municipality of Clarington, 40 Temperance Street, Bowmanville, Ontario. L1C 3A6 Attention: Mr. Frank Wu Dear Sir: January 29, 1996 ; X(VIRIMP.1 rtu , ,sss MUNICIPALITY OF CLARINGTON PLANNING DEPgRTMENT RE: South East corner of Ring and Trulls Road Clarington At our meeting of October 16, 1995 it was agreed that we would request the terms of reference be drafted for an urban design plan for this area once your heavy workload diminished with the completion of the Clarington Official Plan. We do not have a customer at present for the referenced property but we do want to get prepared as much as is possible. Therefore, please prepare the terms of reference. This study will include other developers land, is it your intent to collect their share when they proceed to develop? I am most anxious to be sure we can get the study done at the least cost. It will be more carefully bid if there is a large net of consultants invited to bid and if they realize that the developers who are paying for the study will be carefully monitoring its cost. It is not my intention to try to sway the findings of the study. On the contrary, I welcome the unbiased decision of the Clarington Planning Department. However, the consulting industry regularly charges higher fees to local municipalities than is available to private developers. This is what I want to avoid. I The Corporation of the Municipality of Clarington January 29, 1996 Attention: Mr. Frank Wu - 2 - Since there is very little development work going on now, we should be able to get a very competitive price. A strong effort should be made to avoid any excuse for extras or add -ons. I am available to help staff however necessary in your judgement to make sure the job is carefully tendered, properly carried out and brought to a correct conclusion. Please phone me if you wish to discuss this further. Otherwise, please advise at your convenience what the time table might be. Thank you. Yours truly, VALIANT PROPERTY MANAGEMENT /. 1AAA r Robert Hann RH /jmck President ATTACHMENT NO. 3 COURTICE MAIN CENTRAL AREA STUDY TERMS OF REFERENCE I Background The Courtice Main Central Area is approximately sixteen hectares in size and is bounded by Highway 2 to the north, Trulls Road to the west, Sandringham Drive to the south and the future Maplefield Street road allowance to the east. The Courtice Main Central Area is identified as Special Study Area No. 1 in the Clarington Official Plan. The Main Central Area Study is comprised of two components: • The Secondary Plan Study of the Courtice Main Central Area will be undertaken by the Municipality of Clarington Planning and Development Department. • The Urban Design Study will be undertaken by a consultant and will proceed concurrently with the Secondary Plan Study. The particular responsibilities of the Consultant are specified within these Terms of Reference. II Study Purpose 1. To develop a long term development strategy for the Courtice Main Central Area with an emphasis on establishing an urban environment in accordance with the policy framework as contained in the Regional and Clarington Official Plans. 2. To develop an Urban Design Plan with guidelines to facilitate the implementation of the development strategy. III Study Objectives 1. To formulate an Urban Design Plan which facilitates the development of the Courtice Main Central Area as the civic focus and the major commercial centre of the Courtice Urban Area. 2. To determine a means for integrating the Courtice Main Central Area with the adjacent areas with consideration to land use, transportation and urban form. 3. To distribute the initial and ultimate commercial floorspace allocated to the Courtice Main Central Area in order to allow the provision of a range of retail, service and office uses. 613 IV ►7 order to allow the provision of a range of retail, service and office uses. 4. To formulate plans for the development of a civic square, including the possible display of public art, to serve the users of the Courtice Main Central Area. The civic square shall integrate with other components of the park and open space systems serving the community, in accordance with the Town of Newcastle Recreation /Leisure Services Master Plan (1991). 