HomeMy WebLinkAboutCOD-026-12 Clarington REPORT
CORPORATE SERVICES DEPARTMENT
Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE
Date: October 29, 2012 Resolution#: By-law#:
Report#: COD-026-12 File :
Subject: CL2012-29, GUIDERAIL IMPROVEMENTS, VARIOUS LOCATIONS
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose and Administration Committee
recommend to Council the following:
1. THAT Report COD-026-12 be received;
2. THAT Peninsula Construction Inc., Fonthill, ON with a total bid in the amount of
$328,907.76 (Net of HST Rebate), being the lowest responsible bidder meeting
all terms, conditions, and specifications of Tender CL2012-29, be awarded the
contract for 2012 Guiderail Improvements, Various Locations as required by the
Engineering Department;
3. THAT the funds required in the amount of $403,000.00 which includes
$328,907.76 for tender, design contract administration and contingencies and net
HST be drawn from the following accounts:
Roadside Protection Program, 110-32-330-83338-7401 $397,000.00
(2012, 2011 and 2010)
Bridge Maintenance, 100-36-380-10200-7112 $ 6,000.00
Total Funds Required $403,000.00
and
4. THAT the Mayor and Clerk be authorized to execute the ne ssary agreement.
Submitted by: // �'� �` °' Reviewed by: t -Z_C
Warie Marano, H.B.Sc., C.M.O., Franklin Wu,
Direr or of Corpo ate Services Chief Administrative
� Officer
Nancy T ylor, B'' .A., C.A.,
Director of Finance/Treasurer
MM\JDB\km
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379
REPORT NO.: COD-026-12 PAGE 2
1. BACKGROUND
1.1 Tender specifications were provided by AECOM Canada Ltd. for the 2012
Guiderail Improvements, Various Locations as required by the Engineering
Department.
1.2 Tenders were advertised in the Daily Commercial News as well as electronically
on the Municipality's website and the Ontario Public Buyer's Association website.
Subsequently, tenders were received and tabulated as per the letter from
AECOM Canada Ltd., Attachment 1.
2. ANALYSIS
2.1 A total of two (2) submissions were received in response to the tender call.
2.2 After further review and analysis by the Engineering Department, AECOM
Canada Ltd. and Purchasing, it was mutually agreed that the low bidder,
Peninsula Construction Inc., Fonthill, ON, be recommended for the contract for
the 2012 Guiderail Improvements, Various Locations. A copy of the
recommending memos from the Department of"Engineering and the consultant
AECOM are attached as Attachment 1.
2.3 Peninsula Construction Inc., Fonthill, ON has completed similar projects for the
Municipality of Clarington and they have completed a number of projects of
similar scope and value for the Ministry of Transportation and City of Vaughan.
All work has been completed satisfactorily.
2.4 Queries with respect to department needs, specifications, etc., should be
referred to the Director of Engineering.
3. FINANCIAL
3.1 The total project cost, including tender price of $328,907.76, design contract
administration, contingencies and utilities amounts to $403,000.00 (Net of HST
Rebate). The detailed funding required for the project is outlined in the memo
from Engineering Services and the letter from AECOM Canada Ltd., marked
Attachment 1 and summarized below.
3.2 Funding for this project will be paid by the following:
Roadside Protection Program, 110-32-330-83338-7401 $397,000.00
(2012-, 2011, 2010)
Bridge Maintenance, 110-36-380-10200-7112 $ 6,000.00
Combined Total Project Cost $403,000.00
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379
REPORT NO.: COD-026-12 PAGE 3
4. CONCURRENCE
4.1 This report has been reviewed by the Purchasing Manager with the appropriate
departments and circulated as follows:
Concurrence: Director of Engineering
CONFORMITY WITH STRATEGIC PLAN
The recommendations contained in this report conform to the general intent of the
following priorities of the Strategic Plan:
Promoting economic development
Maintaining financial stability
Connecting Clarington
Promoting green initiatives
X Investing in infrastructure
Showcasing our community
Not in conformity with Strategic Plan
Staff Contact: Jerry Barber, Manager of Purchasing
Attachments:
Attachment 1 - Recommendation Memo, Engineering Services & Letter from AECOM
Canada Ltd.
List of interested parties to be advised of Council's decision: NONE
CORPORATION OF THE MUNICIPALITY OF CLARINGTON
40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379
ATTACHMENT"I"
IN"I E M 0
Leading t7ae Way
TO: Jerry Barber, Purchasing Manager
FROM: Ron Albright, Manager, Infrastructure and Capital Works
DATE: October 22, 2012
RE: 2012 Guiderail Improvements
CL2012-29
The Engineering Services Department has reviewed the attached tender review letter provided
by AECOM Canada Ltd. ("AECOM") and offers the following comments.
The scope of work involves the installation of steel beam guiderail at 9 sites within the
Municipality and various minor repairs to existing guiderail at a number of other sites. The
specific site locations are noted on the cost apportionment attached to the letter from AECOM.
