HomeMy WebLinkAboutCS-06-90TOWN OF NEWCASTLE
J
rt REPORT File #
Res. #
By -Law #
MEETING: GENERAL PURPOSE AND ADMINISTRATION
DATE: MARCH 9, 1990
REPORT #: Cs -06 -90 FILE #:
MUNICIPAL BUILDING MAINTENANCE
RECOMMENDATIONS:
It is respectfully recommended that the General Purpose &
Administration Committee recommend to Council the following: -
1. That Report No. CS -06 -90 be received;
2. That the level of service for the capital upgrading of
Municipal Buildings be established to ensure structural
stability and compliance with Building and Fire Codes; and
3. That the level of services for the Preventative Maintenance
program be expanded to include the mechanical components of
all Municipal Buildings.
1.0 BACKGROUND:
1.1 As a result of the 1989 budget deliberations approval was
given for staff to conduct seventeen (17) building profiles
of Municipally owned buildings which are as follows:
.l. Base Line Community Centre
2. Bowmanville Memorial Clubhouse
3. Bowmanville Works Department Yard & Animal Control
Building
4. Brownsdale Community Centre
" ../2
REPORT-CS -06 -90 - 2 - MARCH 9, 1990
5. Courtice Fire Station #4
6. Hampton Works Department Yard
7. Haydon Community Centre
8. Newcastle Community Hall
9. Newcastle Fire Station #2
10. Newcastle Village Arena
11. Newtonville Hall
12. Orono Arena & Community Hall
13. Orono Fire Station #3
14. Orono Town Hall
15. Orono Works Department Yard
16. Solina Community Centre
17. Tyrone Community Centre
1.2 It should be noted, that these seventeen (17) buildings in
addition to the ten (10 ) addressed in 1987 and 1988 represents
all buildings of which the Municipality possess ownership,
excluding the Newcastle Administration Building and the
Bowmanville Recreation Complex.
1.3 The length and detail of these profiles prevents their
inclusion in this report, however a copy of these in addition
to the ten (10) previous profiles is available to Members of
Council through the Mayor's office.
1.4 Each building was reviewed as it relates to its structural,
mechanical and electrical components in addition to the
overall compliance with both the Fire and Building Codes.
2.0 REPORT FINDINGS:
2.1 For the most part, each of the buildings is reported to be in
good to fair condition noting three (3) buildings were listed
as very good and just one categorized as poor. Attachment #1
is provided as a summary of the 17 profiles conducted in 1989
outlining the respective buildings condition and estimated
capital costs required to upgrade.
../3
REPORT CS -06 -90 - 3 - MARCH 9, 1990
2.2 Attachment #1 also includes figures addressed through the
departments 1990 capital budget submission representing the
first year of a 5 year upgrading plan for each of the 17
buildings, based on priority. Attachment #2 is provided as
a reference to the 10 profiles conducted in 1987 and 1988.
2.3 Coupled with the previous profiles, conducted in 1987, 1988
and those during 1989 capital cost related to upgrading the
respective twenty -seven (27) Municipally owned buildings and
facilities are estimated at approximately $1,064,400 (1989
dollars). These works are proposed to be accommodated over
a period of 5 years. This will be presented in the
Department's 1990 budget and 4 year forecast.
3.0 BUILDING SERVICES PROGRAM:
3.1 Recognizing the Municipalities ultimate responsibility through
ownership of these buildings, and the substantial capital
requirement, staff has developed a Municipal Building Services
Program to be addressed during the 1990 budget deliberations.
3.2 For the most part, staff through the proposed Building
Services program is recommending an evolution towards a
comprehensive preventative maintenance system for the Town's
buildings.
3.3 Because of the volume of work required, the Community Services
Department's existing staff complement cannot adequately
accommodate this increase in responsibility. Staff will be
requesting the addition of a Lead Hand and a labourer position
to accommodate this need.
3.4 Responsibility for this new division will be to oversee
various contracts involving 25 proposed projects in 1990 with
an estimated construction value of $372,500. ($228,300 related
to 17 buildings listed in Attachment #1; $53,900 related to
10 buildings listed in Attachment #2; $34,300 related to the
../4
REPORT CS -06 -90 - 4 - MARCH 9, 1990
Newcastle Administration Building; $46,000 and $10,000 related
to additional work required at the Newcastle Community Hall
and the Orono Town Hall respectively) and further to extend
our preventative maintenance program, to those Municipal
buildings and facilities represented in Attachments #1 and #2.