5. To develop an implementation strategy for the recommended Urban Design Plan for the Courtice Main Central Area. Study Area The Study Area shall generally encompass the lands delineated as the Courtice Main Central Area by the Municipality of Clarington Official Plan. In addition, the consultant shall consider and have regard for lands in the general vicinity to provide the appropriate context for the study. The Study Area is shown on Attachment #1. Study Process Phase 1 - Background Report (prepared by municipal staff) The Secondary Plan and Urban Design Plan will proceed concurrently generally in accordance with the process identified on Attachment #2. Phase 1 will involve the collection of background information relevant to the Study, and the identification of issues to be addressed by the Study. As well, the general principles for the future development of the Courtice Main Central Area shall be established. The work undertaken in this Phase shall include the following components: 1. Policy Context a) review existing Official Plan policies and the policies of relevant agencies such as the Municipality of Clarington Public Works Department, the Region of Durham Works Department and the Conservation Authority to determine any implications for future development patterns. In addition, the review of the policy framework will have regard for servicing issues and urban design criteria. In order to assist in the review, Section 9 of the Durham Regional Official Plan, which allocates a maximum of 40,000 sq.m. of gross leasable floorspace within the Courtice Main Central Area forms Attachment #3 to these Terms of Reference. • L In addition, the Clarington Official Plan allocates a maximum of 20,000 square metres of floor space to the Courtice Main Central Area to the year 2016. The relevant policies of the Clarington Official Plan forms Attachment #4 to these Terms of Reference. 2. Land Use a) provide detailed mapping of existing land use and land ownership; b) identify significant natural features and issues including hazard lands, if any; c) prepare a comprehensive assessment of development constraints related to land use and urban form, including existing and potential land use conflicts; d) review studies relevant to development in the Courtice Main Central Area, if applicable; e) identify and assess various measures to integrate the various land uses and minimize land use conflicts in the Study Area; f) identify natural heritage features to be considered in the planning and development of the study area; and g) identify streetscape and heritage elements to be considered in the planning and development of the Courtice Main Central Area. 3. Transportation a) identify and assess any existing deficiencies in the transportation network serving the Study Area; b) identify options for the transportation network in the Study Area, with reference to the proposed urban structure in the Durham Regional Official Plan and Clarington Official Plan, including but not limited to intersection improvements and additional collector and local roads; c) identify and assess existing and future pedestrian, bicycle and vehicular connections to ensure safe and convenient linkages within and leading to the Study Area; and d) assess the opportunities and requirements for the incorporation of public transit into the transportation network. 615 4. Open Space /Recreation a) detail the park and open space network within the Study Area including: • opportunities for the provision of additional parkland and /or recreational facilities including the display of public art • existing and potential linkages with valleylands and parks • civic park development opportunities and any necessary acquisition program 5. Municipal Servicing a) identify the capacity existing in municipal sanitary sewer, storm sewer and water systems available to service development within the Courtice Main Central Area b) identify any constraints on residential or commercial intensification within the Study Area The Background Report with appropriate base mapping produced in AutoCadd will be available to the selected consultant to undertake the balance of the Urban Design Study. Phase 2 - Urban Design Concept (prepared by consultant) Phase 2 will involve the preparation of an urban design concept for the Courtice Main Central Area. The consultant will embrace a "team approach" which would include discussions and "round table meetings" with municipal staff and stakeholders. As a minimum, the concept will include: • a statement of goals and objectives • a review of urban design alternatives and configurations for proposed land uses • a description of the proposed built form, public domain, the transportation system, parking and landscape features • outline public and private elements of the preferred urban design concept • describe how the urban design concept addresses the constraints and opportunities of the site 616 • describe how the urban design concept addresses the current requirements of retail development and land ownership and is flexible for future needs Phase 3A - Secondary Plan (prepared by municipal Staff) 1. On the basis of the Urban Design Concept, Phase 3A will involve the preparation of the appropriate land use policies and designations. 