We recommend that the contract be awarded to Peninsula Construction Inc. in the amount of
$365,237.58 inclusive of HST ($328,907.76 net HST).
A detailed breakdown of the project costs including design and tender fees, contract
administration fees and other project costs is provided on the cost apportionment attached to
AECOM's tender review letter. Due to past experiences on similar projects, a contingency
amount of approximately 7.5% is carried forward.
Funding for the guiderail installation will come from the Roadside Protection Program account
including the current funding year and unexpended funds from previous years, as shown in the
table below. Funding for the various repairs will come from the Operations Department's Bridge
Maintenance account.
ATTACHMENT 1"
"0 12 C�uiderail Improvements, 0120.12-29 2 October 22, 2012
Total Project Value $403,000.00
Budget Amount
Roadside Protection Program, 110-32-330-83338-7401 $397,000.00
(2012, 2011, 2010)
Bridge Maintenance, 100-36-380-10200-7112 $6,000.00
Estimated Unexpended Budget $0.00
Additional Funding Required $0.00
We recommend that staff award the contract to Peninsula Construction Inc. based on the above
apportionments. Should you have any further questions, please feel free to contact the
undersigned,
Regards,
1
Ron Albright, P. Eng,
Manager, Infrastructure and Capital Works
RA/sb/dv
Attachment
Pc: Will McCrae, P. Eng., Manager, Cobourg Office, AECOM
Nancy Taylor, Director of Finance
A.S. Cannella, Director of Engineering Services
_ rrr- Lc;p dhnsrJ i tpltl 4h ,Ai:1'A. ...IP f r., I:Pi .I tli i, Ib 'e, rr!1=r :.1LL=,,.0 I I i u re C.i.:_Pl 'J T' J" ,sar.-I
i
Attachment"l
/�„„„CO j AECOM 906 372 2121 W j
/��4 ,r' 513 Division Street 905 372 3621 fax
Cobourg,Ontario K9A 506
wwmaecom.com
October 16, 2012
Mr.A. S. Cannella, C.E.T.
Director, Engineering Services
The Municipality of Clarington
40 Temperance Street
BOWMANVILLE, Ontario L1C 3A6
Dear Sir:
Project No. 60276868
Regarding: 2012 Guiderail Improvements
Contract No. CL2012.29(the"Contract")
Municipality of Clarington
Tenders for the above project were opened at the Municipal Offices on Friday, October 12,2012 at
2:15p.m. A list of the bids received is provided in the table below,
�c h m t,...�.i..Yd::,,.:L:�.}-..ate y tS3t'41-i}'•Pti.}• r•,x°i"•^s:;°
iiP�•�SE:.,i ii{^�`�.:.gs:•eiu i:E.l":�c�•°}}'^°i s l�i ic}E$,mo�i•?::3 i}:t tx x�I uE�Yi!�5 s•:�$i E�'!�s'.•"}}3E��t.r S'�a:ti,'�xE s E.y"(:i lE-i��i"n 7r3':���.�I{r:°:nii:p k+„Yr t.:ltu.•i,S iii t°u�,:�c}n�n.l i 22dr'���,i wo F{E:I i��&>�t!..i}n.i!.1 3}.3+:S4 i'91'E 3S.•:tt iS^ta,t.•ai�t�,iY7{t^��»nS{jrE i s��n r!_ti(_^$,y;tSi•l!!i�{t 1nii'�n',�N°^A a'-.p�l}^S?*�,ru�a�.,:�'�I rrn,„°tsi s1 E�&�•�.,^u,s a t,,l.'��s:�hsca,i�m�.�ri a�.s.��c':}}h•x,srim^I�a•:",.r.1p r�i.i•s ai!r,�r i^t..-�i i.e,aE:��xte, z Milli 7r a alaa esn.c. i��i:n fss,�z:E•'•_Nt,,.'x•;ri:?•l�a vT.''`•b�°r y
a}'t•�}k l
ilriEril2
d E;f,t
0' p�c•i tLii
I' lip,seF s^
sd Ei
Peninsula Construction Inc.
FONTHILL, Ontario $365,237,58 $328,907.76
Powell Contracting Limited
GORMLEY, Ontario $412,611.70 $371,569.62
The Municipality of Clarington's Purchasing Department (the"Purchasing Department") reviewed all
bids to confirm compliance with the Clarington Purchasing By-Law. All bids were deemed compliant
by the Purchasing Department. AECOM Canada Ltd. ("AECOM")has reviewed the two lowest bids
and confirmed the bid values noted above. Peninsula Construction Inc. is the lowest bidder. Its
submitted tender has been reviewed and is found to be arithmetically correct.
As requested by the Purchasing Department, references were checked only for the lowest bidder.
