HomeMy WebLinkAboutCOD-018-12 Clarington REPORT CORPORATE SERVICES DEPARTMENT Meeting: GENERAL PURPOSE AND ADMINISTRATION COMMITTEE Date: September 10, 2012 Resolution#: - 31-1 By-law#: N/A Report#: COD-018-12 File#: Subject: CONTRACT AWARDS DURING COUNCIL RECESS RECOMMENDATIONS: It is respectfully recommended that the General Purpose and Administration Committee recommend to Council the following: 1. THAT Report COD-018-12 be received for information. Submitted by: Reviewed by: earie Marano, H.B.Sc., C.M.O., Franklin Wu, Director of Corporate Services Chief Administrative Officer MM/JB/km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 REPORT NO.: COD-018-12 PAGE 2 1. BACKGROUND 1.1 During periods when Council is in recess provision has been made for the approval of contract awards in order to continue with business as usual. During the summer recess of 2012 there were four contract awards that would normally necessitate a report to Council. 2. COMMENTS 2.1 In accordance with Purchasing By-law 2010-112, Part 2, Section 67, the following contracts were awarded during the Council Recess. Q2012-18, Hampton Skateboard Park Construction CL2012-20, Soil Remediation — 3333 Highway#2, Newcastle (Fire Hall #2 Site) RFP2012-4, Provision of Cold Beverages Q2012-17 Rubberized Surface on Concrete Splash Pad (Guildwood Park) A copy of the recommending Report Memos for the above noted projects are attached as Attachments "1","2", "3" and "4", respectively. 3. CONCURRENCE Not applicable 4. CONCLUSION The actions taken by Staff as documented in the attached Report Memos be provided for Councils information. CONFORMITY WITH STRATEGIC PLAN — Not Applicable Staff Contact: Jerry Barber, Purchasing Manager Attachments: Attachment 1 - Q2012-18, Hampton Skateboard Park Construction Attachment 2 - CL2012-20, Soil Remediation — 3333 Highway#2, Newcastle (Fire Hall #2 Site) Attachment 3 - RFP2012-4, Provision of Cold Beverages Attachment 4 - Q2012-17 Rubberized Surface on Concrete Splash.Pad (Guildwood Park) List of interested parties to be advised of Council's decision: Not Applicable Attachment 1 CiffiflgWR RtwuRT MEMO PURCHASING SERVICES Date: August 21, 2012 To: Frank Wu, Chief Administrative Officer From: Jerry Barber, Purchasing Services Report#: PS-020-12 File#: Q2012-18 Subject: QUOTATION Q2012-18, HAMPTON SKATEBOARD PARK CONSTRUCTION RECOMMENDATIONS: It is respectfully recommended to the Chief Administrative Officer the following: 1. THAT Nick Carchidi Excavating, Janetville, Ontario, with a total bid in the amount of$94,165.30 (net of H.S.T. Rebate), being the lowest responsible bidder meeting all terms, conditions and specifications of Quotation Q2012-18 be awarded the contract for Hampton Skateboard Park Construction, as required by the Engineering Department; 2. THAT the $17,130.25 funding shortfall for this project be financed from the Engineering Parks Capital Reserve Fund; 3. THAT the funds required in the amount of $98,873.00 (which includes $94,165.30 tendered cost as well as contingencies) be drawn from Engineering Department Hampton Skateboard Park Account (2012 Capital) #110-32-325- 83367-7401; and 4. THAT the actions taken during the summer recess be reported to Council for information. MM\JDB\km CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 Attachment 1 REPORT NO.: PS-020-12 PAGE 2 Recommended b : Je rber, Manager, Purchasing Services bate Concurrence: �.� Tony Cannella, Director of Engineering Date Concurrence: N Director of Finance Da e Approved by: F ra n k-I aief Administrative Officer Date MM\JB\km c: M. Marano, Director, Corporate Services. Attachment 1 REPORT NO.: PS-020-12 PAGE 3 1. BACKGROUND 1.1 Quotation specifications were provided by the Engineering Department for the Hampton Skateboard Park Project. 