2. Based on the assessment and the options presented in the Background Report, recommendations will be made regarding the preferred transportation network including pedestrian and cyclist connections and the provision of public transit. Phase 3B - Urban Design Plan and Guidelines (prepared by consultant) 1. Work on the Urban Design Plan and Guidelines by the consultant will proceed concurrently with the Secondary Plan Study by the Planning and Development Department. 2. The Urban Design Plan and Guidelines will be presented to the Municipal Council for approval at the same time as the Secondary Plan. 3. The Urban Design Plan and Guidelines are intended to supplement and implement the Secondary Plan. It is not to be incorporated into the Clarington Official Plan, but rather is to be adopted as a guideline by Council. 4. The Urban Design Plan and Guidelines shall generally address the issues outlined below. These issues may be further refined upon completion of Phase 1 (Overview and Land Use Options) of the Study. As well, additional issues as follows, may be identified for study within the individual Design Precincts: • Building Massing, including bulk /height limitations, building setbacks and fenestration • Street facade features including doors and windows • Pedestrian linkages between nodal points • Locational criteria for service entrances • Use of arcades, awnings, canopies, outdoor patios and other special architectural features • Landscaping • Design concept for the Public Square 617 • Signage • Public art display • Profiles and sections for public and private roads including pavement widths, servicing details and street furniture such as seating, trash receptacles, streetlighting, bus shelters and bicycle racks, with detailed hardware specifications to be provided for each. 5. The consultant will make recommendations with respect to the Sign By -law of the former Town of Newcastle as it applies to the Courtice Main Central Area 6. The consultant will make recommendations with respect to landscape design criteria for the Courtice Main Central Area. 7. The consultant will make recommendations with respect to the internal system of roads with particular emphasis placed upon a grid system of roads as required by Section 9.2.2 b) of the Regional Official Plan. 8. The consultant will make recommendations with respect to the implementation of public infrastructure. VI Public Participation 1. Meaningful public involvement and consultation will be sought at each phase of the study process although public involvement will be organized by the municipality via daytime workshops with the stakeholders and evening workshops with the public. The consultant's attendance at both the evening and daytime workshops will be required. 2. Groups with a particular interest in the Main Central Area must be identified. 3. The most effective mechanisms for providing information to the public and securing public input must be identified prior to the commencement of the Land Use Component of the Study. Suggested mechanisms include: • interviews with special interest groups, major landowners, and members of the development industry in Phase 1 and at the end of Phase 2. • the placement of a Public Notice in local newspapers, as well as postings in community facilities, at the beginning of each phase of the Study requesting submissions from the public • • • Public Open Houses /Workshops Municipal staff will be responsible for all arrangements, advertising, newsletters etc. VII Meetings The consultant will be required to attend meetings, including but not limited to: 1. Meetings with the Municipality of Clarington Planning and Development Department as required. 2. Consultation with the public and interest groups, including Public Open Houses. 3. Presentation of findings at a Public Meeting of Council at the conclusion of Phase 2. 4. Presentation with staff of the Recommended Secondary Plan and the Recommended Urban Design Plan to the municipal Council. 5. Presentation with staff of the Recommended Secondary Plan and the Recommended Urban Design Plan to the Regional Planning Committee if deemed necessary. VIII Timing 1. The Study is expected to commence on or around December 1, 1996. It is expected that the Study will be completed within 12 -14 months from commencement. I% Deliverables The consultant shall prepare the following documents through the study process • Working Paper on Urban Design Concept (max. 10 pages of text) Draft 15 Final 50 • Recommended Urban Design Plan Draft 15 Final 50 Appropriate visual displays which illustrate the various reports will be prepared for the public participation process. ►;1 All original text, maps, plates, data, reports and other materials or information collected or prepared by the Consultant shall be considered municipal property and will be turned over to the Municipality at the conclusion of the