4.0 FINANCING:
4.1 Assuming Council endorses the Building Services Program a
preliminary operating budget for implementation is as follows:
Wages $ 50,754
Benefits $ 12,539
Clothing Allowance $ 525
Misc. Operating Supplies $ 3,000
R/M Supplies $ 4,500
R/M Equipment $ 20,000
R/M Fire Equipment $ 1,000
TOTAL $ 92,318
5.0 IMPLEMENTATION:
5.1 Subsequent to receiving approval of Council, staff will
initiate a series of meetings with respective Hall Boards, and
occupants of the related buildings to explain the Town's role
with respect to the Preventative Maintenance Program and share
information provided through the various profiles.
5.2 It is anticipated that these meetings will allow for input
with respect to the priorization df the capital works required
and ultimately assist the Municipal Grant process, resulting
in co- ordinated capital upgrading and preventative maintenance
programs, to be administered by the Municipality.
6.0 SUMMARY:
6.1 Although the required capital costs recognized through the
Building Profiles represents a substantial financial
commitment, it is imperative that the Building Services
../5
REPORT CS -06 -90 - 5 - MARCH 9, 1990
Program be initiated to ensure public safety and efficient
mechanical operation of the Municipality's structural assets.
Respectfully submitted,
Joseph P. Caruana, Director
Department of Community Services
JPC:JDC:sa
Recommended for presentation
to the Committee,
Lawrence E. Kotseff
Chief Administrative Officer
ATTACHMENT #1
BUILDING
GENERAL CONDITION
STRUCTURAL MECHANICAL
BUILDING &
FIRE CODES
ESTIMATED
CAPITAL
COSTS
1990 CAPITAL
BUDGET
REQUESTS COMMENTS
Base Line Community Centre
very good
very good
very good
$ 700
$ 700
- well maintained
Bowmanville Memorial Park
Clubhouse
fair
very good
fair
$32,100
$ 2,200
- structural repairs deferred
for one year
Bowmanville Works Dept. Yard
good
very good
very good
$21,600
$ 7,600
- includes Animal Control Bldg.
Brownsdale Community Centre
fair
very good
very good
$14,200
$ 5,200
- structure shows aging
Courtice Fire Station #4
good
very good
very good
$50,700
$50,700
- requires a new roof a.s.a.p.
Hampton Works Dept. Yard
fair
very good
very good
$40,800
$ 2,500
- cladding of stuccoed building
deferred for one year
Haydon Community Centre
fair
good
fair
$10,900
$ 2,000
- showing signs of age
Newcastle Community Hall
fair
good
poor
$174,800
$10,500
- repairs related to weather
proofing of building
Newcastle Fire Station #2
fair
good
fair
$20,700
$16,000
Newcastle Arena
fair
good
fair
$88,800
$56,000
- new flat roof required
Newtonville Hall
poor
good
good
$33,900
$15,000
- showing signs of age
Orono Arena & Community Hall
good
very good
good
$14,400
$ 8,500
- well maintained
Orono Fire Station #3
very good
very good
very good
$ 4,000
$ 4,000
- well maintained
Orono Town Hall
fair
very good
fair
$48,900
$17,000
- main cost - reinforce floor &
replace balcony stairs
Orono Works Department Yard
good
very good
very good
$37,000
$12,500
- well maintained
Solina Community Centre
very good
very good
good
$17,000
$13,000
- well maintained
Tyrone Community Centre
good
very good
very good
$8,500
$ 4,900
- well maintained
TOTALS
$619,000
$228,300
LOX
EL
OW
•Z
.'fie
IS
(A)
(B) (C) (D)
(E) (F1
r ArrrArur�rFnrr � i
BUILDING A
AGE S
GENERAL CONDITION E
ESTIMATE 1
1989 CAPITAL
COMMEN'T'S
RT & FIRE BUILDING 2
22 YEARS G
GOOD G
GOOD $
$ 31,900 $
$ 16,000 I
Items have been prioriz
addressed through 1989 (
Budget and 4 year forec.
NOTE - These costs are included in the budget as presented by the respective Museum Boards.
�d and
:apital
iSt.
�d and
:apital
(st.
�d and
;apital
[St.
!d and
:apital
Est.
�d and
:apital
Est.
�d and
:apital
rst.
> Museum
Museurn
�d and
:apital
ist.
i in 1986.
majority
the Cap -
;t 3 years.