1.2 Quotation Q2012-18, Hampton Skateboard Park was advertised on the Municipality's website and the Ontario Public Buyer's Association website. Subsequently, quotations documents were downloaded by 12 firms with bids being received from 3 firms as per "Attachment 1". 2. ANALYSIS 2.1 A total of three (3) submissions were received in response to the quotation call. All submissions were deemed compliant. 2.2 After further review and analysis of the compliant bids by the Engineering Department and Purchasing, it was mutually agreed that the low bidder, Nick Carchidi Excavating, Janetville, Ontario be recommended for the contract for the Hampton Skateboard Park construction project. A copy of the recommendation memo from the Department of Engineering is appended as "Attachment 2". 2.3 The low bidder acting as a subcontractor has provided similar services to the Municipality of Clarington in the past and is currently working on 2 different projects as a general contractor and the level of service has been satisfactory. 2.4 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Engineering. 3. FINANCIAL 3.1 The total project cost is $98,873.00 (net of H.S.T. Rebate). The funding required for the project is outlined in the memo from Engineering Services ("Attachment 1"). 3.2 The total project cost of $98,873.00 for the Hampton Skateboard Park exceeds the budgeted amount by $17,130.25 after the additional fundraising monies of $6,742 are applied. The additional funds required to complete the project are available in the Engineering Parks Capital Reserve Fund and will be transferred to the project account. 3.3 Funding for this project will be drawn from the Engineering Capital account for the Hampton Skateboard Park #110-32-325-83367-7401 - $98,873.00. Attachment 1 REPORT NO.: PS-020-12 PAGE 4 4. CONCLUSION 4.1 To award the contract to Nick Carchidi Excavating, Janetville, Ontario for the Hampton Skateboard Park Project. Attachments: Attachment#1 - Bid Tabulation Attachment#2 - Recommendation Memo from Engineering Services Attachment 1 Attachment#1 Municipalit'L ,r SUMMARY OF BID RESULTS Q2012-18 HAMPTON SKATEBOARD PARK BIDDER TOTAL BID Total Bid (HST Included) Net of HST rebate Nick Carchidi Excavating Ltd. Janetville, ON $104,405.56 $94,165.30 Mopal Construction Limited Gormley, ON $130,566.41 $117,434.25 Tri Son Contracting Inc. Port Perry $164,093.40 $147,771.19 Attachment 1 MEIVIU Leading the Way TO: Jerry Barber, Purchasing Manager FROM: Peter Windolf, Park Development Manager DATE: August 20, 2012 SUBJECT: Hampton Skateboard Park Construction Quotation No. Q2012-18 The Engineering Services Department has reviewed the low bid by Nick Carchidi Excavating and offers the following comments: In 2012 Council approved $75,000 for the construction of Hampton Skateboard Park. External Funding was anticipated to be $35,000 with $40,000 from the Engineering Parks Capital reserve fund. The community exceeded their fundraising goal so the actual amount of external funding is $41,742.75. The external funding has been raised by the community to purchase modular skateboard equipment that will be placed on a concrete pad. The modular equipment has been included as a cash allowance in the contract in the amount of$41,997. We recommend award of the contract in the amount of$94,165.30 (net of H.S.T. rebate) for the project. Nick Carchidi Excavating has recently been awarded two other projects for the Engineering Department and their work to date has been acceptable. I am satisfied they will be able to complete the project to our satisfaction. A contingency allowance of 5% is carried forward. Construction inspection and contract administration will be done by municipal staff. The Engineering Services Department advises the following breakdown for the above referenced project: Project Breakdown Total Project Costs $94,165 contract award 10-32-325-83367-7401 $4,708 contingency allowance $98,873 2012 Approved Budget Hampton Skate Board Park $75,000 Additional Fundraising Funds $6,742 Budget over under $17,131 i Attachment 1 Hampton Skateboard Park 02012-18 2 The Finance Department has confirmed that the additional funds of $17,131.00 are available in the Engineering Parks Capital Reserve fund. Should you have any questions, please feel free to contact me. Regards, Peter Windolf, OALA, CSLA Manager Park Development Attachment Cc Nancy Taylor, Director of Finance Tony Cannella, Director of Engineering CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T(905)623-3379 Attachment 2 E R E P 0 T M NE M 'But' • PURCHASING I Date: August 13, 2012 To: Frank Wu, Chief Administrative Officer From: Staff, Purchasing Services Report#: PS-016-12 File#: CL2012-20 Subject: CL2012-20, SOIL REMEDIATION — 3333 HIGHWAY 2 RECOMMENDATIONS It is respectfully recommended to the Chief Administrative Officer the following: 1. THAT Ground Force Environmental Inc., Waterloo, with a bid price of$98,357.65 (net of H.S.T. rebate), being the lowest responsible bidder meeting all terms, conditions and specifications of Tender CL2012-20, be awarded the contract for the Soil Remediation — 3333 Highway 2, Newcastle, as required by the Emergency and Fire Services Department; 2. THAT the funds required in the amount of$200,000.00 (which includes $98,357.65 for tendering, design and contingency) be drawn from the Emergency and Fire Services Department, Account#110-28-370-828447401; and 3. THAT the actions taken during summer recess be reported to Council for information. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T (905)623-3379 F (905)623-3330 I Attachment 2 REPORT NO.: PS-016-12 PAGE 2 Recommended,b : JerPCurrence: r, Manager, Purchasing Services Date Co l 1.---� I Gord eir, Director of Emergency & Fire J Date Services Concurrence: Nancy ayO, Director of Finance Da e Approved_by.- Frank Wu, Chief Administrative Officer Date A MM\JB\km fcc: M. Marano, Director, Corporate Services Attachment 2 REPORT NO.: PS-016-12 PAGE 3 1.0 BACKGROUND 1.1 Tender CL2012-20 for Soil Remediation at 3333 Highway 2, Newcastle, the site of Fire Hall #2 was advertised in the Daily Commercial .News and electronically on the municipal website and the Ontario Public Buyers Website with 24 documents issued. Subsequently, 11 bids were received and tabulated as per "Attachment 1". 1.2 Tenders were invited on the basis of an estimated project total cost for required work based on estimated quantities and firm unit prices. Provisional prices were also invited for the provision of a.temporary groundwater treatment facility for the discharge treatment of groundwater and the removal and disposal of asphalt if required. These costs, if incurred will be extra to the base contract and will be dealt with using the contingency funds. 2.0 ANALYSIS 2.1 A summary of bids received for the Municipality's requirements is attached and marked as Attachment 1". For clarification, there are 2 bids noted as rejected. The bid submitted by Salandria Ltd., (low bid) received negative comments on the reference check sufficient to warrant rejection. The second rejected bid, JMX Contracting Inc., fail to include all prices requested on the bid form. 2.2 The recommendation is to award the contract to Ground Force Environmental Inc., Waterloo with a bid price of$98,357.65 (net of H.S.T. rebate), being the lowest responsible bidder meeting all terms, conditions and specifications of CL2012-20 for Soil Remediation at 3333 Highway 2 and providing satisfactory references. 2.3 After review and analysis of the bids by the Emergency and Fire Services Department, Golder Associates and Purchasing, it was mutually agreed that the low responsible and responsive compliant bidder, Ground Force Environmental Attachment 2 REPORT NO.: PS-016-12 PAGE 4 Inc., Waterloo., be awarded the contract for the Soil Remediation at 3333 Highway 2, Newcastle, 2.4 Ground Force Environmental Inc. has not provided similar service to the Municipality in the past; however, a review of references indicates that Ground Force Environmental Inc. has completed similar projects satisfactorily. 