Report To: General Government Committee
Date of Meeting: March 4, 2024 Report Number: FSD-010-24
Submitted By:
Reviewed By:
Authored by:
File Number:
Report Subject:
Trevor Pinn, Deputy CAO/Treasurer, Finance and Technology
Mary-Anne Dempster, CAO Resolution#: GG-028-24
David Ferguson & Toni Anderson
CL2023-1 By-law Number: Shaw House
Accessibility Upgrades – Additional Funding
Recommendations:
1.That Report FSD-010-24, be received;
2.That additional funds in the amount of $131,170 to complete the Shaw House
Renovation project be allocated from the Community Services Building
Refurbishment Reserve Fund be approved;
3.That $193,830 of unexpended capital project funds be reallocated to the Shaw
House Renovation project be approved; and
4.That all interested parties listed in Report FSD-010-24, and any delegations be
advised of Council’s decision.
Municipality of Clarington Page 2
Report FSD-010-24
Report Overview
To seek Council approval for additional funds required to complete the Shaw House
Renovation project.
1. Background
1.1 In 2020, Council approved a budget of $300,000 to complete renovations at the Shaw
House (156 Church St) for mixed office use. In 2021, an additional $475,000 was
approved and the Municipality also received ICIP Grant funding in the amount of
$300,000.
1.2 In 2021, RFP2021-2 was awarded to Moon-Matz Ltd to complete the design, contract
administration, engineering services and tender specifications. Tender CL2021-23 was
subsequently issued to prequalified general contractors, with two submissions
received. Both submissions exceeded the initial budget. As a result, the tender call was
cancelled with the intent to be reissued with a reduced scope of work.
1.3 In 2021/2022, Moon-Matz Ltd completed a full redesign to bring the project within
budget, while retaining base plans and site-specific reports already completed. Tender
CL2022-21 was issued to prequalified general contractors with only one compliant bid
received. The compliant submission was over budget, and it was determined that the
best course of action was to cancel the tender call and revisit the scope of work
required for further reduction.
1.4 In 2022, an additional $200,000 was approved through FSD-028-22 for a total budget
of $1,275,000. Moon-Matz Ltd, in consultation with the Municipality, reduced the scope
further to include the accessibility elevator and ramps only. Tender CL2023-1 was
issued and awarded to Snyder Construction as phase one.
1.5 During phase one of the construction, there were several change orders required to
complete various aspects of the project. There was additional asbestos found during
demolition activities on two occasions, as well as concealed structural deficiencies that
were required to be addressed as part of the work. These types of change orders are
common in a construction project, especially in a renovation project where there are
many unforeseen conditions. The cost for these unforeseen conditions amounted to
$98,521.
1.6 Phase 2 of the project includes additional washroom facilities and electrical and
plumbing upgrades required by the building code to allow for increased occupancy of
the space with the intention of Snyder Construction completing renovation activities to
substantial completion. The cost for phase two is anticipated to be $325,000.
Municipality of Clarington Page 3
Report FSD-010-24
2. Future Use of Shaw House
2.1 Upon further evaluation of the Shaw House by Economic Development as a potential
incubator, concerns have been identified that its suitability for the purpose of an
incubator is not ideal. Specifically, capacity limitations based on building code and the
layout of Shaw House as a two-story heritage building does not align with the
requirements of an effective incubator space, which requires room for large meetings,
events, and presentations.
2.2 The recent decision by the Clarington Public Library Museums and Archives (CPLMA)
to divest from the Sarah Jane Williams location presents a promising alternative home
for an incubator. With a more expansive footprint, single-floor layout, and open-concept
design, this location aligns more closely with the specifications typical of a tech
incubator space. This location also maintains the incubator space being centrally
located.
2.3 Identified as a priority in the 2024 Council Workplan G.1.4 - Establish a small business
incubator. It is recommended that the Municipality further explore the potential of the
Sarah Jane Williams building as a host location by funding a feasibility study to assess
the suitability and determine the scope of work required to convert the space into an
incubator. Furthermore, it is recommended that the funds previously earmarked in the
current budget for furniture, fixtures, equipment (FF&E), and IT improvements for the
Shaw House incubator project be redirected to support the conversion of the future
Sarah Jane Williams to a business Incubator.
2.4 As a result of the determination that the incubator space is not conducive to being
hosted at this site, staff evaluated possible uses for Shaw House once the renovation is
complete. Clarington Emergency and Fire Services (CEFS) are currently set to
temporarily relocate to Fire Station 4 as a result of the planned renovation at Fire
Station 1. This temporary relocation required a renovation of the current MLEO offices
to accommodate CEFS administration, as well as a rental of a trailer at Station 2, until
the new Operations and Fire Training facility is built.
2.5 Moving CEFS permanently into the Shaw House space will save $50,000 in the
temporary renovation at Station 4, as well as the $15,000 per year trailer lease that
would be situated at Station 2.
2.6 Further, this permanent relocation of CEFS administration will change the scope of the
new facility design, by reducing the required administrative footprint, which stands to
reduce that proposed budget significantly.
Municipality of Clarington Page 4
Report FSD-010-24
3. Financial Considerations
3.1 Total funds required for the completion of this project is $325,000.
3.2 The funding for this project will be comprised of unexpended funds from completed
capital projects and the Community Services Building Refurbishment Reserve Fund.
The breakdown of the funding is as follows:
Description Amount
Community Services Building Refurbishment Reserve Fund $131,170
Various Roof Replacements – remaining balance unexpended 130,000
Trulls Rd – transferred from Station 4 renovations for Fire
Administration
50,000
Various Location Suppression Upgrades – remaining balance
unexpended
11,473
Orono Yard Septic System – remaining balance unexpended 2,357
4. Strategic Plan
4.1 The completion of the Shaw House renovation project supports strategic plan priority
L.2.5 - Maintain, protect and invest in Municipal infrastructure and assets.
5. Concurrence
This report has been reviewed by the Deputy CAO, Public Services and the Deputy
CAO, Planning and Infrastructure who concur with the recommendations.
6. Conclusion
It is respectfully recommended that funds in the amount of $131,170 be transferred from
the Community Services Building Refurbishment Reserve Fund and that $193,830 of
Municipality of Clarington Page 5
Report FSD-010-24
unexpended capital project funds be reallocated towards the completion of the Shaw
House Renovation project be approved.
Staff Contact: Ken Ferguson, Manager, Facility Services, 905-623-3379 ext. 2504 or
kferguson@clarington.net.
Attachments:
Not Applicable
Interested Parties:
There are no interested parties to be notified of Council's decision.