Study. All data files used and developed through the study process will be provided to the Municipality on a floppy computer disk (3.5 inch format). In addition, all reports will be provided on a floppy computer disk (3.5 inch format) in Wordperfect 5.1. All newsletters and reports shall be printed on paper made with recycled materials. Study Direction The work of the consultant will be directed by the Municipality of Clarington Planning and Development Department. The consultant will be required to meet regularly with municipal Staff to review the Study's progress and to seek direction from Staff. Proposal for Services The Consultant shall prepare a written proposal containing the following: • a detailed description of the Consultant's suggested approach to the Study as outlined in these Terms of Reference and the requirements for any municipal staff resources. • a specific timetable /work plan for the various phases of the Study and a deadline for commencement, the submission of any reports and completion of the Study process and final report. • the name(s) of the principal(s) of the firm who will be coordinating and presenting the Study and the Staff who will specifically be assigned to the Study. • cost estimates with upset costs for the Study, including such matters as the cost of meetings, mileage, secretarial, telephone, fax, computer and printing costs. The Consultant will furnish an itemized estimate of the costs of each component and phase of the Study process. Any per diem rates and meeting rates for additional work not specifically covered in these terms shall also be provided. Costs estimates will be prepared utilizing the form contained in Attachment #5. 620 • a schedule of hourly rates and an estimate of the number of days that each member would spend on the study and a sum total of this time. • a statement of disclosure that the consultant has no conflict of interests in undertaking the study and shall refrain from undertaking future assignments which may conflict or make use of confidential information obtained through this study. The Consultant is encouraged to make separate constructive comments and suggestions regarding the Terms of Reference and the approach to the Study which in his /her opinion, would improve performance in carrying out the assignment. Such comments shall not be made conditional to the acceptance of the assignment. Upon approval of funding for this Study, a contract will be executed by the Municipality. %II Cost Overrun All costs incurred by the Consultant in preparation of the Study and not specifically provided for in the Consultant's proposal and authorization letter will not be the responsibility of the Municipality of Clarington. %III Conditions The consultant must not include restrictive or conditional statements to alter the intent of the Terms of reference. In addition, the Municipality of Clarington advises that the lowest bidder will not necessarily be the consultant retained. Attachments # 1 Map of study Area # 2 Secondary Plan and Urban Design Plan process # 3 Section 9 (Central Areas) of the Durham Regional Official Plan. # 4 Section 17 (Special Study Areas) of the Clarington Official Plan. # 5 Proposal Cost - Estimate form. # 6 List of Materials to be provided to consultant 6 2 1 SECONDARY PLAN STUDY FOR THE COURTICE MAIN CENTRAL AREA Material Provided to Consultants 1. Terms of Reference including Attachments as follows: • Section 9 of the Durham Regional Official Plan • Section 17 of the Clarington Official Plan 2. Extracts from the Durham Regional Official Plan • Schedule A (Clarington portion) • Section 3.3.5 (Population Targets for Urban Areas) 3. Key Map showing location of commercial applications 4. Mapping Cadastral Mapping • Courtice Main Central Area Scale - 1:5000 Ontario Base Mapping • OBM Scale - 1 : 10,000 (digital) • OBM Scale - 1 : 2,000 (print only) Conservation Authority Mapping • CLOCA Flood and Fill Scale - 1 : 2000 (print only) 5. Base - Mapping of Study Area prepared for Phase 1 Report 6. Municipality of Clarington Official Plan 7. Storm Water Management Plan - Robinson Creek 8. Phase 1: Courtice Main Central Area Study Background Report 622 SECONDARY PLAN STUDY FOR THE COURTICE MAIN CENTRAL AREA Documentation Available 1. 'Town of Newcastle Planning Studies'; Murray V. Jones & Associates, 1975 2. 'Town of Newcastle Recreation and Leisure Services Master Plan'; 1990 3. 'Environmental Sensitivity Mapping Project'; Central Lake Ontario Conservation Authority, 1978 4. Inventory of Commercial Floorspace in the Town of Newcastle; Town of Newcastle Planning Department, 1979, 1985, 1990 5. Storm Water Management Studies for the Courtice Major Urban Area 6. Functional Engineering Report: Bowmanville Main Central Area 7. List of Other Documents Available 623