2.5 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Emergency & Fire Services, 3.0 FINANCIAL 3.1 The total estimated project cost, including tender price of $98,357.65, design and contingencies amounts to 200,000.00 (Net of HST Rebate). The funding required for the project is outlined below. 3.2 Funding for this project will be paid by the following: Emergency & Fire Services Department-- 2010 Capital Budget Construct New Fire Station #2, Newcastle Account# 110-28-370-82844-7401 $200,000.00 4.0 CONCLUSION 4.1 To award the contract to Ground Force Environmental Inc., Waterloo, Ontario for Tender CL2012-20 for the Soil Remediation at 3333 Highway 2, Newcastle. 4.2 Although the value of this award falls within the guidelines for approval by the CAO it is being reported under the Section 64 c) dealing with recommendation for award of bids from other than the lowest bidder and Section 67 Council Recess Procedures which requires an information report to Council after the conclusion of the recess. Attachment 2 �I I REPORT NO.: PS-016-12 PAGE 5 Attachments: i Attachment 1 — Bid Tabulation Attachment 2 — Location Map i cc: M. Marano, Director, Corporate Services i I I i Attachment 2 Attachment #1 THE MUNICIPALITY OF CLARINGTON TENDER CL2012-20 SOIL REMEDIATION AT 3333 HIGHWAY 2 BID TABULATION BIDDER TOTAL BID Total Bid (Excluding HST) (Net of HST Rebate) Ground Force International $ 96,656.50 $98,357.65 Waterloo, ON Clean Harbors Canada Inc. $101,352.50 $103,136.30 Guelph, ON Sierra Excavating Enterprises Inc. $102,334,50 $104,135.59 Bolton, ON Milestone Environmental Contracting Inc. $104,050,00 $105,881.28 Ottawa, ON The Cannington Group Inc. $105,710.00 $107,570.50 Gormley, ON Accuworx Inc $105,780.00 $107,641.73 Brampton, ON Terratechnik Environmental $115,675.63 $117,711.52 Mississauga, ON R.W. Tomlinson Limited $131,439.00 $133,752.33 Ottawa, ON Tri-Phase Environmental $182,220.00 $185,427.07 Mississauga, ON Salandria Ltd. Rejected Rejected Toronto, ON JMX Contracting Rejected Rejected Gormley, ON Attachment 2 Attachment #2 690DOD 691000 692000 693000 694000 Flo f 1l j z, (P It � �`la�isS�7l ��� ,• �. t , S I glOSw 1> 3, O It �Z ^hfi b r QS � P9� for ., CLARKS o\ ) SITE LOCATION `t b !- HI6 H`NAY2 j \ �. A PY 0 s •w, os DARLINGTON 1( r7 ti a Ill tAKEON AR10 s Bg' 8 000000 691000 692000 697000 604000 S 500 0 600 11000 p SCALE 1;25,000 MTRFS TtnE SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT VACANTAND UNDEVELOPED LAND 3333 DURHAM REGIONAL HIGHWAY#2 MUNICIPALITY OF CLARINGTON,ONTARIO TIT4E d KEY PLAN s REFERENCE E .I S e SC/1E SR PFV.00 N Beet Data•61NR RRVIS,oblalned208E S I Ptodute06y OOldtrAwaAelea Eld urdU fanoe kom GULQQ�C OIB Sr wand QM.&MkA,Iy of NaMAI RteWwef,00uetnt MR,2008 AS30 Clil(Cti CREUi FIGURE 1 (� Roltdi—Tianrre-Mermlor Dal—NA087 COaolnelo"l—UTMtanel7 MAl .0n900 Attachment 3 CiffiffgWfl REPORT MEMO PURCHASING SERVICES Date: August 14, 2012 To: Frank Wu, Chief Administrative Officer From: Jerry Barber, Purchasing Services Report#: PS-019-12 File#: RFP2012-4 Subject: RFP2012-4 PROVISION OF COLD BEVERAGES (COUNCIL RECESS REPORT) RECOMMENDATIONS: It is respectfully recommended to the Chief Administrative Officer the following: 1. THAT the proposal received from Coca-Cola Refreshments, Toronto being the most responsive submission meeting all terms, conditions and specifications of Request for Proposal RFP2012-4 be awarded the contract for the Provision of Cold Beverages for the Municipality of Clarington as required by the Community Services Department for a five year term. The estimated annual value of the contract is $103,773.90, (Net of HST Rebate); 2. THAT the funds be drawn from the respective year's Community Services Operating accounts; 3. THAT all