Peninsula Construction Inc. has completed projects of similar scope and value. Three references
were contacted and each stated that Peninsula Construction Inc, completed work to specification and
to their satisfaction,
Should funding be available and based on the input provided by the references contacted regarding
performance on previous projects, we are not aware of any reason why the Municipality would not be
entitled, in its sole discretion,to award the Contract to Peninsula Construction Inc. in the amount of
CL2012.20 Tondor Award Letter•Quldereil Improvements.noo
Attachment'T'
AZCOM
Page 2
October 16,2012
$328,907.76 (inclusive of net HST rebate)subject to all provisions of the Clarington Purchasing Bylaw
being met.
Bid Cheques or Bid Bonds shall be retained for Peninsula Construction Inc, and Powell Contracting
Limited, the second low bidder, until the Contract has been executed.
Should you have any questions regarding this matter, please contact the undersigned.
Sincerely,
AECOM Canada Ltd.
Doug Timms, P.Eng.
Senior Project Manager
doug.timms@Etecom.com
DT;cs
encl.
cc, Mr.Ron Albright,P,Eng.,Manager of Infrastructure and Capital Works,Municipality of Clarington(via a-mall)
Mr.Sean Bagshaw,P.Eng.,Capital Works Engineer,Municipality of Clarington(via a-mall)
I
I
I
i
OL2012.29 Tender Award Letter-Gvlderall Imr,mvements.um
Cost Apportionment Based on LOW Bid
Contract CL2012-29
Municipality of Clarington
2012 Guiderail Improvements
October 16,2012
AECOM Project#60225382/60276868
Description
Total
Municipality of Clarington
Engineering
Municipality of Clarington
Operations
Comments
Project ID/Account Number
11032330-83338-7401
100-36-380-10200-7112
Construction Costs Contract CL2012-29
Part'A': South Service Road 1.8Km W.Of Waverly Road-Structure No.99051
$ 47,037.60
$
47,037.60
$
Part'B': Baseline Road 0.3Km W.Of Green Road-Structure No.99065
$ 39,591.40
$
39,591.40
$ -
Part'C': Baseline Road 0.5Km E.Of Holt Road-Structure No.99505
$ 28,564.95
$
28,564.95
$ -
Part'D': Baseline Road 0.1 Km E.Of Holt Road-Structure No.99063
$ 52,717.75
$
52,717.75
$ -
Part'E': Baseline Road 0.3Km W.Of Holt Road-Structure No.99059
$ 25,068.40
$
25,068.40
$ -
Part'F': Nash Road 0.6Km E.Of Green Road-Guiderail No.94074A
$ 18,604.88
$
18,604.88
$ -
Part'G': Nash Road 0.06Km W.Of Maple Grove Road-Guiderail No.99069A
$ 37,430.50
$
37,430.50
$ -
Part'H': King Street(Hwy 2)1.2Km E.Of Liberty Street-Structure No.94017(Provisional)
$ 5,330.00
$
2,827.50
$ 2,502.50
Part T: Morgans Road 1.OKm S.Of Conc.Road 4-Structure No.98033
$ 37,522.98
$
36,522.98
$ 1,000.00
Part V: East Beach Road 0.3Km W.Of Lambs Road-Guiderail No.94001A
$ 11,738.84
$
11,738.84
$ -
Part'K': New Hazard Markers(Various Locations)
$ 2,250.00
$
-
$ 2,250.00
Part'L': General Items(All Locations)
$ 17,361.80
$
17,361.80
$
Total Construction
$ 323,219.10
$
317,466.60
$ 5,752.50
Design and Tendering
Design and Tendering
$ 23,000.00
$
23,000.00
$
Budget
Total Design and Tendering
$ 23,000.00
$
23,000.00
$
Construction Administration and Inspection
Construction Administration and Inspection
$ 25,000.00
$
25,000.00
$
Total Construction Administration and Inspection
Is 25,000.00
$
25,000.00
$
Other Costs
CLOCA Standard Permit'B'
Total Other Costs
$ 900.00
$ 900.00
$
$ 900.00
$ 900.00
$ -
Additional Project Costs
1.76%Unrecoverable HST
$ 6,549.30
$
6,448.05
$ 101.24
7.5%Contingencies Inclusive of Net HST)
$ 24,331.60
$
24,185.35
$ 146.26
Total Estimated Project Costs
$ 403,000.00
$
397,000.00
$ 6,000.00
Budget Amount
$ 403,000.00
$
397,000.00
$ 6,000.00
Under/(Over)Budget Amount
Is
Is
Is
_
All Costs Exclude HST Unless Indicated Otherwise
1
i
AECOM 0
3
m
ENNISKILLEN
CI
3
ri
0 e
SOUK,
VIAPLEGROVE
1 P4
Le Bend
0—w-
-A I--
it �--HIGMAY
MU=NICIM ROU
A�'
TYRONE
.........
35
LES
31
L I
Jt-
KENDAL
111-Y
4
17
57
14 ORONO
Q
35
T! '15
UMA
2 NEWCASTLE) i ,{
2
d
N
AXOM
Leading the V7ay
2012 GUIDERAIL
IMPROVEMENTS
CL2012-29
SITE LOCATIONS
66225382.01
1