commissions and revenues due to the Municipality be directed to appropriate Community Services Operating Accounts; and 4. THAT the actions taken during summer recess be reported to Council for information. CORPORATION OF THE MUNICIPALITY OF CLARINCTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1C 3A6 T 905-623-3379 Attachment 3 REPORT NO.: PS-019-12 PAGE 2 Recommended by: Jerry BA p , Manager, Purchasing Services ,�'`/ Date Concurrence: Jose p Caruana, Director of Community Date/ Servi s Approved by: r Frank Wu, Chief Administrative Officer Date J B\s m c: M. Marano, Director, Corporate Services i Attachment 3 REPORT NO.: PS-019-12 PAGE 3 1. BACKGROUND 1.1 A Request for Proposal (RFP) was drafted for the provision of Cold Beverages as required by the Community Services Department. 1.2 This RFP was publicly advertised on the Municipality's website as well as the Ontario Public Buyers' website. Three firms picked up or downloaded the specifications. The three (3) companies who downloaded all responded to the RFP and were deemed to be compliant. These companies are as follows: Coca- Cola Refreshments, Toronto; Pepsico Beverage Company, Fraserville and Al Quality Vending, Whitby 1.3 The RFP asked bidders to provide their ideas/suggestions on how the Municipality of Clarington could meet or exceed the requirements previously established. 1.4 Each submission received contained a comprehensive proposal addressing all issues contained in the bid document including exclusivity incentives, marketing incentives, cost for products, etc. 1.5 The servicing and maintenance of all vending equipment and coolers will the responsibility of the successful bidder. All equipment loaned during the course of the contract remains the property of Coca-Cola Refreshments. 1.6 The Community Services Department will assume the responsibility of ordering product and filling the vending equipment. Attachment 3 REPORT NO.: PS-019-12 PAGE 4 2. ANALYSIS 2.1 Representatives from the Community Services Department and Purchasing Services reviewed and scored each proposal based on the criteria contained within the RFP document. Some of the areas on which the submissions were evaluated were as follows: ➢ Previous Experience ➢ Quality of Selection of Brands Proposed ➢ Features of Proposed Equipment ➢ Compliance with Specifications ➢ Overall Performance of Proposed Equipment ➢ Price 2.3 Upon completion of the document review by the Evaluation Team, the following firms where short-listed: Pepsico Beverage Company, Fraserville and Coca-Cola Refreshments, Toronto. 2.4 The'two short-list companies were invited to the Municipality to provide short presentation and to further discuss their submissions. The companies were evaluated and rated on the following criteria for their presentation: ➢ Ability to Communicate ➢ Attention to Concerns/Questions ➢ Overall Impression of Demonstration ➢ Ability to Understand Requirements and Identify a Practical Solution. 2.5 Upon the completion.of the evaluation Coca-Cola Refreshments, Toronto was the highest ranked company. i i Attachment 3 REPORT NO.: PS-019-12 PAGE 5 3. FINANCIAL 3.1 The estimated annual cost is $103,773.90 (net of H.S.T. Rebate) based on previous sales history for this service. 3.2 The required funds will be drawn from the various years Current Budget Accounts. 3.3 Upon signing the agreement the Municipality of Clarington will receive allowances for exclusivity, marketing, menu boards, rebates for product purchased as well as vending equipment for the Community Services Facilities including coolers for the Concession areas. 4. CONCURRENCE 4.1 This report has been reviewed by Joseph P. Caruana, Director of Community Services, and he concurs with the recommendations. 5. CONCLUSION 5.1 It is recommended that the proposal received from Coca-Cola Refreshments, Toronto, being the highest ranked proposal be accepted. 5.2 That based upon mutual agreement of contract terms, satisfactory to the Solicitor, Coca-Cola Refreshments be awarded the contract on a five year term for the Provision of Cold Beverages to the Municipality of Clarington as required. 5.3 The term of the contract will commence approximately September 14, 2012 through to September 13, 2017. Pricing is firm for the first year of the contract and shall be subject to increase once per year by approximately 3.5%. Attachment 4 Ciff MgWjU ' REPORT MEMO PURCHASING SERVICES Date: July 24, 2012 To: Frank Wu, Chief Administrative Officer From: Jerry Barber, Manager, Purchasing Services Report#: PS-011-12 File#: Q2012-17 Subject: Q2012-17 — Rubberized Surface on Concrete Splash Pad RECOMMENDATIONS It is respectfully recommended to the Chief Administrative Officer the following: 1. THAT Ure-Tech Surfaces Incorporated, Bowmanville, Ontario with a bid price of $30,949.29 (net of H.S.T. rebate), being the lowest responsible bidder meeting all terms, conditions and specifications of Quotation Q2012-17, be awarded the contract for the Rubberized Surface on Concrete Splash Pad, as required by the Municipality of Clarington, Operations Department; and 2. THAT the funds required in the amount of $30,949.29 be drawn from the 2011 and 2012 Various Parks - Upgrades Account 110-36-325-83663-7401. CORPORATION OF THE MUNICIPALITY OF CLARINGTON 40 TEMPERANCE STREET, BOWMANVILLE, ONTARIO L1 C 3A6 T (905)623-3379 F (905)623-3330 Attachment 4 REPORT NO.: PS-011-12 PAGE 2 Recommended bv: Jerry B rb , Manager, Purchasing Services Efate Concurrence: ��ir L Fred Horvath bIrector of Operations �J Datd Approved by_: lhl/��Z' IA Nancy`I'ayl�a/i', B" -W t.A:, Gate Director of Finance/Treasurer Frank Wu, Chief Administrative Officer Date MM\JB\bh c M. Marano, Director, Corporate Services Attachment 4 REPORT NO.: PS-011-12 PAGE 3 1.0 BACKGROUND 1.1 Quotation Q2012-17 for the Rubberized Surface on Concrete Splash Pad was advertised electronically on the municipal website. Subsequently, one (1) bid was received and tabulated as per Schedule "A" attached. 2.0 ANALYSIS 2.1 After review and analysis of the bid by the Operations Department and Purchasing, it was mutually agreed that the sole, compliant bidder, Ure-Tech Surfaces Incorporated, Bowmanville, Ontario, be awarded the contract for the Rubberized Surface on Concrete Splash Pad. 2.2 The references for Ure-Tech Surfaces Incorporated, Bowmanville have been checked and are satisfactory. 3.0 FINANCIAL 3.1 The budget for the Rubberized Surface on Concrete Splash Pad is $30,300.00 and funds are provided in the Various Parks - Upgrades Capital Account 110-36- 325-83663-7401. The dollar amount required to complete the purchase of the Rubberized Surface on Concrete Splash Pad is $30,949.29. 3.2 The additional funds required in the amount of $649.29 to complete the purchase of the Rubberized Surface on Concrete Splash Pad are available in the Capital Project Account 110-36-325-83663-7401 from 2011. 3.3 In view of the Council summer recess authorization is requested to award the above contract, in accordance with the Purchasing By-law 2010-112 Part 2, Section 67- Council Recess Procedures, with the additional funds being drawn from the Capital Project Account. 3.4 Queries with respect to the department needs, specifications, etc. should be referred to the Director of Operations. Attachment 4 REPORT NO.: PS-011-12 PAGE 4 4.0 CONCLUSION 4.1 To award the contract to Ure-Tech Surfaces Incorporated, Bowmanville, Ontario, for Quotation Q2012-17 Rubberized Surface on Concrete Splash Pad. Attachments: Schedule "A" — Bid Tabulation cc: M. Marano, Director, Corporate Services Attachment 4 SCHEDULE "A" THE MUNICIPALITY OF CLARINGTON TENDER Q2012-17 BID TABULATION BIDDER GUILDWOOD PARK GUILDWOOD PARK TOTAL BID TOTAL BID (HST included) (net of HST rebate) Ure-Tech Surfaces Inc. Bowmanville, ON $34,367.82 $30,949.29